CN110467930A - The first track infrastructure of coke guide - Google Patents

The first track infrastructure of coke guide Download PDF

Info

Publication number
CN110467930A
CN110467930A CN201910847874.3A CN201910847874A CN110467930A CN 110467930 A CN110467930 A CN 110467930A CN 201910847874 A CN201910847874 A CN 201910847874A CN 110467930 A CN110467930 A CN 110467930A
Authority
CN
China
Prior art keywords
support
track
support frame
coke guide
joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910847874.3A
Other languages
Chinese (zh)
Other versions
CN110467930B (en
Inventor
王允岭
王大伟
李�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shiheng Special Steel Group Co Ltd
Original Assignee
Shandong Shiheng Special Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shiheng Special Steel Group Co Ltd filed Critical Shandong Shiheng Special Steel Group Co Ltd
Priority to CN201910847874.3A priority Critical patent/CN110467930B/en
Publication of CN110467930A publication Critical patent/CN110467930A/en
Application granted granted Critical
Publication of CN110467930B publication Critical patent/CN110467930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B33/00Discharging devices; Coke guides
    • C10B33/14Coke guides

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Escalators And Moving Walkways (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

This application provides the first track infrastructures of coke guide, including joist, bottom beam, support and the first track, the bottom beam is set to above the joist, the support is set to above the bottom beam, first track is set to above the support, support frame is additionally provided between the joist and support, described support one end is erected on above the bottom beam, and the support other end is erected on above support frame as described above.The application passes through setting support frame, so that total is more firm, and when total is replaced in addition to remaining structure except the replacement of the first track, it does not all need to stop production with regard to achievable replacement work, in replacement, do not need it is whole be displaced outwardly, the problem of track is not easy centering caused by reinstalling there is no track needs.

Description

The first track infrastructure of coke guide
Technical field
This application involves coke guide track infrastructure technical fields, and in particular to the first track infrastructure of coke guide.
Background technique
Coke guide is the corollary equipment of capacity coke oven, is generally operated on the track of coke oven coke side, and it is burnt to be mainly used for switch Furnace door, the incandescent coke that pusher machine is released out of coke oven chamber are guided to coke quenching cart, and are responsible for transporting the furnace that need to be repaired Door and firedoor frame.When walking, the track close to coke oven stay side is the first track of coke guide, the first rail of coke guide to coke guide Road foundation structure, which works normally tool for coke guide, to have a significant impact.
In the prior art, the first track infrastructure of coke guide includes the pedestal and bottom beam being arranged below the first track, Bottom beam is arranged above furnace stay bracket, and first track infrastructure of coke guide design is weak, and sole plate is easy to appear rotten Situations such as losing, snapping causes the accidents such as coke guide derailing.Existing the first track of coke guide such as Fig. 1 is such as pressed, is needed in the first track When replacing basic bottom beam or pedestal, due to the whole outer shifting of platform, it is not easy centering when reinstalling track, it can not with furnace body spacing Guarantee;And the costly, heavy workload that more changes jobs that there are bottom beams, off-time are long, and will appear repetition accident etc. after replacing Problem.
Summary of the invention
In order to solve the above-mentioned technical problem, this application provides the first track infrastructures of coke guide, including joist, bottom Beam, support and the first track, the bottom beam are set to above the joist, and the support is set to above the bottom beam, described First track is set to above the support, support frame is additionally provided between the joist and support, described support one end is taken Above the bottom beam, the support other end is erected on above support frame as described above.The application passes through setting support frame, so that Total is more firm, and when total is replaced in addition to remaining structure except the replacement of the first track, not Need the just achievable replacement work that stops production, in replacement, do not need it is whole be displaced outwardly, need to reinstall there is no track and The problem of caused track is not easy centering.
Further, the bottom beam includes connected the first I-beam and the second I-beam, and first I-beam is east To the first I-beam of setting, second I-beam is the second I-beam of North and South direction setting, second I-shaped in west Beam is set between first I-beam and support frame as described above.Bottom beam passes through the I-beam of setting different directions in the application, So that if I-shaped beam flange plate is corroded when needing replacing, it is only necessary to it does local replacing, repair the position, it is whole without integral replacing A I-beam.
Further, described support one end is erected on first I-beam upper end, and the support other end is erected on institute State support frame upper end.When support, bottom beam need replacing after being corroded in the application, it can replace one by one.
Further, first track is set to the support close to one end of support frame as described above.First in the application The setting position of track makes total more firm.
Further, the distance between second I-beam and support frame as described above are 0.6-0.8 meters.Second in the application For the setting of the distance between I-beam and support frame so that total is more firm, operability is stronger, more flexible.
Further, the height of support frame as described above is 2-3 times of the height of support.
Further, the width of the support is 1.8-2.5 times of support frame as described above width.Support frame and branch in the application The height of seat, width are arranged so that total is more firm.
Further, support frame as described above includes first support bar and second support bar, the first support bar with second Strut is arranged in parallel, and the first support bar is set between the second I-beam and second support bar.
Further, support frame as described above lower end is connected by the first snap-gauge with the joist, and support frame as described above upper end passes through Second snap-gauge is connected with the support.Support frame upper and lower ends are connected with snap-gauge in the application, so that the more convenient replacement of the structure.
Further, support frame as described above lower end is provided with the first fixture block, is provided on first snap-gauge and the first fixture block The first card slot being equipped with;Support frame as described above upper end is provided with the second fixture block, is provided on second snap-gauge and the second card The second card slot that block is equipped with.
The application's has the beneficial effect that:
1, the application so that total is more firm, and makes total in addition to the first rail by setting support frame When remaining structure except road replacement is replaced, does not all need to stop production with regard to achievable replacement work, in replacement, not need whole The problem of body is displaced outwardly, and track is not easy centering caused by reinstalling there is no track needs;
2, bottom beam passes through the I-beam that different directions are arranged in the application, if needs are more so that I-shaped beam flange plate is corroded When changing, it is only necessary to do local replacing, repair the position, be not necessarily to the entire I-beam of integral replacing;
3, it when being needed replacing after support, the corrosion of bottom beam grain in the application, can replace one by one;
4, the setting position of the first track makes total more firm in the application;
5, the setting of the distance between the second I-beam and support frame is so that total is more firm in the application, and operability is more By force, more flexible;
6, the height of support frame and support, width are arranged so that total is more firm in the application;
7, support frame upper and lower ends are connected with snap-gauge in the application, so that the more convenient replacement of the structure.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, this Shen Illustrative embodiments and their description please are not constituted an undue limitation on the present application for explaining the application.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the first track infrastructure used in the prior art;
Fig. 2 is the structural schematic diagram of the first track infrastructure in the application;
Fig. 3 is the top view of the first track infrastructure in Fig. 2;
Fig. 4 is the structural schematic diagram of support frame in the application.
Specific embodiment
For the clearer general idea for illustrating the application, carry out in an illustrative manner with reference to the accompanying drawings of the specification detailed It describes in detail bright.
Many details are explained in the following description in order to fully understand the application, still, the application may be used also To be implemented using other than the one described here other modes, therefore, the protection scope of the application is not by described below Specific embodiment limitation.
In addition, in the description of the present application, it is to be understood that term " center ", "upper", "lower", "front", "rear", The orientation of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " axial direction ", " radial direction ", " circumferential direction " Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the application and simplifies description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It should not be understood as the limitation to the application.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the present application, the meaning of " plurality " is two or more, remove It is non-separately to have clearly specific restriction.
In this application unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect It connects, is also possible to be electrically connected, can also be communication;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements.For the ordinary skill in the art, may be used To understand the concrete meaning of above-mentioned term in this application as the case may be.
In this application unless specifically defined or limited otherwise, fisrt feature in the second feature " on " or " down " can be with It is that the first and second features directly contact or the first and second features pass through intermediary mediate contact.In retouching for this specification In stating, the description of reference term " one embodiment ", " some embodiments ", " example ", " specific example " or " some examples " etc. Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one of the application In embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to identical embodiment Or example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples It can be combined in any suitable manner.
The first track infrastructure of coke guide, as in Figure 2-4, including joist 1, bottom beam 2, support 3 and the first track 4, Bottom beam 2 is set to 1 top of joist, and support 3 is set to 2 top of bottom beam, and the first track 4 is set to 3 top of support, in 1 He of joist Support frame 5 is additionally provided between support 3,3 one end of support is erected on 2 top of bottom beam, and 3 other end of support is erected on support frame 5 Side.Bottom beam 2 includes connected the first I-beam 21 and the second I-beam 22, and the first I-beam 21 is the first of east-west direction setting I-beam 21, the second I-beam 22 are the second I-beam 22 of North and South direction setting, and the second I-beam 22 is set to the first I-shaped Between beam 21 and support frame 5.3 one end of support is erected on 21 upper end of the first I-beam, and 3 other end of support is erected on support frame 5 End.First track 4 is set to support 3 close to one end of support frame 5.Support frame as described above 5 includes first support bar 51 and second Strut 52, the first support bar 51 are arranged in parallel with second support bar 52, and the first support bar 51 is set to the second I-shaped Between beam 22 and second support bar 52.5 lower end of support frame is connected by the first snap-gauge 61 with joist 1, and 5 upper end of support frame passes through the Two snap-gauges 62 are connected with support 3.5 lower end of support frame is provided with the first fixture block 71, is provided on the first snap-gauge 61 and the first fixture block 71 the first card slots 611 being equipped with;5 upper end of support frame is provided with the second fixture block 72, is provided on the second snap-gauge 62 and second The second card slot 621 that fixture block 72 is equipped with.
The distance between second I-beam 22 and support frame 5 are 0.6-0.8 meters.The height of support frame 5 is 3 height of support 2-3 times.The width of support 3 is 1.8-2.5 times of 5 width of support frame.
4 foundation structure of the first track of common coke guide is as shown in Figure 1,1 one end of joist and 8 phase of furnace stay in present factory Even, it is provided with bottom beam 2 above furnace stay 8, support 3 is provided with above bottom beam 2, the first track 4 is mounted on 3 top of support, this knot Structure if desired replace when bottom beam 2 or support 3 entire orbital platform will it is whole it is outer move, and while installing the first track 4 again, is not easy centering, It not can guarantee with furnace body spacing.And bottom beam 2 is costly, heavy workload, off-time are long for replacement, and will appear repetition after replacing Accident.
And when using the first 4 foundation structure of track in the application, 1 one end of joist is connected with furnace stay 8, above joist 1 First I-beam 21, the second I-beam 22 and support frame 5 be installed, then by the installation of support 3 and 2 top of bottom beam, then by the first track 4 Installation and 3 top of support.The structure when in use, if 5 either component of the first I-beam 21, the second I-beam 22 or support frame It when needing replacing, does not all need to stop production, it is only necessary to be individually replaced, since total is relatively firm, the will not be influenced The normal work of one track 4.
It is understood that the structure of fixture block and card slot in the application between snap-gauge and support rod can be common card Block and clamping slot structure are connect, for example fixture block is T-type fixture block, card slot is the T-type sliding slot being equipped with T-type fixture block, and fixture block can be with It is slid into from sliding slot one end and completes assembling.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method Part explanation.
The above description is only an example of the present application, is not intended to limit this application.For those skilled in the art For, various changes and changes are possible in this application.All any modifications made within the spirit and principles of the present application are equal Replacement, improvement etc., should be included within the scope of the claims of this application.

Claims (10)

1. the first track infrastructure of coke guide, which is characterized in that including joist, bottom beam, support and the first track, the bottom beam It being set to above the joist, the support is set to above the bottom beam, and first track is set to above the support, Support frame is additionally provided between the joist and support, described support one end is erected on above the bottom beam, and the support is another One end is erected on above support frame as described above.
2. the first track infrastructure of coke guide according to claim 1, which is characterized in that the bottom beam includes connected First I-beam and the second I-beam, first I-beam are the first I-beam of east-west direction setting, second I-shaped Beam is the second I-beam of North and South direction setting, second I-beam be set to first I-beam and support frame as described above it Between.
3. the first track infrastructure of coke guide according to claim 2, which is characterized in that described support one end is erected on First I-beam upper end, the support other end are erected on support frame as described above upper end.
4. the first track infrastructure of coke guide according to claim 1, which is characterized in that first track is set to The support is close to one end of support frame as described above.
5. the first track infrastructure of coke guide according to claim 2, which is characterized in that second I-beam and institute Stating the distance between support frame is 0.6-0.8 meters.
6. the first track infrastructure of coke guide according to claim 1, which is characterized in that the height of support frame as described above is 2-3 times of the height of support.
7. the first track infrastructure of coke guide according to claim 1, which is characterized in that the width of the support is institute 1.8-2.5 times for stating support frame width.
8. the first track infrastructure of coke guide according to claim 2, which is characterized in that support frame as described above includes first Support rod and second support bar, the first support bar are arranged in parallel with second support bar, and the first support bar is set to Between two I-beams and second support bar.
9. the first track infrastructure of coke guide according to claim 8, which is characterized in that support frame as described above lower end passes through First snap-gauge is connected with the joist, and support frame as described above upper end is connected by the second snap-gauge with the support.
10. the first track infrastructure of coke guide according to claim 9, which is characterized in that support frame as described above lower end is set It is equipped with the first fixture block, the first card slot being equipped with the first fixture block is provided on first snap-gauge;Support frame as described above upper end It is provided with the second fixture block, the second card slot being equipped with the second fixture block is provided on second snap-gauge.
CN201910847874.3A 2019-09-09 2019-09-09 First track foundation structure of coke guide Active CN110467930B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910847874.3A CN110467930B (en) 2019-09-09 2019-09-09 First track foundation structure of coke guide

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910847874.3A CN110467930B (en) 2019-09-09 2019-09-09 First track foundation structure of coke guide

Publications (2)

Publication Number Publication Date
CN110467930A true CN110467930A (en) 2019-11-19
CN110467930B CN110467930B (en) 2024-05-24

Family

ID=68515260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910847874.3A Active CN110467930B (en) 2019-09-09 2019-09-09 First track foundation structure of coke guide

Country Status (1)

Country Link
CN (1) CN110467930B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010070680A (en) * 2008-09-19 2010-04-02 Nippon Steel Corp Apparatus and method of removing coke jammed in coke guide
CN201942643U (en) * 2011-01-21 2011-08-24 太原重工股份有限公司 Cleaning device for coke grid rail of coke guide
CN206502777U (en) * 2017-03-02 2017-09-19 攀钢集团攀枝花钢钒有限公司 Coke guide coke guidance device upper rail
CN208617771U (en) * 2018-07-28 2019-03-19 孟州市双林重工机械有限公司 A kind of coke guide leads burnt grid
CN208667590U (en) * 2018-08-22 2019-03-29 孟州市鑫达制动材料有限公司 A kind of reinforced coke guide grid of coke guide track
CN208667591U (en) * 2018-08-22 2019-03-29 孟州市鑫达制动材料有限公司 One kind leading track beam structure on burnt grid
CN210796341U (en) * 2019-09-09 2020-06-19 石横特钢集团有限公司 First track foundation structure of coke guide

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010070680A (en) * 2008-09-19 2010-04-02 Nippon Steel Corp Apparatus and method of removing coke jammed in coke guide
CN201942643U (en) * 2011-01-21 2011-08-24 太原重工股份有限公司 Cleaning device for coke grid rail of coke guide
CN206502777U (en) * 2017-03-02 2017-09-19 攀钢集团攀枝花钢钒有限公司 Coke guide coke guidance device upper rail
CN208617771U (en) * 2018-07-28 2019-03-19 孟州市双林重工机械有限公司 A kind of coke guide leads burnt grid
CN208667590U (en) * 2018-08-22 2019-03-29 孟州市鑫达制动材料有限公司 A kind of reinforced coke guide grid of coke guide track
CN208667591U (en) * 2018-08-22 2019-03-29 孟州市鑫达制动材料有限公司 One kind leading track beam structure on burnt grid
CN210796341U (en) * 2019-09-09 2020-06-19 石横特钢集团有限公司 First track foundation structure of coke guide

Also Published As

Publication number Publication date
CN110467930B (en) 2024-05-24

Similar Documents

Publication Publication Date Title
CN109680568A (en) The linear adjustment equipment of track girder and method
CN110230502B (en) Mounting structure and method for intermediate wall of simply supported shield tunnel
EP2631424B1 (en) Support structure
CN110499701A (en) A kind of bridge construction ruggedized construction and its reinforcement means
CN110117923A (en) A kind of gyrocar track installation node and the construction method for installing node
CN110467930A (en) The first track infrastructure of coke guide
CN105755957B (en) A kind of across rail overpass fast hoisting method of large span
JP2014145231A (en) Girder suspension structure
CN111037251A (en) Accelerator cavity device assembling tool and method of free electron laser device
US20050232698A1 (en) Driveway for magnetically lavitated vehicles
CN112166061B (en) Variable transformer holding device for electric locomotive
CN209686169U (en) Spacing subassembly and switch subassembly
CN105040587B (en) Track walking hanging pieces for bridge inspection car and supporting assembly composed of hanging pieces
CN202527929U (en) Roof preassembling unit of railway vehicle
CN210796341U (en) First track foundation structure of coke guide
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN212984187U (en) Steel structure supporting seat
CN209194710U (en) A kind of assembling type steel structure supporting beam for building
CN109571084B (en) Drilling fixture for steel structural part
CN209179636U (en) A kind of subway stainless steel railing support
CN205061241U (en) Elevator load -bearing device structure
CN205171364U (en) Bridge inspection trolley rail -engaging pendant and by its supporting component that constitutes
CN221760319U (en) Eccentric combined steel sleeper for TBM tunnel
CN105108684B (en) Positioner
CN209739861U (en) independent tank body top cover supporting beam connecting piece and supporting beam end and tank body connecting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant