CN206722357U - A kind of construction scaffold - Google Patents

A kind of construction scaffold Download PDF

Info

Publication number
CN206722357U
CN206722357U CN201720459818.9U CN201720459818U CN206722357U CN 206722357 U CN206722357 U CN 206722357U CN 201720459818 U CN201720459818 U CN 201720459818U CN 206722357 U CN206722357 U CN 206722357U
Authority
CN
China
Prior art keywords
cross bar
latch
spacing ring
inserted block
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720459818.9U
Other languages
Chinese (zh)
Inventor
成正伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'anshan Changsheng Construction And Installation Co Ltd
Original Assignee
Ma'anshan Changsheng Construction And Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'anshan Changsheng Construction And Installation Co Ltd filed Critical Ma'anshan Changsheng Construction And Installation Co Ltd
Priority to CN201720459818.9U priority Critical patent/CN206722357U/en
Application granted granted Critical
Publication of CN206722357U publication Critical patent/CN206722357U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of construction scaffold, and top plate is installed between the top of two root posts, cross bar is provided between two root posts bottom;The bottom at cross bar both ends is installed with inserted block, after inserted block lower end passes through fixed cover, inserts in spacing ring, the fixed cover is fixedly mounted on the top of spacing ring;The first latch is fixedly connected with the top of cross bar both ends, the second latch is connected with the first latch, is fixedly connected at the top of the second latch on support plate bottom surface, the support plate is bolted on the column of corresponding end;The termination of cross bar is external thread section, and the external thread section is threadedly coupled with swivel nut, and the swivel nut is fixed on screw rod, and screw rod is rotatably assorted with column;The bottom of spacing ring is installed with snib, is opened up on snib fluted.The utility model provides a kind of construction scaffold.Possesses following beneficial effect:The utility model improves the stability of scaffold by setting the parts such as inserted block and swivel nut.

Description

A kind of construction scaffold
Technical field
Technical field of buildings is the utility model is related to, specially a kind of construction scaffold.
Background technology
Scaffold, is the instrument for being frequently necessary to use in construction, and builder generally stands at and carried out on scaffold Paint wall, installation many work such as wallboard and punching.
All it is using fixed, with being continuously increased for building height, pin for the sake of existing scaffold is generally stable The height of hand cradle also increases therewith, existing scaffold it is high have more than ten meters even tens meters, the height of scaffold once increases, Its stability will certainly be affected.Existing scaffold is fixed generally by the mode of grafting or welding, these The stability of connected mode is relatively low, and scaffold slightly rocks, and the junction of scaffold easily falls off or is broken, and easily triggers Security incident.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of construction scaffold, solves existing pin The problem of hand cradle less stable.
(2) technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of construction scaffold, including two The column that root is arranged side by side, it is characterised in that:Top plate, two root posts bottom are installed between the top of two columns Between be provided with cross bar;The bottom at the cross bar both ends is installed with inserted block, after inserted block lower end passes through fixed cover, inserts spacing ring Interior, the fixed cover is fixedly mounted on the top of spacing ring;The inserted block lower end is provided with groove, the groove and the projection at the top of fixture block Tight fit, fixture block are installed in the inner bottom surface of spacing ring;
The first latch is fixedly connected with the top of the cross bar both ends, the second latch, institute are connected with first latch State and be fixedly connected at the top of the second latch on support plate bottom surface, the support plate is bolted on the column of corresponding end;It is described The termination of cross bar is external thread section, and the external thread section is threadedly coupled with swivel nut, and the swivel nut is fixed on screw rod, and screw rod with it is described Column is rotatably assorted;The bottom of the spacing ring is installed with snib, opened up on the snib it is fluted, in the groove lead to Snubber block is crossed to be fixedly connected at the top of pilum.
The column bottom is socketed with retainer ring, and retainer ring is located at the top of spacing ring.
The inner chamber of the fixed cover is arranged with two fixture blocks, and the region between two fixture blocks is used to clamp inserted block, and often A spring is connected between individual fixture block and fixed cover.
The opposite side of two columns is respectively installed with cat ladder.
(3) beneficial effect
The utility model provides a kind of construction scaffold.Possesses following beneficial effect:The utility model passes through The part such as inserted block and swivel nut is set, the stability of scaffold is improved, prevents from causing cross bar to come off or break from column because rocking The hidden danger split, improve the degree of safety of scaffold.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model pillar construction partial sectional view;
Fig. 3 is the utility model fixed cover structure sectional view.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As Figure 1-3, a kind of construction scaffold, including two columns 1 being arranged side by side, it is characterised in that: Top plate 2 is installed between the top of two root posts 1, cross bar 3 is provided between the bottom of two root posts 1.The bottom at the both ends of cross bar 3 Inserted block 4 is installed with, after the lower end of inserted block 4 passes through fixed cover 5, is inserted in spacing ring 6, the fixed cover 5 is fixedly mounted on spacing The top of ring 6.The lower end of inserted block 4 is provided with groove, and the groove and the raised tight fit at the top of fixture block 7, fixture block 7 are installed in spacing ring 6 Inner bottom surface.
The first latch 8 is fixedly connected with the top of the both ends of cross bar 3, the second latch 9, the second card are connected with the first latch 8 The top of tooth 9 is fixedly connected on the bottom surface of support plate 10, and the support plate is bolted on the column 1 of corresponding end.The end of cross bar 3 Head is external thread section 11, and the external thread section is threadedly coupled with swivel nut 12, and the swivel nut is fixed on screw rod 13, and screw rod 13 and column 1 is rotatably assorted.The bottom of spacing ring 6 is installed with snib 14, and fluted 15 are opened up on snib 14, passes through damping in groove 15 Block 16 is fixedly connected on the top of pilum 50.
The bottom of column 1 is socketed with retainer ring 17, and retainer ring 17 is located at the top of spacing ring 6.The inner chamber of fixed cover 5 is symmetrical Provided with two fixture blocks 19, the region between two fixture blocks 19 is used to clamp inserted block 4, and each connects between fixture block 19 and fixed cover 5 It is connected to a spring 18.The opposite side of two root posts 1 is respectively installed with cat ladder 20.
In use, first injecting cross bar 3 in column 1, the external thread section 11 on cross bar 3 is set to inject in swivel nut 12, then Screw rod 13 is rotated, band movable snail sleeve 12 rotates, swivel nut 12 is locked external thread section 11, then spacing ring 6 is enclosed on column 1, and Inserted block 4 is injected on the fixture block 7 in spacing ring 6, so as to be fixed to the bottom of cross bar 3, and the mistake of column 1 is inserted in cross bar 3 Cheng Zhong, the first latch 8 fasten with the second latch 9, and because the first latch 8 and the second latch 9 are reversed acanthoid, therefore cross bar 3 is easy Enter difficulty to go out, so as to be fixed to the top of cross bar 3, by multi-faceted fixation, so as to improve the stability of scaffold, prevent because The hidden danger for causing cross bar 3 to come off or be broken from column 1 is rocked, improves the degree of safety of scaffold.It can to sum up obtain, the building is applied Work scaffold, by setting inserted block 4, fixed cover 5, spacing ring 6, fixture block 7, the first latch 8, the second latch 9, support plate 10, outer Thread segment 11, swivel nut 12 and screw rod 13, solves the problems, such as existing scaffold less stable.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of construction scaffold, including two columns (1) being arranged side by side, it is characterised in that:Two columns (1) top plate (2) is installed between top, cross bar (3) is provided between two root posts (1) bottom;Cross bar (3) both ends Bottom be installed with inserted block (4), after inserted block (4) lower end passes through fixed cover (5), in insertion spacing ring (6), the fixed cover (5) it is fixedly mounted on the top of spacing ring (6);Inserted block (4) lower end is provided with groove, the groove with it is convex at the top of fixture block (7) Tight fit is played, fixture block (7) is installed in the inner bottom surface of spacing ring (6);
The first latch (8) is fixedly connected with the top of cross bar (3) both ends, the second card is connected with first latch (8) Tooth (9), it is fixedly connected on support plate (10) bottom surface at the top of second latch (9), the support plate is bolted on correspondingly On the column (1) at end;The termination of the cross bar (3) is external thread section (11), and the external thread section is threadedly coupled with swivel nut (12), should Swivel nut is fixed on screw rod (13), and screw rod (13) is rotatably assorted with the column (1);The bottom of the spacing ring (6) is fixed Snib (14) is installed, opened up fluted (15) on the snib (14), it is fixed by snubber block (16) in the groove (15) It is connected at the top of pilum (50).
A kind of 2. construction scaffold according to claim 1, it is characterised in that:Column (1) the bottom socket There is retainer ring (17), and retainer ring (17) is located at the top of spacing ring (6).
A kind of 3. construction scaffold according to claim 1, it is characterised in that:The inner chamber of the fixed cover (5) Be arranged with two fixture blocks (19), the region between two fixture blocks (19) is used to clamping inserted block (4), and each fixture block (19) with it is solid A spring (18) is connected between fixed set (5).
A kind of 4. construction scaffold according to claim 1, it is characterised in that:The phase of two columns (1) Offside is respectively installed with cat ladder (20).
CN201720459818.9U 2017-04-26 2017-04-26 A kind of construction scaffold Expired - Fee Related CN206722357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720459818.9U CN206722357U (en) 2017-04-26 2017-04-26 A kind of construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720459818.9U CN206722357U (en) 2017-04-26 2017-04-26 A kind of construction scaffold

Publications (1)

Publication Number Publication Date
CN206722357U true CN206722357U (en) 2017-12-08

Family

ID=60507665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720459818.9U Expired - Fee Related CN206722357U (en) 2017-04-26 2017-04-26 A kind of construction scaffold

Country Status (1)

Country Link
CN (1) CN206722357U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204120A (en) * 2018-02-06 2018-06-26 重庆熵臻科技有限公司 A kind of high stability and anti-dumping obforms supporting mechanism for building
CN108240107A (en) * 2018-03-21 2018-07-03 西南科技大学 A kind of steel bamboo combines scaffold board

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204120A (en) * 2018-02-06 2018-06-26 重庆熵臻科技有限公司 A kind of high stability and anti-dumping obforms supporting mechanism for building
CN108240107A (en) * 2018-03-21 2018-07-03 西南科技大学 A kind of steel bamboo combines scaffold board
CN108240107B (en) * 2018-03-21 2023-10-10 西南科技大学 Steel-bamboo combined scaffold board

Similar Documents

Publication Publication Date Title
CN205000554U (en) A concrete column for assembling overall structure
CN206722357U (en) A kind of construction scaffold
CN110159839A (en) A kind of multidirectional adjusting pipeline support frame
CN206859812U (en) Architectural engineering protection network
CN215482385U (en) Temporary supporting device for large steel structure bridge falling beam
CN211058278U (en) Convenient building construction of dismantling climbs frame
CN207131065U (en) A kind of building scaffold of high security
CN108277759A (en) Adjustable-angle combines guardrail and its installation method
CN208563181U (en) A kind of adjustable fence unit of setting angle
CN206859611U (en) Construction scaffold
CN208563179U (en) Adjustable-angle combines guardrail
CN209429259U (en) A kind of Special-Shaped Column beam-column node structure
CN208563180U (en) A kind of guardrail cross beams bindiny mechanism
CN112681743A (en) Concrete wall quick detach auxiliary assembly
CN207176510U (en) A kind of convenient working bracket component of bridge
CN207032480U (en) A kind of Rod Bracing connecting node for steel building
CN207960492U (en) A kind of portable manual is at well equipment
CN211145012U (en) Connecting structure of steel pipe tower
CN209443771U (en) A kind of Special-Shaped Column template reinforcing device
CN201802082U (en) Loquat support frame
CN206397001U (en) A kind of H steel columns parcel cylinder being easily installed
CN204662996U (en) Auxiliary fixed support device built by a kind of pull-type post
CN214996596U (en) Isolation railing for landscaping
CN207960171U (en) A kind of engineering management guardrail supporting rack
CN216109580U (en) Scaffold frame of dismouting of being convenient for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20180426