CN110467930A - The first track infrastructure of coke guide - Google Patents
The first track infrastructure of coke guide Download PDFInfo
- Publication number
- CN110467930A CN110467930A CN201910847874.3A CN201910847874A CN110467930A CN 110467930 A CN110467930 A CN 110467930A CN 201910847874 A CN201910847874 A CN 201910847874A CN 110467930 A CN110467930 A CN 110467930A
- Authority
- CN
- China
- Prior art keywords
- support
- track
- support frame
- coke guide
- joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000571 coke Substances 0.000 title claims abstract description 34
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000010791 quenching Methods 0.000 description 1
- 230000000171 quenching effect Effects 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B33/00—Discharging devices; Coke guides
- C10B33/14—Coke guides
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Organic Chemistry (AREA)
- Escalators And Moving Walkways (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
This application provides the first track infrastructures of coke guide, including joist, bottom beam, support and the first track, the bottom beam is set to above the joist, the support is set to above the bottom beam, first track is set to above the support, support frame is additionally provided between the joist and support, described support one end is erected on above the bottom beam, and the support other end is erected on above support frame as described above.The application passes through setting support frame, so that total is more firm, and when total is replaced in addition to remaining structure except the replacement of the first track, it does not all need to stop production with regard to achievable replacement work, in replacement, do not need it is whole be displaced outwardly, the problem of track is not easy centering caused by reinstalling there is no track needs.
Description
Technical field
This application involves coke guide track infrastructure technical fields, and in particular to the first track infrastructure of coke guide.
Background technique
Coke guide is the corollary equipment of capacity coke oven, is generally operated on the track of coke oven coke side, and it is burnt to be mainly used for switch
Furnace door, the incandescent coke that pusher machine is released out of coke oven chamber are guided to coke quenching cart, and are responsible for transporting the furnace that need to be repaired
Door and firedoor frame.When walking, the track close to coke oven stay side is the first track of coke guide, the first rail of coke guide to coke guide
Road foundation structure, which works normally tool for coke guide, to have a significant impact.
In the prior art, the first track infrastructure of coke guide includes the pedestal and bottom beam being arranged below the first track,
Bottom beam is arranged above furnace stay bracket, and first track infrastructure of coke guide design is weak, and sole plate is easy to appear rotten
Situations such as losing, snapping causes the accidents such as coke guide derailing.Existing the first track of coke guide such as Fig. 1 is such as pressed, is needed in the first track
When replacing basic bottom beam or pedestal, due to the whole outer shifting of platform, it is not easy centering when reinstalling track, it can not with furnace body spacing
Guarantee;And the costly, heavy workload that more changes jobs that there are bottom beams, off-time are long, and will appear repetition accident etc. after replacing
Problem.
Summary of the invention
In order to solve the above-mentioned technical problem, this application provides the first track infrastructures of coke guide, including joist, bottom
Beam, support and the first track, the bottom beam are set to above the joist, and the support is set to above the bottom beam, described
First track is set to above the support, support frame is additionally provided between the joist and support, described support one end is taken
Above the bottom beam, the support other end is erected on above support frame as described above.The application passes through setting support frame, so that
Total is more firm, and when total is replaced in addition to remaining structure except the replacement of the first track, not
Need the just achievable replacement work that stops production, in replacement, do not need it is whole be displaced outwardly, need to reinstall there is no track and
The problem of caused track is not easy centering.
Further, the bottom beam includes connected the first I-beam and the second I-beam, and first I-beam is east
To the first I-beam of setting, second I-beam is the second I-beam of North and South direction setting, second I-shaped in west
Beam is set between first I-beam and support frame as described above.Bottom beam passes through the I-beam of setting different directions in the application,
So that if I-shaped beam flange plate is corroded when needing replacing, it is only necessary to it does local replacing, repair the position, it is whole without integral replacing
A I-beam.
Further, described support one end is erected on first I-beam upper end, and the support other end is erected on institute
State support frame upper end.When support, bottom beam need replacing after being corroded in the application, it can replace one by one.
Further, first track is set to the support close to one end of support frame as described above.First in the application
The setting position of track makes total more firm.
Further, the distance between second I-beam and support frame as described above are 0.6-0.8 meters.Second in the application
For the setting of the distance between I-beam and support frame so that total is more firm, operability is stronger, more flexible.
Further, the height of support frame as described above is 2-3 times of the height of support.
Further, the width of the support is 1.8-2.5 times of support frame as described above width.Support frame and branch in the application
The height of seat, width are arranged so that total is more firm.
Further, support frame as described above includes first support bar and second support bar, the first support bar with second
Strut is arranged in parallel, and the first support bar is set between the second I-beam and second support bar.
Further, support frame as described above lower end is connected by the first snap-gauge with the joist, and support frame as described above upper end passes through
Second snap-gauge is connected with the support.Support frame upper and lower ends are connected with snap-gauge in the application, so that the more convenient replacement of the structure.
Further, support frame as described above lower end is provided with the first fixture block, is provided on first snap-gauge and the first fixture block
The first card slot being equipped with;Support frame as described above upper end is provided with the second fixture block, is provided on second snap-gauge and the second card
The second card slot that block is equipped with.
The application's has the beneficial effect that:
1, the application so that total is more firm, and makes total in addition to the first rail by setting support frame
When remaining structure except road replacement is replaced, does not all need to stop production with regard to achievable replacement work, in replacement, not need whole
The problem of body is displaced outwardly, and track is not easy centering caused by reinstalling there is no track needs;
2, bottom beam passes through the I-beam that different directions are arranged in the application, if needs are more so that I-shaped beam flange plate is corroded
When changing, it is only necessary to do local replacing, repair the position, be not necessarily to the entire I-beam of integral replacing;
3, it when being needed replacing after support, the corrosion of bottom beam grain in the application, can replace one by one;
4, the setting position of the first track makes total more firm in the application;
5, the setting of the distance between the second I-beam and support frame is so that total is more firm in the application, and operability is more
By force, more flexible;
6, the height of support frame and support, width are arranged so that total is more firm in the application;
7, support frame upper and lower ends are connected with snap-gauge in the application, so that the more convenient replacement of the structure.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, this Shen
Illustrative embodiments and their description please are not constituted an undue limitation on the present application for explaining the application.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the first track infrastructure used in the prior art;
Fig. 2 is the structural schematic diagram of the first track infrastructure in the application;
Fig. 3 is the top view of the first track infrastructure in Fig. 2;
Fig. 4 is the structural schematic diagram of support frame in the application.
Specific embodiment
For the clearer general idea for illustrating the application, carry out in an illustrative manner with reference to the accompanying drawings of the specification detailed
It describes in detail bright.
Many details are explained in the following description in order to fully understand the application, still, the application may be used also
To be implemented using other than the one described here other modes, therefore, the protection scope of the application is not by described below
Specific embodiment limitation.
In addition, in the description of the present application, it is to be understood that term " center ", "upper", "lower", "front", "rear",
The orientation of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " axial direction ", " radial direction ", " circumferential direction "
Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the application and simplifies description, and
It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore
It should not be understood as the limitation to the application.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more this feature.In the description of the present application, the meaning of " plurality " is two or more, remove
It is non-separately to have clearly specific restriction.
In this application unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc.
Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect
It connects, is also possible to be electrically connected, can also be communication;It can be directly connected, can also indirectly connected through an intermediary, it can be with
It is the interaction relationship of the connection or two elements inside two elements.For the ordinary skill in the art, may be used
To understand the concrete meaning of above-mentioned term in this application as the case may be.
In this application unless specifically defined or limited otherwise, fisrt feature in the second feature " on " or " down " can be with
It is that the first and second features directly contact or the first and second features pass through intermediary mediate contact.In retouching for this specification
In stating, the description of reference term " one embodiment ", " some embodiments ", " example ", " specific example " or " some examples " etc.
Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one of the application
In embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to identical embodiment
Or example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples
It can be combined in any suitable manner.
The first track infrastructure of coke guide, as in Figure 2-4, including joist 1, bottom beam 2, support 3 and the first track 4,
Bottom beam 2 is set to 1 top of joist, and support 3 is set to 2 top of bottom beam, and the first track 4 is set to 3 top of support, in 1 He of joist
Support frame 5 is additionally provided between support 3,3 one end of support is erected on 2 top of bottom beam, and 3 other end of support is erected on support frame 5
Side.Bottom beam 2 includes connected the first I-beam 21 and the second I-beam 22, and the first I-beam 21 is the first of east-west direction setting
I-beam 21, the second I-beam 22 are the second I-beam 22 of North and South direction setting, and the second I-beam 22 is set to the first I-shaped
Between beam 21 and support frame 5.3 one end of support is erected on 21 upper end of the first I-beam, and 3 other end of support is erected on support frame 5
End.First track 4 is set to support 3 close to one end of support frame 5.Support frame as described above 5 includes first support bar 51 and second
Strut 52, the first support bar 51 are arranged in parallel with second support bar 52, and the first support bar 51 is set to the second I-shaped
Between beam 22 and second support bar 52.5 lower end of support frame is connected by the first snap-gauge 61 with joist 1, and 5 upper end of support frame passes through the
Two snap-gauges 62 are connected with support 3.5 lower end of support frame is provided with the first fixture block 71, is provided on the first snap-gauge 61 and the first fixture block
71 the first card slots 611 being equipped with;5 upper end of support frame is provided with the second fixture block 72, is provided on the second snap-gauge 62 and second
The second card slot 621 that fixture block 72 is equipped with.
The distance between second I-beam 22 and support frame 5 are 0.6-0.8 meters.The height of support frame 5 is 3 height of support
2-3 times.The width of support 3 is 1.8-2.5 times of 5 width of support frame.
4 foundation structure of the first track of common coke guide is as shown in Figure 1,1 one end of joist and 8 phase of furnace stay in present factory
Even, it is provided with bottom beam 2 above furnace stay 8, support 3 is provided with above bottom beam 2, the first track 4 is mounted on 3 top of support, this knot
Structure if desired replace when bottom beam 2 or support 3 entire orbital platform will it is whole it is outer move, and while installing the first track 4 again, is not easy centering,
It not can guarantee with furnace body spacing.And bottom beam 2 is costly, heavy workload, off-time are long for replacement, and will appear repetition after replacing
Accident.
And when using the first 4 foundation structure of track in the application, 1 one end of joist is connected with furnace stay 8, above joist 1
First I-beam 21, the second I-beam 22 and support frame 5 be installed, then by the installation of support 3 and 2 top of bottom beam, then by the first track 4
Installation and 3 top of support.The structure when in use, if 5 either component of the first I-beam 21, the second I-beam 22 or support frame
It when needing replacing, does not all need to stop production, it is only necessary to be individually replaced, since total is relatively firm, the will not be influenced
The normal work of one track 4.
It is understood that the structure of fixture block and card slot in the application between snap-gauge and support rod can be common card
Block and clamping slot structure are connect, for example fixture block is T-type fixture block, card slot is the T-type sliding slot being equipped with T-type fixture block, and fixture block can be with
It is slid into from sliding slot one end and completes assembling.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment
Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality
For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method
Part explanation.
The above description is only an example of the present application, is not intended to limit this application.For those skilled in the art
For, various changes and changes are possible in this application.All any modifications made within the spirit and principles of the present application are equal
Replacement, improvement etc., should be included within the scope of the claims of this application.
Claims (10)
1. the first track infrastructure of coke guide, which is characterized in that including joist, bottom beam, support and the first track, the bottom beam
It being set to above the joist, the support is set to above the bottom beam, and first track is set to above the support,
Support frame is additionally provided between the joist and support, described support one end is erected on above the bottom beam, and the support is another
One end is erected on above support frame as described above.
2. the first track infrastructure of coke guide according to claim 1, which is characterized in that the bottom beam includes connected
First I-beam and the second I-beam, first I-beam are the first I-beam of east-west direction setting, second I-shaped
Beam is the second I-beam of North and South direction setting, second I-beam be set to first I-beam and support frame as described above it
Between.
3. the first track infrastructure of coke guide according to claim 2, which is characterized in that described support one end is erected on
First I-beam upper end, the support other end are erected on support frame as described above upper end.
4. the first track infrastructure of coke guide according to claim 1, which is characterized in that first track is set to
The support is close to one end of support frame as described above.
5. the first track infrastructure of coke guide according to claim 2, which is characterized in that second I-beam and institute
Stating the distance between support frame is 0.6-0.8 meters.
6. the first track infrastructure of coke guide according to claim 1, which is characterized in that the height of support frame as described above is
2-3 times of the height of support.
7. the first track infrastructure of coke guide according to claim 1, which is characterized in that the width of the support is institute
1.8-2.5 times for stating support frame width.
8. the first track infrastructure of coke guide according to claim 2, which is characterized in that support frame as described above includes first
Support rod and second support bar, the first support bar are arranged in parallel with second support bar, and the first support bar is set to
Between two I-beams and second support bar.
9. the first track infrastructure of coke guide according to claim 8, which is characterized in that support frame as described above lower end passes through
First snap-gauge is connected with the joist, and support frame as described above upper end is connected by the second snap-gauge with the support.
10. the first track infrastructure of coke guide according to claim 9, which is characterized in that support frame as described above lower end is set
It is equipped with the first fixture block, the first card slot being equipped with the first fixture block is provided on first snap-gauge;Support frame as described above upper end
It is provided with the second fixture block, the second card slot being equipped with the second fixture block is provided on second snap-gauge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910847874.3A CN110467930B (en) | 2019-09-09 | 2019-09-09 | First track foundation structure of coke guide |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910847874.3A CN110467930B (en) | 2019-09-09 | 2019-09-09 | First track foundation structure of coke guide |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110467930A true CN110467930A (en) | 2019-11-19 |
CN110467930B CN110467930B (en) | 2024-05-24 |
Family
ID=68515260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910847874.3A Active CN110467930B (en) | 2019-09-09 | 2019-09-09 | First track foundation structure of coke guide |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110467930B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010070680A (en) * | 2008-09-19 | 2010-04-02 | Nippon Steel Corp | Apparatus and method of removing coke jammed in coke guide |
CN201942643U (en) * | 2011-01-21 | 2011-08-24 | 太原重工股份有限公司 | Cleaning device for coke grid rail of coke guide |
CN206502777U (en) * | 2017-03-02 | 2017-09-19 | 攀钢集团攀枝花钢钒有限公司 | Coke guide coke guidance device upper rail |
CN208617771U (en) * | 2018-07-28 | 2019-03-19 | 孟州市双林重工机械有限公司 | A kind of coke guide leads burnt grid |
CN208667590U (en) * | 2018-08-22 | 2019-03-29 | 孟州市鑫达制动材料有限公司 | A kind of reinforced coke guide grid of coke guide track |
CN208667591U (en) * | 2018-08-22 | 2019-03-29 | 孟州市鑫达制动材料有限公司 | One kind leading track beam structure on burnt grid |
CN210796341U (en) * | 2019-09-09 | 2020-06-19 | 石横特钢集团有限公司 | First track foundation structure of coke guide |
-
2019
- 2019-09-09 CN CN201910847874.3A patent/CN110467930B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010070680A (en) * | 2008-09-19 | 2010-04-02 | Nippon Steel Corp | Apparatus and method of removing coke jammed in coke guide |
CN201942643U (en) * | 2011-01-21 | 2011-08-24 | 太原重工股份有限公司 | Cleaning device for coke grid rail of coke guide |
CN206502777U (en) * | 2017-03-02 | 2017-09-19 | 攀钢集团攀枝花钢钒有限公司 | Coke guide coke guidance device upper rail |
CN208617771U (en) * | 2018-07-28 | 2019-03-19 | 孟州市双林重工机械有限公司 | A kind of coke guide leads burnt grid |
CN208667590U (en) * | 2018-08-22 | 2019-03-29 | 孟州市鑫达制动材料有限公司 | A kind of reinforced coke guide grid of coke guide track |
CN208667591U (en) * | 2018-08-22 | 2019-03-29 | 孟州市鑫达制动材料有限公司 | One kind leading track beam structure on burnt grid |
CN210796341U (en) * | 2019-09-09 | 2020-06-19 | 石横特钢集团有限公司 | First track foundation structure of coke guide |
Also Published As
Publication number | Publication date |
---|---|
CN110467930B (en) | 2024-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109680568A (en) | The linear adjustment equipment of track girder and method | |
CN110230502B (en) | Mounting structure and method for intermediate wall of simply supported shield tunnel | |
EP2631424B1 (en) | Support structure | |
CN110499701A (en) | A kind of bridge construction ruggedized construction and its reinforcement means | |
CN110117923A (en) | A kind of gyrocar track installation node and the construction method for installing node | |
CN110467930A (en) | The first track infrastructure of coke guide | |
CN105755957B (en) | A kind of across rail overpass fast hoisting method of large span | |
JP2014145231A (en) | Girder suspension structure | |
CN111037251A (en) | Accelerator cavity device assembling tool and method of free electron laser device | |
US20050232698A1 (en) | Driveway for magnetically lavitated vehicles | |
CN112166061B (en) | Variable transformer holding device for electric locomotive | |
CN209686169U (en) | Spacing subassembly and switch subassembly | |
CN105040587B (en) | Track walking hanging pieces for bridge inspection car and supporting assembly composed of hanging pieces | |
CN202527929U (en) | Roof preassembling unit of railway vehicle | |
CN210796341U (en) | First track foundation structure of coke guide | |
CN205329549U (en) | Corbel frame device is deposited to steel case roof beam temporarily | |
CN212984187U (en) | Steel structure supporting seat | |
CN209194710U (en) | A kind of assembling type steel structure supporting beam for building | |
CN109571084B (en) | Drilling fixture for steel structural part | |
CN209179636U (en) | A kind of subway stainless steel railing support | |
CN205061241U (en) | Elevator load -bearing device structure | |
CN205171364U (en) | Bridge inspection trolley rail -engaging pendant and by its supporting component that constitutes | |
CN221760319U (en) | Eccentric combined steel sleeper for TBM tunnel | |
CN105108684B (en) | Positioner | |
CN209739861U (en) | independent tank body top cover supporting beam connecting piece and supporting beam end and tank body connecting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |