CN107181321A - It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric - Google Patents

It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric Download PDF

Info

Publication number
CN107181321A
CN107181321A CN201710469244.8A CN201710469244A CN107181321A CN 107181321 A CN107181321 A CN 107181321A CN 201710469244 A CN201710469244 A CN 201710469244A CN 107181321 A CN107181321 A CN 107181321A
Authority
CN
China
Prior art keywords
load
power grid
power
switch
grid topology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710469244.8A
Other languages
Chinese (zh)
Other versions
CN107181321B (en
Inventor
陈厚荣
兰翠芸
陈梅珍
刘丽莎
潘玮明
李毅鹏
许�鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Quanzhou Yixing Electric Power Co Ltd
Original Assignee
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Quanzhou Yixing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd, Quanzhou Yixing Electric Power Co Ltd filed Critical Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority to CN201710469244.8A priority Critical patent/CN107181321B/en
Publication of CN107181321A publication Critical patent/CN107181321A/en
Application granted granted Critical
Publication of CN107181321B publication Critical patent/CN107181321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/10—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00—Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20—Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种基于电网拓扑结构实现快速拉荷的方法,基于电网调控一体化技术支持系统,嵌入电网拓扑分析规则及并行控制技术,通过电网拓扑分析,可快速定位末端负荷开关,并利用并行遥控技术实现一键式批量拉荷。本发明转变传统电网拉荷的一般思路,直接在电网末端负荷侧开关执行拉荷操作,在电网发生重大事故时可实现快速拉荷,不受电网运行方式、设备状态的影响,可靠性高,能为重特大电网事故争取极为宝贵的黄金时间,有效避免电网崩溃事件。在事故情况下能够最大程度缩短事故处理时间和停电范围,降低用户的不良感受。且可有效减少人工工作量,提高事故紧急拉荷管理的工作效率和工作质量,具有良好的经济及社会效益。

A method based on power grid topology to realize rapid loading, based on the integrated technical support system of power grid regulation, embedded power grid topology analysis rules and parallel control technology, through power grid topology analysis, can quickly locate the terminal load switch, and use parallel remote control technology to realize One-click batch loading. The invention transforms the general idea of traditional power grid load loading, and directly performs the load load operation on the load side switch at the end of the power grid, and can realize fast load load when a major accident occurs in the power grid, without being affected by the power grid operation mode and equipment status, and has high reliability. It can win extremely precious golden time for major power grid accidents and effectively avoid power grid collapse events. In the case of an accident, it can minimize the accident handling time and the scope of power outage, and reduce the user's bad feeling. And it can effectively reduce the manual workload, improve the work efficiency and work quality of accident emergency load management, and has good economic and social benefits.

Description

一种基于电网拓扑结构实现快速拉荷的方法A Method of Realizing Rapid Load Loading Based on Grid Topology Structure

技术领域technical field

本发明涉及一种电网故障处理方法,特别是一种基于电网拓扑结构实现快速拉荷的方法。The invention relates to a power grid fault processing method, in particular to a method for realizing rapid loading based on the power grid topology.

背景技术Background technique

随着核电项目及特高压工程的投运,电网运行的外部环境及因素日趋复杂,对安全稳定运行的要求大大提高;国内外多起重特大停电事故的经验教训历历在目,虽然引起重特大停电事故的原因是复杂多样的,但是,电网发生重特大事故后,快速拉停负荷往往是保障电网稳定的最直接有效措施,为此我省制定有事故紧急拉荷、事故特急拉停主变等一系列应急措施,目的在于构造保障电网安全的最后一道防线,防止发生电压、频率崩溃导致的大面积停电;为落实最后一道防线的保障措施,需每年编制操作细则并随方式变化进行异动。即便如此,在执行层面,由于拉荷的操作一般在220千伏变电站的电源侧执行,在电网安全自动装置配置日益完善的情况下,执行拉荷往往会造成备自投装置动作,经常需要两个轮次的多开关操作才能执行拉荷操作,导致耗时长,且可能造成其他正常运行设备过载,既达不到快速拉荷的要求,又增加了扩大事故范围的风险;在技术层面,一般仍延续在电源侧进行拉停负荷的思路,将重点放在因安全自动装置动作开关的甄别及二次拉路上,相关算法逻辑复杂,同时不能有效解决在拉荷的同时出现另一起电网事故的甄别难题,设计思路存在一定缺陷。因此,亟需解决实现电网快速拉荷的问题。With the operation of nuclear power projects and UHV projects, the external environment and factors of power grid operation have become increasingly complex, and the requirements for safe and stable operation have been greatly increased; The reasons for power outages are complex and diverse. However, after a major accident occurs in the power grid, quickly pulling down the load is often the most direct and effective measure to ensure the stability of the power grid. The purpose of a series of emergency measures is to construct the last line of defense to ensure the safety of the power grid and prevent large-scale power outages caused by voltage and frequency collapse. Even so, at the implementation level, since the loading operation is generally performed on the power supply side of the 220 kV substation, under the condition that the grid safety automatic device configuration is increasingly perfect, the implementation of loading will often cause the backup automatic input device to operate, often requiring two The loading operation can only be performed by multi-switch operations in multiple rounds, which will take a long time and may cause overloading of other normal operating equipment, which will not meet the requirements of fast loading and increase the risk of expanding the scope of accidents; at the technical level, generally The idea of pulling and stopping the load on the power supply side is still continued, and the focus is on the screening of the action switch of the safety automatic device and the secondary pull. Screening problems, there are certain flaws in the design ideas. Therefore, it is urgent to solve the problem of realizing fast loading of the power grid.

发明内容Contents of the invention

本发明的主要目的是克服现有技术的缺点,提供一种可基于电网拓扑结构快速定位末端负荷开关,实现一键式批量拉荷,可靠性高,且可大大减少人工工作量,提高事故紧急拉荷管理的工作效率和工作质量基于电网拓扑结构实现快速拉荷的方法。The main purpose of the present invention is to overcome the shortcomings of the prior art, to provide a terminal load switch that can quickly locate the terminal load switch based on the topological structure of the power grid, realize one-button batch loading, high reliability, and can greatly reduce the manual workload and improve the emergency response rate of accidents. The work efficiency and quality of load management are based on the grid topology to achieve fast load load.

本发明采用如下技术方案:The present invention adopts following technical scheme:

一种基于电网拓扑结构实现快速拉荷的方法,包括以下步骤:A method for realizing fast loading based on grid topology, comprising the following steps:

①基于电网调控一体化技术支持系统,嵌入电网拓扑分析规则及并行控制技术算法;①Based on the integrated technical support system of power grid regulation, embedded power grid topology analysis rules and parallel control technology algorithms;

②通过绘图建模工具创建一个电网事故拉闸限电序位表,添加限电序位轮次,为每一轮次添加操作项目,包括操作开关设备、线路负荷、次序;②Create a power grid accident switch-off and power-limiting sequence table through the drawing modeling tool, add power-limiting sequence rounds, and add operation items for each round, including operating switchgear, line load, and sequence;

③根据调控运行人员选定的电源侧拉停设备,进行电网拓扑分析,快速定位末端负荷开关,并根据对应开关的遥测、遥信自动化信息,判断是否执行遥控操作;③According to the pull-stop equipment on the power supply side selected by the control and operation personnel, perform power grid topology analysis, quickly locate the terminal load switch, and judge whether to perform remote control operation according to the telemetry and remote signaling automation information of the corresponding switch;

④通过潮流计算自动统计、分析每次操作的实际拉荷量;④ Automatically count and analyze the actual load load of each operation through power flow calculation;

⑤利用并行遥控技术批量拉停电网拓扑分析自动识别、定位的电网末端负荷开关,实现一键式限电拉荷。⑤ Use parallel remote control technology to batch stop load switches at the end of the power grid that are automatically identified and positioned by grid topology analysis, and realize one-button power-limiting pull-in.

进一步地,所述电网拓扑分析规则基于符合IEC61970标准的电网拓扑模型进行定义。Further, the grid topology analysis rule is defined based on a grid topology model conforming to the IEC61970 standard.

进一步地,所述电网事故拉闸限电序位表基于电网调控一体化技术支持系统内已创建的各类事故拉闸限电序位表模型自动生成。Further, the power grid accident switching sequence table is automatically generated based on various types of accident switching sequence table models that have been created in the integrated technical support system for power grid regulation.

进一步地,所述电网末端负荷开关定义为最低电压等级的负载变压器的中、低压侧开关。Further, the grid end load switch is defined as the medium and low voltage side switch of the load transformer with the lowest voltage level.

进一步地,所述电网拓扑分析规则的分析方法为:将所有组成电网拓扑结构的元素划分为开关间隔和元件间隔,开关间隔定义为由断路器和其两侧刀闸设备构成,元件间隔为除开关间隔以外的设备,将电网中设备划分为多个元件间隔,并将开关间隔作为连接点将元件间隔相连,形成由点、线组成的新的拓扑结构图,根据电网拓扑分析模型,通过拉停元件间隔定位识别末端开关间隔。Further, the analysis method of the power grid topology analysis rule is: divide all the elements that make up the grid topology into switch intervals and component intervals, the switch interval is defined as being composed of circuit breakers and switch devices on both sides, and the element intervals are divided into For equipment outside the switch interval, the equipment in the power grid is divided into multiple component intervals, and the switch interval is used as a connection point to connect the element intervals to form a new topological structure diagram composed of points and lines. According to the grid topology analysis model, by pulling The stop element interval positioning identifies the end switch interval.

进一步地,所述电网拓扑分析采用广度优先搜索法,选择一节点作为基准,以此为起点,按层次对和起点连通的路径进行搜索。Further, the grid topology analysis adopts a breadth-first search method, selects a node as a reference, and uses this as a starting point to search for paths connected to the starting point according to levels.

进一步地,电网发生重、特大事故时,调度员接到省调下达的拉荷调度指令后,地调调度员利用网络IP技术将省调下达的拉停负荷的调度指令下达到各运维站;与此同时,通过电网拓扑分析自动识别、定位电网末端负荷,并自动生成拉停方案;拉停方案经调度员确认后,同时下达到各运维站,分层分布实施,系统直接将电网末端负荷开关以列表形式展示,调控运行人员仅需执行一次遥控操作的过程即可对列表中的开关进行批量控制。Further, when a serious or extraordinarily serious accident occurs in the power grid, after the dispatcher receives the loading and load dispatching order issued by the provincial dispatcher, the dispatcher of the local dispatcher uses the network IP technology to issue the dispatching order of pulling and stopping the load issued by the provincial dispatcher to each operation and maintenance station ; At the same time, through the grid topology analysis, it can automatically identify and locate the end load of the power grid, and automatically generate a pull-off plan; The terminal load switches are displayed in the form of a list, and the control and operation personnel only need to perform a remote operation process to control the switches in the list in batches.

进一步地,具有拉闸限电辅助决策支持功能,可根据人工输入的计划减负荷数以及轮次优先级设置选择操作项目。Furthermore, it has an auxiliary decision support function for power cuts, and can select operation items according to the number of planned load reductions and round priority settings entered manually.

进一步地,所述并行控制技术对外提供原有遥控接口和并行遥控接口两种遥控接口方式,原有遥控接口可实现现场多人多地遥控,并行控制接口采用线程池技术,可同时向多个厂站同时发送遥控指令并执行。Further, the parallel control technology provides two remote control interface modes, the original remote control interface and the parallel remote control interface. The original remote control interface can realize the remote control of many people and multiple places on site. The parallel control interface adopts thread pool technology, which can simultaneously send multiple The factory station sends remote control commands and executes them at the same time.

由上述对本发明的描述可知,与现有技术相比,本发明具有如下有益效果:As can be seen from the above description of the present invention, compared with the prior art, the present invention has the following beneficial effects:

第一,转变传统电网拉荷的一般思路,直接在电网末端负荷侧开关执行拉荷操作。解决了事故紧急拉荷需要多轮次拉路的难题,并基于电网拓扑结构智能分析,自动识别定位拉荷开关。通过并行控制技术“一键式”批量拉停电网末端负荷开关。可避免电网安全自动装置动作造成的切荷时间长或切荷量不足。算法逻辑简单、明确,并且不受电网运行方式、设备状态的影响,可靠性高。First, change the general idea of traditional power grid load-loading, and directly perform load-loading operations on the load side switch at the end of the power grid. It solves the problem that multiple rounds of road pulling are required for emergency load loading in an accident, and based on the intelligent analysis of the power grid topology, it automatically identifies and locates the load switch. Through the parallel control technology "one-button" batch stop load switch at the end of the power grid. It can avoid the long load shedding time or insufficient load shedding caused by the action of the grid safety automatic device. The algorithm logic is simple and clear, and it is not affected by the power grid operation mode and equipment status, and has high reliability.

第二,基于电网拓扑结构实现快速拉停电网末端负荷开关,在电网重大事故发生后极短的时间内能有效作为,可为重特大电网事故争取极为宝贵的黄金时间,有效避免电网崩溃事件,夯实了电网最后一道安全防线的基础。并且切荷量能够准确控制,在技术层面保证拉荷操作能够严格落实各级政府批准的限电方案,在事故情况下能够最大程度降低用户的不良感受及争取用户的理解,也能够有效缩短事故处理时间和停电范围,具有良好的社会效益。Second, based on the topological structure of the power grid, the fast pull-down of the end load switch of the power grid can be effectively performed in a very short period of time after a major power grid accident occurs, which can win extremely valuable golden time for major power grid accidents and effectively avoid power grid collapse events. It has consolidated the foundation of the last line of defense of the power grid. Moreover, the amount of load shedding can be accurately controlled, and at the technical level, it is guaranteed that the load-loading operation can strictly implement the power-limiting schemes approved by governments at all levels. In the event of an accident, it can minimize the user's bad feelings and win the user's understanding, and can also effectively shorten the accident. Dealing with time and range of outages, it has good social benefits.

第三,事故紧急拉停管理工作依托电网调控一体化技术支持系统开展,通过智能分析自动适应电网实时变化,无需再进行年度拉停主变细则修订,也无需在根据设备检修、电网运行方式变化、电网设备异动等进行异动作业,大大减少了人工管理、培训及维护的工作量,事故紧急拉荷管理的工作效率和工作质量均大幅提升。可大大节省工时及人工费用,具有良好的经济效益。Third, the emergency shutdown management work is carried out relying on the integrated technical support system of power grid regulation, which automatically adapts to real-time changes in the power grid through intelligent analysis, without the need to revise the main and detailed rules for annual shutdowns, and does not need to be adjusted according to equipment maintenance and changes in power grid operation mode , Power grid equipment changes, etc., greatly reduce the workload of manual management, training and maintenance, and greatly improve the work efficiency and work quality of accident emergency load management. It can greatly save working hours and labor costs, and has good economic benefits.

第四,在现有的电网调控一体化技术支持系统基础上,进行功能扩展,基于准确的符合IEC61970标准的电网拓扑模型,调控的变电站均采用网络和模拟两种远动通道采集常规的四遥实时信息,遵循硬件设备无关化、电网模型标准化、数据通信标准化的统一标准和规范建设,实现源端维护,不需要再单独根据此项功能进行异动管理。Fourth, on the basis of the existing integrated technical support system for power grid regulation, the function is expanded. Based on the accurate topology model of the power grid that conforms to the IEC61970 standard, the substations for regulation and control adopt two telecontrol channels, network and analog, to collect conventional four-remote control channels. Real-time information follows the unified standards and normative construction of hardware device independence, grid model standardization, and data communication standardization to achieve source-end maintenance, and there is no need to perform transaction management based on this function alone.

附图说明Description of drawings

图1是本发明系统模型图示例;Fig. 1 is an example of a system model diagram of the present invention;

图2是图1系统模型的母线分析和网络分析图;Fig. 2 is the bus bar analysis and the network analysis figure of Fig. 1 system model;

图3是本发明的广度优先搜索法程序框图;Fig. 3 is a program block diagram of the breadth-first search method of the present invention;

图4是本发明的并行控制示意图。Fig. 4 is a schematic diagram of parallel control of the present invention.

