CN110438941A - A method of it is jettisoninged Sai Kegebin using moulding box - Google Patents
A method of it is jettisoninged Sai Kegebin using moulding box Download PDFInfo
- Publication number
- CN110438941A CN110438941A CN201910615461.2A CN201910615461A CN110438941A CN 110438941 A CN110438941 A CN 110438941A CN 201910615461 A CN201910615461 A CN 201910615461A CN 110438941 A CN110438941 A CN 110438941A
- Authority
- CN
- China
- Prior art keywords
- sai
- ship
- kegebin
- moulding box
- jettisoninging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/129—Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/10—Placing gravel or light material under water inasmuch as not provided for elsewhere
Abstract
It is jettisoninged the method for Sai Kegebin the present invention relates to a kind of using moulding box, (1), preparation of construction: is prepared and moulding box prepares including march into the arena preparation, match gram gabion net and block stone of ship machine;(2), it crane barge ship positionning: carries out staying ship positionning according to Sai Kegebin construction background paper figure;(3), after crane barge ship stays position, excavator, moulding box and Sai Ke gabion net piece are hung on transport of materials ship using loop wheel machine;Then cabinet is connected and loading plate of jettisoninging using hoist rope;(4), Sai Kegebin is laid with and loads: (5), Sai Kegebin jettisoning: loosening the hoist rope far from the hinged side of loading plate of jettisoninging, the Sai Kege for carrying block stone under gravity, which is in compliance in moulding box, to be slid to designated position, and then completes operation of jettisoninging under water.This construction method strong operability effectively improves Sai Kegebin filling and efficiency of jettisoninging, saves cost of human resources, Optimizing construction process flow.
Description
Technical field
The invention belongs to Yangtze river basin waterway regulation technical field, jettisoninged Sai Kegebin more particularly to a kind of using moulding box
Method.
Background technique
It is carried out in waterway regulation works in the Yangtze river basin, is formed and protected using the opposite bank Sai Kegebin side, in Sai Kegebin stone
The artificial packing efficiency of cage is low, and existing engineering machinery directly can not be loaded and be jettisoninged, using moulding box to Sai Kegebin into
Row construction is imperative, and Sai Kegebin specification and pattern are different, and constructs without general moulding box in Sai Kegebin, for this
The novel moulding box of engineering Sai Kegebin feature manufacture, saving human resources are reached using new moulding box, and Optimizing construction technique improves
Construction efficiency meets construction intensity requirement.
Summary of the invention
The present invention is to provide a kind of simple process, strong operability, effectively improves underwater Sai Kegebin filling and effect of jettisoninging
The method of rate.
The technical solution adopted by the present invention is that:
A method of it is jettisoninged Sai Kegebin using moulding box, it is characterised in that:
(1), preparation of construction:
A, ship machine is marched into the arena: workboat machine is marched into the arena, and mainly includes crane barge ship, transport of materials ship and excavator;
B, material prepares: match gram gabion net and block stone;
C, moulding box prepares: the moulding box includes cabinet, and the top and bottom of the cabinet are Open architecture;The case
Body is welded by front side board, back side panel, left plate and right side plate, wherein front side board and back side panel, left plate and right side plate
In mirror image, the width of the front side board and back side panel is greater than the width of left plate and right side plate;The front side board and
The height of back side panel is equal to the height of left plate and right side plate;Front side board, back side panel, left plate and the right side plate of the cabinet
Upper end be welded with upper end frame;The lower end of the cabinet front plate or back side panel is hingedly equipped with loading plate of jettisoninging;It is described
Front side board and back side panel lateral surface are welded with two cabinet raising lifting lugs in mirror symmetry close to upper end frame position;In corresponding case
Jettisoning described in the width direction of the body both ends of loading plate are welded with two loading plate raising lifting lugs of jettisoninging;Two loading plates of jettisoninging
Raising lifting lug is in symmetrical structure in the end for loading plate of jettisoninging;
D, personnel are in place: all kinds of construction personnel include administrative staff, ship machine operator, Security Officer, worker;
(2), crane barge ship positionning:
A, the progress of background paper figure is constructed tentatively in ship positionning, crane barge ship work surface side ship side label according to Sai Kegebin
It jettisonings and setting and imports the positioning system of crane barge ship;
B, after crane barge ship Primary Location, flow velocity, water level are measured, is calculated according to the drift that design document provides away from calculation formula
Good drift is away from, crane barge ship precise positioning again;
(3), after crane barge ship stays position, building stones cargo ship marches into the arena berthing in crane barge outboard side appropriate location;It will be dug using loop wheel machine
Pick machine, moulding box and Sai Ke gabion net piece are hung on transport of materials ship;Then a cabinet is separately connected using eight hoist ropes
Raising lifting lug and loading plate raising lifting lug of jettisoninging;Tractive force in real time that root hoist rope is not upward by loop wheel machine, cabinet is by self weight
Seat is mounted in and jettisonings on loading plate;
(4), Sai Kegebin is laid with and loads: manually match gram gabion net placement being fixed in moulding box, and passes through flanger
Shaping is carried out along model inner wall to turn over time, forms the open match gram gabion net bag in top;Then excavator Xiang Saike gabion net is used
Sai Kegebin opening edge sealing, after the completion of filling, is twisted after the rubble of manual sorting surface with steel wire by stone filling in bag.
(5), Sai Kegebin jettisonings: the moulding box with Sai Kegebin being hoisted to ship side with crane barge ship and marks operation of jettisoninging
Point, connects four hoist ropes of moulding box cabinet at this time and the hoist rope close to the hinged side of loading plate of jettisoninging keeps its hanging
State;Loosen far from the hoist rope of the hinged side of loading plate of jettisoninging, with the release of this hoist rope jettisoning loading plate slowly around
Hinge joint downlink, the Sai Kege for carrying block stone under gravity, which is in compliance in moulding box, to be slid to designated position, and then is completed
Underwater operation of jettisoninging.
The present invention can also use following technical measures:
The upper end frame edge of the moulding box is equipped with hook, the hook connection match gram gabion net bag open side selvage.
The moulding box bosom sets partition panel, and the partition panel separates cabinets cavity in mutually independent two matches visitor
Ge Bin accommodates storehouse.
The advantages and positive effects of the present invention are: this construction method strong operability, effectively improves Sai Kegebin
It loads and jettisonings efficiency, relatively manually filling Sai Kegebin greatly shortens the time, saves cost of human resources, Optimizing construction technique stream
Journey improves packing efficiency, to meet the needs of jettisoninging intensity of constructing.
Detailed description of the invention
Fig. 1 is ship's fix and schematic diagram of jettisoninging;
Fig. 2 is the main view of moulding box of the present invention;
Fig. 3 is the rearview of Fig. 2;
Fig. 4 is the schematic perspective view of moulding box of the present invention;
Fig. 5 is moulding box Unclosing structure schematic diagram of the present invention;
Fig. 6 is the moulding box structural schematic diagram with deep floor;
Fig. 7 is the moulding box structural schematic diagram with partition panel;
Fig. 8 is the moulding box structural schematic diagram with hook.
In figure, 1, crane barge ship;2, transport of materials ship;3, excavator;10, cabinet;101, front side board;102, back side panel;
103, left plate;104, right side plate;105, upper end frame;106, cabinet raising lifting lug;107, deep floor;108, it links up with;20, it throws
Throw loading plate;201, it jettisonings loading plate raising lifting lug;30, partition panel.
Specific embodiment
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and cooperate attached drawing
Detailed description are as follows:
There is strong operability in order to further illustrate the present invention, effectively improve Sai Kegebin filling and efficiency of jettisoninging,
Relatively manually filling Sai Kegebin greatly shortens the time, saves cost of human resources, and Optimizing construction process flow improves filling effect
Rate, with meet construction jettisoning intensity the needs of, jettisoninged experiment with the Changjiang river Ma'an Mountain section certain water conservancy training works Sai Kegebin below
For illustrate:
Referring to Fig. 1, a kind of jettisoninged the method for Sai Kegebin using moulding box,
(1), preparation of construction:
A, ship machine is marched into the arena: workboat machine is marched into the arena, and mainly includes crane barge ship 1, transport of materials ship 2 and excavator 3;
B, material prepares: match gram gabion net and block stone;Sai Kegebin uses steel wire mesh bag, having a size of 3.0 × 2.0 (long ×
It is wide), specification is SG2 × 2.98GF, and steel wire plates Gao Erfan preservative treatment, and Sai Kegebin is having a size of 1.5 × 1.2 × 0.5m after pack
(length × width × height);The partial size of rubble is 100-300mm;
C, moulding box prepares: please see Fig. 2 to Fig. 4, the moulding box includes cabinet 10, and the top and bottom of the cabinet are
Open architecture;The cabinet is welded by front side board 101, back side panel 102, left plate 103 and right side plate 104, wherein
Front side board and back side panel, left plate and right side plate are in mirror image, and the width of the front side board and back side panel is greater than left side
The width of plate and right side plate;The height of the front side board and back side panel is equal to the height of left plate and right side plate;The cabinet
Front side board, back side panel, left plate and right side plate upper end be welded with upper end frame 105;The design of upper end frame improves cabinet
Stability;The lower end of the cabinet front plate or back side panel is hingedly equipped with loading plate 20 of jettisoninging;The front side board is with after
Side plate lateral surface is welded with two cabinet raising lifting lugs 106 in mirror symmetry close to upper end frame position;In the width of corresponding cabinet
The both ends for spending loading plate of jettisoninging described in direction are welded with two loading plate raising lifting lugs 201 of jettisoninging;Two loading plates of jettisoninging rise
Hanging ear is in symmetrical structure in the end for loading plate of jettisoninging.Moulding box the size of each part are as follows: upper end frame 15cm is thick;Compartment having a size of
1.6 × 1.2 × 0.6m, length and width direction reserve 10cm assembling fold for length is stayed, and are lauched after being also beneficial to filling;It jettisonings
Loading plate 16cm is thick;Four pieces of side plates plate thickness 8cm, height 95cm, width 15cm all around;Cabinet raising lifting lug and carrying of jettisoninging
Plate raising lifting lug is formed using the sheet fabrication of thickness 4cm.
D, personnel are in place: all kinds of construction personnel include administrative staff, ship machine operator, Security Officer, worker;
(2), crane barge ship positionning:
A, the progress of background paper figure is constructed tentatively in ship positionning, crane barge ship work surface side ship side label according to Sai Kegebin
It jettisonings and setting and imports the positioning system of crane barge ship;Realize that staying ship positionning belongs to the prior art in this field.
B, after crane barge ship Primary Location, flow velocity, water level are measured, is calculated according to the drift that design document provides away from calculation formula
Good drift is away from, crane barge ship precise positioning again.Above-mentioned drift belongs to techniques known away from calculation formula.
(3), after crane barge ship stays position, building stones cargo ship marches into the arena berthing in crane barge outboard side appropriate location;It will be dug using loop wheel machine
Pick machine, moulding box and Sai Ke gabion net piece are hung on transport of materials ship;Then a cabinet is separately connected using eight hoist ropes
Raising lifting lug and loading plate raising lifting lug of jettisoninging;Tractive force in real time that root hoist rope is not upward by loop wheel machine, cabinet is by self weight
Seat is mounted in and jettisonings on loading plate;
(4), Sai Kegebin is laid with and loads: manually match gram gabion net placement being fixed in moulding box, and passes through flanger
Shaping is carried out along model inner wall to turn over time, forms the open match gram gabion net bag in top;Then excavator Xiang Saike gabion net is used
Sai Kegebin opening edge sealing, after the completion of filling, is twisted after the rubble of manual sorting surface with steel wire by stone filling in bag.
(5), Sai Kegebin jettisonings: the moulding box with Sai Kegebin being hoisted to ship side with crane barge ship and marks operation of jettisoninging
Point, connects four hoist ropes of moulding box cabinet at this time and the hoist rope close to the hinged side of loading plate of jettisoninging keeps its hanging
State;Loosen far from the hoist rope of the hinged side of loading plate of jettisoninging, with the release of this hoist rope jettisoning loading plate slowly around
Hinge joint downlink, refering to Fig. 5, the Sai Kege for carrying block stone under gravity, which is in compliance in moulding box, to be slid to designated position,
And then complete operation of jettisoninging under water.
Referring to Fig. 6, the outer surface of the front side board and back side panel is equipped with several deep floors 107, several deep floors
Along front side board and back side panel equidistantly distributed.
Referring to Fig. 7, the moulding box bosom sets partition panel 30, the partition panel separates cabinets cavity in mutually solely
The objective lattice guest of two vertical matches accommodates storehouse, and such a moulding box can meet 2 Sai Kegebin simultaneously while place, charges and jettisoning,
Improve working efficiency.
Referring to Fig. 8, the upper end frame edge of the moulding box is equipped with hook 108, the hook connection match gram gabion net bag is opened
Itself and the objective lattice guest of match are detached from by mouth side selvage before jettisoninging;Guarantee the mounting stability of the objective lattice guest of match.
In conclusion this construction method strong operability, effectively improves Sai Kegebin filling and efficiency of jettisoninging, more manually
Filling Sai Kegebin greatly shortens the time, saves cost of human resources, and Optimizing construction process flow improves packing efficiency, with full
Foot construction is jettisoninged the demand of intensity.
Claims (4)
1. a kind of jettisoninged the method for Sai Kegebin using moulding box, it is characterised in that:
(1), preparation of construction:
A, ship machine is marched into the arena: workboat machine is marched into the arena, and mainly includes crane barge ship, transport of materials ship and excavator;
B, material prepares: match gram gabion net and block stone;
C, moulding box prepares: the moulding box includes cabinet, and the top and bottom of the cabinet are Open architecture;The cabinet by
Front side board, back side panel, left plate and right side plate are welded, and wherein front side board and back side panel, left plate and right side plate are in mirror
As symmetrical structure, the width of the front side board and back side panel is greater than the width of left plate and right side plate;The front side board and rear side
The height of plate is equal to the height of left plate and right side plate;The front side board of the cabinet, back side panel, left plate and right side plate it is upper
End is welded with upper end frame;The lower end of the cabinet front plate or back side panel is hingedly equipped with loading plate of jettisoninging;The front side
Plate and back side panel lateral surface are welded with two cabinet raising lifting lugs in mirror symmetry close to upper end frame position;In corresponding cabinet
Jettisoning described in the width direction both ends of loading plate are welded with two loading plate raising lifting lugs of jettisoninging;Two loading plate raisings of jettisoninging
Lifting lug is in symmetrical structure in the end for loading plate of jettisoninging;
D, personnel are in place: all kinds of construction personnel include administrative staff, ship machine operator, Security Officer, worker;
(2), crane barge ship positionning:
A, the progress of background paper figure is constructed tentatively in ship positionning according to Sai Kegebin, crane barge ship work surface side ship side label is jettisoninged
Setting and the positioning system for importing crane barge ship;
B, after crane barge ship Primary Location, flow velocity, water level are measured, drift is calculated away from calculation formula according to the drift that design document provides
Away from, crane barge ship precise positioning again
(3), after crane barge ship stays position, building stones cargo ship marches into the arena berthing in crane barge outboard side appropriate location;Using loop wheel machine by excavator,
Moulding box and Sai Ke gabion net piece are hung on transport of materials ship;Then a cabinet is separately connected using eight hoist ropes play hanging
Ear and loading plate raising lifting lug of jettisoninging;Tractive force in real time that root hoist rope is not upward by loop wheel machine, cabinet are mounted in by self weight seat
It jettisonings on loading plate;
(4), Sai Kegebin is laid with and filling: manually match gram gabion net placement is fixed in moulding box, and by flanger along
Model inner wall carries out shaping and turns over time, forms the open match gram gabion net bag in top;Then in excavator Xiang Saike gabion net bag
Sai Kegebin opening edge sealing after the completion of filling, is twisted after the rubble of manual sorting surface with steel wire by stone filling.
(5), Sai Kegebin jettisonings: the moulding box with Sai Kegebin is hoisted to ship side with crane barge ship and marks setting of jettisoninging, this
When connection moulding box cabinet four hoist ropes and keep its hanging state close to the hoist rope of the hinged side of loading plate of jettisoninging;
Loosen the hoist rope far from the hinged side of loading plate of jettisoninging, as the release of this hoist rope jettisonings loading plate slowly around hinge joint
Downlink, the Sai Kege for carrying block stone under gravity, which is in compliance in moulding box, to be slid to designated position, and then completes underwater throw
Throw operation.
2. according to claim 1 jettisoninged the method for Sai Kegebin using moulding box, it is characterised in that: the front side board and after
The outer surface of side plate is equipped with several deep floors, and several deep floors are along front side board and back side panel equidistantly distributed.
3. according to claim 1 jettisoninged the method for Sai Kegebin using moulding box, it is characterised in that: the upper end of the moulding box
Frame edge is equipped with hook, the hook connection match gram gabion net bag open side selvage.
4. according to claim 1 jettisoninged the method for Sai Kegebin using moulding box, it is characterised in that: in the moulding box inside
Between set partition panel, the partition panel separates cabinets cavity in mutually independent two matches objective lattice guest receiving storehouse.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910615461.2A CN110438941A (en) | 2019-07-09 | 2019-07-09 | A method of it is jettisoninged Sai Kegebin using moulding box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910615461.2A CN110438941A (en) | 2019-07-09 | 2019-07-09 | A method of it is jettisoninged Sai Kegebin using moulding box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110438941A true CN110438941A (en) | 2019-11-12 |
Family
ID=68429979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910615461.2A Pending CN110438941A (en) | 2019-07-09 | 2019-07-09 | A method of it is jettisoninged Sai Kegebin using moulding box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110438941A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114855855A (en) * | 2022-05-27 | 2022-08-05 | 长江河湖建设有限公司 | Seker gabion side caisson throwing construction process |
TWI807808B (en) * | 2021-05-07 | 2023-07-01 | 日商不動堤土樂股份有限公司 | Bag body and method for manufacturing bag body |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1375045A (en) * | 1972-03-28 | 1974-11-27 | ||
JPH09151434A (en) * | 1995-11-24 | 1997-06-10 | Tootetsu:Kk | Deformation preventing frame for square gabion and installation method for the gabion |
JPH09302641A (en) * | 1996-05-16 | 1997-11-25 | Nippon Steel Metal Prod Co Ltd | Seabottom structure, and laying method thereof |
CN2705436Y (en) * | 2004-05-11 | 2005-06-22 | 刘天杰 | Silk cage loading and throwing device |
JP4112790B2 (en) * | 2000-09-25 | 2008-07-02 | 英二 安田 | Forming means for forming futon ridges and construction method using the same |
CN205603045U (en) * | 2016-04-07 | 2016-09-28 | 重庆恒瑞建筑工程有限责任公司 | Check guest gabion is put in and is used slide case |
CN109322283A (en) * | 2018-11-28 | 2019-02-12 | 江苏省水利建设工程有限公司 | A kind of Sai Kegebin construction technology |
-
2019
- 2019-07-09 CN CN201910615461.2A patent/CN110438941A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1375045A (en) * | 1972-03-28 | 1974-11-27 | ||
JPH09151434A (en) * | 1995-11-24 | 1997-06-10 | Tootetsu:Kk | Deformation preventing frame for square gabion and installation method for the gabion |
JPH09302641A (en) * | 1996-05-16 | 1997-11-25 | Nippon Steel Metal Prod Co Ltd | Seabottom structure, and laying method thereof |
JP4112790B2 (en) * | 2000-09-25 | 2008-07-02 | 英二 安田 | Forming means for forming futon ridges and construction method using the same |
CN2705436Y (en) * | 2004-05-11 | 2005-06-22 | 刘天杰 | Silk cage loading and throwing device |
CN205603045U (en) * | 2016-04-07 | 2016-09-28 | 重庆恒瑞建筑工程有限责任公司 | Check guest gabion is put in and is used slide case |
CN109322283A (en) * | 2018-11-28 | 2019-02-12 | 江苏省水利建设工程有限公司 | A kind of Sai Kegebin construction technology |
Non-Patent Citations (1)
Title |
---|
沃玉报 等: "赛克格宾沉箱新工艺在长江崩岸整治工程中的应用", 《水利水电快报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI807808B (en) * | 2021-05-07 | 2023-07-01 | 日商不動堤土樂股份有限公司 | Bag body and method for manufacturing bag body |
CN114855855A (en) * | 2022-05-27 | 2022-08-05 | 长江河湖建设有限公司 | Seker gabion side caisson throwing construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858067B (en) | Process for vertically prefabricating, turning, centering and installing semi-circle body on water | |
CN110438941A (en) | A method of it is jettisoninged Sai Kegebin using moulding box | |
CN201729566U (en) | Multifunctional semi-circular structure lifting appliance | |
CN104878728B (en) | A kind of floating extension convolution flexibility dash curtain | |
CN100577919C (en) | Packed sand throwing and filling method by tuck net | |
CN203623934U (en) | Pontoon for collecting riverway garbage | |
CN108286257A (en) | A kind of dress sandbox body deep water weir system | |
CN110409452A (en) | Underwater Sai Kegebin jettisonings moulding box | |
CN210946823U (en) | Underwater Saike gabion throwing mould box | |
CN206109986U (en) | A simply hang basket for construction of bridge cross slab | |
CN208647111U (en) | Wind wave prevention marine devices | |
CN104929128B (en) | Automatic pier protection bagged material overwater throwing and filling device and construction method thereof | |
CN204753594U (en) | Pier protects material automation on water in bags and throws action | |
CN201080602Y (en) | Drag type snow shoveling plate | |
CN210239095U (en) | High-rise building outer wall construction is with safe type manned hanging flower basket | |
CN208762987U (en) | A kind of river corridor restoration operation ship | |
CN104875854B (en) | A kind of shell collecting system and method | |
CN207846209U (en) | A kind of bridge construction construction hanger | |
CN205367592U (en) | Small -size multi -functional machineshop car in oil field | |
CN111194714A (en) | On-shore culture feeding system with moving vehicle and multi-trolley device | |
CN111194715A (en) | Take breed feed system of weighing metering nozzle feeder | |
CN111194708A (en) | Water culture feeding system with telescopic cylinder lifting mechanism feeding machine | |
CN111096272A (en) | Abalone culture feeding system with annular track and adjustable double-lifting-hook distance | |
CN111194712A (en) | Abalone culture feeding system with material guiding tongue and lifting mechanism feeding machine | |
CN111096267A (en) | Culture feeding system with annular track and hanging running mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191112 |
|
RJ01 | Rejection of invention patent application after publication |