CN110424761A - Rehabilitating historic building support device and its construction method - Google Patents

Rehabilitating historic building support device and its construction method Download PDF

Info

Publication number
CN110424761A
CN110424761A CN201910535593.4A CN201910535593A CN110424761A CN 110424761 A CN110424761 A CN 110424761A CN 201910535593 A CN201910535593 A CN 201910535593A CN 110424761 A CN110424761 A CN 110424761A
Authority
CN
China
Prior art keywords
support
post
later
fixed
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910535593.4A
Other languages
Chinese (zh)
Other versions
CN110424761B (en
Inventor
朱卫安
郑震雷
胡峰
蒋新宝
孙剑锋
刘学应
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Guanghe Ancient Architectural Technology Research And Development Co Ltd
Original Assignee
Jinhua Guanghe Ancient Architectural Technology Research And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Guanghe Ancient Architectural Technology Research And Development Co Ltd filed Critical Jinhua Guanghe Ancient Architectural Technology Research And Development Co Ltd
Priority to CN201910535593.4A priority Critical patent/CN110424761B/en
Publication of CN110424761A publication Critical patent/CN110424761A/en
Application granted granted Critical
Publication of CN110424761B publication Critical patent/CN110424761B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/04Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action

Abstract

The invention discloses rehabilitating historic building support devices, including support post, support rail and support beam, support beam is set on support post, support rail is set in support beam, and support post is equipped with decorative post, and support post is equipped with annular relief, lug boss is equipped with ring limit block, decorative post is equipped with annular groove, and annular groove matches with annular relief, and annular groove is equipped with annular slot;Its construction method includes the following steps: the preparation of a, ancient building measurement and construction;B, the installation of support construction;C, the installation of fixed mechanism, decorative post and decoration bar;D, the installation of kelly and gag lever post;E, the laying of roof supported frame;F, the installation of plank.The present invention can reinforce ancient building;The construction party rule of support device can reduce the damage to ancient building in the construction process, retain the original style and features of ancient building.

Description

Rehabilitating historic building support device and its construction method
Technical field
The invention belongs to rehabilitating historic building technical field more particularly to rehabilitating historic building support device and its construction parties Method.
Background technique
Chinese culture is increasingly pursued and is advocated by the people of the world, wherein important load of the ancient building as Chinese culture Body is a Sinitic important famous brand.But damaged as caused by human factor and natural cause, ancient building be badly in need of into Row is comprehensively complete to be repaired, therefore restoration of the ecosystem is most important for ancient building.Due to the history culture of ancient building itself Researching value needs to save its authenticity in repair process, will its more exquisite science especially in the selection of repair materials. It in ancient times in building, is limited by construction technology, building structure is mainly built using wood material.But wood structure by To the limitation of the attribute of its own, such as: the elasticity modulus of timber is relatively low and is easier to deform, ancient building With the extension of its life span, corresponding disease incidence also occurs therewith, and these all will affect the existence of ancient architecture.In Usually ancient building is reinforced using modern material during rehabilitating historic building, although improving the carrying of ancient building in this way Ability, but modern material seems lofty in ancient building, destroys the appearance of ancient building so that ancient building is newly or not, it is old not It is old.
Summary of the invention
Above-mentioned technical problem present in present invention aims to solve the prior art provides rehabilitating historic building support dress It sets and its construction method, ancient building can be reinforced, while support device can be decorated, so that support device is in Gu Do not seem in building lofty, combines together with ancient building;It is right in the construction process that the construction party rule of support device can be reduced The damage of ancient building retains the original style and features of ancient building.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
Rehabilitating historic building support device, it is characterised in that: including support post, support rail and support beam, support Crossbeam is set on support post, and support rail is set in support beam, and support post is equipped with decorative post, and support post is equipped with ring Shape lug boss, lug boss are equipped with ring limit block, and decorative post is equipped with annular groove, and annular groove matches with annular relief, ring Shape slot is equipped with annular slot, and annular slot matches with ring limit block, is rotatablely connected between decorative post and support post.It is logical It crosses support post support beam and support rail ancient building is supported, improve the load-bearing capacity of ancient building, prevent ancient building from falling It collapses, while support post is equipped with decorative post, decorative post uses wooden structures, so that support post is wrapped, in Gu Not seeming in building lofty, the connection between support post and decorative post is ingenious, and it is easy for installation, and good connecting effect.
Further, support beam is equipped with first through hole, and support post is equipped with the first lug boss, and the first lug boss is set to first In through-hole, support beam is equipped with the first card slot, and the first card slot is connected with first through hole, and the first lug boss is equipped with the second through-hole, Positive stop strip is equipped in second through-hole, the first card slot is equipped with fixture block, and fixture block is bolted with support beam, fixture block clamping positive stop strip, Positive stop strip is equipped with limiting slot, and fixture block sets stop bosses, and retention bead portion is set in limiting slot.Realize support beam and support The connection of column, positive stop strip and the second through-hole cooperate, so that support post is limited in support beam, and can not be rotated, card The retention bead portion of block setting limits positive stop strip, prevents positive stop strip from skidding off from the second through-hole in use.
Further, support beam is equipped with the second card slot, and support rail is equipped with third card slot, the second card slot and third card slot phase Engaging, support beam are equipped with fixed mechanism with support rail, and fixed mechanism includes fixing seat and fixed lid, and fixing seat is covered with fixed Between be bolted, fixing seat is equipped with the first groove, and fixed to be covered with the second groove, support beam is set to the first groove and second In groove, support rail is set in the first groove and the second groove.By the second card slot and third card slot, support rail is engaged In support beam, fixed mechanism then further fixes support beam and support rail, prevents support rail from propping up It supports and generates loosening on crossbeam.
Further, support beam is equipped with the first decoration bar, and the first decoration bar is equipped with third through-hole, and support post is set to third In through-hole, decorative post support the first decoration bar, support rail is equipped with the second decoration bar, and the second decoration bar is equipped with fixing groove, Gu Reservation is equipped with fixed link, and fixed link is set in fixing groove.First decoration bar and the second decoration bar use wooden structures, horizontal to support Beam and support rail play decoration function, prevent support beam and support rail from seeming lofty in ancient building, to support beam Certain concealment effect is played with support rail, fixing seat is fixed the second decoration bar by fixed link.
Further, the first decoration bar is equipped with first sliding groove, and decorative post is connected with gag lever post, and gag lever post dismantling connection has card Lid, support beam are equipped with kelly, and kelly is equipped with second sliding slot.The cooperation of first sliding groove and gag lever post facilitates the wood in ancient building Board closes, and without plank can be fixed in the turn of the screw of plank upper drill hole, can reduce the damage to the plank in ancient building Wound, while the shadow of first sliding groove and gag lever post hiding effect is good, is not easy to be found.Lead to partially short plank for having damaged, it can Vertical bar is arranged in first sliding groove and gag lever post, partially short plank is supported.Plank, the are engaged on kelly and gag lever post One decoration bar and gag lever post engaging plank can be supported fixation to plank, convenient for the recovery to ancient building appearance.
Further, support rail is equipped with roof supported frame, and roof supported frame includes support bottom frame, mandril and activity Bar, support bottom frame are set on support rail, and support bottom frame is equipped with connector, and connector is slidably connected with motion bar, connector packet The first rotating block and the second rotating block are included, is rotatablely connected between the first rotating block and the second rotating block, the first rotating block is set to branch It supports on bottom frame, the second rotating block is set on motion bar, and shaft, the company of rotation between two motion bars are equipped between two motion bars It connects, support bottom frame is equipped with support guide mechanism, and mandril is set in support guide mechanism, and mandril connects shaft.Support bottom frame and work Lever by connector realize rotation connection and be slidably connected, by mandril realize two by shaft be connected motion bar it Between angle and height adjustment so that can be improved support effect when to roof supported.
Further, support guide mechanism includes guide pad and supporting block, and mandril is slidably connected with guide pad, supporting block and branch Support frame is slidably connected, supporting block supporting post-rod.Guide pad plays guiding role to mandril, enables mandril on support bottom frame Vertical activity, supporting block play a supporting role to mandril, and mandril is enable to preserve value the support to two motion bars, and then are promoted pair The support effect on roof.
Further, guide pad is equipped with the first locating slot, and supporting block is equipped with the second locating slot, the first locating slot and the second positioning Pin is equipped in slot.Position-limiting action is played to supporting block by pin, preventing supporting block from skidding off from guide pad causes mandril sliding It falls.
The construction method of rehabilitating historic building support device, it is characterised in that include the following steps:
A, the preparation of ancient building measurement and construction;
B, the installation of support construction: support post, support beam and support rail are carried in ancient building, later will Support post, which erects, to be come, and the first decoration rod set is entered to the top of support post, then support beam is inserted in the first of support post In lug boss, later then positive stop strip is inserted into the second through-hole, with changing the direction of the second through-hole by card by rotational support column Bolt is screwed on block clamping positive stop strip, then fixture block and support beam, the third card slot of support rail is directed at support beam later The second card slot, support rail is placed in support beam, screws on bolt on support beam and support rail later.Support knot The installation of structure, is supported ancient building.Being arranged the first decoration bar in advance is then to facilitate subsequent construction, is needing whole peace It can be avoided when dress decoration bar and decorative post and dismantle support post and support beam, simplify construction procedure, improve and apply Work efficiency rate.
C, the first groove of fixing seat the installation of fixed mechanism, decorative post and decoration bar: is directed at support rail and branch Crossbeam is supportted, by the second groove alignment support rail and support beam of fixed lid, the fixed fixed link direction covered and support are horizontal The direction of bar is consistent, retells fixing seat and fixed cover buckle is closed, and screws on bolt in fixing seat and fixed cover later, by fixed link from It is extracted out in fixing seat, later the second decoration of installation bar on support rail, it will be in the fixing groove alignment and fixation seat of the second decoration bar The position of fixed link retells fixed link and is passed through fixing seat until fixed link is passed through in fixing groove completely, by the annular of decorative post Slot is directed at the annular relief of support post, and decorative post is tightly attached to one side of something of the not set ring limit block of support post, it After rotate decorative post so that the annular slot of decorative post is stuck in ring limit block completely, block on support post later Then two decorative posts are rotated together 90 ° by upper second decorative post, so that clamping two decorations are vertical in ring limit block Column.First mechanism for installing then facilitates the installation of subsequent second decoration bar, and subsequent second decoration bar need to pass through fixed machine Structure is fixed, because the second decoration bar and fixing seat shape are irregular, if it is bad directly to fix then fixed effect with bolt, only It is that the second decoration bar is easy to fall off from fixed mechanism, causes safety problem, the second decoration bar is fixed by fixed link, The fixed effect of the second decoration bar is improved, and fixed link is easy for installation, reduces the set-up time of the second decoration bar.Decoration is vertical Column simple installation, as long as decorative post is directed at support post, rotation.
D, the installation of kelly and gag lever post: setting up two kellies between two support beams, first solid in support beam Determine one end of kelly, measures the spacing between two fixed one end of kelly with tape measure later, adjust a kelly water later It is flat, it is measured with horizontal ruler after ensuring that the kelly is horizontal, the kelly is fixed in support beam with bolt, then adjusts another Kelly is fixed at a distance from kelly with before, so that two kellies are parallel to each other, is later fixed another kelly, in kelly position It sets corresponding underface and places gag lever post, gag lever post is fixed on decorative post later.Kelly and gag lever post it is easy for installation The plank of segmentation is reinstalled in ancient building, when installation ensures the level of kelly and gag lever post, the water of kelly and kelly It is flat, facilitate it is subsequent be more easier when sliding into plank, will not because of kelly and gag lever post installation accuracy it is too low cause plank without Method slides into.
E, the laying of roof supported frame: splicing roof supported bottom frame in support beam and support rail, later will branch Support bottom frame is located on support rail and fixed, covers upper connector and fixation on support bottom frame, later by motion bar from connector In penetrate, two motion bars are connected with shaft at the top of motion bar, mandril are penetrated from guide pad later, by shaft It is fixed on mandril, then makes motion bar be close to roof the upward pushing tow of mandril, slidably support block later and carry out supporting post-rod, then Pin is plugged between the first locating slot and the second locating slot.The laying of roof supported frame can play the roof of ancient building Supporting role, while roof supported frame is completely embedded with support rail, so that the support effect to roof is good.
F, the installation of plank: plank is installed in kelly and gag lever post according to the position at original place, limiting slot and limit In the bar of position, Ka Gai is fixed on gag lever post later, completes the fixation to plank.Plank installation carries out the original appearance of ancient building Restore.
Further, the detailed step of step a) are as follows: ancient building measures, and architectural plan is drawn, later by ancient building In be not used in that support functions only as the plank of segmentation effect and door and window disassembles, be carried to outdoor, blockette is placed, it Simple deashing is carried out to the plank and door and window disassembled afterwards.Plank is removed to press in support device work progress in order to prevent Badly or plank is smashed, lead to the damage to ancient building, subregion storage then can guarantee and will not misplace when spelling back plank.
The present invention is by adopting the above-described technical solution, have the advantages that
The present invention includes support post, support rail and support beam, and support beam is set on support post, support rail Support post is equipped with decorative post in support beam, and support post is equipped with annular relief, and lug boss is equipped with annular stop Block, decorative post are equipped with annular groove, and annular groove matches with annular relief, and annular groove is equipped with annular slot, annular slot and Ring limit block matches, and is rotatablely connected between decorative post and support post.The present invention by support post support beam and Support rail ancient building is supported, and is improved the load-bearing capacity of ancient building, is prevented ancient building from collapsing, while support post is equipped with dress Column is adornd, decorative post uses wooden structures, so that support post is wrapped, does not seem lofty in ancient building, supports Connection between column and decorative post is ingenious, easy for installation, and good connecting effect.
The present invention can be supported reinforcing by above-mentioned construction method to ancient building, improve the support effect of ancient building Fruit prevents ancient building from collapsing, and simplifies the installation steps of support device, improves the installation accuracy of support device, work progress In can reduce destruction to ancient building, retain the original style and features of ancient building.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the structural schematic diagram of rehabilitating historic building support device of the present invention;
Fig. 2 is the structural schematic diagram of support beam in the present invention;
Fig. 3 is the structural schematic diagram that support post, support beam are connected with support rail in the present invention;
Fig. 4 is the structural schematic diagram of support rail in the present invention;
Fig. 5 is the structural schematic diagram of decorative post in the present invention;
Fig. 6 is the structural schematic diagram of the first decoration bar in the present invention;
Fig. 7 is the structural schematic diagram of support post in the present invention;
Fig. 8 is the structural schematic diagram of fixture block in the present invention;
Fig. 9 is the structural schematic diagram of positive stop strip in the present invention;
Figure 10 is the structural schematic diagram of the second decoration bar in the present invention;
Figure 11 is the structural schematic diagram of fixed mechanism in the present invention;
Figure 12 is guide pad and the separated structural schematic diagram of supporting block in the present invention;
Figure 13 is the structural schematic diagram of kelly in the present invention.
In figure, 1- support post;2- support rail;3- support beam;4- decorative post;5- annular relief;6- annular Limited block;7- annular groove;8- first through hole;The first lug boss of 9-;The first card slot of 10-;The second through-hole of 11-;12- positive stop strip;13- Fixture block;14- limiting slot;15- retention bead portion;The second card slot of 16-;17- third card slot;18- fixed mechanism;19- fixing seat; The fixed lid of 20-;The first groove of 21-;The second groove of 22-;23- first decorates bar;24- third through-hole;25- second decorates bar;26- Fixing groove;27- fixed link;28- first sliding groove;29- gag lever post;30- Ka Gai;31- kelly;32- second sliding slot;33- supports bottom Frame;34- mandril;35- motion bar;36- connector;The first rotating block of 37-;The second rotating block of 38-;39- shaft;40- guide pad; 41- supporting block;The first locating slot of 42-;The second locating slot of 43-;44- pin;45- annular slot.
Specific embodiment
It as shown in figure 1 to figure 13, is rehabilitating historic building support device of the present invention, including support post 1, support rail 2 With support beam 3, support beam 3 is set on support post 1, and support rail 2 is set in support beam 3, and support post 1 is equipped with dress Column 4 is adornd, support post 1 is equipped with annular relief 5, and annular relief 5 is equipped with ring limit block 6, and decorative post 4 is equipped with annular Slot 7, annular groove 7 match with annular relief 5, and annular groove 7 is equipped with annular slot 45, annular slot 45 and ring limit block 6 Match, is rotatablely connected between decorative post 4 and support post 1.Pass through 1 support beam 3 of support post and 2 ancient architecture of support rail It builds and is supported, improve the load-bearing capacity of ancient building, prevent ancient building from collapsing, while support post 1 is equipped with decorative post 4, dress Decorations column 4 use wooden structures so that support post 1 is wrapped, do not seem lofty in ancient building, support post 1 with Connection between decorative post 4 is ingenious, easy for installation, and good connecting effect.
Support beam 3 is equipped with first through hole 8, and support post 1 is equipped with the first lug boss 9, and it is logical that the first lug boss 9 is set to first In hole 8, support beam 3 is equipped with the first card slot 10, and the first card slot 10 is connected with first through hole 8, and the first lug boss 9 is equipped with second Through-hole 11 is equipped with positive stop strip 12 in second through-hole 11, and the first card slot 10 is equipped with fixture block 13, and fixture block 13 and 3 bolt of support beam connect It connects, 13 clamping positive stop strip 12 of fixture block, positive stop strip 12 is equipped with limiting slot 14, and fixture block 13 sets stop bosses 15, retention bead portion 15 are set in limiting slot 14.Realize the connection of support beam 3 and support post 1, positive stop strip 12 and the second through-hole 11 cooperate, so that Support post 1 is limited in support beam 3, and can not be rotated, fixture block 13 be arranged retention bead portion 15 to positive stop strip 12 into Row limit, prevents positive stop strip 12 from skidding off from the second through-hole 11 in use.
Support beam 3 is equipped with the second card slot 16, and support rail 2 is equipped with third card slot 17, the second card slot 16 and third card slot 17 fasten, and support beam 3 and support rail 2 are equipped with fixed mechanism 18, and fixed mechanism 18 includes fixing seat 19 and fixed lid 20, It being bolted between fixing seat 19 and fixed lid 20, fixing seat 19 is equipped with the first groove 21, and fixed lid 20 is equipped with the second groove 22, Support beam 3 is set in the first groove 21 and the second groove 22, and support rail 2 is set in the first groove 21 and the second groove 22. By the second card slot 16 and third card slot 17, support rail 2 is fastened in support beam 3, fixed mechanism 18 is then horizontal to support Beam 3 and support rail 2 are further fixed, and prevent support rail 2 from generating loosening in support beam 3.
Support beam 3 is equipped with the first decoration bar 23, and the first decoration bar 23 is equipped with third through-hole 24, and support post 1 is set to the In three through-holes 24, the support of decorative post 4 first decoration bar 23, support rail 2 is equipped with the second decoration bar 25, and the second decoration bar 25 is set There is fixing groove 26, fixing seat 19 is equipped with fixed link 27, and fixed link 27 is set in fixing groove 26.First decoration bar 23 and the second decoration Bar 25 uses wooden structures, plays decoration function to support beam 3 and support rail 2, prevents support beam 3 and support rail 2 Seem in ancient building lofty, certain concealment effect is played to support beam 3 and support rail 2, fixing seat 19 passes through fixation The second decoration bar 25 is fixed in bar 27.
First decoration bar 23 is equipped with first sliding groove 28, and decorative post 4 is connected with gag lever post 29, and 29 dismantling connection of gag lever post has Card lid 30, support beam 3 are equipped with kelly 31, and kelly 31 is equipped with second sliding slot 32.The cooperation side of first sliding groove 28 and gag lever post 29 Just the plank in ancient building is engaged, without plank can be fixed in the turn of the screw of plank upper drill hole, can be reduced to Gu The damage of plank in building, while the shadow of first sliding groove 28 and gag lever post 29 hiding effect is good, is not easy to be found.For having damaged It is bad to lead to partially short plank, vertical bar can be set in first sliding groove 28 and gag lever post 29, partially short plank is supported.Card It can be connected by Bolt dismantling between lid 30 and gag lever post 29, it is also special to be connected by way of buckle.
Support rail 2 is equipped with roof supported frame, and roof supported frame includes support bottom frame 33, mandril 34 and motion bar 35, support bottom frame 33 is set on support rail 2, and support bottom frame 33 is equipped with connector 36, and connector 36 and the sliding of motion bar 35 connect It connects, connector 36 includes the first rotating block 37 and the second rotating block 38, is rotated between the first rotating block 37 and the second rotating block 38 Connection, the first rotating block 37 are set on support bottom frame 33, and the second rotating block 38 is set on motion bar 35, between two motion bars 35 It equipped with shaft 39, is rotatablely connected between two motion bars 35, support bottom frame 33 is equipped with support guide mechanism, and mandril 34 is set to support On guiding mechanism, mandril 34 connects shaft 39.Bottom frame 33 and motion bar 35 is supported to realize rotation connection by connector 36 and slide Dynamic connection realizes two by the angle and height adjustment between the connected motion bar 35 of shaft 39 by mandril 34, so that It can be improved support effect when to roof supported.
Support guide mechanism includes guide pad 40 and supporting block 41, and mandril 34 is slidably connected with guide pad 40, supporting block 41 It is slidably connected with support frame, 41 supporting post-rod 34 of supporting block.Guide pad 40 plays guiding role to mandril 34, enables mandril 34 Enough activities vertical on support bottom frame 33, supporting block 41 play a supporting role to mandril 34, and mandril 34 is enable to preserve value to two The support of motion bar 35, and then promote the support effect to roof.
Guide pad 40 is equipped with the first locating slot 42, and supporting block 41 is equipped with the second locating slot 43, the first locating slot 42 and second Pin 44 is equipped in locating slot 43.Position-limiting action is played to supporting block 41 by pin 44, prevents supporting block 41 from guide pad 40 In skid off cause mandril 34 slide.
The construction method of rehabilitating historic building support device, includes the following steps:
A, the preparation of ancient building measurement and construction;
B, the installation of support construction: support post 1, support beam 3 and support rail 2 are carried in ancient building, it Afterwards support post 1 is erected to come, the first decoration bar 23 is inserted in the top of support post 1, then support beam 3 is inserted in support and is stood In first lug boss 9 of column 1, later then positive stop strip 12 is inserted by rotational support column 1 with the direction of the second through-hole 11 of change In second through-hole 11, bolt will be screwed on 13 clamping positive stop strip 12 of fixture block, then fixture block 13 and support beam 3, it later will support cross The third card slot 17 of bar 2 is directed at the second card slot 16 of support beam 3, and support rail 2 is placed in support beam 3, is being propped up later Bolt is screwed on support crossbeam 3 and support rail 2.The installation of support construction, is supported ancient building.It is arranged the first decoration in advance Bar 23 is then to facilitate subsequent construction, be can be avoided when needing integral installation decoration bar and decorative post 4 by support post 1 It is dismantled with support beam 3, simplifies construction procedure, improve construction efficiency.
C, it is horizontal that the first groove 21 of fixing seat 19 installation of fixed mechanism 18, decorative post 4 and decoration bar: is directed at support The the second groove 22 alignment support rail 2 and support beam 3 of fixed lid 20 are fixed consolidating on lid 20 by bar 2 and support beam 3 27 direction of fixed pole is consistent with the direction of support rail 2, retells fixing seat 19 and fixed lid 20 fastens, later in fixing seat 19 and admittedly Determine to screw on bolt on lid 20, fixed link 27 is extracted out from fixing seat 19, later the second decoration of installation bar on support rail 2 25, by the position of fixed link 27 in the 26 alignment and fixation seat 19 of fixing groove of the second decoration bar 25, retells fixed link 27 and be passed through fixation Seat 19 is until fixed link 27 is passed through completely in fixing groove 26, by the convex annular of the alignment support post 1 of annular groove 7 of decorative post 4 Portion 5 is played, decorative post 4 is tightly attached to one side of something of the not set ring limit block 6 of support post 1, decorative post 4 is rotated later, makes The annular slot 45 for obtaining decorative post 4 is stuck in completely in ring limit block 6, blocks upper second decoration on support post 1 later Then two decorative posts 4 are rotated together 90 ° by column 4, so that two decorative posts 4 of clamping in ring limit block 6.First pacify Dress fixed mechanism 18 then facilitates the installation of subsequent second decoration bar 25, and subsequent second decoration bar 25 need to pass through fixed mechanism 18 are fixed, and because the second decoration bar 25 and 19 shape of fixing seat are irregular, if directly being fixed then with bolt, fixed effect is not Good, only the second decoration bar 25 is easy to fall off from fixed mechanism 18, causes safety problem, is decorated by fixed link 27 to second Bar 25 is fixed, and improves the fixed effect of the second decoration bar 25, and fixed link 27 is easy for installation, reduces the second decoration bar 25 set-up time.4 simple installation of decorative post, as long as decorative post 4 is directed at support post 1, rotation.
D, the installation of kelly 31 and gag lever post 29: setting up two kellies 31 between two support beams 3, first horizontal in support One end of kelly 31 is fixed on beam 3, is measured the spacing between two fixed one end of kelly 31 with tape measure later, is adjusted later A piece kelly 31 is horizontal, is measured after ensuring 31 level of kelly with horizontal ruler, the kelly 31 is fixed on support beam 3 with bolt On, it then adjusts another kelly 31 and is fixed at a distance from kelly 31 before, so that two kellies 31 are parallel to each other, later will Another kelly 31 is fixed, places gag lever post 29 in the corresponding underface in 31 position of kelly, gag lever post 29 is fixed on dress later It adorns on column 4.Kelly 31 and the easy for installation of gag lever post 29 reinstall to the plank of segmentation in ancient building, and when installation is true Level, the level of kelly 31 and kelly 31 for protecting kelly 31 and gag lever post 29, facilitate it is subsequent be more easier when sliding into plank, no It can cause plank that can not slide into because the installation accuracy of kelly 31 and gag lever post 29 is too low.
E, the laying of roof supported frame: splice roof supported bottom frame 33 in support beam 3 and support rail 2, later Support bottom frame 33 is located on support rail 2 and is fixed, upper connector 36 is covered on support bottom frame 33 and is fixed, it later will be movable Bar 35 is penetrated from connector 36, connects two motion bars 35 in the top shaft 39 of motion bar 35, later from leading Mandril 34 is penetrated into block 40, shaft 39 is fixed on mandril 34, then makes motion bar 35 tight the upward pushing tow of mandril 34 Roof is pasted, block 41 is slidably supported later and carrys out supporting post-rod 34, then plug pin between the first locating slot 42 and the second locating slot 43 Column 44.The laying of roof supported frame can play a supporting role to the roof of ancient building, while roof supported frame and support Cross bar 2 is completely embedded, so that the support effect to roof is good.
F, the installation of plank: plank is installed in kelly 31 and gag lever post 29 according to the position at original place, limiting slot 14 and gag lever post 29 in, card lid 30 is fixed on gag lever post 29 later, completes fixation to plank.Plank installation, to ancient architecture The original appearance built is restored.
The detailed step of step a) are as follows: ancient building measures, and draws architectural plan, will be not used in ancient building later Support functions only as the plank of segmentation effect and door and window disassembles, it is carried to outdoor, blockette is placed, later to disassembly The plank and door and window to get off carries out simple deashing.Plank is removed to damage by pressure or pound in support device work progress in order to prevent Bad plank, leads to the damage to ancient building, and subregion storage then can guarantee and will not misplace when spelling back plank.
The present invention includes support post 1, support rail 2 and support beam 3, and support beam 3 is set on support post 1, branch It supports cross bar 2 and is equipped with decorative post 4 set on support post 1 in support beam 3, support post 1 is equipped with annular relief 5, lug boss Equipped with ring limit block 6, decorative post 4 is equipped with annular groove 7, and annular groove 7 matches with annular relief 5, and annular groove 7 is equipped with ring Shape card slot 45, annular slot 45 match with ring limit block 6, are rotatablely connected between decorative post 4 and support post 1.This hair It is bright to be supported by 1 support beam 3 of support post and 2 ancient building of support rail, the load-bearing capacity of ancient building is improved, Gu is prevented Building collapse, while support post 1 is equipped with decorative post 4, decorative post 4 uses wooden structures, so that support post 1 is wrapped up To get up, does not seem lofty in ancient building, the connection between support post 1 and decorative post 4 is ingenious, and it is easy for installation, and connect Effect is good.
The present invention can be supported reinforcing by above-mentioned construction method to ancient building, improve the support effect of ancient building Fruit prevents ancient building from collapsing, and simplifies the installation steps of support device, improves the installation accuracy of support device, work progress In can reduce destruction to ancient building, retain the original style and features of ancient building.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (10)

1. rehabilitating historic building support device, it is characterised in that: including support post, support rail and support beam, the branch It supports crossbeam to be set on the support post, the support rail is set in the support beam, and the support post is equipped with decoration Column, the support post are equipped with annular relief, and the lug boss is equipped with ring limit block, and the decorative post is equipped with annular Slot, the annular groove match with the annular relief, the annular groove be equipped with annular slot, the annular slot with it is described Ring limit block matches, and is rotatablely connected between the decorative post and the support post.
2. rehabilitating historic building support device according to claim 1, it is characterised in that: the support beam is equipped with first Through-hole, the support post are equipped with the first lug boss, and first lug boss is set in the first through hole, the support beam Equipped with the first card slot, first card slot is connected with the first through hole, and first lug boss is equipped with the second through-hole, described Positive stop strip is equipped in second through-hole, first card slot is equipped with fixture block, and the fixture block is bolted with the support beam, described Positive stop strip described in fixture block clamping, the positive stop strip are equipped with limiting slot, and the fixture block sets stop bosses, the retention bead portion In the limiting slot.
3. rehabilitating historic building support device according to claim 1, it is characterised in that: the support beam is equipped with second Card slot, the support rail are equipped with third card slot, and second card slot fastens with the third card slot, the support beam and The support rail is equipped with fixed mechanism, and the fixed mechanism includes that fixing seat is covered with fixed, the fixing seat and the fixation It is bolted between lid, the fixing seat is equipped with the first groove, and the fixation is covered with the second groove, and the support beam is set to In first groove and second groove, the support rail is set in first groove and second groove.
4. rehabilitating historic building support device according to claim 3, it is characterised in that: the support beam is equipped with first Bar is decorated, the first decoration bar is equipped with third through-hole, and the support post is set in the third through-hole, the decorative post The first decoration bar is supported, the support rail is equipped with the second decoration bar, and the second decoration bar is equipped with fixing groove, described solid Reservation is equipped with fixed link, and the fixed link is set in the fixing groove.
5. rehabilitating historic building support device according to claim 4, it is characterised in that: the first decoration bar is equipped with the One sliding slot, the decorative post are connected with gag lever post, and the gag lever post dismantling connection has Ka Gai, and the support beam is equipped with card Bar, the kelly are equipped with second sliding slot.
6. rehabilitating historic building support device according to claim 1, it is characterised in that: the support rail is equipped with room Top support frame, the roof supported frame include support bottom frame, mandril and motion bar, and the support bottom frame is set to the support On cross bar, the support bottom frame is equipped with connector, and the connector is slidably connected with the motion bar, and the rotating member includes the One rotating block and the second rotating block are rotatablely connected between first rotating block and second rotating block, first rotation Block is set on the support bottom frame, and second rotating block is set on the motion bar, is equipped with and is turned between two motion bars Axis is rotatablely connected between two motion bars, and the support bottom frame is equipped with support guide mechanism, and the mandril is set to the branch It supports on guiding mechanism, the mandril connects the shaft.
7. rehabilitating historic building support device according to claim 6, it is characterised in that: the support guide mechanism includes Guide pad and supporting block, the mandril are slidably connected with the guide pad, and the supporting block is slidably connected with the support frame, institute It states supporting block and supports the mandril.
8. rehabilitating historic building support device according to claim 7, it is characterised in that: it is fixed that the guide pad is equipped with first Position slot, the supporting block are equipped with the second locating slot, are equipped with pin in first locating slot and second locating slot.
9. the construction method based on rehabilitating historic building support device described in claim 1, it is characterised in that including walking as follows It is rapid:
A, the preparation of ancient building measurement and construction;
B, the installation of support construction: support post, support beam and support rail are carried in ancient building, later will support Column, which erects, to be come, and the first decoration rod set is entered to the top of support post, then support beam is inserted in the first protrusion of support post In portion, later then positive stop strip is inserted into the second through-hole, with changing the direction of the second through-hole by fixture block card by rotational support column Bolt is screwed on tight positive stop strip, then fixture block and support beam, later by the of the third card slot alignment support beam of support rail Support rail is placed in support beam by two draw-in groove, screws on bolt in support beam and support rail later;
C, the installation of fixed mechanism, decorative post and decoration bar: the first groove of fixing seat is directed at support rail and support is horizontal The the second groove alignment support rail and support beam of fixed lid are fixed the fixed link direction and support rail covered by beam Direction is consistent, retells fixing seat and fixed cover buckle is closed, and screws on bolt in fixing seat and fixed cover later, by fixed link from fixation It is extracted out in seat, later the second decoration of installation bar on support rail, it will be fixed in the fixing groove alignment and fixation seat of the second decoration bar The position of bar retells fixed link and is passed through fixing seat until fixed link is passed through in fixing groove completely, by the annular groove pair of decorative post Decorative post is tightly attached to one side of something of the not set ring limit block of support post, Zhi Houzhuan by the annular relief of quasi- support post Dynamic decorative post blocks upper the so that the annular slot of decorative post is stuck in ring limit block completely on support post later Then two decorative posts are rotated together 90 ° by two decorative posts, so that two decorative posts of clamping in ring limit block;
D, the installation of kelly and gag lever post: setting up two kellies between two support beams, first the fixing card in support beam One end of bar measures the spacing between two fixed one end of kelly with tape measure later, adjusts a kelly level later, uses Horizontal ruler is measured after ensuring that the kelly is horizontal, and the kelly is fixed in support beam with bolt, then adjusts another kelly It is fixed at a distance from kelly with before, so that two kellies are parallel to each other, later fixes another kelly, in kelly position pair Gag lever post is placed in the underface answered, and gag lever post is fixed on decorative post later.
E, the laying of roof supported frame: splice roof supported bottom frame in support beam and support rail, bottom will be supported later Frame is located on support rail and fixes, and covers upper connector and fixation on support bottom frame, later wears motion bar from connector Enter, connected two motion bars with shaft at the top of motion bar, penetrates mandril from guiding bulk later, shaft is fixed On mandril, then make motion bar be close to roof the upward pushing tow of mandril, slidably support block later and carry out supporting post-rod, then the Pin is plugged between a positioning groove and the second locating slot.
F, the installation of plank: plank is installed in kelly and gag lever post according to the position at original place, limiting slot and gag lever post In, Ka Gai is fixed on gag lever post later, completes the fixation to plank.
10. the construction method of rehabilitating historic building support device according to claim 9, it is characterised in that: step a's) Detailed step are as follows: ancient building measures, and draws architectural plan, will be not used in support in ancient building later and function only as dividing The plank and door and window of effect disassemble, it is carried to outdoor, blockette is placed, later to the plank and door disassembled Window carries out simple deashing.
CN201910535593.4A 2019-06-20 2019-06-20 Supporting device for repairing ancient buildings and construction method thereof Active CN110424761B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910535593.4A CN110424761B (en) 2019-06-20 2019-06-20 Supporting device for repairing ancient buildings and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910535593.4A CN110424761B (en) 2019-06-20 2019-06-20 Supporting device for repairing ancient buildings and construction method thereof

Publications (2)

Publication Number Publication Date
CN110424761A true CN110424761A (en) 2019-11-08
CN110424761B CN110424761B (en) 2021-08-06

Family

ID=68408756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910535593.4A Active CN110424761B (en) 2019-06-20 2019-06-20 Supporting device for repairing ancient buildings and construction method thereof

Country Status (1)

Country Link
CN (1) CN110424761B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049461A (en) * 2020-07-27 2020-12-08 成龙建设集团有限公司 Reinforcing method for ancient building brick wall
CN113123631A (en) * 2021-04-23 2021-07-16 绍兴市第一园林工程有限公司 Integral jacking device for historic building and using method
CN113250480A (en) * 2021-04-25 2021-08-13 重庆市工程管理有限公司 BIM technology-based ancient building repairing method
CN114319922A (en) * 2021-12-28 2022-04-12 上海建为历保科技股份有限公司 Reinforcing device and method based on deterioration of ancient building wood member material

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2165576A (en) * 1984-10-08 1986-04-16 John Michael Dyson Method of repairing a house
JP2000320158A (en) * 1999-05-06 2000-11-21 Nippon Spindle Mfg Co Ltd Partition panel constructing method and partition panel
JP2003003678A (en) * 2001-06-22 2003-01-08 Sekisui House Ltd Reform method for house
CN201031441Y (en) * 2007-02-25 2008-03-05 张勇飞 Multipurpose movable dwelling capable of repeat quick-speed disassembling and assembling multipurpose mobile house
JP3205221U (en) * 2016-01-15 2016-07-14 正人 木下 Structure consisting of simple assembly frame
CN107143186A (en) * 2016-12-01 2017-09-08 吴峰 The Chinese style local-style dwelling houses of optional energy shock insulation is hinged with prefabricated components quick-assembling flexible rigid
CN207144153U (en) * 2017-09-15 2018-03-27 中国建筑设计院有限公司 Steel skeleton bamboo base fiber composite building materials and its building element and assembling composite building
CN207260320U (en) * 2017-09-30 2018-04-20 南京市园林规划设计院有限责任公司 A kind of pseudo-classic architecture verandah structure
CN208184050U (en) * 2018-04-26 2018-12-04 江苏亚雨创建科技股份有限公司 A kind of civilian villa liftable roof truss
CN208310306U (en) * 2018-05-14 2019-01-01 上海创盟国际建筑设计有限公司 A kind of repeatable assembled quickly builds bookstore
CN109138250A (en) * 2018-09-26 2019-01-04 安徽品小院建筑科技有限公司 A kind of assembled roof and its construction method
CN109162478A (en) * 2018-10-23 2019-01-08 洛阳理工学院 A kind of pair of ancient building unrest joining seam formula rafter span centre position carries out the method for reinforcing repairerment
CN208415993U (en) * 2018-06-01 2019-01-22 杨宣玲 A kind of old building reconstruction structure
CN208545827U (en) * 2018-05-24 2019-02-26 新疆北新建材工业集团有限公司 A kind of modularization steel house suitable for high seismic intensity area
CN109610880A (en) * 2018-12-11 2019-04-12 上海市园林工程有限公司 Two layers of pin Dun of ancient building, which connect, raises construction method

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2165576A (en) * 1984-10-08 1986-04-16 John Michael Dyson Method of repairing a house
JP2000320158A (en) * 1999-05-06 2000-11-21 Nippon Spindle Mfg Co Ltd Partition panel constructing method and partition panel
JP2003003678A (en) * 2001-06-22 2003-01-08 Sekisui House Ltd Reform method for house
CN201031441Y (en) * 2007-02-25 2008-03-05 张勇飞 Multipurpose movable dwelling capable of repeat quick-speed disassembling and assembling multipurpose mobile house
JP3205221U (en) * 2016-01-15 2016-07-14 正人 木下 Structure consisting of simple assembly frame
CN107143186A (en) * 2016-12-01 2017-09-08 吴峰 The Chinese style local-style dwelling houses of optional energy shock insulation is hinged with prefabricated components quick-assembling flexible rigid
CN207144153U (en) * 2017-09-15 2018-03-27 中国建筑设计院有限公司 Steel skeleton bamboo base fiber composite building materials and its building element and assembling composite building
CN207260320U (en) * 2017-09-30 2018-04-20 南京市园林规划设计院有限责任公司 A kind of pseudo-classic architecture verandah structure
CN208184050U (en) * 2018-04-26 2018-12-04 江苏亚雨创建科技股份有限公司 A kind of civilian villa liftable roof truss
CN208310306U (en) * 2018-05-14 2019-01-01 上海创盟国际建筑设计有限公司 A kind of repeatable assembled quickly builds bookstore
CN208545827U (en) * 2018-05-24 2019-02-26 新疆北新建材工业集团有限公司 A kind of modularization steel house suitable for high seismic intensity area
CN208415993U (en) * 2018-06-01 2019-01-22 杨宣玲 A kind of old building reconstruction structure
CN109138250A (en) * 2018-09-26 2019-01-04 安徽品小院建筑科技有限公司 A kind of assembled roof and its construction method
CN109162478A (en) * 2018-10-23 2019-01-08 洛阳理工学院 A kind of pair of ancient building unrest joining seam formula rafter span centre position carries out the method for reinforcing repairerment
CN109610880A (en) * 2018-12-11 2019-04-12 上海市园林工程有限公司 Two layers of pin Dun of ancient building, which connect, raises construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
顾杨: "《印象中国 纸上博物馆 传统家具》", 30 June 2016, 黄山书社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049461A (en) * 2020-07-27 2020-12-08 成龙建设集团有限公司 Reinforcing method for ancient building brick wall
CN112049461B (en) * 2020-07-27 2022-05-17 成龙建设集团有限公司 Reinforcing method for ancient building brick wall
CN113123631A (en) * 2021-04-23 2021-07-16 绍兴市第一园林工程有限公司 Integral jacking device for historic building and using method
CN113250480A (en) * 2021-04-25 2021-08-13 重庆市工程管理有限公司 BIM technology-based ancient building repairing method
CN114319922A (en) * 2021-12-28 2022-04-12 上海建为历保科技股份有限公司 Reinforcing device and method based on deterioration of ancient building wood member material

Also Published As

Publication number Publication date
CN110424761B (en) 2021-08-06

Similar Documents

Publication Publication Date Title
CN110424761A (en) Rehabilitating historic building support device and its construction method
CN208363546U (en) A kind of adjustable construction scaffolding
CN207392708U (en) A kind of Fast Installation scaffold for building
CN108915273A (en) A kind of plain type structural sheeting fitting machine
CN207422010U (en) A kind of street lamp post
CN205804939U (en) template assembly for subway station side wall
CN106958233B (en) For pouring the hydraulic self-lifting formula cantilever form construction method of Arch Dam Concrete
CN209179399U (en) The back of the body bolt mounting structure of wallboard
CN219365284U (en) Floor bearing structure with adjustable
CN208815540U (en) Deep foundation pit support structure
CN108569646A (en) A kind of assembled architecture wallboard mounting machine
CN209570441U (en) A kind of available reaction frame for applying railing horizontal thrust on site
CN206722357U (en) A kind of construction scaffold
CN213710508U (en) Detachable temporary support for constructional engineering construction
CN209429513U (en) A kind of building structure strengthening attachment device
CN209556454U (en) A kind of Stand Inclined Beams
CN110725619B (en) Fender is enclosed in construction convenient to dismantle
CN209368825U (en) A kind of solid mechanical device of stake for building
CN208310048U (en) The wooden facing being easily installed
CN207513168U (en) Jacking device and oblique cylinder formwork device
CN209082964U (en) A kind of scaffold gone up and down safely
CN205224572U (en) A ledger board for fastener -style steel pipe scaffold
CN205804905U (en) Adjustable concrete pavement template
CN203797592U (en) Movable assembled type engineering lighting table
CN205892630U (en) Many jack combination equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Support devices and construction methods for the restoration of ancient buildings

Effective date of registration: 20231019

Granted publication date: 20210806

Pledgee: Zhejiang Panan Rural Commercial Bank Co.,Ltd.

Pledgor: Jinhua Guanghe Ancient Architectural Technology Research and Development Co.,Ltd.

Registration number: Y2023330002378

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210806

Pledgee: Zhejiang Panan Rural Commercial Bank Co.,Ltd.

Pledgor: Jinhua Guanghe Ancient Architectural Technology Research and Development Co.,Ltd.

Registration number: Y2023330002378