CN204785046U CN201520390474.1U CN201520390474U CN204785046U CN 204785046 U CN204785046 U CN 204785046U CN 201520390474 U CN201520390474 U CN 201520390474U CN 204785046 U CN204785046 U CN 204785046U
Authority
CN
China
Prior art keywords
piping lane
support
support frame
braced frame
submodule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520390474.1U
Other languages
Chinese (zh)
Inventor
黄益平
朱东亮
陆晓咏
徐义明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201520390474.1U priority Critical patent/CN204785046U/en
Application granted granted Critical
Publication of CN204785046U publication Critical patent/CN204785046U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an integrated module piping lane system, every piping lane submodule piece includes piping lane, braced frame and pernetti, braced frame fixes on the pernetti, and braced frame includes horizontal pipe holder and vertical duct support, the fixed multilayer frame construction that is of horizontal pipe holder and vertical duct support mutually perpendicular, every layer of piping lane that frame construction formation is used for the pipeline to place, braced frame is last to be equipped with a plurality of support piece, support piece sets up respectively in the both sides of piping lane, and support piece connects on braced frame. The equipment is simple, connect in a flexible way, but reuse rate is high, ensure the only degree of discerning of module product in the project engineering, improved integrated module piping lane system's efficiency greatly, simple structure convenient operation, high, the strong adaptability of installation effectiveness easily realize the industrialization and promote to have better market prospect.

Description

A kind of integration module piping lane system
Technical field
The utility model relates to a kind of steel structure piping lane module, particularly relates to a kind of integration module piping lane system.
Background technique
Along with the progress in epoch, management expectancys such as reducing high-rise working reduction security risk to greatest extent, ensure installation quality, the reduction of erection time makes investment be recompensed early, all queries to traditional construction method of installation.Construction organization order traditionally, erecting bed is just as an integrated workshop, steel structure prefabricate and install is complete, carry out equipment installation, craft piping, the hydrostatic test, then carry out corrosion-resistant thermal insulation, a large amount of engineering work loads was overstock in the engineering later stage, cause scheduling peak, resource consumption is large, inefficiency, and safe mass exists hidden danger.
The application of modular construction, its modularization scale and quantity are subject to the impact of the patent business extent of supply and the restriction of transporting and hoisting condition, are only limitted to a small amount of assembling die blocking of core.Along with the continuous lifting of equipment manufacturing level and transporting and hoisting ability, modular construction is able to extensive use in Special section or engineering.Modularization refers to form single delivery unit in several frameworks that the thought integrated according to modularization such as equipment, pipeline, electric meter, air grid optimization of whole system device makes to transport fractionation at modern industrial engineering special secondary school---module, after all modular transportation to erecting bed, lifting, in place and be mounted to the device that can play given process function.
Module can relate within battery limit piping lane in installation process, the piping lane support that form is generally directly and agent structure welds together of the within battery limit piping lane of current use, and such piping lane support generally can be divided into overall formula and single-unit formula along with the form of topic module.For these two kinds of within battery limit piping lanes, its technology applies to obtain comparative maturity, and the scope of application is also more extensive.But do not propose to have module of one's own to piping lane self all the time, this just causes Pipe rack and the pipeline laid thereon must carry out designing, build and installing along with main structure module; And more than 70% of whole device district interior conduit concentrated often by the pipeline on piping lane; Thus the pipe laying that result on piping lane receives the impact of the space of main body steel structure module, height and other side; The pipeline that finally result in whole device district on piping lane must be high-lift operation in installation process, is also subject to the impact of main structural framework simultaneously, and the Pipe installing speed had influence on piping lane and progress.
Model utility content
Model utility object: the utility model object is for the deficiencies in the prior art, provides a kind of integration module piping lane system, realizes modularization and installs.
Technological scheme: a kind of integration module piping lane system described in the utility model, comprise at least one piping lane submodule, described each piping lane submodule comprises piping lane, support frame and pernetti, described support frame is fixed on pernetti, support frame comprises transverse pipe support and vertical duct support, described transverse pipe support is fixed as multistory frame structure with vertical duct support is mutually vertical, every story frame structure forms the piping lane being used for pipeline and placing, described support frame is provided with multiple supporting element, described supporting element is separately positioned on the both sides of piping lane, supporting element connects on the support frame.
As one of optimal way of the present utility model, in described piping lane, be provided with many registration ring.
As one of optimal way of the present utility model, described supporting element is connected to support frame by concavo-convex slideway or bolt.
As one of optimal way of the present utility model, described adjacent piping lane submodule is interconnected by flange.
As one of optimal way of the present utility model, described each piping lane submodule is provided with radio-frequency identification card.
Beneficial effect: the utility model hinge structure has the following advantages: assembling is simple, connects flexibly, can recycling rate of waterused high; Utilize RF identification (RFID) to number each piping lane submodule in location, guarantee the unique identification degree of module product in projects, substantially increase the efficiency of integration module piping lane system; Structure simple operations is convenient, installation efficiency is high, strong adaptability, easily realizes industrialization promotion, has good market prospects.
Accompanying drawing explanation
Fig. 1 is the structural representation of piping lane submodule;
Fig. 2 is the partial schematic diagram of support frame and pernetti in Fig. 1.
Embodiment
Below by accompanying drawing, technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
As depicted in figs. 1 and 2, Fig. 1 is the structural representation of single piping lane submodule, piping lane submodule comprises piping lane 1, support frame 2 and pernetti 3, support frame 2 is fixed on pernetti 3, support frame 2 comprises transverse pipe support and vertical duct support, described transverse pipe support is fixed as multistory frame structure with vertical duct support is mutually vertical, every story frame structure forms the piping lane 1 being used for pipeline and placing, described support frame 2 is provided with multiple supporting element 4, described supporting element 4 is separately positioned on the both sides of piping lane 1, and supporting element 4 is connected on support frame 2.
Be provided with many registration ring 6 in piping lane 1, be convenient to the location of pipeline.The equidistant bottom being fixed on piping lane 1 of the positioning ring 6 often arranged.
As shown in Figure 2, the supporting element 4 of the present embodiment is connected on support frame 2 by bolt 5.In other embodiments, the Placement of concavo-convex slideway can be adopted.
Adjacent piping lane submodule is interconnected by flange.For convenience detach.With the combination of Flange joint flexible form, meet the different needs installing occasion.
Each piping lane submodule is provided with radio-frequency identification card.By each piping lane module in RF identification (RFID) numbering location, guarantee the unique identification degree of module product in projects, substantially increase the efficiency of integration module piping lane system.
This integration module piping lane system erection sequence is: pipeline precast → pipe holder fabrication design → pipeline installation → pipeline pressure testing.According to the respective tube veranda module be divided into, erecting bed is transported in batches after construction completes, integral installation construction debugging, profit can preferably independent from main body steel structure module for steel structure piping lane system, make piping lane system be no matter its steel structure frame or the pipeline laid thereon all can be parallel to main body steel structure module carry out prefabricated, install and inspection.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (5)

1. an integration module piping lane system, it is characterized in that, comprise at least one piping lane submodule, described each piping lane submodule comprises piping lane, support frame and pernetti, described support frame is fixed on pernetti, support frame comprises transverse pipe support and vertical duct support, described transverse pipe support is fixed as multistory frame structure with vertical duct support is mutually vertical, every story frame structure forms the piping lane being used for pipeline and placing, described support frame is provided with multiple supporting element, described supporting element is separately positioned on the both sides of piping lane, and supporting element connects on the support frame.
2. a kind of integration module piping lane system according to claim 1, is characterized in that, be provided with many registration ring in described piping lane.
3. a kind of integration module piping lane system according to claim 1, is characterized in that, described supporting element is connected on the support frame by concavo-convex slideway or bolt.
4. a kind of integration module piping lane system according to claim 1, is characterized in that, described adjacent piping lane submodule is interconnected by flange.
5. a kind of integration module piping lane system according to claim 1, is characterized in that, described each piping lane submodule is provided with radio-frequency identification card.
CN201520390474.1U 2015-06-08 2015-06-08 Integrated module piping lane system Expired - Fee Related CN204785046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520390474.1U CN204785046U (en) 2015-06-08 2015-06-08 Integrated module piping lane system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520390474.1U CN204785046U (en) 2015-06-08 2015-06-08 Integrated module piping lane system

Publications (1)

Publication Number Publication Date
CN204785046U true CN204785046U (en) 2015-11-18

Family

ID=54525095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520390474.1U Expired - Fee Related CN204785046U (en) 2015-06-08 2015-06-08 Integrated module piping lane system

Country Status (1)

Country Link
CN (1) CN204785046U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105677978A (en) * 2016-01-08 2016-06-15 中建三局第一建设工程有限责任公司 Horizontal multi-pipe support and prefabricating construction method thereof based on BIM
CN107323811A (en) * 2017-06-28 2017-11-07 江苏利柏特股份有限公司 A kind of prefabricated use pipeline section packed and transported device of chemical industry modularization and its packed and transported method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105677978A (en) * 2016-01-08 2016-06-15 中建三局第一建设工程有限责任公司 Horizontal multi-pipe support and prefabricating construction method thereof based on BIM
CN107323811A (en) * 2017-06-28 2017-11-07 江苏利柏特股份有限公司 A kind of prefabricated use pipeline section packed and transported device of chemical industry modularization and its packed and transported method
CN107323811B (en) * 2017-06-28 2023-04-14 江苏利柏特股份有限公司 Pipe section packaging and transporting device for chemical modular prefabrication and packaging and transporting method thereof

Similar Documents

Publication Publication Date Title
CN102322071B (en) Universal base structure of main transformer of 220kV substation
CA2786113A1 (en) Modular manufacturing facility and method
CN102168858A (en) Manufacturing process for shipping chimney unit module
CN204785046U (en) Integrated module piping lane system
CN110107972A (en) Cabin-type refrigerating plant room and its construction method
CN103291075B (en) Method of manufacturing large-scale module of nuclear power plant
CN204865457U (en) Wet flue gas desulfurization carries torrent pipe bars device and desulfurization absorption tower of effect
CN101136259A (en) Modularize building method for nuclear reactor of nuclear plant
CN201699020U (en) Photovoltaic module combination frame
CN205077914U (en) Split axle gas - steam combined -cycle power plant unites high -order arrangement structure of main building
CN102733614A (en) Method for constructing room module of nuclear power plant
CN204850368U (en) Modularization riser system
CN206831058U (en) Modularization channel steel base
CN110271846A (en) A kind of defeated coal transfer station of hoisting type
CN202164623U (en) Universal foundation structure of 220 kV transformer substation main transformer
CN206308787U (en) A kind of frame-type gully arch bar erecting device
CN106451169B (en) A kind of box module prefabricated substation and its installation method
CN206319624U (en) Construction for frame ball node locating conversion equipment
CN205064389U (en) Air cooling fan crane span structure installation base
CN203850627U (en) Overall framework type modularization secondary device applied to substation construction
CN204304264U (en) Prefabricated cabin interior framework formula modularization secondary screen cabinet
CN202061429U (en) Split type thickener transported and arranged in modularization manner
CN206600027U (en) Split axle Combined cycle gas-steam turbine unit low level combines main building arrangement structure
CN204112791U (en) The optimum organization structure of thermal power plant's steam turbine building, cooling tower and power distribution equipment
CN205907814U (en) Island is with combination formula dismouting structure cabin body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 210000 Yaojia Road, Qixia District, Nanjing, Jiangsu Province

Patentee after: CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP Co.,Ltd.

Address before: 210000 Yaojia Road, Qixia District, Nanjing, Jiangsu Province

Patentee before: China Construction Installation Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee