CN110456742A - A kind of detection of construction site fugitive dust and spray integral system - Google Patents

A kind of detection of construction site fugitive dust and spray integral system Download PDF

Info

Publication number
CN110456742A
CN110456742A CN201910595956.3A CN201910595956A CN110456742A CN 110456742 A CN110456742 A CN 110456742A CN 201910595956 A CN201910595956 A CN 201910595956A CN 110456742 A CN110456742 A CN 110456742A
Authority
CN
China
Prior art keywords
fugitive dust
spray
dust
detection device
linkage controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910595956.3A
Other languages
Chinese (zh)
Inventor
康亮亮
荣怀松
何子房
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201910595956.3A priority Critical patent/CN110456742A/en
Publication of CN110456742A publication Critical patent/CN110456742A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/4185Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the network communication
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31088Network communication between supervisor and cell, machine group
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

A kind of detection of construction site fugitive dust and spray integral system, including fugitive dust detection device, information monitoring platform, linkage controller, it is characterized by: the fugitive dust detection device is the fugitive dust on-line monitoring system dedicated for project under construction project, the information monitoring platform includes that extension cabinet and data acquire receiver, the linkage controller includes digital quantity network inputs output module, input/output signal is transmitted through the network to the control system of the network other end, wherein: information monitoring platform and fugitive dust detection device are electrically connected, fugitive dust detection device is electrically connected with linkage controller, signal wire connection, depositing dust can pass through manually and automatically two kinds of control modes with the control that water spot is depositing dust water spot.The advantages of present invention is simple with system apparatus arrangements, setting is convenient, and engineering fugitive dust quality safety is controllable, the indices meet the requirement of environmental protection in building site, and reduction, mitigation fugitive dust endanger site staff and surrounding population.

Description

A kind of detection of construction site fugitive dust and spray integral system
Technical field
The present invention relates to a kind of detection of fugitive dust and water spray systems, specifically, be a kind of detection of construction site fugitive dust with Spray integral system.
Background technique
With advances in technology with the mankind to the growing of environmental resource demand, environment for human survival deterioration just becomes One serious problem, wherein dust pollution is most intuitive, also just becomes one of the environmental problem for influencing most serious.Wherein build Building site and the important sources for being fugitive dust.Building trade colleague is made that contribution to fugitive dust processing.
Chinese patent CN105046889B discloses fugitive dust real-time monitoring alarming linkage in construction site on June 29th, 2018 Device, including cabinet, infrared transmitter, infrared remote receiver, optical channel I, optical channel II, light sky channel, air duct, sky Gas collector, air filter, control host, warning device, power switch and intermediate relay.Although the technical solution can reach To the function of construction site fugitive dust real-time monitoring alarming, but enter intelligence communication, 5G communication technology epoch now, is based on infrared waves The beam communication pattern of section has been fallen behind.
Chinese patent CN108037666A discloses a kind of dust from construction sites automatic control Threshold Analysis on May 15th, 2018 And dynamic control method, wherein analysis of data collected calculates fugitive dust and automatically controls threshold value, realizes data with the mode of wireless transmission The data of acquisition terminal and monitoring sensor are transmitted, and construction site fugitive dust Contribution Rate, automatic monitoring and control are realized, can Replace traditional artificial mode, reduces cost of labor.But it intelligently requires to greatly differ from each other with the epoch.
Therefore known construction site fugitive dust detection and spray model there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of construction site fugitive dust detection system integrated with spray based on intelligence communication System.
To achieve the above object, the technical solution of the invention is as follows:
The detection of construction site fugitive dust and spray integral system, including fugitive dust detection device, information monitoring platform, linkage control Device, it is characterised in that:
The fugitive dust detection device is the fugitive dust on-line monitoring system dedicated for project under construction project, monitors system communication interface It is wirelessly transferred using GPRS, monitoring system includes air temperature sensor, air humidity sensor, air velocity transducer, wind direction biography Sensor;
The information monitoring platform includes that extension cabinet and data acquire receiver, is adopted by extension cabinet and data acquisition receiver Collection real time information connection is transferred to IP storage host, by IP storage host be responsible for read and store after be connected to display by Display shows the standby and operating condition of current real time environment state and dust falling device;
The linkage controller includes digital quantity network inputs output module, that input/output signal is transmitted through the network to network is another The control system of one end, using standard Modbus TCP communications protocol;
Wherein: information monitoring platform and fugitive dust detection device are electrically connected, and fugitive dust detection device and linkage controller carry out electrically Connection, signal wire connection;System line laying power supply line and signal wire wear 1JDG pipe and lead to fugitive dust from information monitoring platform Detection device, linkage controller, then 2JDG pipe is worn by signal wire and connects each depositing dust water from linkage controller to induction module Point, depositing dust can be by manually and automatically two kinds of control modes with the control that water spot is depositing dust water spot, and when place, dirt value, which reaches, sets Automatically start many places or many places Signal butterfly bamper at one when determining the upper limit to open, water source intervention carries out system water supplement and linkage spray system Starting carries out atomizing spray measurements for reduction to site environment, spray system is automatically closed when fugitive dust value, which reaches, sets offline value.
Construction site fugitive dust detection of the invention and spray integral system can also using technical measures below come into One step is realized.
Method above-mentioned, wherein the electric connection between the fugitive dust detection device and linkage controller is using 2*2.5 electricity Source line.
Method above-mentioned, wherein the signal wire connection between the fugitive dust detection device and linkage controller uses 2*2.5 Signal wire.
Method above-mentioned, wherein the automatic control mode: linkage controller setting input PM2.5 depositing dust initiation value and just Constant value, when PM2.5 numerical value be more than make numerical value by oneself when, by each depositing dust point the received alarm signal concentration of transmissions of induction module to Linkage controller is transferred to fugitive dust detection device after the quantity by linkage controller summed signal source, is set at this time by fugitive dust detection The standby alarm source received and signal show that the PM2.5 grain value of each Dust Improvement point live at this time finally judges whether It is exceeded, as system detection induction judge errorless information monitoring platform can terminal automatically make linkage start dust falling device it is a series of Linkage measure starts exceeded dust falling device water spot and starts water spray dust, until PM2.5 value reaches the regime values made by oneself.
Method above-mentioned, wherein the depositing dust with water spot be indoor fire-fighting spray, it is tower crane spray, road spray, fog gun, outer Frame spray.
After adopting the above technical scheme, fugitive dust detection in construction site of the invention is with spray integral system with following excellent Point:
1, system apparatus arrangements are simple, setting is convenient;
2, engineering fugitive dust quality safety is reliable, the indices meet the requirement of environmental protection in building site;
3, it reduces, mitigate fugitive dust to site staff and the harm of surrounding population bring.
Detailed description of the invention
Fig. 1 is fugitive dust detection and the spray integral system structural schematic diagram of the embodiment of the present invention.
In figure: 1 induction module, 2 Signal butterfly bampers, 3 indoor fire-fightings spray, 4 tower cranes spray, 5 roads spray, 6 fog guns, outside 7 Frame spray.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Fugitive dust detection in construction site of the invention and spray integral system, including fugitive dust detection device, information monitoring platform, connection Movement controller.
Fig. 1 is fugitive dust detection and the spray integral system structural schematic diagram of the embodiment of the present invention.The fugitive dust detection is set The standby fugitive dust on-line monitoring system for dedicated for project under construction project, monitoring system communication interface are wirelessly transferred using GPRS, Monitoring system includes air temperature sensor, air humidity sensor, air velocity transducer, wind transducer.Wherein fugitive dust is online Monitoring system model RS-ZSYC-5S-G is produced by Shandong Ren Ke observation and control technology Co., Ltd.
The information monitoring platform includes that extension cabinet and data acquire receiver, is received by extension cabinet and data acquisition The real time information connection of device acquisition is transferred to IP storage host, is responsible for being connected to display after reading and storing by IP storage host Device is shown the standby and operating condition of current real time environment state and dust falling device by display.
The linkage controller includes that digital quantity network inputs output module, input/output signal are transmitted through the network to net The control system of the network other end, using standard Modbus TCP communications protocol.Wherein linked switch controller model C2000-A2-SDD4040-BB9 is produced by Zhonglian Innovation Self Control System Co., Ltd., Shenzhen City.
Fugitive dust detection in construction site of the invention is with spray integral system line arrangement by 2*2.5 power supply line and 2*2.5 Signal wire wears JDG25 (JDG is the Material Name of pipeline, and 25 be diameter 25mm) pipe and leads to-fugitive dust inspection from information monitoring platform Measurement equipment-linkage controller, then JDG15 pipe is worn from linkage controller-induction module 1- depositing dust water spot by 2*2.5 signal wire, The control of depositing dust water spot can pass through manually and automatically two kinds of control modes.Automatic control mode: setting input PM2.5 depositing dust opens Dynamic value and normal value, when PM2.5 numerical value is more than to make numerical value by oneself, by the received alarm signal collection of induction module of each depositing dust point In be transferred to linkage controller, fugitive dust detection device is transferred to after the quantity by linkage controller summed signal source, at this time by raising The alarm source and signal that dirt detection device receives are final come the PM2.5 grain value for showing each Dust Improvement point live at this time Judge whether it is exceeded, as system detection induction judge errorless information monitoring platform can terminal automatically make linkage start depositing dust set A series of standby linkage measures start exceeded dust falling device water spot and start water spray dust, make by oneself just until PM2.5 value reaches Constant value.The depositing dust is indoor fire-fighting spray 3, tower crane spray 4, road spray 5, fog gun 6, outrigger spray 7 with water spot.
The present invention has substantive distinguishing features and significant technological progress, fugitive dust detection in construction site of the invention and spray one Body system energy real-time online monitoring fugitive dust, has the function of automatic control alarm, and when place, dirt value reaches automatic when the setting upper limit Start many places or many places Signal butterfly bamper 2 at one to open, water source intervention carries out system water supplement and linkage spray system starting, (fog gun System, road spray system, outrigger spray system, indoor fire-fighting spray, tower crane spray), atomizing spray is carried out to site environment Spray system is automatically closed when fugitive dust value, which reaches, sets offline value in measurements for reduction.
Fugitive dust detection in construction site of the invention is with spray integral system in the Sixian County home Hong Yun work of renovating shantytowns project It uses, works well in engineering.10 main buildings of engineering are 27/32 story shear wall construction, and 260,000 cubes of earth excavation.Cubic metre of earth It excavates operation and continues two months, project management department is mounted with fugitive dust detection and scene spray integral system during earth excavation, Start spray equipment automatically when fugitive dust detected value reaches the setting upper limit, can such as be opened automatically when particulate matter value reaches the setting upper limit The unlatching of dynamic (fog gun) spray system carries out atomizing spray measurements for reduction to site environment, when grain value reaches preset lower limit When spray system is just automatically closed, achieve the purpose that intelligent automatic-control.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (5)

1. a kind of construction site fugitive dust detection and spray integral system, including fugitive dust detection device, information monitoring platform, linkage Controller, it is characterised in that:
The fugitive dust detection device is the fugitive dust on-line monitoring system dedicated for project under construction project, monitors system communication interface It is wirelessly transferred using GPRS, monitoring system includes air temperature sensor, air humidity sensor, air velocity transducer, wind direction biography Sensor;
The information monitoring platform includes that extension cabinet and data acquire receiver, is adopted by extension cabinet and data acquisition receiver Collection real time information connection is transferred to IP storage host, by IP storage host be responsible for read and store after be connected to display by Display shows the standby and operating condition of current real time environment state and dust falling device;
The linkage controller includes digital quantity network inputs output module, that input/output signal is transmitted through the network to network is another The control system of one end, using standard Modbus TCP communications protocol;
Wherein: information monitoring platform and fugitive dust detection device are electrically connected, and fugitive dust detection device and linkage controller carry out electrically Connection, signal wire connection;System line laying power supply line and signal wire wear 1JDG pipe and lead to fugitive dust from information monitoring platform Detection device, linkage controller, then 2JDG pipe is worn by signal wire and connects each depositing dust water from linkage controller to induction module Point, depositing dust can be by manually and automatically two kinds of control modes with the control that water spot is depositing dust water spot, and when place, dirt value, which reaches, sets Automatically start many places or many places Signal butterfly bamper at one when determining the upper limit to open, water source intervention carries out system water supplement and linkage spray system Starting carries out atomizing spray measurements for reduction to site environment, spray system is automatically closed when fugitive dust value, which reaches, sets offline value.
2. fugitive dust detection in construction site as described in claim 1 and spray integral system, which is characterized in that the fugitive dust inspection Electric connection between measurement equipment and linkage controller uses 2*2.5 power supply line.
3. fugitive dust detection in construction site as described in claim 1 and spray integral system, which is characterized in that the fugitive dust inspection Signal wire connection between measurement equipment and linkage controller uses 2*2.5 signal wire.
4. fugitive dust detection in construction site as described in claim 1 and spray integral system, which is characterized in that the automatic control Mode processed: linkage controller setting input PM2.5 depositing dust initiation value and normal value, when PM2.5 numerical value is more than to make numerical value by oneself, by The received alarm signal concentration of transmissions of induction module of each depositing dust point is to linkage controller, by linkage controller summed signal source Quantity after be transferred to fugitive dust detection device, the alarm source that is received at this time by fugitive dust detection device and signal are existing at this time to show The PM2.5 grain value of each Dust Improvement point in field is exceeded finally to judge whether, as system detection induction judges no false information prison Control platform can make automatically a series of linkage starting linkage measures of dust falling device in terminal and start exceeded dust falling device water spot Start water spray dust, until PM2.5 value reaches the regime values made by oneself.
5. fugitive dust detection in construction site as described in claim 1 and spray integral system, which is characterized in that the depositing dust is used Water spot is indoor fire-fighting spray, tower crane spray, road spray, fog gun, outrigger spray.
CN201910595956.3A 2019-07-03 2019-07-03 A kind of detection of construction site fugitive dust and spray integral system Pending CN110456742A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910595956.3A CN110456742A (en) 2019-07-03 2019-07-03 A kind of detection of construction site fugitive dust and spray integral system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910595956.3A CN110456742A (en) 2019-07-03 2019-07-03 A kind of detection of construction site fugitive dust and spray integral system

Publications (1)

Publication Number Publication Date
CN110456742A true CN110456742A (en) 2019-11-15

Family

ID=68481988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910595956.3A Pending CN110456742A (en) 2019-07-03 2019-07-03 A kind of detection of construction site fugitive dust and spray integral system

Country Status (1)

Country Link
CN (1) CN110456742A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111007822A (en) * 2019-12-24 2020-04-14 河南祥辰工程管理有限公司 Remote monitoring management system and method thereof
CN112323806A (en) * 2020-12-02 2021-02-05 深圳百勤建设工程有限公司 Foundation pit construction site monitoring device and monitoring method
CN112642241A (en) * 2020-12-29 2021-04-13 河南橡树智能科技有限公司 Intelligent environment monitoring linkage spraying equipment dust suppression system
CN113390145A (en) * 2021-05-26 2021-09-14 中国五冶集团有限公司 Slope roofing goes out roofing hood structure
CN114544448A (en) * 2022-01-14 2022-05-27 杨伟锋 Raise dust monitoring system based on beidou system

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104656719A (en) * 2014-12-30 2015-05-27 济南东之林智能软件有限公司 Dust removing system
US20150149617A1 (en) * 2013-11-22 2015-05-28 Growthment Technology Co., Ltd. Cloud-based monitoring apparatus
CN205926115U (en) * 2016-08-12 2017-02-08 南京合智信息技术有限公司 Building site automatic spraying system
CN107153035A (en) * 2016-03-03 2017-09-12 上海蓝丰信息科技有限公司 Airborne dust monitors administering method and system on-line
CN107180513A (en) * 2016-03-10 2017-09-19 上海睿济智能科技有限公司 Environment airborne dust noise monitoring early warning system
CN206540573U (en) * 2017-02-06 2017-10-03 河南瑞欧光电科技有限公司 A kind of ambient condition monitoring host computer
CN207281516U (en) * 2017-08-22 2018-04-27 中建八局第一建设有限公司 A kind of airborne dust detects automatic control spraying and sprinkling system
CN108037666A (en) * 2017-12-14 2018-05-15 中建三局第建设工程有限责任公司 A kind of dust from construction sites automatically controls Threshold Analysis and dynamic control method
CN207439460U (en) * 2017-09-25 2018-06-01 苏州永升源智能科技有限公司 A kind of online environment monitoring system
CN208018322U (en) * 2017-11-08 2018-10-30 富盛科技股份有限公司 A kind of auto spraying fog gun for inhibiting construction site airborne dust
CN208072314U (en) * 2018-03-23 2018-11-09 浙江培华建设有限公司 A kind of gloomy depositing dust cooling system of construction site mist
CN108803739A (en) * 2018-06-20 2018-11-13 中国五冶集团有限公司 A kind of wisdom building site spraying linkage management system
CN208282873U (en) * 2018-06-27 2018-12-25 常州力航电气科技有限公司 A kind of building site environment multi parameter intallingent detection system of double mode power supply
CN208406448U (en) * 2018-05-18 2019-01-22 中国建筑第二工程局有限公司 A kind of intelligent tower crane spray system
CN208567960U (en) * 2018-06-27 2019-03-01 常州力航电气科技有限公司 A kind of multiplexing ground intellectual monitoring and linkage spray dust's system

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150149617A1 (en) * 2013-11-22 2015-05-28 Growthment Technology Co., Ltd. Cloud-based monitoring apparatus
CN104656719A (en) * 2014-12-30 2015-05-27 济南东之林智能软件有限公司 Dust removing system
CN107153035A (en) * 2016-03-03 2017-09-12 上海蓝丰信息科技有限公司 Airborne dust monitors administering method and system on-line
CN107180513A (en) * 2016-03-10 2017-09-19 上海睿济智能科技有限公司 Environment airborne dust noise monitoring early warning system
CN205926115U (en) * 2016-08-12 2017-02-08 南京合智信息技术有限公司 Building site automatic spraying system
CN206540573U (en) * 2017-02-06 2017-10-03 河南瑞欧光电科技有限公司 A kind of ambient condition monitoring host computer
CN207281516U (en) * 2017-08-22 2018-04-27 中建八局第一建设有限公司 A kind of airborne dust detects automatic control spraying and sprinkling system
CN207439460U (en) * 2017-09-25 2018-06-01 苏州永升源智能科技有限公司 A kind of online environment monitoring system
CN208018322U (en) * 2017-11-08 2018-10-30 富盛科技股份有限公司 A kind of auto spraying fog gun for inhibiting construction site airborne dust
CN108037666A (en) * 2017-12-14 2018-05-15 中建三局第建设工程有限责任公司 A kind of dust from construction sites automatically controls Threshold Analysis and dynamic control method
CN208072314U (en) * 2018-03-23 2018-11-09 浙江培华建设有限公司 A kind of gloomy depositing dust cooling system of construction site mist
CN208406448U (en) * 2018-05-18 2019-01-22 中国建筑第二工程局有限公司 A kind of intelligent tower crane spray system
CN108803739A (en) * 2018-06-20 2018-11-13 中国五冶集团有限公司 A kind of wisdom building site spraying linkage management system
CN208282873U (en) * 2018-06-27 2018-12-25 常州力航电气科技有限公司 A kind of building site environment multi parameter intallingent detection system of double mode power supply
CN208567960U (en) * 2018-06-27 2019-03-01 常州力航电气科技有限公司 A kind of multiplexing ground intellectual monitoring and linkage spray dust's system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111007822A (en) * 2019-12-24 2020-04-14 河南祥辰工程管理有限公司 Remote monitoring management system and method thereof
CN112323806A (en) * 2020-12-02 2021-02-05 深圳百勤建设工程有限公司 Foundation pit construction site monitoring device and monitoring method
CN112642241A (en) * 2020-12-29 2021-04-13 河南橡树智能科技有限公司 Intelligent environment monitoring linkage spraying equipment dust suppression system
CN113390145A (en) * 2021-05-26 2021-09-14 中国五冶集团有限公司 Slope roofing goes out roofing hood structure
CN113390145B (en) * 2021-05-26 2022-07-01 中国五冶集团有限公司 Slope roofing goes out roofing hood structure
CN114544448A (en) * 2022-01-14 2022-05-27 杨伟锋 Raise dust monitoring system based on beidou system

Similar Documents

Publication Publication Date Title
CN110456742A (en) A kind of detection of construction site fugitive dust and spray integral system
CN205910570U (en) Need not people intelligent monitoring system of transformer substation that always falls on duty
CN209485924U (en) A kind of fugitive dust monitoring device and system
CN105569732B (en) The coal mine floods alarm method monitored based on image and hydrographic data
CN105484796A (en) Underground flood alarm system based on temperature, humidity and image monitoring equipment
CN110763270A (en) Power transmission line tower pole working condition monitoring system based on multiple information acquisition
CN114724337A (en) Remote intelligent monitoring and early warning system and method based on photovoltaic cell power supply
CN110197567A (en) A kind of inspection well cover monitoring system
CN106097155A (en) A kind of passenger vehicle plumbing intelligent monitoring based on mobile Internet and management system
CN204679775U (en) A kind of fire-fighting Internet of Things microprocessing systems
CN205330734U (en) Floods alarm system in pit based on humiture and image monitoring facilities
CN202975758U (en) Unattended-pumping station coordinated-control system for city water-supply industry
CN206818669U (en) Dangerous matter sources gas monitoring system
CN101778263A (en) Intelligent power grid wireless monitoring system
CN114995272A (en) Intelligent centralized control system and method for blasting and air exhaust in tunnel construction
CN204388922U (en) Micro-climate monitoring and early warning system
CN210324484U (en) Inspection well cover monitoring system
CN113202735A (en) Drainage management system
CN206683694U (en) A kind of monitoring and warning system
CN210294860U (en) Tunnel fire water monitoring device
CN203039803U (en) Power transmission line remote monitoring system
CN112017419A (en) Building safety monitoring and early warning system and method based on multi-source data
CN208479835U (en) A kind of console mode internet of things equipment based on video camera
CN115547009A (en) Digital flood prevention system convenient for additionally installing and transforming transformer substation
CN205862504U (en) City complex fire management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115