具体实施方式detailed description

以下通过具体实施方式对本发明作进一步的描述。The present invention will be further described below through specific embodiments.

参照图1至图4,本发明的一种基于电网拓扑结构实现快速拉荷的方法,包括以下步骤:Referring to Fig. 1 to Fig. 4, a kind of method of the present invention is based on grid topological structure and realizes fast pull load, comprises the following steps:

①基于电网调控一体化技术支持系统的SCADA模块,数据采集、绘图建模、平台管理、实时数据维护以及遥控通道全面利用SCADA模块已有的功能,并进行功能扩展,充分利用全网各种遥测、遥信信息,结合各种事故、超供电能力限管理规定与电网结构的结合,嵌入电网拓扑分析规则及并行控制技术算法。①Based on the SCADA module of the integrated technical support system for power grid regulation, data acquisition, drawing modeling, platform management, real-time data maintenance and remote control channels fully utilize the existing functions of the SCADA module and expand the functions to make full use of various telemetry of the entire network , Remote signaling information, combined with various accidents, super power supply capacity limit management regulations and grid structure, embedded grid topology analysis rules and parallel control technology algorithms.

所述并行控制技术提供控制过程的可视化和交互操作,包括计算、下令和操作三大部分,并能自动循环执行。The parallel control technology provides visualization and interactive operation of the control process, including calculation, command and operation, and can be executed automatically and cyclically.

所述电网拓扑分析规则基于符合IEC61970标准的电网拓扑模型进行定义,可复用任何符合IEC61970标准的电网拓扑模型,因此,只需相应维护人员维护好符合IEC61970标准的电网模型,不再重复构建,维护电网模型和接线图。The grid topology analysis rules are defined based on the grid topology model conforming to the IEC61970 standard, and any grid topology model conforming to the IEC61970 standard can be reused. Therefore, only the corresponding maintenance personnel need to maintain the grid model conforming to the IEC61970 standard, and no repeated construction is required. Maintain grid models and wiring diagrams.

调控的变电站均采用网络和模拟两种远动通道采集常规的四遥实时信息,网络通道采用的规约为标准IEC60870-5-104规约,模拟通道采用的规约根据实际需要选择IEC60870-5-101、DISA、CDT451-91等;采用对IEC104规约进行扩展的方法,使用TYP=167(类型号)的ASDU(应用服务数据单元)对IEC103报文进行封装实现对微机保护软报文事件采集。由省调管辖的外网厂站数据,通过调度数据网从省调EMS系统上进行转发。Controlled substations use network and analog telecontrol channels to collect conventional four-remote real-time information. The network channel uses the standard IEC60870-5-104 protocol, and the analog channel uses IEC60870-5-101 and IEC60870-5-101 according to actual needs. DISA, CDT451-91, etc.; use the method of extending the IEC104 protocol, and use the ASDU (application service data unit) of TYP=167 (type number) to encapsulate the IEC103 message to realize the event collection of the microcomputer protection soft message. The external network plant data under the jurisdiction of the Provincial Commissioner is forwarded from the Provincial Commissioner's EMS system through the dispatching data network.

②通过绘图建模工具创建一个电网事故拉闸限电序位表,添加限电序位轮次,为每一轮次添加操作项目,包括操作开关设备、线路负荷、次序;所述电网事故拉闸限电序位表基于电网调控一体化技术支持系统内已创建的各类事故拉闸限电序位表模型自动生成。②Create a power grid accident switch-off and power-limiting sequence table through the drawing modeling tool, add power-limiting sequence rounds, and add operation items for each round, including operating switchgear, line load, and sequence; The power limit sequence table is automatically generated based on the various accident switch and power limit sequence table models that have been created in the integrated technical support system for power grid regulation.

③根据调控运行人员选定的电源侧拉停设备,进行电网拓扑分析,快速定位末端负荷开关,并根据对应开关的遥测、遥信自动化信息,判断是否执行遥控操作。③According to the pull-stop equipment on the power supply side selected by the control and operation personnel, the power grid topology analysis is carried out to quickly locate the terminal load switch, and according to the telemetry and remote signaling automation information of the corresponding switch, it is judged whether to perform remote control operation.

对照电网各类事故限电序位表及拉荷实施细则,在电源侧定义了具备实现基于电网拓扑结构拉荷的两种设备类型:主变及线路;在负荷侧定义了电网末端负荷开关的设备类型,所述电网末端负荷开关定义为最低电压等级的负载变压器的中、低压侧开关。Comparing with various accident power limit sequence tables and pull-load implementation rules of the power grid, two types of equipment capable of realizing load-load based on the grid topology are defined on the power supply side: main transformer and line; on the load side, the load switch at the end of the grid Equipment type, the grid end load switch is defined as the medium and low voltage side switch of the load transformer with the lowest voltage level.

设备状态智能识别,综合利用设备间电气拓扑连接关系、遥信信息和遥测信息实现设备状态的智能识别。对于不同类型的电气设备具有不同的运行状态,例如线路具有运行状态、热备用状态、冷备用状态、检修状态。并能根据设备当前状态列出所选设备当前的操作任务。Intelligent identification of equipment status, comprehensively utilizing the electrical topology connection relationship between equipment, remote signaling information and telemetry information to realize intelligent identification of equipment status. There are different operating states for different types of electrical equipment, for example, a line has an operating state, a hot standby state, a cold standby state, and an inspection state. And according to the current state of the equipment, the current operation tasks of the selected equipment can be listed.

所述电网拓扑分析规则的分析方法为:将所有组成电网拓扑结构的元素划分为开关间隔和元件间隔,开关间隔定义为由断路器和其两侧刀闸设备构成,元件间隔为除开关间隔以外的设备,包括发电机、线路、母线、变压器等。将电网中设备划分为多个元件间隔,并将开关间隔作为连接点将元件间隔相连,形成由点、线组成的新的拓扑结构图,根据电网拓扑分析模型,通过拉停元件间隔定位识别末端开关间隔。采用广度优先搜索法进行网络拓扑分析,选择一节点作为基准,以此为起点,按层次对和起点连通的路径进行搜索,实现快速定位末端负荷开关。The analysis method of the grid topology analysis rule is: divide all the elements that make up the topology of the grid into switch intervals and component intervals, the switch interval is defined as being composed of a circuit breaker and the switch equipment on both sides of it, and the element interval is except the switch interval equipment, including generators, lines, buses, transformers, etc. Divide the equipment in the power grid into multiple component compartments, and use the switch compartment as a connection point to connect the component compartments to form a new topology structure diagram composed of points and lines. According to the power grid topology analysis model, identify the end by pulling down the component compartment switch interval. The breadth-first search method is used to analyze the network topology, and a node is selected as the reference point, which is used as the starting point, and the path connected to the starting point is searched according to the level, so as to realize the rapid positioning of the terminal load switch.

④系统自动调用潮流计算功能,在图形上实时显示潮流计算结果,自动统计、分析每次操作的实际拉荷量。④The system automatically calls the power flow calculation function, displays the power flow calculation results on the graph in real time, and automatically counts and analyzes the actual load load of each operation.

⑤利用并行遥控技术批量拉停电网拓扑分析自动识别、定位的电网末端负荷开关,实现一键式限电拉荷。⑤ Use parallel remote control technology to batch stop load switches at the end of the power grid that are automatically identified and positioned by grid topology analysis, and realize one-button power-limiting load switching.

所述并行控制技术对外提供原有遥控接口和并行遥控接口两种遥控接口方式,原有遥控接口保留原有的遥控方式,增加了实际控制中可以实现多工作站多人员同时进行遥控的功能;并行控制接口接收批量遥控方式,接收自动遥控软件发来的遥控命令,由实时库模块实现“遥控选择-遥控返校-遥控执行”的过程,每一个遥控对象可以独立的执行遥控操作中的每一个过程,当调度员发出拉荷命令时软件同时向多个厂站同时发送遥控指令并执行,通过选择、反较、执行等过程完成操作并生成记录表,由于需要多线同时处理命令,因此采用“线程池”技术,可自动启动已创建线程的所有任务,每个线程都是独立的、专用的,能进保证每个遥控对象的独立完成所有操作。The parallel control technology provides two remote control interface modes, the original remote control interface and the parallel remote control interface, and the original remote control interface retains the original remote control mode, which increases the function that multiple workstations and multiple personnel can simultaneously perform remote control in the actual control; parallel The control interface receives the batch remote control mode, receives the remote control commands sent by the automatic remote control software, and realizes the process of "remote control selection - remote control return to school - remote control execution" by the real-time library module. Each remote control object can independently execute each of the remote control operations. process, when the dispatcher sends out the pull command, the software simultaneously sends remote control commands to multiple factories and stations and executes them. The operation is completed through selection, comparison, execution and other processes and a record table is generated. Since multiple lines are required to process commands at the same time, it is adopted The "thread pool" technology can automatically start all the tasks of the created threads, each thread is independent and dedicated, and can ensure that each remote control object can independently complete all operations.

电网发生重、特大事故时,调度员接到省调下达的拉荷调度指令后,要求在5分钟内操作完毕。采用多媒体技术的调度指令系统,启动应急调度指令模式,地调调度员通过IP电话将省调下达的拉停负荷的调度指令下达到各运维站,与此同时,通过电网拓扑分析自动识别、定位电网末端负荷,并自动生成拉停方案。拉停方案经调度员确认后,同时分集控下达到各运维站,系统直接将电网末端负荷开关以列表形式展示,调控运行人员仅需执行一次遥控操作的过程即可对列表中的开关进行批量控制。When a serious or catastrophic accident occurs in the power grid, the dispatcher is required to complete the operation within 5 minutes after receiving the Laho dispatch order issued by the provincial dispatcher. The dispatching command system adopts multimedia technology, starts the emergency dispatching command mode, and the dispatcher of the local dispatcher sends the dispatching command of pulling and stopping the load issued by the provincial dispatcher to each operation and maintenance station through the IP phone. At the same time, through the grid topology analysis, automatic identification, Locate the end load of the power grid and automatically generate a pull-stop plan. After the pull-stop plan is confirmed by the dispatcher, the diversity control is sent to each operation and maintenance station at the same time, and the system directly displays the load switches at the end of the power grid in the form of a list. batch control.

本发明还设置有拉闸限电辅助决策支持功能,可根据人工输入的计划减负荷数以及轮次优先级设置选择操作项目。The present invention is also provided with an auxiliary decision-making support function for power cuts, which can select operation items according to the number of planned load reductions and round priority settings manually input.

本发明在实际的拉荷操作中,基于对电网事故发生后的判断,调度员仍需要从电网电源侧找出拉荷方案。因此,在拉停负荷的控制命令方面仍选择在电源侧的电气设备,其界面简单,符合调控运行人员的日常应用习惯。In the actual loading operation of the present invention, based on the judgment after the grid accident, the dispatcher still needs to find out the load loading scheme from the grid power supply side. Therefore, the electrical equipment on the power supply side is still selected for the control command of pulling and stopping the load, and its interface is simple, which is in line with the daily application habits of the control and operation personnel.

本发明还设置有安全配置管理工具用于责任区划分及管理功能,支持对包括区域、主机、用户、角色、权限在内的安全管理对象的安全配置管理,满足调控一体化、地县一体化模式下事故紧急拉荷操作的责任区管理要求。The present invention is also equipped with a security configuration management tool for the division of responsibility areas and management functions, supports security configuration management of security management objects including areas, hosts, users, roles, and permissions, and satisfies the integration of control and integration of districts and counties Area of responsibility management requirements for accident emergency pull load operation under the mode.

本发明还设置有防误功能,通过多层面的防误分析,主要分为本体状态、关系状态、业务流程的防误校验。当使用限电拉荷时,被操作设备本体处于某种接地、检修等非正常状态而应予以禁止,通过调度技术支持系统智能识别该拉停的开关后,进行防误校核,若设备处于某些状态,应终止拉停该开关的操作,经调度员确认后,才可继续操作。按照安全配置管理,明确规定定义各类操作人员权限,在各自的区域管理范围内履行操作(请求)、监护两大类职责,并固化至快速拉荷的流程当中,杜绝因人为原因造成的无人监护或误操作事件。The present invention is also equipped with an error prevention function, through multi-level error prevention analysis, mainly divided into error prevention verification of ontology state, relationship state, and business process. When using power-limited pull load, the body of the operated equipment is in some abnormal state such as grounding, maintenance, etc. and should be prohibited. After the dispatching technical support system intelligently identifies the switch that is pulled, the anti-mistake check is performed. If the equipment is in In some states, the operation of pulling and stopping the switch should be terminated, and the operation can only be continued after the dispatcher confirms. According to the security configuration management, clearly define the authority of various operators, perform the two types of duties of operation (request) and guardianship within the scope of their respective regional management, and solidify them into the process of fast loading, and eliminate the useless accidents caused by human factors. personal monitoring or misuse events.

本发明基于地县一体化系统建设,人机界面友好,达到了项目建设的预期目标。该功能自上线以来,在2014年累计达11次的各类反事故演习中得到应用,并通过DTS进行仿真演练,其实操性、实用性均得到了充分验证。根据反事故演习的统计进行分析对比,以拉停一台220kV主变为例,按照以往常规模式执行时前后平均需要执行开关远方遥控操作18次,两组人员同时执行的情况下平均耗时长达11.7分钟;而应用本发明的方法后,一组人员在4.6分钟内就执行完毕,其应用成效显著,将可为重特大电网事故争取极为宝贵的黄金时间。The invention is based on the construction of an integrated system of prefectures and counties, has a friendly man-machine interface, and achieves the expected goal of project construction. Since its launch, this function has been applied in various anti-accident exercises accumulatively 11 times in 2014, and has been simulated through DTS, and its operability and practicability have been fully verified. According to the analysis and comparison of anti-accident drill statistics, taking the example of stopping a 220kV main transformer, according to the previous conventional mode, it needs to perform on-off remote remote control operations on average 18 times, and the average time-consuming when two groups of personnel perform at the same time is as long as 11.7 minutes; and after applying the method of the present invention, a group of personnel completed the execution within 4.6 minutes, and its application effect is remarkable, which will win extremely valuable golden time for serious and extraordinarily serious power grid accidents.

同时,该项目实施后,事故紧急拉荷管理工作依托调控技术支持系统开展,通过智能分析自动适应电网实时变化,无需再进行年度拉停主变细则修订,也无需在根据设备检修、电网运行方式变化、电网设备异动等进行异动作业,大大减少了人工管理、培训及维护的工作量,事故紧急拉荷管理的工作效率和工作质量均大幅提升。At the same time, after the implementation of the project, the management of accident emergency pull load is carried out relying on the control technical support system, which automatically adapts to the real-time changes of the power grid through intelligent analysis, and there is no need to revise the main and detailed rules of annual pull stop, and there is no need to adjust the power grid according to equipment maintenance and power grid operation mode. Changes, power grid equipment changes, etc., greatly reduce the workload of manual management, training and maintenance, and greatly improve the work efficiency and work quality of accident emergency load management.

上述仅为本发明的一个具体实施方式,但本发明的设计构思并不局限于此,凡利用此构思对本发明进行非实质性的改动,均应属于侵犯本发明保护范围的行为。The above is only a specific embodiment of the present invention, but the design concept of the present invention is not limited thereto, and any insubstantial changes made to the present invention by using this concept should be an act of violating the protection scope of the present invention.

Claims (9)

1.一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:包括以下步骤:1. A method for fast load-loading based on grid topology, characterized in that: comprising the following steps: ①基于电网调控一体化技术支持系统,嵌入电网拓扑分析规则及并行控制技术算法;①Based on the integrated technical support system of power grid regulation, embedded power grid topology analysis rules and parallel control technology algorithms; ②通过绘图建模工具创建一个电网事故拉闸限电序位表,添加限电序位轮次,为每一轮次添加操作项目,包括操作开关设备、线路负荷、次序;②Create a power grid accident switch-off and power-limiting sequence table through the drawing modeling tool, add power-limiting sequence rounds, and add operation items for each round, including operating switchgear, line load, and sequence; ③根据调控运行人员选定的电源侧拉停设备,进行电网拓扑分析,快速定位末端负荷开关,并根据对应开关的遥测、遥信自动化信息,判断是否执行遥控操作;③According to the pull-stop equipment on the power supply side selected by the control and operation personnel, perform power grid topology analysis, quickly locate the terminal load switch, and judge whether to perform remote control operation according to the telemetry and remote signaling automation information of the corresponding switch; ④通过潮流计算自动统计、分析每次操作的实际拉荷量;④ Automatically count and analyze the actual load load of each operation through power flow calculation; ⑤利用并行遥控技术批量拉停电网拓扑分析自动识别、定位的电网末端负荷开关,实现一键式限电拉荷。⑤ Use parallel remote control technology to batch stop load switches at the end of the power grid that are automatically identified and positioned by grid topology analysis, and realize one-button power-limiting load switching. 2.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:所述电网拓扑分析规则基于符合IEC61970标准的电网拓扑模型进行定义。2 . The method for realizing fast loading based on the grid topology according to claim 1 , wherein the grid topology analysis rules are defined based on the grid topology model conforming to the IEC61970 standard. 3 . 3.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:所述电网事故拉闸限电序位表基于电网调控一体化技术支持系统内已创建的各类事故拉闸限电序位表模型自动生成。3. A method for realizing fast loading based on power grid topology as claimed in claim 1, characterized in that: said power grid accident switch-off and power-limiting sequence bit table is based on each created in the grid regulation and control integration technical support system. Automatic generation of sequence table model for switching-off and power-cutting in similar accidents. 4.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:所述电网末端负荷开关定义为最低电压等级的负载变压器的中、低压侧开关。4. A method for realizing fast loading based on grid topology according to claim 1, characterized in that: said grid terminal load switch is defined as the medium and low voltage side switch of the load transformer with the lowest voltage level. 5.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:所述电网拓扑分析规则的分析方法为:将所有组成电网拓扑结构的元素划分为开关间隔和元件间隔,开关间隔定义为由断路器和其两侧刀闸设备构成,元件间隔为除开关间隔以外的设备,将电网中设备划分为多个元件间隔,并将开关间隔作为连接点将元件间隔相连,形成由点、线组成的新的拓扑结构图,根据电网拓扑分析模型,通过拉停元件间隔定位识别末端开关间隔。5. A kind of method based on grid topological structure to realize quick loading as claimed in claim 1, it is characterized in that: the analysis method of described grid topology analysis rule is: divide all the elements that form grid topology into switch interval and The component interval, the switch interval is defined as consisting of a circuit breaker and the knife switch equipment on both sides, the element interval is the equipment other than the switch interval, the equipment in the power grid is divided into multiple element intervals, and the switch interval is used as the connection point to divide the element interval Connected to form a new topological structure diagram composed of points and lines. According to the power grid topology analysis model, the terminal switch interval is identified by the interval positioning of the pull-off components. 6.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:所述电网拓扑分析采用广度优先搜索法,选择一节点作为基准,以此为起点,按层次对和起点连通的路径进行搜索。6. A method for realizing fast loading based on power grid topology as claimed in claim 1, characterized in that: said power grid topology analysis adopts the breadth-first search method, selects a node as a reference, and uses this as a starting point, Search for paths connected to the starting point. 7.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:电网发生重、特大事故时,调度员接到省调下达的拉荷调度指令后,地调调度员利用网络IP技术将省调下达的拉停负荷的调度指令下达到各运维站;与此同时,通过电网拓扑分析自动识别、定位电网末端负荷,并自动生成拉停方案;拉停方案经调度员确认后,同时下达到各运维站,分层分布实施,系统直接将电网末端负荷开关以列表形式展示,调控运行人员仅需执行一次遥控操作的过程即可对列表中的开关进行批量控制。7. A method for fast load-loading based on power grid topology as claimed in claim 1, characterized in that: when a serious or extraordinarily serious accident occurs in the power grid, after the dispatcher receives the load-loading dispatch command issued by the provincial dispatcher, the local dispatcher will The dispatcher uses the network IP technology to issue the dispatching order for the pull-stop load issued by the provincial dispatch to each operation and maintenance station; at the same time, through the grid topology analysis, it automatically identifies and locates the end load of the power grid, and automatically generates a pull-stop plan; the pull-stop plan After being confirmed by the dispatcher, it will be sent to each operation and maintenance station at the same time, and the layered distribution will be implemented. The system will directly display the load switches at the end of the power grid in the form of a list. batch control. 8.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:具有拉闸限电辅助决策支持功能,可根据人工输入的计划减负荷数以及轮次优先级设置选择操作项目。8. A method for realizing rapid loading based on power grid topology as claimed in claim 1, characterized in that: it has the auxiliary decision-making support function of power cuts, and can be based on the number of planned load reductions and round priorities entered manually Set the selection action item. 9.如权利要求1所述的一种基于电网拓扑结构实现快速拉荷的方法,其特征在于:所述并行控制技术对外提供原有遥控接口和并行遥控接口两种遥控接口方式,原有遥控接口可实现现场多人多地遥控,并行控制接口采用线程池技术,可同时向多个厂站同时发送遥控指令并执行。9. A method for realizing fast loading load based on power grid topology as claimed in claim 1, characterized in that: the parallel control technology provides two remote control interface modes, the original remote control interface and the parallel remote control interface, and the original remote control interface The interface can realize the remote control of many people and places on site, and the parallel control interface adopts the thread pool technology, which can send and execute remote control commands to multiple factories at the same time.
CN201710469244.8A 2017-06-20 2017-06-20 A method to realize fast load pull based on power grid topology Active CN107181321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710469244.8A CN107181321B (en) 2017-06-20 2017-06-20 A method to realize fast load pull based on power grid topology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710469244.8A CN107181321B (en) 2017-06-20 2017-06-20 A method to realize fast load pull based on power grid topology

Publications (2)

Publication Number Publication Date
CN107181321A true CN107181321A (en) 2017-09-19
CN107181321B CN107181321B (en) 2020-05-05

Family

ID=59835592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710469244.8A Active CN107181321B (en) 2017-06-20 2017-06-20 A method to realize fast load pull based on power grid topology

Country Status (1)

Country Link
CN (1) CN107181321B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109494715A (en) * 2018-11-13 2019-03-19 国电南瑞南京控制系统有限公司 A kind of low-voltage power distribution station area electrical network topology Dynamic Identification system and method
CN110504754A (en) * 2019-08-28 2019-11-26 国网天津市电力公司 One kind automatically generating three-dimensional grid monitoring approach layered based on geography information
CN112165100A (en) * 2020-09-18 2021-01-01 国网福建省电力有限公司龙岩供电公司 Power grid over-supply power online control method and equipment
CN115622248A (en) * 2022-10-27 2023-01-17 国网山东省电力公司淄博供电公司 A precise load control method based on distribution network automation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882182A (en) * 2010-07-22 2010-11-10 广东电网公司中山供电局 Power System Modeling Method and Power System Modeling System
CN102832710A (en) * 2012-08-13 2012-12-19 中国电力科学研究院 Assistant decision making method for quick power rationing of regional power grids
CN102842961A (en) * 2012-08-13 2012-12-26 中国电力科学研究院 Quick cutting-off and rationing power assistant decision-making system of regional power grid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882182A (en) * 2010-07-22 2010-11-10 广东电网公司中山供电局 Power System Modeling Method and Power System Modeling System
CN102832710A (en) * 2012-08-13 2012-12-19 中国电力科学研究院 Assistant decision making method for quick power rationing of regional power grids
CN102842961A (en) * 2012-08-13 2012-12-26 中国电力科学研究院 Quick cutting-off and rationing power assistant decision-making system of regional power grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王璘 等: "调度 EMS 并行遥控技术的研究与应用", 《电力与电工》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109494715A (en) * 2018-11-13 2019-03-19 国电南瑞南京控制系统有限公司 A kind of low-voltage power distribution station area electrical network topology Dynamic Identification system and method
CN110504754A (en) * 2019-08-28 2019-11-26 国网天津市电力公司 One kind automatically generating three-dimensional grid monitoring approach layered based on geography information
CN112165100A (en) * 2020-09-18 2021-01-01 国网福建省电力有限公司龙岩供电公司 Power grid over-supply power online control method and equipment
CN115622248A (en) * 2022-10-27 2023-01-17 国网山东省电力公司淄博供电公司 A precise load control method based on distribution network automation system

Also Published As

Publication number Publication date
CN107181321B (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN102088209B (en) Self-healing control method of distribution network
CN102938587B (en) Intelligent power grid safety and stability early-warning and control method
CN107506849A (en) A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system
CN108599379B (en) A power monitoring system for microgrid clusters
CN107093928A (en) Power distribution network scheduling aid decision and trouble analysis system
CN101673965A (en) Automatic switching control method for wide-area emergency power source of electric power system
CN107134787A (en) Urgent accurate cutting load control system and cutting load method based on distributed feeder automation
CN104835376B (en) There is the dispatcher training system system of prepared auto restart automatic safety device action simulation
CN102832710B (en) Assistant decision making method for quick power rationing of regional power grids
CN103138390A (en) Power distribution network fault handling method based on self-recovering control
CN210780230U (en) Switch device for switching high power from off-grid to grid-connected
CN105048630A (en) Intelligent scheduling control system and method based on data automatic analysis system
CN104835077B (en) The static security analysis system of function is supported with dispatcher's prediction failure
CN104835078B (en) Consider that the trend of prepared auto restart action determines method in static security analysis system
CN106357004A (en) Distributed feeder line automatic monitoring device for rural power distribution network
CN107181321B (en) A method to realize fast load pull based on power grid topology
CN107896005A (en) A kind of comprehensive automation system of transformer substation
CN104809659B (en) Intelligent advanced application system suitable for districted dispatch system
CN102185372B (en) Generation Method and Device of EMS-Based Standby Self-starting Control Model
CN201360178Y (en) Intelligent controller of low-voltage distribution system
CN104898460B (en) Suitable for the online static security analysis system of districted dispatch system
CN104836329B (en) Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation
CN104348131B (en) A recovery system and method based on 35kV power failure of intelligent distribution network
CN103887775B (en) Distribution network microcomputer protection system integrating distribution automation master station dynamic setting
CN106026047A (en) Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant