- CN110512909A CN110512909A CN201910755929.8A CN201910755929A CN110512909A CN 110512909 A CN110512909 A CN 110512909A CN 201910755929 A CN201910755929 A CN 201910755929A CN 110512909 A CN110512909 A CN 110512909A
- Authority
- CN
- China
- Prior art keywords
- pond body
- bearing column
- workshop
- pulping equipment
- slip house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Paper (AREA)
Abstract
The invention proposes a kind of assembled slip house and its production method, solve the problems, such as that prior art workshop manufacturing cost is high, space utilization rate is low.The assembled slip house includes pond body, more bearing columns, pulping equipment, exterior-protecting wall panels, and lower part and the pond body of partial weight-bearing column are fixed together, at least partly the pulping equipment top that is arranged in the pond body.The production method of the assembled slip house includes the edge that bearing column is welded on pond body by following sequential steps S1.;S2. on the basis of the top of pond body manufacture pulping equipment;S3. on the basis of pulping equipment being mounted on;S4., exterior-protecting wall panel, pipeline installation are installed.The present invention can carry out productivity test run after workshop has manufactured armamentarium in advance, find any hiding problem, and processing is convenient, and processing cost is low, and unnecessary loss will not be caused to client, have preferable economic benefit and social benefit.
Description
Technical field
The present invention relates to pulp and paper industry machinery technical field, particularly relate to that a kind of structure is simple, cost is relatively low, installing and dismounting
Convenient assembled slip house and its production method.
Background technique
The pulp mill of the prior art is all that producer builds workshop (generally concrete structure either coagulation soil matrix well
Plinth lightweight steel construction), and concrete basin, concrete stock tank, power supply etc. are arranged in workshop, equipment to be produced transports to
Afterwards, then production equipment is transported in workshop and is assembled, water pipe, slurry pipe, gas are then arranged according to the equipment after assembling again
Pipe, steam pipe, electric wire, cable etc., not only manufacturing cost is high for this mode, installation cost height, complex steps, long construction period, and
And after putting into production, it is difficult to undergo technological transformation and moves, recycling rate of waterused is low.In addition, in order to ensure the peace of production equipment
Dress uses, and workshop is built usually all bigger, causes space utilization rate extremely low, the consumptions such as various water pipes of auxiliary
Greatly, operating cost is high, power consumption is big, and under winter conditions, in order to ensure the safety of pipeline, heat preservation is at high cost, warms oneself at high cost.
Summary of the invention
The present invention proposes a kind of assembled slip house, solves prior art workshop manufacturing cost height, space utilization rate
Low problem.
The technical scheme of the present invention is realized as follows: a kind of assembled slip house, including pond body, more load-bearing are stood
Column, pulping equipment, exterior-protecting wall panel, lower part and the pond body of partial weight-bearing column are fixed together, and at least partly pulping equipment is arranged
In the top of the pond body.
As a preferred embodiment, the partial outer face of the pond body constitutes portion top surface and the part side in workshop
Face.
As a preferred embodiment, being up and down may be used at least partly bearing column that the pond body is fixed together
Two sections of dismantling connection.
As a preferred embodiment, the height of lower section bearing column is equal with the height of pond body.
After above-mentioned technical proposal, the beneficial effects of the present invention are: assembled slip house of the invention is by load-bearing
The lower part of column is fixed together with pond body, so that fixed function of the bearing column by pond body, pond body are equivalent to entirely
The installation pedestal in workshop, pond body constitute a part in workshop, and after the fluids such as paper pulp are accommodated in pond body, bearing column is just more
The stabilization added, compared to bearing column is mounted on for the structure on concrete pedestal before, paper pulp workshop of the invention is steady
It is qualitative stronger, more securely.And the present invention can save traditional concrete pedestal completely, and user need to only provide one piece and put down
Whole ground can be placed.In addition, bearing column is virtually after the lower part of bearing column and pond body are fixed together
The stiffness and strength of pond body can also be increased, such as original pond body need to use the steel plate of 10mm thickness, need to only use 6mm thickness now
.In short, slip house of the invention embodies the think of of " equipment is a part in workshop, and workshop is a part of equipment "
Road plays 1 plus 1 effect for being greater than 2, reduces the cost in workshop, reduce the cost of equipment.
In addition, part pulping equipment to be arranged in the top of pond body, first is that can reduce the occupied area in workshop, vehicle is reduced
Between overall cost, second is that increase the weight of pond body, so that the basis in entire workshop is more stable.
In assembled slip house of the invention, the partial outer face of pond body constitutes portion top surface and the part side in workshop
Face, and the top surface and side of workshop other parts can be then made of exterior-protecting wall panel, pond body and exterior-protecting wall panel define jointly
The top surface and side in workshop, for example, the side wall of pond body can serve as the side in workshop, certain pulping equipments above pond body completely
The top surface of (such as feed bin) can also act as the top surface in workshop, to reduce the usage amount of exterior-protecting wall panel, reduce workshop
Cost input.
It sets bearing column at the both ends being detachably connected up and down, and lower section is directly weldingly fixed on one with pond body
It rises, convenient transportation can reduce transportation cost.
It sets equal with the height of pond body for the height of lower section bearing column, enables to pond body easy for installation, structure
Stability is good.
The present invention also proposes a kind of production method of assembled slip house, including following sequential steps
S1., bearing column is welded on to the edge of pond body;
S2. on the basis of the top of pond body manufacture pulping equipment;
S3. on the basis of pulping equipment being mounted on;
S4., exterior-protecting wall panel, pipeline installation are installed.
As a preferred embodiment, in step S1
S11. by the lower weld of bearing column pond body edge.
As a preferred embodiment, in step S3
S31. after on the basis of pulping equipment being mounted on, the lower part on the top of bearing column and bearing column is fixed together.
As a preferred embodiment, in step S3
S31. after the lower part on the top of bearing column and bearing column being fixed together, then pulping equipment is mounted on basis
On.
It is steady can not only to improve it to production method of the invention using the top of pond body as a part on pulping equipment basis
It is qualitative, and the cost on basis can be reduced.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 is the overlooking structure diagram of an embodiment of the present invention;
Fig. 2 is the schematic view of the front view of an embodiment of the present invention;
In figure: the pond 1-;2- stock tank;3- bearing column;31- column lower section;32- column upper section;4- exterior-protecting wall panel;5- slurrying is set
It is standby;The basis 6-.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment one:
It as depicted in figs. 1 and 2, is the top view and main view of a kind of embodiment of assembled slip house, the workshop of the embodiment
It mainly include following sections: pond body, bearing column, pulping equipment, exterior-protecting wall panel, wherein pond body includes pond 1 and stock tank 2,
It can also be configured according to actual needs, the position of pond 1 and stock tank 2 can be configured according to the actual situation, set up
It is connected to using screw or welding at rear and increases whole stability together.The number of bearing column 3 is more, master
The support section in entire workshop is constituted, bearing column 3 herein is divided to for two kinds of situations, and a part of bearing column 3 is arranged in pond
The corner location of body, another part bearing column 3 do not have between pond body then connection relationship (example as shown in figure 1 left end two
Root).The former is that two sections (including column lower section 31 and column upper sections 32) being detachably connected up and down are constituted, and column lower section 31
Height with the height of pond body be it is equal, the two is fixed together, so that pond body becomes the installation pedestal of column, stablizes
Property is higher, and column can also enhance the mechanical strength of pond body.The latter is the bearing column 3 of an entirety.In transport, stand
Column lower section 31 and column upper section 32 are assembled, to reduce transport difficulty and transport again first without assembling after being transported to scene
Cost.
The part pulping equipment 5 of the embodiment is arranged in the top of pond body, mainly has both sides to act on: first is that reducing
Occupied area, reduction workshop cost can further increase entire vehicle second is that the weight of pulping equipment 5 is pressed in the top of pond body
Between stability and fastness.Certainly, optimal is that all setting is mounted on the upper of pond body by all pulping equipments 5
The occupied area of side, such workshop is minimum, the optimal stability in workshop.
The effect of exterior-protecting wall panel 4 of the embodiment is that the side and top surface in composition workshop are not certainly all sides in workshop
What face and top surface were made of exterior-protecting wall panel 4, the partial outer face which can use pond body constitutes the part in workshop
Top surface and surface, and the top surface and side of workshop other parts can be then made of exterior-protecting wall panel 4.Example institute as shown in figure 1
Showing, the side wall and exterior-protecting wall panel 4 of pond 1 and stock tank 2 have collectively constituted the side in workshop, in another example shown in Fig. 2, part slurrying
The top surface of equipment 5 and exterior-protecting wall panel 4 have collectively constituted the top surface in workshop, can reduce the usage amount of exterior-protecting wall panel 5 in this way, reduce
The cost input in workshop.
Embodiment two:
The embodiment is a kind of production method of assembled slip house, including following sequential steps
S1., bearing column 3 is welded on to the edge of pond body;
S2. on the basis 6 of the top of pond body manufacture pulping equipment 5;
S3. pulping equipment 5 is mounted on basis 6;
S4., exterior-protecting wall panel 4, pipeline installation are installed.
It wherein, is that first column lower section 31 is weldingly fixed at the corner location of pond body in step S1, after transporting scene to,
32 groups of column upper section are installed again.Basis 6 in step S2 is generally steel plate production, is also possible to cement production, grasps in this way
Make that the cost on basis 6 can be further decreased using the top of pond body as a part on basis 6.In step S4, pipeline
Size be it is pre-designed, manufacture in factory, be mounted directly at the scene.
For some workshops for needing to install driving, in step s3, needing first will be under column upper section 32 and column
After section 31 is fixed together, then driving is mounted on column upper section 32, then recycles mounted driving by pulping equipment 5
It is lifted on basis 6, so there is no need to external hanging devices, can greatly reduce the assembling cost in workshop.
For the pulping equipment of some heavier-weights or do not need in step s3, to need first benefit for the workshop driven a vehicle
Pulping equipment 5 is lifted in place with external hanging device, then column upper section 32 is installed again, to prevent good morning from filling column upper section
Obstacle is generated after 32.
Assembled slip house of the invention and its production method pass through actual measuring and calculating, have apparent technical advantage and
Effect.
The OCC pulping production line that one: 5 ten thousand ton of example, traditional technology needs at least 1500 square metres of workshop, and this hair
Bright patent is only needed less than 120 square meters, and occupied area is insufficient 1/10th originally, the manufacturing cycle and installation week of equipment
Phase shortens at least half, takes around 1 year time originally, includes now manufacture including installation, it is thus only necessary to 4 months
Time, project total cost save at least 30%, and ton slurry reduces at least 5 degree electricity.
Example two: bagasse produces 50000 tons of true qualities chemical pulp lines per year, and traditional technology needs 1500 square metres of workshop, and originally
Patent of invention only needs to can be realized less than 1/10th, and the manufacturing cycle of such equipment and installation period shorten at least one
Half, 1 year time was taken around originally, included now manufacture and installation, it is thus only necessary to which 4 months time, project total cost is extremely
30% is saved less, and ton slurry reduces at least 5 degree electricity.
Assembled slip house of the invention and its production method have the advantage of following several respects:
First, pulping and papermaking equipments are creatively organically combined with the workshop for carrying these equipment, are not only subtracted significantly
Lacked the invalid of workshop, even and eliminate traditional workshop have to factory building foundation that some involves great expense or
Factory building foundation is set but has been greatly reduced the cost of factory building foundation;
Second, the partial outer face of the necessary equipments such as stock tank pond in pulping and papermaking equipments can become the one of workshop exterior wall
Part further reduced the cost of workshop;
Third, all stock tank ponds are combined with workshop bearing column, and nearly all equipment is arranged on stock tank pond
On, the stability of workshop is increased, the rigidity in stock tank pond is also increased.The stock tank sink top material of steel also reduces
The manufacturing cycle of Equipment Foundations mounted thereto;
4th, workshop can reduce the duration in device fabrication producer modular manufacturing, on-site assembly;
5th, according to live weather conditions and scale of the project property, it is high, long construction period mixed that workshop may not need setting cost
Solidifying earth foundation, even if needing to be arranged, it is desirable that also simple;
6th, all slurry pipes, water pipe required for project, vapour (gas) pipe, wire and cable, power distribution cabinet, the operation tradition such as walk on stage need
Work that is installing manufacture at the scene and taking a long time can be completed all in device fabrication producer, reduce cost, reduce work
Phase;
7th, the equipment debugging stage that time-consuming at scene, waste is big can complete in professional stronger device fabrication producer, together
When can also complete demander personnel technical training work;
8th, detachable workshop and Equipment Foundations move integrally extremely low, changeable especially suitable for the environmental protection policy country of cost
And area, also it is suitble to field projects investment, reduces project social policy risk;
9th, according to the project that above scheme carries out, installation period is very short, and can undertake this by device fabrication producer
Function, demander only need to draw water, electricity, vapour to workshop interface;
Tenth, according to the project that above scheme carries out, Project Unit saves worry, is laborsaving, is economical, is time saving, and unpredictalbe risk is big
It is big to reduce, and such as traditional intermediate item almost 100% excess budget the case where can never occur.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of assembled slip house, including pond body, more bearing columns, pulping equipment, exterior-protecting wall panels, it is characterised in that:
The lower part of partial weight-bearing column is fixed together with pond body, at least partly the pulping equipment top that is arranged in the pond body.
2. assembled slip house as described in claim 1, it is characterised in that: the partial outer face of the pond body constitutes workshop
Portion top surface and surface.
3. assembled slip house as described in claim 1, it is characterised in that: at least portion being fixed together with the pond body
Being divided to bearing column is two sections be detachably connected up and down.
4. assembled slip house as claimed in claim 3, it is characterised in that: the height of lower section bearing column and pond body
It is highly equal.
5. the production method of assembled slip house, it is characterised in that: including following sequential steps
S1., bearing column is welded on to the edge of pond body;
S2. on the basis of the top of pond body manufacture pulping equipment;
S3. on the basis of pulping equipment being mounted on;
S4., exterior-protecting wall panel, pipeline installation are installed.
6. the production method of assembled slip house as claimed in claim 5, it is characterised in that: in step S1
S11. by the lower weld of bearing column pond body edge.
7. the production method of assembled slip house as claimed in claim 6, it is characterised in that: in step S3
S31. after on the basis of pulping equipment being mounted on, the lower part on the top of bearing column and bearing column is fixed together.
8. the production method of assembled slip house as claimed in claim 6, it is characterised in that: in step S3
S31. after the lower part on the top of bearing column and bearing column being fixed together, then pulping equipment is mounted on basis
On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910755929.8A CN110512909A (en) | 2019-08-16 | 2019-08-16 | A kind of assembled slip house and its production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910755929.8A CN110512909A (en) | 2019-08-16 | 2019-08-16 | A kind of assembled slip house and its production method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110512909A true CN110512909A (en) | 2019-11-29 |
Family
ID=68626103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910755929.8A Pending CN110512909A (en) | 2019-08-16 | 2019-08-16 | A kind of assembled slip house and its production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110512909A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409588A (en) * | 2011-11-25 | 2012-04-11 | 中铁十二局集团第三工程有限公司 | Movable grouting workshop |
CN203097362U (en) * | 2013-03-22 | 2013-07-31 | 成都源创环保工程有限公司 | Module type prefabricated pump station |
CN104727590A (en) * | 2015-02-16 | 2015-06-24 | 浙江佳成建设有限公司 | Comprehensively-utilized assembly type integrated building factory |
CN106400965A (en) * | 2016-10-24 | 2017-02-15 | 深圳市久悦天文化传播有限公司 | Expandable integrated house |
CN206607923U (en) * | 2017-04-05 | 2017-11-03 | 中国水利水电第四工程局有限公司 | ISO container formula grouting room |
CN107620499A (en) * | 2016-07-13 | 2018-01-23 | 成都中源红科技有限公司 | Reassembling type machining operations station cover body |
CN207091253U (en) * | 2017-08-27 | 2018-03-13 | 中铁十二局集团第二工程有限公司 | A kind of new slurry shield slurry pond processing system |
CN108675371A (en) * | 2018-07-18 | 2018-10-19 | 重庆恒越环保工程有限公司 | A kind of quick assembled type pond body structure |
CN208009978U (en) * | 2018-03-19 | 2018-10-26 | 宁夏凤凰城智能制造有限公司 | A kind of assembled workshop |
CN208363724U (en) * | 2018-04-18 | 2019-01-11 | 杭州德洋金属科技有限公司 | A kind of waterproof computer room |
CN109433089A (en) * | 2018-12-14 | 2019-03-08 | 天津赛智灌浆设备有限公司 | A kind of novel high speed vortex pulping system and its application method |
CN109642432A (en) * | 2016-08-29 | 2019-04-16 | 索拉透平公司 | Modularization compression device |
-
2019
- 2019-08-16 CN CN201910755929.8A patent/CN110512909A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409588A (en) * | 2011-11-25 | 2012-04-11 | 中铁十二局集团第三工程有限公司 | Movable grouting workshop |
CN203097362U (en) * | 2013-03-22 | 2013-07-31 | 成都源创环保工程有限公司 | Module type prefabricated pump station |
CN104727590A (en) * | 2015-02-16 | 2015-06-24 | 浙江佳成建设有限公司 | Comprehensively-utilized assembly type integrated building factory |
CN107620499A (en) * | 2016-07-13 | 2018-01-23 | 成都中源红科技有限公司 | Reassembling type machining operations station cover body |
CN109642432A (en) * | 2016-08-29 | 2019-04-16 | 索拉透平公司 | Modularization compression device |
CN106400965A (en) * | 2016-10-24 | 2017-02-15 | 深圳市久悦天文化传播有限公司 | Expandable integrated house |
CN206607923U (en) * | 2017-04-05 | 2017-11-03 | 中国水利水电第四工程局有限公司 | ISO container formula grouting room |
CN207091253U (en) * | 2017-08-27 | 2018-03-13 | 中铁十二局集团第二工程有限公司 | A kind of new slurry shield slurry pond processing system |
CN208009978U (en) * | 2018-03-19 | 2018-10-26 | 宁夏凤凰城智能制造有限公司 | A kind of assembled workshop |
CN208363724U (en) * | 2018-04-18 | 2019-01-11 | 杭州德洋金属科技有限公司 | A kind of waterproof computer room |
CN108675371A (en) * | 2018-07-18 | 2018-10-19 | 重庆恒越环保工程有限公司 | A kind of quick assembled type pond body structure |
CN109433089A (en) * | 2018-12-14 | 2019-03-08 | 天津赛智灌浆设备有限公司 | A kind of novel high speed vortex pulping system and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chang et al. | The embodied energy and emissions of a high-rise education building: A quantification using process-based hybrid life cycle inventory model | |
CN102704960B (en) | Mineral efficient energy-saving emulsification liquid feeding unit | |
CN201474292U (en) | Midsize template assembled large template | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN204960296U (en) | Adjustable shaped steel stencil assembly | |
CN111395744A (en) | Construction method of aluminum template in horizontal flowing section process of villa | |
CN105756380B (en) | A kind of multilayer large-span assembled integral space steel lattice box structure construction of hydropower method | |
CN110512909A (en) | A kind of assembled slip house and its production method | |
CN103410223A (en) | Light-steel industrialized residential structure system | |
CN107201796A (en) | A kind of truss plate | |
CN103590419B (en) | Assembling is adjustable, and high voltage reactor is basic | |
CN102720346A (en) | Multifunctional upright column base for scaffold and manufacturing process thereof | |
CN207016360U (en) | A kind of monoblock type list main beam structure | |
CN207672836U (en) | The outer eaves of combined and spliced formula steel house | |
CN110241674A (en) | It is a kind of to utilize steel plate structure made of the waste and old steel pipe in building site | |
CN202431011U (en) | Reusable tool type bolting reinforcing steel bar processing shed for construction site | |
CN202031344U (en) | Multifunctional combined bracket | |
CN205024850U (en) | Hidden power consumption connecting piece of font timber structure returns | |
CN204785046U (en) | Integrated module piping lane system | |
CN204645582U (en) | Girder steel assembly is chosen outside one is complete | |
CN203213133U (en) | Bottom sealing concrete template for underwater bearing platform of bottomed steel cover box | |
CN207149995U (en) | A kind of preassembled transformer station mounting structure | |
CN206225848U (en) | Bridge-type high-voltage board installs suspension and support | |
CN210264071U (en) | Movable PC component production workshop | |
CN206070803U (en) | The close post steel plate energy-consuming shear wall structure of L-shaped concrete filled steel tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191129 |
|
RJ01 | Rejection of invention patent application after publication |