CN110460044A - 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method - Google Patents

10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method Download PDF

Info

Publication number
CN110460044A
CN110460044A CN201910732865.XA CN201910732865A CN110460044A CN 110460044 A CN110460044 A CN 110460044A CN 201910732865 A CN201910732865 A CN 201910732865A CN 110460044 A CN110460044 A CN 110460044A
Authority
CN
China
Prior art keywords
kilovolts
voltage distribution
distribution network
switchyard
medium voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910732865.XA
Other languages
Chinese (zh)
Inventor
姜世公
杨卫红
王云飞
刘艳茹
时光远
侯佳
胡平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
State Grid Economic and Technological Research Institute
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
State Grid Economic and Technological Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, State Grid Economic and Technological Research Institute filed Critical State Grid Corp of China SGCC
Priority to CN201910732865.XA priority Critical patent/CN110460044A/en
Publication of CN110460044A publication Critical patent/CN110460044A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks

Abstract

The present invention relates to a kind of 10 kilovolts of medium voltage distribution network operation with closed ring systems and its application methods, it is characterized in that, including the first substation, the second substation, first switch station, second switch station, third switchyard and the 4th switchyard, wherein, first switch station, second switch station, third switchyard and the 4th switchyard are all made of single-trunk segmental wiring mode;The I section bus that 10 kilovolts of bus outlets of the first substation are sequentially connected in series first switch station, second switch station, third switchyard and the 4th switchyard forms monocycle web frame;The II section bus that 10 kilovolts of bus outlets of the second substation are sequentially connected in series first switch station, second switch station, third switchyard and the 4th switchyard forms monocycle web frame, and the present invention can be widely applied in power supply-distribution system technical field.

Description

10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method
Technical field
The present invention relates to a kind of 10 kilovolts of medium voltage distribution network operation with closed ring systems and its application methods, belong to power supply and distribution system System technical field.
Background technique
For the electric network composition scheme of 10 kilovolts of Urban Medium Voltage Distribution Networks, the prior art generally uses " closed loop design, open loop The mode of operation ".
High reliability service area medium voltage distribution network uses operation with closed ring pattern, and controller switching equipment meets N-1 verification, and feeder line is equipped with Longitudinal differential protection can be by protective relaying device quickly by event when one section of power supply line or a power supply unit failure Phragma can not have a power failure power supply from, non-faulting section.Chinese generally to use open loop operation electric network composition, i.e., interconnection switch, which is in, opens State, controller switching equipment general satisfaction N-1 verification, feeder line are equipped with overcurrent protection, current quick, zero-sequenceprotection etc., distribution Automation is using centralized, intelligent distributed or formula troubleshooting mode on the spot, when one section of power supply line or a power supply unit When failure, by power distribution automation and protective relaying device quickly by fault location, isolation, interconnection switch closure realizes non-event Hinder section continued power, has the advantages that the method for operation is simple, short circuit current is lesser.
But when an error occurs, it is born since the switchgear of power distribution automation equipment control line road need to be relied on to realize Lotus turns to supply, compared to can operation with closed ring electric network composition, power supply reliability is relatively low.
Summary of the invention
In view of the above-mentioned problems, the 10 kilovolt medium voltage distribution network closed loops high the object of the present invention is to provide a kind of power supply reliability Operating system and its application method.
To achieve the above object, the present invention takes following technical scheme: a kind of 10 kilovolts of medium voltage distribution network operation with closed ring systems System, which is characterized in that the operation with closed ring system include the first substation, the second substation, first switch station, second switch station, Third switchyard and the 4th switchyard, wherein the first switch station, second switch station, third switchyard and the 4th switchyard It is all made of single-trunk segmental wiring mode;10 kilovolts of bus outlets of first substation are sequentially connected in series described first and open The I section bus for closing station, second switch station, third switchyard and the 4th switchyard forms monocycle web frame;Second substation 10 kilovolts of bus outlets be sequentially connected in series the first switch station, second switch station, third switchyard and the 4th switchyard II section bus formed monocycle web frame;10 kilovolts of bus outlets of first substation and the second substation, described first Switchyard, second switch station, third switchyard and the 4th switchyard bus inlet-outlet line and the first switch station, second Breaker is provided on the output end of switchyard, third switchyard and the 4th switchyard;The first switch station, second switch It stands, be provided with bar coupler between third switchyard and the I section bus and II sections of buses of the 4th switchyard.
Further, in a normal mode, each breaker is in closed state, each bar coupler It is in opening state.
Further, 10 KV line protective device main protections of the operation with closed ring system use longitudinal differential protection device.
A kind of application method of 10 kilovolts of medium voltage distribution networks operation with closed ring system, which comprises the following steps: 1) The high voltage distribution network of planning region is planned;10 kilovolts of medium voltage distribution network operation with closed ring systems are constructed, to planning region 10 kilovolts of medium voltage distribution networks are planned;0.4 kilovolt of low-voltage network of planning region is planned;2) according to high voltage power distribution The Electric Power Network Planning of net, 10 kilovolts of medium voltage distribution networks and 0.4 kilovolt of low-voltage network is based on user information, selects the access of user Voltage class;And the voltage class and and web form of selection access power distribution network.
Further, the detailed process that the high voltage distribution network to planning region is planned are as follows: according to high voltage distribution network Higher level's power supply point, construct the electric network composition of high voltage distribution network, determine substation's electric power loop;Power transformation to high voltage distribution network It stands, short-circuit current level and planned, complete the Electric Power Network Planning of high voltage distribution network.
Further, the step is planned the substation of high voltage distribution network, short-circuit current level and route type selecting specific Process are as follows: determine the construction form of substation in high voltage distribution network, main transformer allocation plan, electrical main connecting wire form, 10 kilovolts go out Line returns several and reactive compensation;It is returned according to determining construction form, main transformer allocation plan, electrical main connecting wire form, 10 kilovolts of outlets Several and reactive compensation determines that each voltage class fault control of substation in high voltage distribution network is horizontal;To the line of high voltage distribution network Road type selecting is planned: it is horizontal according to each voltage class fault control of determining substation, determine route in high voltage distribution network Construction form and conductor cross-section, complete the Electric Power Network Planning of high voltage distribution network.
Further, 10 kilovolts of medium voltage distribution network operation with closed ring systems of the building, to being press-fitted in 10 kilovolts of planning region The detailed process that power grid is planned are as follows: 10 kilovolts of medium voltage distribution network operation with closed ring systems of building;To 10 kilovolts of medium voltage distribution networks Capacity of distribution transform, switchyard construction, route type selecting and relaying configuration planned, complete the power grid rule of 10 kilovolts of medium voltage distribution networks It draws.
Further, described to the capacity of distribution transform of 10 kilovolts of medium voltage distribution networks, switchyard construction, route type selecting and relaying configuration The detailed process planned are as follows: determine that the lectotype selection of distribution transformer in 10 kilovolts of medium voltage distribution network operation with closed ring systems is former Then, device model and capacity and construction mode;According to lectotype selection principle, device model and the capacity of determining distribution transformer And construction mode, determine the construction form and inlet-outlet line time that each switchyard uses in 10 kilovolts of medium voltage distribution network operation with closed ring systems Number;The construction form and inlet-outlet line feeder number used according to determining each switchyard, determines 10 kilovolts of medium voltage distribution network closed loops The construction form and conductor cross-section of route in operating system;The relaying configuration of 10 kilovolts of medium voltage distribution networks is planned: being determined 10 KV line of 10 kilovolts of medium voltage distribution network operation with closed ring systems are protected after planning capacity of distribution transform, switchyard construction and route type selecting Protection unit completes the Electric Power Network Planning of 10 kilovolts of medium voltage distribution networks.
Further, the detailed process that 0.4 kilovolt of low-voltage network to planning region is planned are as follows: determine 0.4 The grid structure of kilovolt low-voltage network, building is adapted to the mode of connection of different user types, and determines conductor selection.
Further, the user information in the step 2) includes that user applies to install capacity, peak load, load nature of electricity consumed and important Degree.
The invention adopts the above technical scheme, which has the following advantages: 1, operation with closed ring system of the invention can It solves existing medium voltage distribution network open loop operation system power supply reliability and promotes bottleneck problem, in the item for keeping 100% turn of load confession Under part, the maximum load rate of each section of route can reach 83.3% in the present invention.When one section of power supply line or a power supply unit event , can be by power distribution automation quickly by Fault Isolation when barrier, faulty section realizes " zero second " automatism isolation, and non-faulting section is realized not Interruptedly supplying power.Due to two power supplys (i.e. two 10 kilovolts be arranged in the first substation 1 and the second substation 2 of ring network power supply Bus) it is all from the same bus of same substation, same power supply point not will form voltage difference, can be by operation with closed ring short circuit electricity Flow control is in the reasonable scope.2, the present invention is provided and is pressed in 10 kilovolts on the basis of considering the electric network composition of higher level substation The application method of power distribution network operation with closed ring system, specifies lectotype selection and relaying configuration scheme, and planning and designing personnel only need root It is designed according to the actual conditions of planning region, the efficiency and accuracy of planning and designing can be greatly improved, can be widely applied In power supply-distribution system technical field.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of operating system of the present invention;
Fig. 2 is the flow chart of the method for the present invention.
Specific embodiment
Come to carry out detailed description to the present invention below in conjunction with attached drawing.It should be appreciated, however, that attached drawing has been provided only more Understand the present invention well, they should not be interpreted as limitation of the present invention.In the description of the present invention, it is to be understood that, Term " first ", " second " etc. are only used for the purpose of description, are not understood to indicate or imply relative importance.
As shown in Figure 1,10 kilovolts of medium voltage distribution network operation with closed ring systems of the invention, including the first substation 1, second become Power station 2, first switch station 3, second switch station 4, third switchyard 5 and the 4th switchyard 6, wherein first switch station 3, second Switchyard 4, third switchyard 5 and the 4th switchyard 6 are all made of single-trunk segmental wiring mode.
10 kilovolts of bus outlets of the first substation 1 are sequentially connected in series first switch station 3, second switch station 4, third are opened The I section bus at station 5 and the 4th switchyard 6 is closed, monocycle web frame is formed.10 kilovolts of bus outlets of the second substation 2 are successively gone here and there Connection connection first switch station 3, second switch station 4, third switchyard 5 and the 4th switchyard 6 II section bus, formation Single-ring network knot Structure.
10 kilovolts of bus outlets of the first substation 1 and the second substation 2, first switch station 3, second switch station 4, third Bus inlet-outlet line and first switch station 3, second switch station 4, the third switchyard 5 and of switchyard 5 and the 4th switchyard 6 Breaker 7, and first switch station 3, second switch station 4, third switchyard 5 and are provided on the output end of four switchyards 6 Bar coupler 8 is provided between the I section bus and II sections of buses of four switchyards 6.
Under normal mode (i.e. each component does not have failure), each breaker 7 is in closed state, to form looped network formula Operation of power networks mode;Each bar coupler 8 is in opening state, and difference may be implemented by the bar coupler 8 Contact between looped network.
In a preferred embodiment, 10 KV line of 10 kilovolts of medium voltage distribution network operation with closed ring systems of the present invention are protected Protection unit main protection can use longitudinal differential protection device, and configure perfect back-up protection.
Based on 10 kilovolts of medium voltage distribution network operation with closed ring systems of the invention, as shown in Fig. 2, 10 kilovolts provided by the invention The application method of medium voltage distribution network operation with closed ring system, comprising the following steps:
1) high voltage distribution network of planning region (containing 110 kilovolts, 66 kilovolts, 35 kilovolts) is planned, specifically:
1.1) higher level's electric network composition is planned: according to higher level's power supply point of high voltage distribution network, constructs high voltage distribution network Electric network composition, determine substation's electric power loop.
1.2) substation of high voltage distribution network is planned: determines construction form, the master of substation in high voltage distribution network Become allocation plan, electrical main connecting wire form, 10 kilovolts of outlets time numbers and reactive compensation etc..
1.3) short-circuit current level of high voltage distribution network is planned: substation in high voltage distribution network after determining planning substation Each voltage class fault control it is horizontal.
1.4) the route type selecting of high voltage distribution network is planned: determines high voltage power distribution after planning substation and short-circuit current level The construction form of route and conductor cross-section etc., complete the Electric Power Network Planning of high voltage distribution network in net.
2) 10 kilovolts of medium voltage distribution network operation with closed ring systems are constructed, 10 kilovolts of medium voltage distribution networks of planning region are advised It draws, specifically:
2.1) electric network composition of 10 kilovolts of medium voltage distribution networks is planned, that is, constructs 10 kilovolts of medium-voltage distributions of the invention The dual-ring network electric network composition of net operation with closed ring system.
2.2) capacity of distribution transform of 10 kilovolts of medium voltage distribution networks is planned: determines 10 kilovolts of medium voltage distribution network operation with closed ring Lectotype selection principle, device model and the capacity of distribution transformer and construction mode etc. in system.
2.3) the switchyard construction of 10 kilovolts of medium voltage distribution networks is planned: is determined after planning capacity of distribution transform in 10 kilovolts It is press-fitted the construction form and inlet-outlet line feeder number that each switchyard uses in power grid operation with closed ring system.
2.4) the route type selecting of 10 kilovolts of medium voltage distribution networks is planned: determines planning capacity of distribution transform and switchyard construction The construction form of route and conductor cross-section etc. in 10 kilovolts of medium voltage distribution network operation with closed ring systems afterwards.
2.5) relaying configuration of 10 kilovolts of medium voltage distribution networks is planned: planning capacity of distribution transform, switchyard construction and line After the type selecting of road, cooperate the network running mode of 10 kilovolts of medium voltage distribution network operation with closed ring systems, reasonably selects and be press-fitted in 10 kilovolts 10 KV line protective devices of power grid operation with closed ring system, complete the Electric Power Network Planning of 10 kilovolts of medium voltage distribution networks.
3) 0.4 kilovolt of low-voltage network of planning region is planned: determines the rack knot of 0.4 kilovolt of low-voltage network Structure, building is adapted to the mode of connection of different user types, and determines conductor selection.
4) user accesses: being advised according to the power grid of high voltage distribution network, 10 kilovolts of medium voltage distribution networks and 0.4 kilovolt of low-voltage network It draws, capacity, peak load, load nature of electricity consumed and significance level etc. is applied to install for information, through technology and economy comparison, selection based on user The access voltage class of user, wherein for special important user, it is also necessary to negotiate user and be equipped with uninterrupted emergency power supply (UPS) etc. facilities, user's access capacity and power supply voltage level are recommended as shown in table 1 below:
Table 1: user's access capacity and power supply voltage level recommendation tables
5) simultaneously, according to information such as distributed electrical Source Type and installed capacitys, the voltage class of selection access power distribution network and And web form, check influence of the distributed generation resource to power grid, wherein power grid voltage class is as shown in table 2 below:
Table 2: power grid voltage class
Power supply total capacity range Grid-connected voltage grade
8kW and following 220V
8kW~400kW 380V
400kW~6MW 10kV
6MW~50MW 20kV、35kV、66kV、110kV
Below by the use of specific embodiment 10 kilovolts of medium voltage distribution network operation with closed ring systems that the present invention will be described in detail Method:
1) high voltage distribution network of planning region is planned:
Electric network composition: layouting according to 220 kv substations, constructs 110 kv grid bilateral source chain structures, stands interior single Platform main transformer power supply comes from different higher level substations.
Substation: indoor construction form, 4 × 50,000 kilovolt-amperes of final scale configurations, the 10 kilovolts of outlets 12 of every main transformer are used It returns.
Short-circuit current level: 110 kilovolts of busbar short-circuit levels of current of substation are controlled by 40 kilo-amperes, 10 kilovolts of busbar short-circuit electric currents Level is controlled by 31.5 kilo-amperes.
Route type selecting: 110 KV line all use cable, and first section route uses 1000 square millimeters, and secondary segment route is adopted With 800 square millimeters, conductor cross-section is once selected, and is laid using the independent power cabin of pipe gallery.
2) 10 kilovolts of medium voltage distribution networks of planning region are planned:
Electric network composition: using the dual-ring network electric network composition of 10 kilovolts of medium voltage distribution network operation with closed ring systems of the invention.
Capacity of distribution transform: public distribution transformers preferentially select energy saving and environment friendly, low-loss low noise dry-type transformer, separate unit Optional 1000,630,400 kilovolt-amperes of transformer capacity, every switchgear house installs 2 and the above distribution transforming.
Switchyard construction: for switchyard using single mother partition wiring, 4 return back out line back into line, 8~12.
Route type selecting: 10 KV line all use cable, and conductor cross-section is once selected, 400 squares of millis of trunk line options Rice, is preferentially laid using the independent power cabin of pipe gallery by 300 square millimeters of branch's line options, is powered to responsible consumer Double back cable run, be preferably arranged in different cabins.
Relaying configuration: to meet high reliability request and cooperation dual-ring network Electromagnetic coupling mode, 10 KV line protection dress It sets main protection and is all made of current comparison pilot protection, and have the function of complete back-up protection.
3) 0.4 kilovolt of low-voltage network of planning region is planned:
For grid structure based on dijection wiring, wired power is 0.4 kilovolt different quoted from different switchgear houses or same switchgear house Bus, 240 square millimeters of economic voltage loss.
4) user accesses:
While power grid provides the service of high power supply reliability, user should require the internal electricity of optimization according to its power supply reliability It is horizontal to reinforce operation management for web frame, uniform external emergency power supply interface standard, lifting means configuration standard and quality.For Special responsible consumer, user side should also provide the uninterrupted emergency power supply (UPS) of high quality for oneself, when realizing external electrical network abnormal electrical power supply Millisecond switching power supply, ensures that user does not have a power failure in equipment life cycle management.
5) distributed generation resource accesses:
Distributed generation resource can be directly accessed the 0.4 of distribution transformer by the distributed generation resource for capacity less than 200 kilowatts Kilovolt side;When distributed generation resource capacity be greater than 200 kilowatt hours, 10 kilovolts of medium voltage distribution network branch lines are preferably accessed, when to power quality When being affected, 10 kilovolts of buses of substation are accessed preferably in the form of special line and are dissolved.
In conclusion the 10 kilovolts of medium voltage distribution network operation with closed ring systems constructed using the present invention, and to the operation with closed ring System carries out specifying its configuration mode, and carry out example demonstration, the results showed that construct 10 kilovolts of the present invention than choosing analysis in detail Power supply reliability can be greatly improved in medium voltage distribution network operation with closed ring system, can provide technology for the region of high reliability demand Support.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention Modification or equivalent replacement, should all cover within the scope of the claims of the present invention.

Claims (10)

1. a kind of 10 kilovolts of medium voltage distribution network operation with closed ring systems, which is characterized in that the operation with closed ring system includes the first power transformation It stands, the second substation, first switch station, second switch station, third switchyard and the 4th switchyard, wherein the first switch It stands, second switch station, third switchyard and the 4th switchyard are all made of single-trunk segmental wiring mode;
10 kilovolts of bus outlets of first substation are sequentially connected in series the first switch station, second switch station, third The I section bus of switchyard and the 4th switchyard forms monocycle web frame;10 kilovolts of bus outlets of second substation are successively The II section bus that the first switch station, second switch station, third switchyard and the 4th switchyard is connected in series forms Single-ring network Structure;
10 kilovolts of bus outlets of first substation and the second substation, the first switch station, second switch station, third The bus inlet-outlet line and the first switch station, second switch station, third switchyard and the 4th of switchyard and the 4th switchyard Breaker is provided on the output end of switchyard;The first switch station, second switch station, third switchyard and the 4th switch Bar coupler is provided between the I section bus and II sections of buses stood.
2. 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as described in claim 1, which is characterized in that in normal mode Under, each breaker is in closed state, and each bar coupler is in opening state.
3. 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as described in claim 1, which is characterized in that the operation with closed ring 10 KV line protective device main protections of system use longitudinal differential protection device.
4. a kind of application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems, which comprises the following steps:
1) high voltage distribution network of planning region is planned;10 kilovolts of medium voltage distribution network operation with closed ring systems are constructed, to planning 10 kilovolts of medium voltage distribution networks in region are planned;
0.4 kilovolt of low-voltage network of planning region is planned;
2) according to the Electric Power Network Planning of high voltage distribution network, 10 kilovolts of medium voltage distribution networks and 0.4 kilovolt of low-voltage network, believed based on user Breath, selects the access voltage class of user;And the voltage class and and web form of selection access power distribution network.
5. the application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as claimed in claim 4, which is characterized in that The detailed process that the high voltage distribution network to planning region is planned are as follows:
According to higher level's power supply point of high voltage distribution network, the electric network composition of high voltage distribution network is constructed, determines substation's electric power loop;
The substation of high voltage distribution network, short-circuit current level and route type selecting are planned, the Electric Power Network Planning of high voltage distribution network is completed.
6. the application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as claimed in claim 5, which is characterized in that The detailed process that the substation of high voltage distribution network, short-circuit current level and route type selecting are planned are as follows:
Determine construction form, main transformer allocation plan, the electrical main connecting wire form, 10 kilovolts of outlets time of substation in high voltage distribution network Several and reactive compensation;
Several and reactive compensation is returned according to determining construction form, main transformer allocation plan, electrical main connecting wire form, 10 kilovolts of outlets, Determine that each voltage class fault control of substation in high voltage distribution network is horizontal;
It is horizontal according to each voltage class fault control of determining substation, determine route in high voltage distribution network construction form and Conductor cross-section completes the Electric Power Network Planning of high voltage distribution network.
7. the application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as claimed in claim 4, which is characterized in that 10 kilovolts of medium voltage distribution network operation with closed ring systems of the building, the tool that 10 kilovolts of medium voltage distribution networks of planning region are planned Body process are as follows:
Construct 10 kilovolts of medium voltage distribution network operation with closed ring systems;
To capacity of distribution transform, the switchyard of 10 kilovolts of medium voltage distribution networks are built, route type selecting and relaying configuration are planned, 10 are completed The Electric Power Network Planning of kilovolt medium voltage distribution network.
8. the application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as claimed in claim 7, which is characterized in that The capacity of distribution transform to 10 kilovolts of medium voltage distribution networks, switchyard build, route type selecting and relaying configuration planned it is specific Process are as follows:
Determine lectotype selection principle, device model and the capacity of distribution transformer in 10 kilovolts of medium voltage distribution network operation with closed ring systems And construction mode;
According to lectotype selection principle, device model and the capacity and construction mode of determining distribution transformer, determine in 10 kilovolts It is press-fitted the construction form and inlet-outlet line feeder number that each switchyard uses in power grid operation with closed ring system;
The construction form and inlet-outlet line feeder number used according to determining each switchyard determines 10 kilovolts of medium voltage distribution network closed loop fortune The construction form and conductor cross-section of route in row system;
The 10000 of 10 kilovolts of medium voltage distribution network operation with closed ring systems after determining planning capacity of distribution transform, switchyard construction and route type selecting Hint line protection device completes the Electric Power Network Planning of 10 kilovolts of medium voltage distribution networks.
9. the application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as claimed in claim 4, which is characterized in that The detailed process that 0.4 kilovolt of low-voltage network to planning region is planned are as follows:
Determine the grid structure of 0.4 kilovolt of low-voltage network, building is adapted to the mode of connection of different user types, and determination is led Line selection type.
10. the application method of 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind as claimed in claim 4, feature exist In the user information in the step 2) includes that user applies to install capacity, peak load, load nature of electricity consumed and significance level.
CN201910732865.XA 2019-08-09 2019-08-09 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method Pending CN110460044A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910732865.XA CN110460044A (en) 2019-08-09 2019-08-09 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910732865.XA CN110460044A (en) 2019-08-09 2019-08-09 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method

Publications (1)

Publication Number Publication Date
CN110460044A true CN110460044A (en) 2019-11-15

Family

ID=68485568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910732865.XA Pending CN110460044A (en) 2019-08-09 2019-08-09 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method

Country Status (1)

Country Link
CN (1) CN110460044A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111082422A (en) * 2019-12-31 2020-04-28 国网河北省电力有限公司 Composite grid structure capable of reliably supplying power

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04255419A (en) * 1991-02-01 1992-09-10 Toshiba Corp Power receiving/transforming system
CN107086570A (en) * 2017-06-21 2017-08-22 广东电网有限责任公司电力科学研究院 A kind of expansible how annular Urban Medium Voltage Distribution Network system
CN108631312A (en) * 2018-06-19 2018-10-09 国网福建省电力有限公司漳州供电公司 A kind of power distribution network mode of connection
CN109149575A (en) * 2018-09-29 2019-01-04 许继集团有限公司 A kind of ring-main unit and bicyclic net type power distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04255419A (en) * 1991-02-01 1992-09-10 Toshiba Corp Power receiving/transforming system
CN107086570A (en) * 2017-06-21 2017-08-22 广东电网有限责任公司电力科学研究院 A kind of expansible how annular Urban Medium Voltage Distribution Network system
CN108631312A (en) * 2018-06-19 2018-10-09 国网福建省电力有限公司漳州供电公司 A kind of power distribution network mode of connection
CN109149575A (en) * 2018-09-29 2019-01-04 许继集团有限公司 A kind of ring-main unit and bicyclic net type power distribution network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111082422A (en) * 2019-12-31 2020-04-28 国网河北省电力有限公司 Composite grid structure capable of reliably supplying power

Similar Documents

Publication Publication Date Title
CN107134787B (en) Cutting load control system and cutting load method based on distributed feeder automation
CN106099917B (en) A kind of method that substation's load transfer scheme quickly determines
CN103904564B (en) High-voltage distribution device with double breakers used for single bus segmentation and application thereof
CN108400650A (en) Power of alterating and direct current integral system
CN107181321A (en) It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric
CN110460044A (en) 10 kilovolts of medium voltage distribution network operation with closed ring systems of one kind and its application method
CN204037372U (en) The resonance being applied to urban track traffic tractive power supply system suppresses circuit
CN207896531U (en) A kind of extra-high-voltage alternating current substation
CN103457350A (en) Automatic throw-in equipment of emergency power supply
Mahdavi et al. Reconfiguration of radial distribution systems: Test System
An et al. A multiattribute and multidimensional based comprehensive evaluation method for new multipulse integrated metro traction power supply system
CN108736480A (en) A kind of multichannel AC looped network type energy router
CN104134162A (en) Marketing, distribution and scheduling whole power grid modeling method of integrated distribution power supply
Wu et al. Reliability assessment of AC/DC hybrid distribution network based on sequential monte carlo method
CN208337238U (en) A kind of Inspection and monitoring system of power distribution network power transmission and transforming equipment
CN113765152A (en) Chain type energy Internet suitable for expressway and canal and control method thereof
Zhong et al. Chinese growing pains
CN207612127U (en) A kind of ultra-high voltage transformer station and current conversion station build monitoring system jointly
Yu General mathematical model of AC traction power supply system simulation based on mathematical reasoning and its application research
Yuan et al. Economic Evaluation of Flexible Interconnection Device in Distribution Network
CN109473984B (en) City electric wire netting wiring structure
CN103607053A (en) Intelligent switching room system of three-layer structure
CN206412764U (en) A kind of new change power network access system
Qiqi et al. Network topology of urban grid considering N-1-1 criterion
CN220325337U (en) Data center electrical architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115

RJ01 Rejection of invention patent application after publication