CN110453675A - 一种叠浇式地下连续墙及其施工方法 - Google Patents
一种叠浇式地下连续墙及其施工方法 Download PDFInfo
- Publication number
- CN110453675A CN110453675A CN201910793514.XA CN201910793514A CN110453675A CN 110453675 A CN110453675 A CN 110453675A CN 201910793514 A CN201910793514 A CN 201910793514A CN 110453675 A CN110453675 A CN 110453675A
- Authority
- CN
- China
- Prior art keywords
- wall
- prefabricated unit
- unit wall
- construction
- beam portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 44
- 238000011065 in-situ storage Methods 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 16
- 239000010959 steel Substances 0.000 claims description 16
- 239000011148 porous material Substances 0.000 claims description 15
- 230000002787 reinforcement Effects 0.000 claims description 12
- 210000003205 muscle Anatomy 0.000 claims description 8
- 238000003032 molecular docking Methods 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 210000001503 joint Anatomy 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 2
- 238000005345 coagulation Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 239000002689 soil Substances 0.000 description 5
- 230000032258 transport Effects 0.000 description 4
- 230000003321 amplification Effects 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 210000003850 cellular structure Anatomy 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000003199 nucleic acid amplification method Methods 0.000 description 3
- 210000002421 cell wall Anatomy 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 210000004027 cell Anatomy 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0046—Production methods using prestressing techniques
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910793514.XA CN110453675A (zh) | 2019-08-27 | 2019-08-27 | 一种叠浇式地下连续墙及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910793514.XA CN110453675A (zh) | 2019-08-27 | 2019-08-27 | 一种叠浇式地下连续墙及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110453675A true CN110453675A (zh) | 2019-11-15 |
Family
ID=68489239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910793514.XA Pending CN110453675A (zh) | 2019-08-27 | 2019-08-27 | 一种叠浇式地下连续墙及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110453675A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113957880A (zh) * | 2021-09-23 | 2022-01-21 | 江苏东合南岩土科技股份有限公司 | 一种钢混地下连续墙的施工方法 |
CN114592499A (zh) * | 2022-03-21 | 2022-06-07 | 浙江鑫润工程管理有限公司 | 一种半预制地下连续墙结构及其施工方法 |
CN114808696A (zh) * | 2022-05-07 | 2022-07-29 | 广西欣港交通投资有限公司 | 一种预制、现浇联合锚碇基础围护结构及施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101331261B1 (ko) * | 2013-04-05 | 2013-11-20 | 주식회사 아라엔텍 | 피씨 지중연속벽을 활용하여 스트럿구조나 어스앙카 구조에서 시공가능한 지하조립식 피씨 저류조 및 이의 시공 방법 |
CN103835283A (zh) * | 2014-03-25 | 2014-06-04 | 东南大学 | 全湿接头预制预应力地下连续墙及其施工方法 |
CN105332370A (zh) * | 2015-10-29 | 2016-02-17 | 广东省基础工程集团有限公司 | 一种装配式地下连续墙单元及其施工方法 |
CN208136903U (zh) * | 2018-05-07 | 2018-11-23 | 河南城建学院 | 一种预制预应力式地下连续墙 |
CN109555112A (zh) * | 2018-12-04 | 2019-04-02 | 中国建筑股份有限公司 | 一种结构叠合式地下连续墙及施工方法 |
CN210562127U (zh) * | 2019-08-27 | 2020-05-19 | 中煤第三建设(集团)有限责任公司 | 一种叠浇式地下连续墙 |
-
2019
- 2019-08-27 CN CN201910793514.XA patent/CN110453675A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101331261B1 (ko) * | 2013-04-05 | 2013-11-20 | 주식회사 아라엔텍 | 피씨 지중연속벽을 활용하여 스트럿구조나 어스앙카 구조에서 시공가능한 지하조립식 피씨 저류조 및 이의 시공 방법 |
CN103835283A (zh) * | 2014-03-25 | 2014-06-04 | 东南大学 | 全湿接头预制预应力地下连续墙及其施工方法 |
CN105332370A (zh) * | 2015-10-29 | 2016-02-17 | 广东省基础工程集团有限公司 | 一种装配式地下连续墙单元及其施工方法 |
CN208136903U (zh) * | 2018-05-07 | 2018-11-23 | 河南城建学院 | 一种预制预应力式地下连续墙 |
CN109555112A (zh) * | 2018-12-04 | 2019-04-02 | 中国建筑股份有限公司 | 一种结构叠合式地下连续墙及施工方法 |
CN210562127U (zh) * | 2019-08-27 | 2020-05-19 | 中煤第三建设(集团)有限责任公司 | 一种叠浇式地下连续墙 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113957880A (zh) * | 2021-09-23 | 2022-01-21 | 江苏东合南岩土科技股份有限公司 | 一种钢混地下连续墙的施工方法 |
CN113957880B (zh) * | 2021-09-23 | 2023-02-14 | 江苏东合南岩土科技股份有限公司 | 一种钢混地下连续墙的施工方法 |
CN114592499A (zh) * | 2022-03-21 | 2022-06-07 | 浙江鑫润工程管理有限公司 | 一种半预制地下连续墙结构及其施工方法 |
CN114592499B (zh) * | 2022-03-21 | 2022-11-11 | 浙江鑫润工程管理有限公司 | 一种半预制地下连续墙结构及其施工方法 |
CN114808696A (zh) * | 2022-05-07 | 2022-07-29 | 广西欣港交通投资有限公司 | 一种预制、现浇联合锚碇基础围护结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106978843B (zh) | 市政排水管道施工工艺 | |
CN104612160B (zh) | 一种紧邻已有建筑物基坑维护结构及施工方法 | |
CN110453675A (zh) | 一种叠浇式地下连续墙及其施工方法 | |
CN104895111B (zh) | 软土地中综合管沟的施工方法 | |
CN108086328A (zh) | 一种动态止水、自回灌的装配式围护结构及其施工方法 | |
CN109403338A (zh) | 一种装配格构型钢trd工法地下连续墙及其施工方法 | |
CN107012871B (zh) | 一种悬挂式围护深大长基坑装配式结构的逆作施工方法 | |
CN109778868A (zh) | 一种双层钢板桩组合围护结构及其施工方法 | |
CN108677969A (zh) | 一种湿陷性黄土地区管廊基坑回填结构及其施工方法 | |
CN108385693A (zh) | 一种用于分期地下室支护的等代锚杆支护方法和支护体系 | |
CN108166532A (zh) | 一种可注浆式地下连续墙接头及其施工方法 | |
CN208023751U (zh) | 砌体装配式地下室外墙后浇带结构 | |
CN210562127U (zh) | 一种叠浇式地下连续墙 | |
CN204326080U (zh) | 一种紧邻已有建筑物基坑维护结构 | |
CN108193666A (zh) | 地下连续墙槽段及地下连续墙 | |
CN208137097U (zh) | 预制式渗井 | |
CN106638670B (zh) | 半预制管廊及施工方法 | |
CN206111218U (zh) | 富水砂卵石地层深埋暗挖车站的盆形冻结止水系统 | |
CN105544598B (zh) | 装配式混凝土管状砌块生态挡土墙 | |
CN105421486B (zh) | 装配式混凝土管状砌块生态挡土墙及其施工方法 | |
CN211446944U (zh) | 深基坑地下结构的内衬结构 | |
CN206204928U (zh) | 构成管廊侧壁的地下连续墙 | |
CN207989047U (zh) | 一种暗做检查室设备孔 | |
CN207672595U (zh) | 套建建筑基础结构 | |
CN107059839B (zh) | 一种钢筋混凝土波形板桩地下结构的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ding Fei Inventor after: Dong Jinkui Inventor after: Niu Gang Inventor after: Nie Xiaokai Inventor after: Wang Jiande Inventor after: Liu Qing Inventor after: Zhang Jie Inventor after: Sun Renhao Inventor after: Zhang Yuwei Inventor before: Dong Jinkui Inventor before: Niu Gang Inventor before: Ding Fei Inventor before: Nie Xiaokai Inventor before: Wang Jiande Inventor before: Liu Qing Inventor before: Zhang Jie Inventor before: Sun Renhao Inventor before: Zhang Yuwei |