CN110512733A - A kind of installation method of assembly concrete shear wall structure - Google Patents

A kind of installation method of assembly concrete shear wall structure Download PDF

Info

Publication number
CN110512733A
CN110512733A CN201910832107.5A CN201910832107A CN110512733A CN 110512733 A CN110512733 A CN 110512733A CN 201910832107 A CN201910832107 A CN 201910832107A CN 110512733 A CN110512733 A CN 110512733A
Authority
CN
China
Prior art keywords
steel pipe
pipe column
shear wall
longitudinal
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910832107.5A
Other languages
Chinese (zh)
Other versions
CN110512733B (en
Inventor
谢其盛
何云峰
谢其阳
周治勺
陈彩凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Baoye Construction Engineering Group Co Ltd
Original Assignee
Anhui Baoye Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Baoye Construction Engineering Group Co Ltd filed Critical Anhui Baoye Construction Engineering Group Co Ltd
Priority to CN201910832107.5A priority Critical patent/CN110512733B/en
Publication of CN110512733A publication Critical patent/CN110512733A/en
Application granted granted Critical
Publication of CN110512733B publication Critical patent/CN110512733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of installation methods of assembly concrete shear wall structure, it is related to building structure technology field, comprising the following steps: step 1: the structural members such as preparation shear wall, longitudinal steel pipe column, lateral steel pipe column, interlayer floor, connection bolt, fastening nut;Step 2: completing isolated footing, longitudinal steel pipe column is erected on isolated footing, longitudinal steel pipe column, which continues up, to be arranged;Step 3: the overlap joint slot overlap joint that lateral steel pipe column is equipped with by both ends is arranged on the clinch of longitudinal steel pipe column side;Step 4: by multiple interlayer floor strung alongsides on enclosing the lateral steel pipe column connect;Step 5: shear wall being erected side by side in interlayer floor edge.The installation method of assembly concrete shear wall structure of the invention is simple to operate, improves efficiency of construction significantly.

Description

A kind of installation method of assembly concrete shear wall structure
Technical field
The present invention relates to building structure technology fields, and in particular to a kind of installation side of assembly concrete shear wall structure Method.
Background technique
Since building recruitment cost is continuously increased, original building extensive style designs, builds, use, dismounting, dirty to environment Dye is all extremely serious, to reduce global pollution, for the offspring that benefits future generations, be building industry sustainable development, realize green building, dress It is the inexorable trend of construction industry development with formula building, government encourages to carry out the development of assembled architecture system.Assembled architecture at present System also shows metope cracking (frame bearing is poor), steel member there are the main structure of steel house is less problematic With the splicing gap of plate and plate and plate larger uneven (connection type not to), soundproof effect is bad, thermal insulation separation thermal effect The disadvantages of fruit is poor, and then it is high, with high costs to result in building body later maintenance difficulty, and existing precast concrete is fabricated Assembled nodal operation complexity is cumbersome, and human cost is big, and traditional mode of construction still uses vertical structure cast-in-place, lateral stacking, Node security will be solved the problems, such as by fully achieving live wet-less operation;Longer curing time, activity duration are needed in addition, pouring It is long, it is necessary to wait next layer of concrete to reach predetermined strength just and can carry out one layer of construction, globality poor influences prefabricated The development of building, therefore be badly in need of finding a kind of technical measures solved these problems.
Summary of the invention
For the problems of the prior art, the present invention provides a kind of installation sides of assembly concrete shear wall structure Method.
In order to achieve the above object, the present invention is achieved through the following technical solutions:
A kind of installation method of assembly concrete shear wall structure, comprising the following steps:
Step 1: the multiple shear walls of preparation, multiple longitudinal steel pipe columns, multiple lateral steel pipe columns, multiple interlayer floors, more The structural members such as a connection bolt, multiple fastening nuts, the shear wall include the first plug division that bottom middle position is equipped with And the second plug division that top center position is equipped with;It is equipped in the longitudinal direction steel pipe column and fills chamber, in the lower part of longitudinal steel pipe column Mantle cavity is offered in tube body, sleeve column is equipped on the top cylinder of longitudinal steel pipe column, longitudinal steel pipe column side is fixed with overlap joint Portion offers the first bolt hole in clinch, offers in the lateral steel pipe column both ends bottom and sets with clinch mutual cooperation The overlap joint slot set offers consistent second bolt hole corresponding with the first bolt hole, lateral steel in lateral steel pipe column both ends side Tubing string includes the first strip slot that top center position offers and the second strip slot that bottom middle position offers; The interlayer floor slab tops offer third strip slot close to edge, are equipped with third close to edge in interlayer floor slab bottoms Plug division;
Step 2: completing isolated footing, longitudinal steel pipe column is vertically erected by hanging device and is fixed on isolated footing On, longitudinal steel pipe column, which continues up, to be arranged, and the longitudinal steel pipe column being located above is sheathed on by the mantle cavity that bottom is equipped with and is in On sleeve column at the top of longitudinal steel pipe column of lower section;
Step 3: the overlap joint slot overlap joint for being equipped with lateral steel pipe column by both ends through hanging device is arranged in longitudinal steel pipe column On the clinch of side, lateral steel pipe column setting is between adjacent longitudinal steel pipe column, and perpendicular connection, will be equipped with again later Connection bolt plug from lateral steel pipe column side into the first bolt hole and the second bolt hole, through fastening nut connect it is i.e. secondary The connection of dual fail-safe fixed lateral steel pipe column and longitudinal steel pipe column;
Step 4: by multiple interlayer floors, by hanging device, successively strung alongside causes on enclosing the lateral steel pipe column connect The third plug division cooperation of its bottom is plugged in the first strip slot of lateral steel pipe column, and then realizes that the installation of interlayer floor is solid It is fixed;
Step 5: multiple shear walls successively being erected by hanging device in interlayer floor edge side by side, cause its bottom The first plug division cooperation be plugged in the third strip slot of interlayer floor, after the completion, need through support member to shearing The support that wall carries out medial surface is firm, then continues to install lateral steel pipe column at the top of shear wall, lateral steel pipe column and vertical To the attended operation such as step 3 of steel pipe column, after connection, the second plug division cooperation of shear wall is plugged on lateral steel pipe column The second strip slot in, then to injecting grouting material in the filling chamber of each longitudinal steel pipe column.
Further, above-mentioned clinch is equipped with 2, is located side by side at the middle part of longitudinal steel pipe column, and clinch steel along longitudinal direction Tubing string side medium line both sides are symmetrical arranged.
Further, the seamless conflict in the side of outermost both sides shear wall and longitudinal steel pipe column side connects, shearing The seamless conflict in the top of wall and lateral steel pipe column bottom connects, and the bottom of shear wall and the seamless conflict of interlayer floor slab tops connect It connects;The seamless conflict in the side of outermost both sides interlayer floor and longitudinal steel pipe column side connects, the bottom of interlayer floor and cross Seamless conflict connection at the top of to steel pipe column.
Preferably, above-mentioned set column length accounts for the 1/3 of longitudinal steel pipe column length.
Preferably, above-mentioned steel pipe column uses low-alloy high-tensile structural steel, trade mark Q460.
The present invention is with following the utility model has the advantages that the installation method operation of assembly concrete shear wall structure of the invention Simple and convenient, the detachable overlap joint of longitudinal steel pipe column socket setting and longitudinal steel pipe column and lateral steel pipe column is arranged, so that Reduce many and diverse operation being welded and fixed during construction and installation, be convenient for construction and installation, it is difficult to reduce building body later maintenance Degree and cost, and the steel pipe column framework bearing of this kind assembling is strong, stability is preferable, passes through shear wall and interlayer floor The adaptive improvement of structure has been also easy to the installation settings of shear wall and interlayer floor, improves shear wall, interlayer floor With the joint efficiency of steel pipe column frame and the replaceability of above-mentioned prefabricated components, in addition, due to reasonable connection type so that Splice gap between steel pipe column and wall board to be substantially reduced, sound-insulating effect promoting, meanwhile, the present invention is to a certain extent Also it solves the defect of pouring in the prior art, maintenance and activity duration length, improves efficiency of construction significantly.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the diagrammatic perspective view of building structure in the present invention;
Fig. 2 is the structural schematic diagram of longitudinal steel pipe column in the present invention;
Fig. 3 is the structural schematic diagram of longitudinal steel pipe column in the present invention;
Fig. 4 is the diagrammatic perspective view of lateral steel pipe column in the present invention;
Fig. 5 is the diagrammatic perspective view of lateral steel pipe column in the present invention;
Fig. 6 is the structural schematic diagram of shear wall in the present invention;
Fig. 7 is the diagrammatic perspective view of floor between middle layer of the present invention;
Fig. 8 is the diagrammatic perspective view of floor between middle layer of the present invention;
In the figure, it is marked as 1, shear wall;101, the first plug division;102, the second plug division;2, steel pipe rod structure;201, Lateral steel pipe column;2011, the first strip slot;2012, the second strip slot;2013, slot is overlapped;2014, the second bolt hole; 202, longitudinal steel pipe column;2021, chamber is filled;2022, mantle cavity;2023, sleeve column;2024, clinch;2025, the first bolt hole;3, layer Between floor;301, third strip slot;302, third plug division.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.
In the description of the present invention, it should be noted that unless otherwise indicated, the meaning of " plurality " is two or two with On;The orientation of the instructions such as term " on ", "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " top ", " bottom " Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It is not considered as limiting the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and cannot It is interpreted as indication or suggestion relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally connect It connects;It can be mechanical connection, be also possible to circuit connection;It can be directly connected, be also possible to through the indirect phase of intermediary Even.For the ordinary skill in the art, visual concrete condition understands the concrete meaning of above-mentioned term in the present invention.
A kind of assembly concrete frame-shear wall architectural structure system, shown referring to Fig.1, general structure is as follows:
Including shear wall 1, steel pipe rod structure 2, interlayer floor 3, steel pipe rod structure 2 includes each rectangular of three-dimensional linking Figure frame space unit, above-mentioned shear wall 1 are set to the side of frame space unit, and interlayer floor 3 is set to frame space list The bottom surface of member;
Frame combined structure of the above-mentioned steel pipe column as building body, with spies such as stability good, intensity is high, good-toughness Point, specifically, the steel pipe column includes lateral steel pipe column 201 and longitudinal steel pipe column 202, lateral steel pipe column 201 and longitudinal direction steel pipe column Perpendicular connection status on 202 space structures, said frame space cell is by multiple lateral steel pipe columns 201 and multiple longitudinal steel What tubing string 202 was formed by connecting.
Current existing assembling type steel structure frame-shear wall building system is contemplated, and there are main assembled nodal operations The problems such as complexity cumbersome and activity duration is long, makes improvement further below the present invention is based on above-mentioned:
Using neighbouring frame space unit as description object:
In conjunction with shown in Fig. 2-3, above-mentioned longitudinal direction 202 cross section profile of steel pipe column is substantially rectangular comprising hollow filling chamber 2021, mantle cavity 2022 is offered in the lower pipe body of longitudinal steel pipe column 202, is set on the top cylinder of longitudinal steel pipe column 202 There is sleeve column 2023, when single longitudinal direction steel pipe column 202 is mutually vertically connected with certainly, the mantle cavity 2022 for the longitudinal steel pipe column 202 being located above Engagement sleeves are set on 2023 outside of sleeve column of longitudinal steel pipe column 202 being below, and using the above structure and connection type, it deposits In following benefit: one has been easy for the installation of longitudinal steel pipe column 202;Two, which have been easy for the injection of concrete grouting material, fills chamber 2021 In;Third is that improving the intensity and stability of longitudinal 202 structure 2 of steel pipe column.
In conjunction with shown in Fig. 4-5, lateral steel pipe column 201, lateral steel pipe column are vertically connected between two longitudinal steel pipe columns 202 201 one end and the middle part of longitudinal steel pipe column 202 use following detachable connection: in longitudinal 202 side of steel pipe column, fixation is set There are 2 clinch 2024,2024 side of clinch offers the first bolt hole 2025, and clinch 2024 is specifically set to longitudinal steel The middle part of tubing string 202,202 side medium line both sides of steel pipe column are symmetrical arranged above-mentioned 2 clinch 2024 along longitudinal direction;
The overlap joint slot for the setting that cooperates with clinch 2024 is offered in 201 both ends bottom of above-mentioned lateral steel pipe column 2013, consistent second bolt hole corresponding with above-mentioned first bolt hole 2025 is offered in lateral 201 both ends side of steel pipe column 2014, when lateral steel pipe column 201 is connect with longitudinal steel pipe column 202, lateral steel pipe column 201 is taken by the overlap joint slot 2013 at both ends Connect be arranged on clinch 2024, later again by the connection bolt (not shown) being equipped with from lateral 201 side of steel pipe column plug to It, most afterwards can fixed lateral steel pipe column through the connection of fastening nut (not shown) in first bolt hole 2025 and the second bolt hole 2014 201 with the connection of longitudinal steel pipe column 202.
In addition, above-mentioned transverse direction steel pipe column 201 includes the first strip slot 2011 and bottom that top center position offers The second strip slot 2012 that portion middle position offers;
As shown in connection with fig. 6, above-mentioned prefabricated shear wall 1 include the first plug division 101 for being equipped with of bottom middle position with And the second plug division 102 that top center position is equipped with, the second plug division 102 are equipped in the second strip slot 2012;
In conjunction with shown in Fig. 7-8, third strip slot is offered close to edge at above-mentioned prefabricated 3 top of interlayer floor 301, above-mentioned first plug division 101 is equipped in third strip slot 301;Near side (ns) is leaned in prefabricated 3 bottom of interlayer floor Third plug division 302 is equipped at, third plug division 302 is equipped in the first strip slot 2011;
Also, by scheme also it can be seen that, above-mentioned shear wall 1 and interlayer floor 3 are provided in single frame space cell Multiple, in the case where chassis body outer dimension is constant, shear wall 1 and interlayer floor 3 can according to the actual situation and need Modularization increases or decreases;Multiple shear walls 1 splice setting in frame space unit side, outermost both sides shearing side by side The seamless conflict in the side of wall 1 and 202 side of longitudinal steel pipe column connects, 201 bottom of the top of shear wall 1 and lateral steel pipe column Seamless conflict connection, the bottom of shear wall 1 and the 3 seamless conflict in top of interlayer floor connect;Outermost both sides interlayer floor 3 Side and longitudinal seamless conflicts in 202 side of steel pipe column connect, the bottom of interlayer floor 3 with it is seamless at the top of transverse direction steel pipe column 201 Contradict connection.
Based on aforementioned, above-mentioned 2023 length of sleeve column accounts for the 1/3 of longitudinal 202 length of steel pipe column.
Based on aforementioned, above-mentioned steel pipe column uses low-alloy high-tensile structural steel, and the trade mark is preferably Q460.
The installation method of above-mentioned assembly concrete shear wall structure, comprising the following steps:
Step 1: the multiple shear walls 1 of preparation, multiple longitudinal steel pipe columns 202, multiple lateral steel pipe columns 201, multiple interlayers The structural members such as floor 3, multiple connection bolts, multiple fastening nuts;
Step 2: completing isolated footing, longitudinal steel pipe column 202 is vertically erected by hanging device and is fixed on independent base On plinth, longitudinal steel pipe column 202, which continues up, to be arranged, the mantle cavity that the longitudinal steel pipe column 202 being located above is equipped with by bottom 2022 are sheathed on the sleeve column 2023 at 202 top of longitudinal steel pipe column being below;
Step 3: the overlap joint of overlap joint slot 2013 for being equipped with lateral steel pipe column 201 by both ends through hanging device is arranged in longitudinal direction On the clinch 2024 of 202 side of steel pipe column, lateral steel pipe column 201 is located between adjacent longitudinal steel pipe column 202, and perpendicular Connection is ensured lateral steel pipe column 201 and indulged by connection bolt and fastening nut in the secondary connection fastening of lap-joint's progress later To the bonding strength and stability of steel pipe column 202;
Step 4: by multiple interlayer floors 3 by hanging device successively strung alongside on enclosing the lateral steel pipe column 201 connect, Cause the third plug division 302 of its bottom to cooperate to be plugged in the first strip slot 2011 of lateral steel pipe column 201, and then realizes The installation of interlayer floor 3 is fixed;
Step 5: multiple shear walls 1 successively being erected by hanging device in 3 edge of interlayer floor side by side, cause its bottom First plug division 101 cooperation in portion is plugged in the third strip slot 301 of interlayer floor 3, after the completion, needs to pass through support portion The support that part carries out medial surface to shear wall 1 is firm, then continues to install lateral steel pipe column 201 at the top of shear wall 1, horizontal To the attended operation such as step 3 of steel pipe column 201 and longitudinal steel pipe column 202, the second plug division 102 cooperation at 1 top of shear wall It is plugged in the second strip slot 2012 that lateral 201 bottom of steel pipe column is equipped with, to the filling chamber 2021 of each longitudinal steel pipe column 202 For reinforcing and keeping the temperature, support member removes the grouting material of middle injection sufficient amount, and single frame space cell is completed, and repeats Step 4 continues to be superimposed interlayer floor 3, is subsequently mounted technique no longer Ao Shu, same as described above, assembly concrete frame-shear wall Architectural structure system is made of multiple frame space units.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, although referring to aforementioned reality Applying example, invention is explained in detail, for those skilled in the art, still can be to aforementioned each implementation Technical solution documented by example is modified or equivalent replacement of some of the technical features.It is all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of installation method of assembly concrete shear wall structure, which comprises the following steps:
Step 1: the multiple shear walls (1) of preparation, multiple longitudinal steel pipe columns (202), multiple lateral steel pipe columns (201), multiple layers Between structural members, the shear wall (1) such as floor (3), multiple connection bolts, multiple fastening nuts include that bottom interposition installs The second plug division (102) that the first plug division (101) having and top center position are equipped with;The longitudinal direction steel pipe column (202) In be equipped with fill chamber (2021), mantle cavity (2022) are offered in the lower pipe body of longitudinal steel pipe column (202), in longitudinal steel pipe column (202) top cylinder is equipped with sleeve column (2023), and longitudinal steel pipe column (202) side is fixed with clinch (2024), overlaps The first bolt hole (2025) are offered in portion (2024), are offered and clinch in described lateral steel pipe column (201) both ends bottom (2024) cooperate the overlap joint slot (2013) being arranged, and offers and the first bolt hole in lateral steel pipe column (201) both ends side (2025) corresponding consistent second bolt hole (2014), lateral steel pipe column (201) includes first that top center position offers The second strip slot (2012) that strip slot (2011) and bottom middle position offer;At the top of the interlayer floor (3) Third strip slot (301) is offered close to edge, is equipped with third plug division close to edge in interlayer floor (3) bottom (302);
Step 2: completing isolated footing, longitudinal steel pipe column (202) is vertically erected and is fixed on isolated footing, longitudinal steel pipe column (202) it continues up and is arranged, the mantle cavity (2022) that the longitudinal steel pipe column (202) being located above is equipped with by bottom is sheathed on place On sleeve column (2023) at the top of longitudinal steel pipe column (202) of lower section;
Step 3: overlap joint slot (2013) overlap joint that lateral steel pipe column (201) is equipped with by both ends is arranged in longitudinal steel pipe column (202) on the clinch (2024) of side, lateral steel pipe column (201) is arranged between adjacent longitudinal steel pipe column (202), and and its Vertical connection, the connection bolt being equipped with plugged from lateral steel pipe column (201) side to the first bolt hole (2025) again later and It is secondary dual fail-safe fixed lateral steel pipe column (201) and longitudinal steel pipe column through fastening nut connection in second bolt hole (2014) (202) connection;
Step 4: by multiple interlayer floors (3), successively strung alongside causes its bottom on enclosing the lateral steel pipe column (201) connect Third plug division (302) cooperation is plugged in the first strip slot (2011) of lateral steel pipe column (201), and then realizes interlayer building Plate (3) installation is fixed;
Step 5: multiple shear walls (1) are successively erected side by side in interlayer floor (3) edge, the first grafting of its bottom is caused Portion (101) cooperation is plugged in the third strip slot (301) of interlayer floor (3), after the completion, is needed through support member to cutting The support that power wall (1) carries out medial surface is firm, then continues to install lateral steel pipe column (201) at the top of shear wall (1), horizontal To the attended operation such as step 3 of steel pipe column (201) and longitudinal steel pipe column (202), after connection, the second of shear wall (1) Plug division (102) cooperation is plugged in the second strip slot (2012) of lateral steel pipe column (201), then to each longitudinal steel pipe Grouting material is injected in the filling chamber (2021) of column (202).
2. a kind of installation method of assembly concrete shear wall structure according to claim 1, which is characterized in that described Clinch (2024) is equipped with 2, is located side by side at the middle part of longitudinal steel pipe column (202), and clinch (2024) steel pipe column along longitudinal direction (202) medium line both sides in side are symmetrical arranged.
3. a kind of installation method of assembly concrete shear wall structure according to claim 2, which is characterized in that outermost The side of the both sides shear wall (1) of side and longitudinal seamless conflict in steel pipe column (202) side connect, the top of shear wall (1) It is connected with the seamless conflict in lateral steel pipe column (201) bottom, seamless conflict at the top of the bottom and interlayer floor (3) of shear wall (1) Connection;The side of outermost both sides interlayer floor (3) and longitudinal seamless conflict in steel pipe column (202) side connect, interlayer floor (3) bottom and the seamless conflict in lateral steel pipe column (201) top connects.
4. a kind of installation method of assembly concrete shear wall structure according to claim 3, which is characterized in that described Sleeve column (2023) length accounts for the 1/3 of longitudinal steel pipe column (202) length.
5. a kind of installation method of assembly concrete shear wall structure according to claim 4, which is characterized in that described Steel pipe column uses low-alloy high-tensile structural steel, trade mark Q460.
CN201910832107.5A 2019-09-04 2019-09-04 Installation method of assembled concrete shear wall structure Active CN110512733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910832107.5A CN110512733B (en) 2019-09-04 2019-09-04 Installation method of assembled concrete shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910832107.5A CN110512733B (en) 2019-09-04 2019-09-04 Installation method of assembled concrete shear wall structure

Publications (2)

Publication Number Publication Date
CN110512733A true CN110512733A (en) 2019-11-29
CN110512733B CN110512733B (en) 2020-10-13

Family

ID=68629842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910832107.5A Active CN110512733B (en) 2019-09-04 2019-09-04 Installation method of assembled concrete shear wall structure

Country Status (1)

Country Link
CN (1) CN110512733B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111705947A (en) * 2020-05-07 2020-09-25 中建材创新科技研究院有限公司 Assembled wall and mounting method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6157734A (en) * 1984-08-27 1986-03-24 株式会社大林組 Connection of box shaped iron skeletal pillar
JPH07133635A (en) * 1993-11-10 1995-05-23 Showa Alum Corp Device for connecting bar like member
JPH08232342A (en) * 1995-02-28 1996-09-10 Shinji Hashimoto Joint structure for column and beam
JPH10115006A (en) * 1996-10-09 1998-05-06 Fuji Art:Kk Connecting device for framework building
CN108824818A (en) * 2018-07-09 2018-11-16 西南科技大学 The method of construction of assembly concrete-filled steel tube frame shear wall structure system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6157734A (en) * 1984-08-27 1986-03-24 株式会社大林組 Connection of box shaped iron skeletal pillar
JPH07133635A (en) * 1993-11-10 1995-05-23 Showa Alum Corp Device for connecting bar like member
JPH08232342A (en) * 1995-02-28 1996-09-10 Shinji Hashimoto Joint structure for column and beam
JPH10115006A (en) * 1996-10-09 1998-05-06 Fuji Art:Kk Connecting device for framework building
CN108824818A (en) * 2018-07-09 2018-11-16 西南科技大学 The method of construction of assembly concrete-filled steel tube frame shear wall structure system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111705947A (en) * 2020-05-07 2020-09-25 中建材创新科技研究院有限公司 Assembled wall and mounting method thereof

Also Published As

Publication number Publication date
CN110512733B (en) 2020-10-13

Similar Documents

Publication Publication Date Title
CN108978949B (en) Steel frame externally-hung filling wall structure system, assembled filling wallboard and construction method
KR101865812B1 (en) Wide girder for precast concrete building structures
CN104074129B (en) A kind of pin-connected panel box girder with corrugated steel webs and manufacture method thereof
CN105863111A (en) Embedded prefabricated concrete shear wall anti-bending steel frame structure
CN101608480B (en) Manufacturing method of precast concrete short-limb shear wall provided with door windows
CN104631659A (en) Prefabricated assembling type composite plate type concrete double-connection shear wall with hidden supports
CN104763085B (en) The double T floor frames structures of assembled integral prestressing force and its construction method
CN104532953A (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
KR101278687B1 (en) Box-type thrust tube structure, and method of building underground structure using the box-type thrust tube structure
KR101011252B1 (en) Rigid-frame bridge frame for reinforcing negative moment part and rigid-frame bridge having it
CN110512733A (en) A kind of installation method of assembly concrete shear wall structure
KR20180042007A (en) Joint for Precast Beam and Columns
CN106760036B (en) A kind of prefabricated steel-combined concrete shear wall
CN203867067U (en) U-shaped steel concrete compound section beam
CN109356286B (en) Assembly type reinforced concrete frame structure node unit decomposition and assembly method
CN108005259A (en) A kind of steel plate combined shear wall splices node
CN105926774A (en) End plate connection integral type combination frame beam and combination method thereof
CN104032855B (en) Assembled cross mixing coupled wall and construction method thereof
CN203716298U (en) Integrated assembling type shear wall and floor plate building system
CN110512732A (en) Assembly concrete frame-shear wall architectural structure system
KR200469319Y1 (en) Construction structure for joining steel or reinforced steel concrete column and beam with reinforcing end part
CN107130634A (en) A kind of noncontact attachment structure of the prefabricated piping lane of split-type
JP2002294858A (en) Halfprecast concrete column member and halfprecast concrete beam member and construction method of reinforced concrete column-beam frame using these members
KR20180031258A (en) Framework structure for cleanroom building and construction method thereof
CN106401191B (en) Grouting device for steel shear structure assembly type building and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant