CN110428026A - The system and method that identification power grid infrastructure project is broken rules and regulations safely - Google Patents

The system and method that identification power grid infrastructure project is broken rules and regulations safely Download PDF

Info

Publication number
CN110428026A
CN110428026A CN201910649683.6A CN201910649683A CN110428026A CN 110428026 A CN110428026 A CN 110428026A CN 201910649683 A CN201910649683 A CN 201910649683A CN 110428026 A CN110428026 A CN 110428026A
Authority
CN
China
Prior art keywords
dimensional code
regulations
server
power grid
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910649683.6A
Other languages
Chinese (zh)
Other versions
CN110428026B (en
Inventor
王刚
张立群
袁胜
魏栋
李佩泽
李岩
高丽莎
李晓令
田志友
卢峰超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Construction Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Construction Branch of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Construction Branch of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910649683.6A priority Critical patent/CN110428026B/en
Publication of CN110428026A publication Critical patent/CN110428026A/en
Application granted granted Critical
Publication of CN110428026B publication Critical patent/CN110428026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computer Security & Cryptography (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses the system and methods that identification power grid infrastructure project is broken rules and regulations safely, are related to power management techniques field;System includes the safety belt of server, video monitoring equipment, the safety cap for being provided with safety cap two dimensional code, the work clothes of work clothes two dimensional code and safety belt two dimensional code, and the video monitoring equipment is connect with server and one-way communication;Method includes S1 Work tool coding, S2 establishes java standard library, S3 determines test stone and S4 is according to test stone checking procedure, and the two dimensional code comparison in the two dimensional code of test stone and real-time live photo is judged whether there is violations of rules and regulations;It realizes project of transmitting and converting electricity identification violating the regulations safely by server, video monitoring equipment, the safety cap for being provided with safety cap two dimensional code, the work clothes of work clothes two dimensional code and safety belt of safety belt two dimensional code etc., time saving and energy saving, high-efficient.

Description

The system and method that identification power grid infrastructure project is broken rules and regulations safely
Technical field
The present invention relates to power management techniques field more particularly to a kind of systems that identification power grid infrastructure project is broken rules and regulations safely And method.
Background technique
Currently, analysis violating the regulations is identified mainly by manual identified, labor intensive, working efficiency traditional project of transmitting and converting electricity safely Low, the requirement for identification timeliness of breaking rules and regulations safely is increasingly unable to satisfy.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of system that identification power grid infrastructure project is broken rules and regulations safely and sides Method passes through the work clothes of server, video monitoring equipment, the safety cap for being provided with safety cap two dimensional code, work clothes two dimensional code With the safety belt of safety belt two dimensional code etc., project of transmitting and converting electricity identification violating the regulations safely is realized, it is time saving and energy saving, it is high-efficient.
In order to solve the above technical problems, the technical solution used in the present invention is: a kind of identification power grid infrastructure project is safe System violating the regulations includes the work of server, video monitoring equipment, the safety cap for being provided with safety cap two dimensional code, work clothes two dimensional code Make the safety belt of clothes and safety belt two dimensional code, the video monitoring equipment is connect with server and one-way communication, and video monitoring is set Back-up not Shi Bie safety cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server.
A further technical solution lies in: module is wireless by wireless communication between the server and video monitoring equipment Connection.
A further technical solution lies in: 5G is communicated to connect between the server and video monitoring equipment.
A further technical solution lies in: wired connection between the server and video monitoring equipment.
A further technical solution lies in: further include mobile terminal, the mobile terminal by wireless communication module and clothes Business device connection.
A further technical solution lies in: 5G is communicated to connect between the mobile terminal and server.
A further technical solution lies in: it further include display, the display and server wired connection.
A further technical solution lies in: it further include printer, the printer and server wired connection.
A kind of method broken rules and regulations safely of identification power grid infrastructure project includes S1 Work tool coding, that S2 establishes java standard library, S3 is true Test stone and S4 are determined according to test stone checking procedure, and the S3 determines that test stone step is existing by server and construction The video monitoring equipment of field determines that the two dimensional code of safety construction, the S4 are by S3 step according to test stone checking procedure Obtained in two dimensional code in two dimensional code and real-time live photo compare, according to whether identical to determine whether existing existing in violation of rules and regulations As.
A further technical solution lies in: it further include S5 conclusion feedback, and S1~S5 step is specific as follows,
S1 Work tool coding
Two dimensional code number is carried out to safety cap, work clothes and safety belt respectively, obtains the safety cap, the work that have safety cap two dimensional code Take the work clothes of two dimensional code and the safety belt of safety belt two dimensional code;
S2 establishes java standard library
Typical power grid infrastructure project operative scenario is inputted into server as standard capital construction work photo and establishes power grid capital construction work Journey safety construction java standard library, while one is established between typical power grid infrastructure project operative scenario and its required Work tool of constructing To more mappings;
S3 determines test stone
The video monitoring equipment of construction site take to realtime construction situation shines and is sent to server, and server will receive Real-time live photo is compared with the histogram of the exemplary operation scene in power grid infrastructure project safety construction java standard library, It is maximum as a result, determining the category of the power grid infrastructure project safety construction scene at scene in turn to choose wherein correlation factors Property, by the one-to-many mapping of construct scene and its required Work tool of constructing, obtain the two dimensional code of safety construction;
S4 is examined according to test stone
Two dimensional code in two dimensional code obtained in S3 step and real-time live photo is compared, according to whether it is identical to determine whether There are violations of rules and regulations;It is deposited if number of the number of the two dimensional code in real-time live photo less than two dimensional code obtained in S3 step In violations of rules and regulations, if the obtained figure of two dimensional code of figure and S3 step of the two dimensional code in real-time live photo mismatch Then there are violations of rules and regulations;
S5 conclusion feedback
The violations of rules and regulations occurred in S4 step are fed back immediately.
The beneficial effects of adopting the technical scheme are that
Its work clothes for passing through server, video monitoring equipment, the safety cap for being provided with safety cap two dimensional code, work clothes two dimensional code With the safety belt of safety belt two dimensional code etc., project of transmitting and converting electricity identification violating the regulations safely is realized, it is time saving and energy saving, it is high-efficient.
It is detailed in specific embodiment part description.
Detailed description of the invention
Fig. 1 is the functional block diagram of the embodiment of the present invention 1;
Fig. 2 is the functional block diagram of the embodiment of the present invention 2;
Fig. 3 is the functional block diagram of the embodiment of the present invention 4;
Fig. 4 is the functional block diagram of the embodiment of the present invention 6;
Fig. 5 is the functional block diagram of the embodiment of the present invention 7;
Fig. 6 is the flow chart of the embodiment of the present invention 8;
Fig. 7 is the relational graph of safety cap and safety cap two dimensional code in the present invention;
Fig. 8 is the relational graph of safety belt and safety belt two dimensional code in the present invention;
Fig. 9 is exemplary operation scene and the one-to-many mapping relations figure of required Work tool of constructing in the present invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.Below Description only actually at least one exemplary embodiment be it is illustrative, never as to the application and its application or making Any restrictions.Based on the embodiment in the application, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall in the protection scope of this application.
Many details are explained in the following description in order to fully understand the application, but the application can be with Implemented using other than the one described here other way, those skilled in the art can be without prejudice to the application intension In the case of do similar popularization, therefore the application is not limited by the specific embodiments disclosed below.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
Unless specifically stated otherwise, positioned opposite, the digital table of the component and step that otherwise illustrate in these embodiments Up to the unlimited scope of the present application processed of formula and numerical value.Simultaneously, it should be appreciated that for ease of description, each portion shown in attached drawing The size divided not is to draw according to actual proportionate relationship.For technology, side known to person of ordinary skill in the relevant Method and equipment may be not discussed in detail, but in the appropriate case, and the technology, method and apparatus should be considered as authorizing explanation A part of book.In shown here and discussion all examples, any occurrence should be construed as merely illustratively, and Not by way of limitation.Therefore, the other examples of exemplary embodiment can have different values.It should also be noted that similar label Similar terms are indicated in following attached drawing with letter, therefore, once it is defined in a certain Xiang Yi attached drawing, then subsequent attached It does not need that it is further discussed in figure.
In the description of the present application, it is to be understood that the noun of locality such as " front, rear, top, and bottom, left and right ", " laterally, vertical, Vertically, orientation or positional relationship indicated by level " and " top, bottom " etc. is normally based on orientation or position shown in the drawings and closes System is merely for convenience of description the application and simplifies description, and in the absence of explanation to the contrary, these nouns of locality do not indicate that It must have a particular orientation or be constructed and operated in a specific orientation with the device or element for implying signified, therefore cannot manage Solution is the limitation to the application protection scope;The noun of locality " inside and outside " refers to inside and outside the profile relative to each component itself.
For ease of description, spatially relative term can be used herein, as " ... on ", " ... top ", " ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation of sign.It should be understood that spatially relative term is intended to comprising the orientation in addition to device described in figure Except different direction in use or operation.For example, being described as if the device in attached drawing is squeezed " in other devices It will be positioned as " under other devices or construction after part or construction top " or the device of " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " may include " ... top " and " in ... lower section " two kinds of orientation.The device can also be positioned with other different modes and (is rotated by 90 ° or in other orientation), and And respective explanations are made to the opposite description in space used herein above.
In addition, it should be noted that, limiting components using the words such as " first ", " second ", it is only for be convenient for Corresponding components are distinguished, do not have Stated otherwise such as, there is no particular meanings for above-mentioned word, therefore should not be understood as to this Apply for the limitation of protection scope.
Embodiment 1:
As shown in Figure 1, the invention discloses a kind of system that identification power grid infrastructure project is broken rules and regulations safely, including server, video Monitoring device, the safety cap for being pasted with safety cap two dimensional code, the work clothes for being pasted with work clothes two dimensional code and it is pasted with safety belt The safety belt of two dimensional code, the video monitoring equipment is connect with server using cable and one-way communication, video monitoring equipment point Not Shi Bie safety cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server.
Embodiment 2:
As shown in Fig. 2, the invention discloses a kind of system that identification power grid infrastructure project is broken rules and regulations safely, including server, video Monitoring device, the safety cap for being pasted with safety cap two dimensional code, the work clothes for being pasted with work clothes two dimensional code and it is pasted with safety belt The safety belt of two dimensional code, module is wirelessly connected and unidirectionally leads to by wireless communication between the video monitoring equipment and server Letter, video monitoring equipment identify that the identity information of safety cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code is concurrent respectively It send to server.
Embodiment 3:
The invention discloses a kind of system for breaking rules and regulations safely of identification power grid infrastructure project, including it is server, video monitoring equipment, viscous The safety for posting the safety cap of safety cap two dimensional code, being pasted with the work clothes of work clothes two dimensional code and being pasted with safety belt two dimensional code Band, module is wirelessly connected by wireless communication between the video monitoring equipment and server and one-way communication, video monitoring are set Back-up not Shi Bie safety cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server.
5G is communicated to connect between the server and video monitoring equipment.
Embodiment 4:
As shown in figure 3, the invention discloses a kind of system that identification power grid infrastructure project is broken rules and regulations safely, including server, video Monitoring device, the work clothes for being pasted with work clothes two dimensional code, is pasted with safety belt two at the safety cap for being pasted with safety cap two dimensional code The safety belt and mobile terminal for tieing up code, module is wirelessly connected simultaneously by wireless communication between the video monitoring equipment and server One-way communication, module is connect the mobile terminal with server by wireless communication, and the video monitoring equipment identifies peace respectively Full cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server, server is by above-mentioned body Part information is sent to mobile terminal.
5G is communicated to connect between the server and video monitoring equipment.
Embodiment 5:
As shown in figure 3, the invention discloses a kind of system that identification power grid infrastructure project is broken rules and regulations safely, including server, video Monitoring device, the work clothes for being pasted with work clothes two dimensional code, is pasted with safety belt two at the safety cap for being pasted with safety cap two dimensional code The safety belt and mobile terminal for tieing up code, module is wirelessly connected simultaneously by wireless communication between the video monitoring equipment and server One-way communication, module is connect the mobile terminal with server by wireless communication, and the video monitoring equipment identifies peace respectively Full cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server, server is by above-mentioned body Part information is sent to mobile terminal.
5G is communicated to connect between the server and video monitoring equipment.
5G is communicated to connect between the mobile terminal and server.
Embodiment 6:
As shown in figure 4, the invention discloses a kind of system that identification power grid infrastructure project is broken rules and regulations safely, including server, video Monitoring device, the work clothes for being pasted with work clothes two dimensional code, is pasted with safety belt two at the safety cap for being pasted with safety cap two dimensional code Tie up code safety belt, mobile terminal and display, between the video monitoring equipment and server by wireless communication module without Line connection and one-way communication, module is connect the mobile terminal with server by wireless communication, the video monitoring equipment point Not Shi Bie safety cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server, server Above-mentioned identity information is sent to mobile terminal.
5G is communicated to connect between the server and video monitoring equipment.
5G is communicated to connect between the mobile terminal and server.
The display and server wired connection.
Embodiment 7:
As shown in figure 5, the invention discloses a kind of system that identification power grid infrastructure project is broken rules and regulations safely, including server, video Monitoring device, the work clothes for being pasted with work clothes two dimensional code, is pasted with safety belt two at the safety cap for being pasted with safety cap two dimensional code Safety belt, mobile terminal, display and the printer of code are tieed up, between the video monitoring equipment and server by wireless communication Module is wirelessly connected and one-way communication, and module is connect the mobile terminal with server by wireless communication, the video monitoring Equipment identify respectively safety cap two dimensional code, work clothes two dimensional code and safety belt two dimensional code identity information and be sent to server, Above-mentioned identity information is sent to mobile terminal by server.
5G is communicated to connect between the server and video monitoring equipment.
5G is communicated to connect between the mobile terminal and server.
The display and server wired connection.
The printer and server wired connection.
Embodiment 8:
As shown in fig. 6, the invention discloses a kind of methods that identification power grid infrastructure project is broken rules and regulations safely, it is characterised in that: including Following steps,
S1 Work tool coding
Two dimensional code number is carried out to safety cap, work clothes and safety belt respectively, obtains the safety cap, the work that have safety cap two dimensional code Take the work clothes of two dimensional code and the safety belt of safety belt two dimensional code.
S2 establishes java standard library
Typical power grid infrastructure project operative scenario is inputted into server as standard capital construction work photo and establishes power grid capital construction work Journey safety construction java standard library, while one is established between typical power grid infrastructure project operative scenario and its required Work tool of constructing To more mappings.
S3 determines test stone
The video monitoring equipment of construction site take to realtime construction situation shines and is sent to server, and server will receive Real-time live photo is compared with the histogram of the exemplary operation scene in power grid infrastructure project safety construction java standard library, It is maximum as a result, determining the category of the power grid infrastructure project safety construction scene at scene in turn to choose wherein correlation factors Property, by the one-to-many mapping of construct scene and its required Work tool of constructing, obtain the two dimensional code of safety construction.
S4 is examined according to test stone
Two dimensional code in two dimensional code obtained in S3 step and real-time live photo is compared, according to whether it is identical to determine whether There are violations of rules and regulations;It is deposited if number of the number of the two dimensional code in real-time live photo less than two dimensional code obtained in S3 step In violations of rules and regulations, if the obtained figure of two dimensional code of figure and S3 step of the two dimensional code in real-time live photo mismatch Then there are violations of rules and regulations.
S5 conclusion feedback
The violations of rules and regulations occurred in S4 step are fed back immediately.
Wherein, server, video monitoring equipment, two dimensional code, mobile terminal, display and printer itself and its mutually Between communication linkage technology sheet as the prior art, details are not described herein.
Present invention design: it is by by server, video monitoring equipment, the safety for being provided with safety cap two dimensional code The ingenious combination of the equipment such as the safety belt of cap, the work clothes of work clothes two dimensional code and safety belt two dimensional code, solves and how to identify The technical issues of project of transmitting and converting electricity safety violating the regulations, time-consuming and laborious, low efficiency, realizes project of transmitting and converting electricity identification violating the regulations safely, province Shi Shengli, it is high-efficient.
Illustrate:
Since in recent years, using deep learning as the artificial intelligence technology of new generation of representative each field achieve attract people's attention at Fruit especially has reached or surmounts the mankind in computer vision field and deep learning algorithm etc..
With the progress and application of 4G, 5G technology, artificial intelligence deep learning and big data technology, infrastructure project bursting tube For reason mode from personnel, apparatus management/control status to the trend that extends into of information technology, especially capital construction scene is widely applied letter Breathization application, the change that foundation construction site safety control has had been provided with the way to manages such as informationization, intelligence, big data is a kind of Trend and trend.
Method of the invention is explained further as follows:
Two dimensional code comparison in the two dimensional code of test stone and real-time live photo is judged whether there is into violations of rules and regulations.
1) required Work tool when as shown in Figure 7, Figure 8, to power grid infrastructure project safety construction, such as safety cap, safety Band etc. carries out two dimensional code number.It is required that power grid infrastructure project staff wears there is the Work tool of unified two dimensional code number to carry out Construction.
2) as shown in figure 9, according to different typical power grid infrastructure project operative scenarios, standard capital construction work photo is inputted, Establish power grid infrastructure project safety construction java standard library.And it establishes needed for typical power grid infrastructure project operative scenario constructs with it Work tool establishes one-to-many mapping.
3) realtime construction situation is carried out to take photograph by the video monitoring equipment of construction site, by real-time live photo with The histogram of exemplary operation scene in power grid infrastructure project safety construction java standard library is compared, and chooses wherein correlation The factor it is maximum as a result, determine scene which kind of power grid infrastructure project safety construction scene belonged to, pass through construction scene and its The one-to-many mapping of Work tool needed for constructing, obtains the two dimensional code of safety construction.
4) by the number and figure and the two dimensional code in real-time live photo of two dimensional code obtained in comparison 3) whether phase Together, violations of rules and regulations are judged whether there is.It is presence if two dimensional code number is less than or is mismatched with the two-dimension code pattern 3) obtained Violations of rules and regulations.
5) 4) the middle violations of rules and regulations that occur are fed back immediately, notifying a line and person liable to stand, row is vertical to be changed, and is eliminated safe hidden trouble With prevention act of violating regulations.
It is perspective:
1, solve the problems, such as the automatic processing of power grid construction image violating the regulations safely, meet instantly with the following power grid security management Development trend.
2, the timeliness for improving site safety discovery violating the regulations, security risk and hidden danger reaches all standing, and dynamic is sent out in real time Existing all kinds of security risk situations.
3, various safety, violating the regulations, risk and hidden danger timely feedback a line, and vertical change of vertical row mentions dangerous point and security risk Preceding elimination avoids the generation of security incident.
4, further using the verifying executive condition for being used for security management and control, quality surveillance and all kinds of technical solutions.
The technical solution of the application can not only be applied in power grid infrastructure project, can be applied in other similar In engineering, application field, the range of industry are very extensive, have very extensive versatility.

Claims (10)

1. a kind of system for breaking rules and regulations safely of identification power grid infrastructure project, it is characterised in that: including server, video monitoring equipment, It is provided with the safety belt of the safety cap of safety cap two dimensional code, the work clothes of work clothes two dimensional code and safety belt two dimensional code, the view Frequency monitoring device is connect with server and one-way communication, and video monitoring equipment identifies safety cap two dimensional code, work clothes two dimension respectively The identity information of code and safety belt two dimensional code is simultaneously sent to server.
2. the system that identification power grid infrastructure project according to claim 1 is broken rules and regulations safely, it is characterised in that: the server Module is wirelessly connected by wireless communication between video monitoring equipment.
3. the system that identification power grid infrastructure project according to claim 2 is broken rules and regulations safely, it is characterised in that: the server 5G is communicated to connect between video monitoring equipment.
4. the system that identification power grid infrastructure project according to claim 1 is broken rules and regulations safely, it is characterised in that: the server The wired connection between video monitoring equipment.
5. the system that identification power grid infrastructure project according to claim 1 is broken rules and regulations safely, it is characterised in that: further include movement Terminal, module is connect the mobile terminal with server by wireless communication.
6. the system that identification power grid infrastructure project according to claim 5 is broken rules and regulations safely, it is characterised in that: described mobile whole 5G is communicated to connect between end and server.
7. the system that identification power grid infrastructure project according to claim 1 is broken rules and regulations safely, it is characterised in that: further include display Device, the display and server wired connection.
8. the system that identification power grid infrastructure project according to claim 1 is broken rules and regulations safely, it is characterised in that: further include printing Machine, the printer and server wired connection.
9. the method that the identification power grid infrastructure project of system described according to claim 1~any one of 8 is broken rules and regulations safely, special Sign is: including S1 Work tool coding, S2 establishes java standard library, S3 determines test stone and S4 foundation test stone checking procedure, The S3 determines that test stone step is to determine safety construction by the video monitoring equipment of server and construction site Two dimensional code, the S4 are by two in two dimensional code obtained in S3 step and real-time live photo according to test stone checking procedure Code comparison is tieed up, according to whether identical to determine whether there are violations of rules and regulations.
10. the method that identification power grid infrastructure project according to claim 9 is broken rules and regulations safely, it is characterised in that: further include S5 Conclusion feedback, and S1~S5 step is specific as follows,
S1 Work tool coding
Two dimensional code number is carried out to safety cap, work clothes and safety belt respectively, obtains the safety cap, the work that have safety cap two dimensional code Take the work clothes of two dimensional code and the safety belt of safety belt two dimensional code;
S2 establishes java standard library
Typical power grid infrastructure project operative scenario is inputted into server as standard capital construction work photo and establishes power grid capital construction work Journey safety construction java standard library, while one is established between typical power grid infrastructure project operative scenario and its required Work tool of constructing To more mappings;
S3 determines test stone
The video monitoring equipment of construction site take to realtime construction situation shines and is sent to server, and server will receive Real-time live photo is compared with the histogram of the exemplary operation scene in power grid infrastructure project safety construction java standard library, It is maximum as a result, determining the category of the power grid infrastructure project safety construction scene at scene in turn to choose wherein correlation factors Property, by the one-to-many mapping of construct scene and its required Work tool of constructing, obtain the two dimensional code of safety construction;
S4 is examined according to test stone
Two dimensional code in two dimensional code obtained in S3 step and real-time live photo is compared, according to whether it is identical to determine whether There are violations of rules and regulations;It is deposited if number of the number of the two dimensional code in real-time live photo less than two dimensional code obtained in S3 step In violations of rules and regulations, if the obtained figure of two dimensional code of figure and S3 step of the two dimensional code in real-time live photo mismatch Then there are violations of rules and regulations;
S5 conclusion feedback
The violations of rules and regulations occurred in S4 step are fed back immediately.
CN201910649683.6A 2019-07-18 2019-07-18 System and method for identifying power grid infrastructure construction safety violation Active CN110428026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910649683.6A CN110428026B (en) 2019-07-18 2019-07-18 System and method for identifying power grid infrastructure construction safety violation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910649683.6A CN110428026B (en) 2019-07-18 2019-07-18 System and method for identifying power grid infrastructure construction safety violation

Publications (2)

Publication Number Publication Date
CN110428026A true CN110428026A (en) 2019-11-08
CN110428026B CN110428026B (en) 2023-02-10

Family

ID=68410983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910649683.6A Active CN110428026B (en) 2019-07-18 2019-07-18 System and method for identifying power grid infrastructure construction safety violation

Country Status (1)

Country Link
CN (1) CN110428026B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111091069A (en) * 2019-11-27 2020-05-01 云南电网有限责任公司电力科学研究院 Power grid target detection method and system guided by blind image quality evaluation

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102332101A (en) * 2010-05-27 2012-01-25 美国能量变换公司 Asset identification and management method and system
CN102880882A (en) * 2011-07-12 2013-01-16 江苏省电力公司南通供电公司 Equipment patrolling and managing device based on two-dimensional code
CN205080594U (en) * 2015-09-28 2016-03-09 国家电网公司 Multiplexer of ascending a height utensil management system based on two -dimensional code
CN106022977A (en) * 2016-08-09 2016-10-12 国网山西省电力公司电力科学研究院 Transformer substation job site safety analysis method
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN106909687A (en) * 2017-03-06 2017-06-30 江苏工程职业技术学院 A kind of high-altitude working safety warning system
CN107169546A (en) * 2017-07-03 2017-09-15 国网冀北电力有限公司唐山供电公司 A kind of power construction managing security tools and instruments management method and system based on Quick Response Code
CN206757716U (en) * 2017-05-04 2017-12-15 丁昕 Anti- violation management system based on Quick Response Code
CN108833831A (en) * 2018-06-15 2018-11-16 陈在新 A kind of power construction intelligent safety monitor system
CN108961486A (en) * 2018-05-17 2018-12-07 国网福建省电力有限公司漳州供电公司 A kind of electric-power safe instruments intelligent management platform
CN109002897A (en) * 2018-08-29 2018-12-14 国网河南省电力公司检修公司 Field operation in transformer substation security management and control system and method based on robot technology
CN109472091A (en) * 2018-11-13 2019-03-15 四川华芯项目管理有限公司 A kind of assembled architecture construction and stage monitoring system and method for being on active service

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102332101A (en) * 2010-05-27 2012-01-25 美国能量变换公司 Asset identification and management method and system
CN102880882A (en) * 2011-07-12 2013-01-16 江苏省电力公司南通供电公司 Equipment patrolling and managing device based on two-dimensional code
CN205080594U (en) * 2015-09-28 2016-03-09 国家电网公司 Multiplexer of ascending a height utensil management system based on two -dimensional code
CN106022977A (en) * 2016-08-09 2016-10-12 国网山西省电力公司电力科学研究院 Transformer substation job site safety analysis method
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN106909687A (en) * 2017-03-06 2017-06-30 江苏工程职业技术学院 A kind of high-altitude working safety warning system
CN206757716U (en) * 2017-05-04 2017-12-15 丁昕 Anti- violation management system based on Quick Response Code
CN107169546A (en) * 2017-07-03 2017-09-15 国网冀北电力有限公司唐山供电公司 A kind of power construction managing security tools and instruments management method and system based on Quick Response Code
CN108961486A (en) * 2018-05-17 2018-12-07 国网福建省电力有限公司漳州供电公司 A kind of electric-power safe instruments intelligent management platform
CN108833831A (en) * 2018-06-15 2018-11-16 陈在新 A kind of power construction intelligent safety monitor system
CN109002897A (en) * 2018-08-29 2018-12-14 国网河南省电力公司检修公司 Field operation in transformer substation security management and control system and method based on robot technology
CN109472091A (en) * 2018-11-13 2019-03-15 四川华芯项目管理有限公司 A kind of assembled architecture construction and stage monitoring system and method for being on active service

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111091069A (en) * 2019-11-27 2020-05-01 云南电网有限责任公司电力科学研究院 Power grid target detection method and system guided by blind image quality evaluation

Also Published As

Publication number Publication date
CN110428026B (en) 2023-02-10

Similar Documents

Publication Publication Date Title
CN106650855B (en) A kind of fire-fighting equipment total management system
CN110795989A (en) Intelligent safety monitoring system for electric power operation and monitoring method thereof
CN108537463A (en) Cast-in-situ bridge support system construction monitoring system and method based on BIM
CN109377585A (en) Factory's public affairs match facility intelligent operation cruising inspection system and its method for inspecting
CN106790034A (en) A kind of internet of things equipment certification and the method for secure accessing
CN107564126A (en) Substation secondary device intelligent patrol detection mobile terminal, server and system
CN110428026A (en) The system and method that identification power grid infrastructure project is broken rules and regulations safely
CN112365201A (en) Neural network-based infrastructure construction monitoring and early warning system and method
CN207689859U (en) A kind of grid switching operation whole process intelligence managing and control system
CN108427995A (en) A kind of natural gas plant stand operation management system
CN111741089B (en) Intelligent safety operation management and control system and method based on industrial Internet of things
CN115239071A (en) Industrial production environment risk assessment system based on big data
CN209433522U (en) Warning system
CN208044634U (en) A kind of car plate intelligence production identifying system
CN208636980U (en) Fire-fighting maintenance system based on Internet of Things
CN208903254U (en) Face identification system
CN208506532U (en) A kind of communication information equipment O&M intelligent alarm platform
CN206270750U (en) Product oil mechanized production system
CN207558177U (en) A kind of perimeter security intelligent monitoring device based on communication network
CN219658161U (en) Access identification device for unattended station
CN208227086U (en) One kind can wired and Lora wireless transmission line anti-slip device
CN216848816U (en) Inspection system
CN206820779U (en) A kind of IEC61968 message authentication apparatus
CN213342286U (en) Wisdom campus network supervision device
CN213094355U (en) Community security protection monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant