CN110485229A - A kind of air bubble mix light-textured soil construction technology - Google Patents

A kind of air bubble mix light-textured soil construction technology Download PDF

Info

Publication number
CN110485229A
CN110485229A CN201910695043.9A CN201910695043A CN110485229A CN 110485229 A CN110485229 A CN 110485229A CN 201910695043 A CN201910695043 A CN 201910695043A CN 110485229 A CN110485229 A CN 110485229A
Authority
CN
China
Prior art keywords
construction technology
mix light
locating piece
air bubble
substrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910695043.9A
Other languages
Chinese (zh)
Other versions
CN110485229B (en
Inventor
吴初平
李韧
陈谊
陈钢
任保军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Traffic International Economic Engineering Cooperation Co Ltd
Original Assignee
Hunan Traffic International Economic Engineering Cooperation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Traffic International Economic Engineering Cooperation Co Ltd filed Critical Hunan Traffic International Economic Engineering Cooperation Co Ltd
Priority to CN201910695043.9A priority Critical patent/CN110485229B/en
Publication of CN110485229A publication Critical patent/CN110485229A/en
Application granted granted Critical
Publication of CN110485229B publication Critical patent/CN110485229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/38Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions wherein the mixing is effected both by the action of a fluid and by directly-acting driven mechanical means, e.g. stirring means ; Producing cellular concrete
    • B28C5/381Producing cellular concrete
    • B28C5/386Plants; Systems; Methods
    • B28C5/388Methods
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2301/00Machine characteristics, parts or accessories not otherwise provided for
    • E01C2301/02Feeding devices for pavers

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of air bubble mix light-textured soil construction technology, includes the following steps: that a. excavates substrate, substrate is tamped;B. it is laid with rubble in substrate, forms bed course;C., multiple locating pieces are set, the locating piece includes locating pin and ontology, the ontology includes locating piece and reinforcing bar, and multiple reinforcing bars are connected on the locating piece in petal-shaped arrangement, and the locating pin is inserted into the substrate after from top to bottom sequentially passing through the locating piece and bed course;D. Foam lightweight soil is poured, surface layer is formed, the surface layer floods the locating piece.Compared with prior art, the present invention reduces the compression and defoaming of bubble by reducing the flowing of Foam lightweight soil in casting process, and bulk density is as close to design objective when so as to guarantee practice of construction.

Description

A kind of air bubble mix light-textured soil construction technology
Technical field
The present invention relates to air bubble mix light-textured soil construction technology, in particular to a kind of air bubble mix light-textured soil construction technology.
Background technique
Air bubble mix light-textured soil is a kind of Novel environment-friendlymaterial material, for solve soft foundation of High-grade Highway embankment in jump vehicle, The relative settlement of new and old roadbed when Soft Ground, Roadbed Widening, highfill embankment stability, economize the land resource Equal global problems provide a kind of fabulous technological means, have good promotional value.But it is mixed using existing bubble Solidifying soil construction technology is easy to cause bulk density to differ greatly with design objective.In view of this, the present inventor obtains by further investigation A kind of air bubble mix light-textured soil construction technology.
Summary of the invention
The object of the present invention is to provide a kind of air bubble mix light-textured soil construction technology, having can effectively be controlled when pouring Bulk density the advantages of.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of air bubble mix light-textured soil construction technology, includes the following steps:
A. substrate is excavated, substrate is tamped;
B. it is laid with rubble in substrate, forms bed course;
C., multiple locating pieces are set, the locating piece includes locating pin and ontology, and the ontology includes locating piece and reinforcing bar, Multiple reinforcing bars are connected on the locating piece in petal-shaped arrangement, and the locating pin from top to bottom sequentially passes through the positioning It is inserted into after block and bed course in the substrate;
D. Foam lightweight soil is poured, surface layer is formed, the surface layer floods the locating piece.
Further to improve, the side of substrate is in step-like in the step a.
It is further to improve, thickness is once constructed between 0.25m~1m when pouring Foam lightweight soil in the step d.
It is further to improve, it further include step t between the step c and step d, the step t includes: 1. to generate gas Bubble;2. preparing cement slurry;3. bubble is mixed with cement slurry, Foam lightweight soil is obtained.
Further to improve, 1. the step is specially that foaming agent solution is foamed by foam device, obtains bubble;Institute 2. stating step is specially uniformly to mix base material, curing materials and water, mixing is at cement slurry.
Further to improve, the wet density of the surface layer is 5.5KN/m3~6.0KN/m3, compression strength be 0.6MPa~ 0.8MPa。
It is further to improve, it is pumped when pouring Foam lightweight soil in the step d using pipeline.
Further to improve, when using pipeline pumping, using disperser, the disperser includes bracket and hard conveying Pipe, the both ends of the hard delivery pipe are erected on the bracket, and one end closing, the other end is connect with pipeline, lower surface Equipped with multiple equally distributed dumping pits.
Further to improve, the caliber of the hard delivery pipe is gradually increased from one end that it connect with pipeline to the other end Greatly.
Compared with prior art, the present invention provides a kind of air bubble mix light-textured soil construction technology, is poured by reducing The flowing of Foam lightweight soil reduces the compression and defoaming of bubble in journey, and bulk density leans on as far as possible when so as to guarantee practice of construction Nearly design objective;Specifically, it prevents flowing of the Foam lightweight soil when pouring, the tectonic sieving energy of locating piece by locating piece It is enough properly arrived at this effect, by setting disperser, shortens the flow distance of Foam lightweight soil, can also play very well Prevent bubble compress and defoaming effect, further control Foam lightweight soil bulk density.
Detailed description of the invention
Fig. 1 is that the present invention relates to a kind of structural schematic diagrams of the locating piece of air bubble mix light-textured soil construction technology.
Fig. 2 is that the present invention relates to a kind of fractionation structural representations of the locating piece of air bubble mix light-textured soil construction technology.
Fig. 3 is that the present invention relates to a kind of structural schematic diagrams of the substrate side of air bubble mix light-textured soil construction technology.
Fig. 4 is that the present invention relates to a kind of bubble formation process flow charts of air bubble mix light-textured soil construction technology.
Fig. 5 is that the present invention relates to a kind of Foam lightweight soils of air bubble mix light-textured soil construction technology to generate process flow chart.
Fig. 6 is that the present invention relates to a kind of structures of the disperser of the Foam lightweight soil of air bubble mix light-textured soil construction technology to show It is intended to.
In figure
Substrate -1;Bed course -2;Locating pin -31;
Locating piece -32;Reinforcing bar -33;Surface layer -4;
Bracket -51;Hard delivery pipe -52;Dumping pit -521.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.
As shown in Figure 1 to Figure 3, a kind of air bubble mix light-textured soil construction technology, includes the following steps:
A. substrate 1 is excavated, substrate 1 is tamped, the side of substrate 1 is in step-like, and when excavation, it is anti-should to carry out rain-proof Water conservancy project is made, and reduces rainwater washing away to the substrate 1 after excavation to the greatest extent, and when slope excavating needs to excavate former draining chute, at this moment It needs the rainwater of road pavement to be drained, repairs a water-proof strip in hardened verge Bian Shangyong cement mortar, rainwater on road surface is drained into The chute on roadbed not excavated should cover the roadbed of excavation when rainwater is larger, after the completion of mechanical thick excavation, adopt Manually carry out subtle finishing;
B. after substrate 1 is tamped, it is laid with rubble on the base 1, forms bed course 2, the construction of bed course 2 is using artificial and mechanical knot Construction is closed, after machinery is slightly put down, then manually essence is flat;
C., multiple locating pieces are set, and the locating piece includes locating pin 31 and ontology, and the ontology includes 32 He of locating piece Reinforcing bar 33, multiple reinforcing bars 33 in petal-shaped arrangement be connected on the locating piece 32, the locating pin 31 from top to bottom according to It is secondary to be inserted into the substrate 1 after the locating piece 32 and bed course 2, the fixation of locating piece 32 is realized using locating pin 31, i.e., Also achieve the positioning of reinforcing bar 33;
D. it pours Foam lightweight soil, forms surface layer 4, the surface layer 4 floods the locating piece, is pouring and process of setting In, reinforcing bar 33, which forms Foam lightweight soil, to be stopped, and is slowed down Foam lightweight soil flowing, is compressed and defoamed general to reduce bubble Rate, effectively control bulk density;After completing the setting, due to the unique contour structures of reinforcing bar 33, Foam lightweight soil can be formed and is drawn Hold, can effective lift structure intensity, extend the service life of highway.
The subtle feature of the existing independence of bubble in Foam lightweight soil, it may have dispersibility, therefore to keep away in the construction process Exempt from undue oscillation.When filling foams mix light soil, due to the influence of its own weight, bubble and defoaming can be compressed, therefore, is filled out Foams mix light soil after building is it sometimes appear that the case where tightening and wet density is caused to increase, so primary maximum construction thickness Degree is not less than 0.25m no more than 1m, minimum construction thickness, i.e., thickness of once constructing when pouring Foam lightweight soil in the described step d Degree is between 0.25m~1m.
It further, further include step t between the step c and step d, the step t includes: 1. to generate bubble;2. making Standby cement slurry;3. bubble is mixed with cement slurry, Foam lightweight soil is obtained;Specifically, 1. the step is specially by foaming agent Solution is foamed by foam device, obtains bubble;2. the step is specially uniformly to mix base material, curing materials and water, mix Cement slurry is made.
In the prior art, mechanical mixture foaming is generallyd use, first uniformly mixes base material, curing materials and water, Mixing is poured into high-speed mixer at raw material soil paste, then by raw material soil paste and foaming agent, is acted on by the high-speed stirred of blade, gas Bubble is a large amount of to be generated, and Foam lightweight soil slurry is thus made, has the drawback that one side bubbling efficiency is lower, foaming agent is molten Liquid can not be completely formed bubble, and the bubble diameter up and down of bubble obtained is uneven, on the other hand, high-speed stirring be used during mixing Machine is mixed, stirring action is strong, and the density of bubble lightweight soil is not easily controlled;And by the way of in the present embodiment, on the one hand It is foamed using foam device, bubbling efficiency is higher, and the utilization rate of foaming agent solution is 100%, and bubble diameter is uniform;On the other hand, High-speed mixer is not used during mixing, mixing effect is not strong, and the density of bubble lightweight soil is easy to control.
As shown in Figure 4 and Figure 5, the generating process of bubble is that foaming agent adds water to generate expanding foam solution, and expanding foam solution adds compressed air Generate bubble;The generating process of Foam lightweight soil be by cementitious material, admixture, gathering materials is mixed to get cement slurry with water, by water Mud and bubble are mixed to get Foam lightweight soil.
Further, the wet density of the surface layer 4 is 5.5KN/m3~6.0KN/m3, compression strength is 0.6MPa~0.8MPa, In practical applications, it is commonly designed wet density 6.0KN/m3, compression strength 0.8MPa or wet density 5.5KN/m3, compression strength 0.6MPa, this is the more excellent design value in engineering practice.
In order to obtain the final match ratio under above-mentioned design objective, the following test of design:
Q1: it by foaming agent by 40 times of dilutions, weighs 1 part of foaming agent and exchanges uniform stirring with 39 parts of water;
Q2: expanding foam solution being foamed by foam device by 20 multiplying powers, bubble be made, and weighing bubble density at this time is 50 ± 2g/ L;
Q3: cement and water are weighed by calculating, and is stirred evenly;
Q4: weighing bubble by calculating, be added in the cement slurry stirred evenly, is again stirring for so that bubble is evenly dispersed In cement slurry, foams mix light soil is made;
Q5: the density and fluidity of measurement foams mix light soil, and record;
Q6: entering mould for matched foams mix light soil, totally two groups, one group 7 days, one group 28 days, reference block 100mm* 100mm*100mm。
Trial dosage and result are as follows:
Final match ratio is selected according to above-mentioned test result:
A, wet density 6.0KN/m is designed3, compression strength 0.8MPa.
Number Cement (kg/m3) Water (kg/m3) Bubble (L/m3)
2 350 215 672
B, wet density 5.5KN/m is designed3, compression strength 0.6MPa.
Number Cement (kg/m3) Water (kg/m3) Bubble (L/m3)
5 320 195 702
Further, it in order to reduce the resolution amount of bubble during transportation, is adopted when pouring Foam lightweight soil in the step d It is pumped with pipeline.
When using pipeline pumping, using disperser, the disperser includes bracket 51 and hard delivery pipe 52, described hard The both ends of matter delivery pipe 52 are erected on the bracket 51, and one end closing, the other end is connect with pipeline, and lower surface is equipped with more A equally distributed dumping pit 521.In practice of construction, two brackets 51 are respectively arranged on roadbed two sides, hard delivery pipe 52 both ends are erected on respectively on two brackets 51, i.e., hard delivery pipe 52 is across roadbed, the bubble to be come by pipeline Foam light soil is flowed out after entering hard delivery pipe 52 by the discharge port, is dropped down on roadbed, since dumping pit 521 is to be uniformly distributed , so Foam lightweight soil can be dropped down onto equably on roadbed, without more polishing operation, this can effectively be avoided pressing Contracting bubble and defoaming can make effective control to the bulk density of Foam lightweight soil.
Further, more uniform in order to discharge, the caliber of the hard delivery pipe 52 is connect by it with pipeline One end be gradually increased to the other end.Under this structure setting, Foam lightweight soil can be more easily defeated full of the hard Pipe 52 is sent, so as to uniformly draw off from equally distributed dumping pit 521.
The bracket 51 and hard delivery pipe 52, which can be selected, to be made of a steel, in the settable pulley in bottom of the bracket 51 It is moved easily.
The above-mentioned description to embodiment be for convenient for those skilled in the art understand and using the present invention, it is ripe The personnel for knowing art technology obviously easily can make various modifications to embodiment, and General Principle described herein is answered It uses in other embodiments without having to go through creative labor.Therefore, the present invention is not limited to the above embodiments, art technology Personnel's announcement according to the present invention, improvement and modification made without departing from the scope of the present invention all should be in protection models of the invention Within enclosing.

Claims (9)

1. a kind of air bubble mix light-textured soil construction technology, which comprises the steps of:
A. substrate (1) is excavated, substrate (1) is tamped;
B. it is laid with rubble on substrate (1), is formed bed course (2);
C., multiple locating pieces are set, the locating piece includes locating pin (31) and ontology, the ontology include locating piece (32) and Reinforcing bar (33), multiple reinforcing bars (33) in petal-shaped arrangement be connected on the locating piece (32), the locating pin (31) by The locating piece (32) is sequentially passed through under and bed course (2) is inserted into afterwards in the substrate (1);
D. Foam lightweight soil is poured, is formed surface layer (4), the surface layer (4) floods the locating piece.
2. a kind of air bubble mix light-textured soil construction technology according to claim 1, which is characterized in that substrate in the step a (1) side is in step-like.
3. wanting a kind of 1 air bubble mix light-textured soil construction technology according to right, which is characterized in that pour bubble in the step d Thickness is once constructed when foam light soil between 0.25m~1m.
4. a kind of air bubble mix light-textured soil construction technology according to claim 1, which is characterized in that the step c and step d Between further include step t, the step t includes: 1. to generate bubble;2. preparing cement slurry;3. bubble is mixed with cement slurry, obtain To Foam lightweight soil.
5. a kind of air bubble mix light-textured soil construction technology according to claim 4, which is characterized in that 1. the step is specially Foaming agent solution is foamed by foam device, obtains bubble;2. the step is specially that base material, curing materials and water is uniform Mixing, mixing is at cement slurry.
6. a kind of air bubble mix light-textured soil construction technology according to claim 1, which is characterized in that the surface layer (4) it is wet Bulk density is 5.5KN/m3~6.0KN/m3, compression strength is 0.6MPa~0.8MPa.
7. according to claim 1 to a kind of foams mix light soil construction method described in any one of 6, which is characterized in that described It is pumped when pouring Foam lightweight soil in step d using pipeline.
8. a kind of air bubble mix light-textured soil construction technology according to claim 7, which is characterized in that pumped using pipeline When, using disperser, the disperser includes bracket (51) and hard delivery pipe (52), the both ends of the hard delivery pipe (52) It is erected on the bracket (51), one end closing, the other end connect with pipeline, and lower surface equally distributed is unloaded equipped with multiple Expect hole (521).
9. a kind of air bubble mix light-textured soil construction technology according to claim 8, which is characterized in that the hard delivery pipe (52) caliber is gradually increased from its one end connecting with pipeline to the other end.
CN201910695043.9A 2019-07-30 2019-07-30 Construction process for bubble mixed light soil Active CN110485229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910695043.9A CN110485229B (en) 2019-07-30 2019-07-30 Construction process for bubble mixed light soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910695043.9A CN110485229B (en) 2019-07-30 2019-07-30 Construction process for bubble mixed light soil

Publications (2)

Publication Number Publication Date
CN110485229A true CN110485229A (en) 2019-11-22
CN110485229B CN110485229B (en) 2021-07-16

Family

ID=68548767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910695043.9A Active CN110485229B (en) 2019-07-30 2019-07-30 Construction process for bubble mixed light soil

Country Status (1)

Country Link
CN (1) CN110485229B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014047565A (en) * 2012-08-31 2014-03-17 Maeda Corp Liquefaction countermeasure construction method for ground
CN205421261U (en) * 2016-03-21 2016-08-03 浙江大学城市学院 Subway tunnel soil layer construction grout pipe
CN105887775A (en) * 2016-06-03 2016-08-24 国网新疆电力公司疆南供电公司 Energy dissipation rib type flood discharging device
CN205676857U (en) * 2016-06-03 2016-11-09 国网新疆电力公司疆南供电公司 Energy dissipating bar formula flood discharge device
CN107060322A (en) * 2017-04-15 2017-08-18 浙江兴远建设有限公司 Concreting die carrier structure
CN109914173A (en) * 2019-03-26 2019-06-21 山东大学 Foam lightweight soil pours platform back structure and its construction method in Expressway Extension Project

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014047565A (en) * 2012-08-31 2014-03-17 Maeda Corp Liquefaction countermeasure construction method for ground
CN205421261U (en) * 2016-03-21 2016-08-03 浙江大学城市学院 Subway tunnel soil layer construction grout pipe
CN105887775A (en) * 2016-06-03 2016-08-24 国网新疆电力公司疆南供电公司 Energy dissipation rib type flood discharging device
CN205676857U (en) * 2016-06-03 2016-11-09 国网新疆电力公司疆南供电公司 Energy dissipating bar formula flood discharge device
CN107060322A (en) * 2017-04-15 2017-08-18 浙江兴远建设有限公司 Concreting die carrier structure
CN109914173A (en) * 2019-03-26 2019-06-21 山东大学 Foam lightweight soil pours platform back structure and its construction method in Expressway Extension Project

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨康: "气泡轻质土及其应用", 《智能城市》 *

Also Published As

Publication number Publication date
CN110485229B (en) 2021-07-16

Similar Documents

Publication Publication Date Title
CN105036789B (en) A kind of lightweight foam soil applied to Metro station excavation backfill
CN106759126B (en) Construction method of side slope support drainage channel
CN105236872A (en) Lightweight foam soil applied to roadbed filling of mountainous-area steep road section
CN107989049A (en) A kind of construction method of frame bank protection
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN105155383A (en) Construction process of bubble light soil
CN113548844A (en) Foaming cement soil slurry for backfilling of construction fertilizer groove and construction process
CN107142902B (en) High head and large flow tunneling boring damming method
CN110172979B (en) Roller compacted concrete damming method
CN110485229A (en) A kind of air bubble mix light-textured soil construction technology
CN111908853A (en) Self-compacting soil, preparation method thereof and construction method for backfilling municipal cavity
JP4548686B2 (en) Concrete, concrete structure, concrete structure construction method, sabo dam and sabo dam construction method
CN112301819B (en) Method for casting roadbed in situ
CN101269520A (en) Method for producing concrete building block by using pipe pile wastewater slurry
CN114396058A (en) Design method for preparing low-strength fluidized backfill material from construction waste fines
CN107366302A (en) A kind of construction technology of reinforced concrete retaining wall
JP2004225453A (en) Construction method of civil engineering structure
CN107935626A (en) A kind of construction method of high-early-strength type road
CN109056794A (en) A kind of piping lane back filling behind abutment method
JP6999253B1 (en) How to build a sabo dam
WO2023159712A1 (en) In-situ road construction method using in-situ soil
Najjar et al. Underwater concreting by using two-stage (preplaced aggregate) concrete
JP4601496B2 (en) Bubble mixed lightweight soil and embankment using the same
CN110984079B (en) Construction method of self-compacting concrete rock-fill dam
CN108035206A (en) A kind of construction method of road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant