CN110424397A - A kind of hydrology special project test inverted well Grouting Pipe and its operating method - Google Patents

A kind of hydrology special project test inverted well Grouting Pipe and its operating method Download PDF

Info

Publication number
CN110424397A
CN110424397A CN201910712434.7A CN201910712434A CN110424397A CN 110424397 A CN110424397 A CN 110424397A CN 201910712434 A CN201910712434 A CN 201910712434A CN 110424397 A CN110424397 A CN 110424397A
Authority
CN
China
Prior art keywords
grouting pipe
plug
driven
electricity
tube body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910712434.7A
Other languages
Chinese (zh)
Inventor
王庆磊
万鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201910712434.7A priority Critical patent/CN110424397A/en
Publication of CN110424397A publication Critical patent/CN110424397A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Abstract

The invention discloses a kind of hydrology special projects to test inverted well Grouting Pipe, and structure includes that Grouting Pipe main structure and top are driven by electricity rotational structure.The bottom of slip casting tube body is equipped with plug, top Grouting Pipe apex structure is fixed on top by top fixing end and is driven by electricity under rotating device, rotary drilling is carried out under the driving of electric power, this new device is due to using motor driven, save manpower, it is flexible and convenient to use, grouting and reinforcing quality is substantially increased, the accuracy of later period hydraulic pressurization Returning test is improved.

Description

A kind of hydrology special project test inverted well Grouting Pipe and its operating method
Technical field
The present invention relates to hydrology special project geologic prospects to test field, and specifically a kind of hydrology special project test inverted well is used Grouting Pipe and its operating method.
Technical background
With the continuous development of engineering technology, deep big foundation pit is more and more, leads to base pit dewatering amount with soil excavation It is very big, geological environment around is generated and destroys and influence Adjacent Buildings.Based on this, water is usually carried out in the survey and construction stage Literary special project geologic prospect test, specially base pit dewatering are tested, and during the test by Returning test come when determining recharge Between, the exploitativeness of the relationship that recharge amount and water level restore and recharge.Based on this for inverted well consolidation grouting construction technology Often up to less than reinforce standard, then hydraulic pressurization recharge during, cause water body to gush along two pleurapophysis of top overburden soil, then Grouting and reinforcing is also needed again to construct.And in consolidation grouting, chief reason is played in the selection of Grouting Pipe.Existing Grouting Pipe Structure usually has some disadvantages: hydrology special project inverted well, and well head is deep, and slip casting depth is not achieved in part Grouting Pipe;I.e. Just Grouting Pipe depth is enough, it is difficult to Grouting Pipe is pressed into slip casting depth by manpower, slip casting low efficiency is at high cost, makes to construction At big inconvenience, the tempo of construction is influenced.
Summary of the invention
The purpose of the present invention is a kind of easy to use, flexible operation for providing in view of the above deficiencies, the water being simple and efficient Literary special test inverted well grouting device.
To achieve the goals above, technical scheme is as follows: a kind of hydrology special project test inverted well Grouting Pipe, Including Grouting Pipe main structure, Grouting Pipe main structure includes Grouting Pipe tube body and the bottom pyramidal plug for being fixed on its bottom, It is characterized in that the Grouting Pipe further includes that top is driven by electricity rotational structure, it includes electricity that the top, which is driven by electricity rotational structure, Power drive external structure and the internal fixing device being set in power driver external structure, rotating hand bar pass through top Fixing end is fixed at the top of power driver external structure, and Grouting Pipe main structure passes through the internal fixing device and top electricity Power drive rotational structure is connected, and the top is driven by electricity rotational structure and is connected by connecting electric wire with generator.
Further, the Grouting Pipe main structure includes Grouting Pipe tube body, is set at the top of Grouting Pipe at the top of Grouting Pipe tube body Structure, the Grouting Pipe top structure outside is the hexagon matched with the internal fixing device of power driver external structure Structure, Grouting Pipe top structure inside is circle, and sets internal screw thread, and the Grouting Pipe bottom sets external screw thread, so that Several Grouting Pipes can be connected through a screw thread.
Further, Grouting Pipe tube body lower part sets two sides connector, and bottom pyramidal the upper part of the plug sets the upper part of the plug device, set Ring is fixed by welding on the upper part of the plug device, and screw passes through the two sides connector of Grouting Pipe tube body lower part and bottom pyramidal blocks up Lantern ring on head, so that bottom pyramidal plug is fixed on Grouting Pipe bottom.Bottom pyramidal lantern ring and screw bore bottom Shape plug is fixed on slip casting tube body lower part, and protection tube body prevents soil from entering during being drilled down into, during slip casting, in water Under the pressure of mud, taper plug can be squeezed and press off, and construction is flexible and convenient.
Further, every Grouting Pipe tube length is 1m, and has scale value on the outside of tube body, convenient in construction drilling for The control of depth, it is ensured that the accuracy of slip casting depth.
A kind of operating method of hydrology special project test inverted well Grouting Pipe, it is characterised in that the method includes following steps It is rapid:
A, lower taper plug is fixed on the two sides connector of slip casting main body tube lower part by screw and screw fixing device;
B, top is fixed on by upper top fixing end to be driven by electricity in rotational structure;
C, generator is opened, under the driving of electric power, starts to carry out under the drilling that Grouting Pipe creeps into screw thread outside taper plug Drilling continues growing second Grouting Pipe after first Grouting Pipe is crept into, and second Grouting Pipe passes through on the outside of Grouting Pipe Rotation is fixed in fixing end inside thread at the top of screw thread and first Grouting Pipe, it is ensured that after stabilization, then is driven by top electric power Dynamic rotational structure carries out being driven by electricity drilling, successively carries out, until stopping drilling after reaching slip casting depth;
D, Grouting Pipe bottom pyramidal plug and slip casting tube body in drilling process is in closed state, will modulate after stopping drilling Mud injected by Grouting Pipe, bottom pyramidal plug is pushed out in the effect of pressure, but under the fixation of lantern ring and screw not It can fall off, it is ensured that construction is gone on smoothly.
The present invention is driven by electricity under rotating device by the way that Grouting Pipe main structure is fixed on top, under the driving of electric power Rotary drilling is carried out, after a Grouting Pipe drilling machine, can continue to creep by continuing addition Grouting Pipe, general inverted well well Deep few then more than ten meters, more then tens meters.Traditional Grouting Pipe depth is often insufficient, is also difficult to pass through people even if slip casting length of tube is enough Power is crept into, however this new device saves manpower due to using motor driven, flexible and convenient to use, is substantially increased Grouting and reinforcing quality improves the accuracy of later period hydraulic pressurization Returning test.
Detailed description of the invention
Fig. 1-top is driven by electricity rotational structure figure;
Fig. 2-Grouting Pipe main structure;
Fig. 3-bottom pyramidal plug;
Fig. 4-screw device;
Fig. 5-top hydraulic rotating structure top view;
Fig. 6-Grouting Pipe top plan;
Fig. 7-construction overall schematic.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.As shown in Figure 1, 2, the invention mainly comprises Grouting Pipe main bodys Structure and top are driven by electricity rotational structure figure two parts composition.It includes 1- rotating hand that its middle part, which is driven by electricity rotational structure, Bar;Fixing end at the top of 2-;3- power driver external structure;4- internal fixing device;5- connection electric wire;6- generator.Note Starching pipe main structure includes: 7- Grouting Pipe apex structure;8- Grouting Pipe tube body;The two sides 9- connector;10- outside screw;11- set Ring;12- the upper part of the plug device;13- taper plug;Screw thread is crept into outside 14-;15- screw;16- screw thread;The fixed dress of 17- screw It sets.Rotating hand bar 1 is fixed on top by top fixing end 2 and is driven by electricity at the top of rotational structure, knot outside power driver Structure 3 is made of stainless steel structure, is played the role of protecting internal structure, while preventing rust corrosion, is passed through connection electric wire 5 and hair Motor 6 is connected.Under the driving of electric power, top is driven by electricity rotational structure and passes through internal fixing device 4 and Grouting Pipe main body knot Grouting Pipe apex structure 7 is connected in structure, is hexagonal structure on the outside of Grouting Pipe apex structure 7, and inside is circle, and quilt is convenient in outside Internal fixing device 4 is fixed, the rotary drilling under electric power effect.There are two sides connector 9, bottom in 8 lower part two sides of Grouting Pipe tube body The upper part of the plug device 12 is arranged at 13 top of taper plug, and lantern ring 11 is fixed by welding at the upper part of the plug device 12.Screw 15 is worn Two sides connector 9 and lantern ring are crossed, screw thread rotation is carried out with screw fixing device 17 and taper plug is fixed on Grouting Pipe main body knot Structure bottom, it is ensured that taper plug is not easy to fall in drilling process, and there is lantern ring certain space carry out taper plug It is up and down, there is external drilling screw thread outside taper plug, convenient for construction drilling.
Here it may include motor and the transmission mechanism being connected to motor, transmission mechanism that top, which is driven by electricity rotational structure, It can be axis transmission, gear drive, chain wheel driving mechanism etc..Power driver external structure can be shell and fixation In the intracorporal motor of shell, electric wire penetrates shell and is connected to motor, and internal fixing device passes through gear drive and is driven by electricity The connection of device external structure, Grouting Pipe apex structure 7 is fixed on internal fixing device in Grouting Pipe main structure, when work, electricity Machine rotation drives the rotary drilling of Grouting Pipe main structure rotation realization Grouting Pipe by internal fixing device.Can certainly be Power driver external structure directly drives for shell and the motor being immobilized in the shell, motor output shaft and is fixed on internal fixation Grouting Pipe rotation or power driver external structure on device are only shell, and motor is fixed on internal fixing device, The Grouting Pipe rotation being fixed on internal fixing device is directly driven, it will be understood by those of skill in the art that there are many sides The driving rotation function that top is driven by electricity rotational structure may be implemented in formula, and details are not described herein by the present invention.
Concrete construction method is as follows: for carrying out 10m grouting and reinforcing test.Under specially Fig. 5-construction overall schematic Lower taper plug is fixed on slip casting main body tube lower part by screw and screw fixing device by portion's structure.Pass through upper top Fixing end is fixed on top and is driven by electricity in rotational structure, opens generator, under the driving of electric power, Grouting Pipe is in taper plug Start to be crept into that (in general, inverted well Cheng Jinghou, the soil body around well head can be relatively loose under the drilling of outside drilling screw thread It is softer), after first Grouting Pipe is crept into, second Grouting Pipe is continued growing, second Grouting Pipe is with bottom slip casting Managing maximum difference is not have two sides connector, on the inside of fixing end at the top of Grouting Pipe outside screw 10 and first Grouting Pipe Rotation is fixed in screw thread, it is ensured that after stablizing, then rotational structure is driven by electricity by top and carries out being driven by electricity drilling, successively into Row, until stopping drilling after reaching slip casting depth.Grouting Pipe bottom pyramidal plug and slip casting tube body in drilling process, which are in, to be closed Conjunction state injects the mud modulated by Grouting Pipe, and bottom pyramidal plug will be pushed out in the effect of pressure, but in lantern ring It will not fall off under the fixation of screw, it is ensured that construction is gone on smoothly.

Claims (5)

1. a kind of hydrology special project tests inverted well Grouting Pipe, including Grouting Pipe main structure, Grouting Pipe main structure includes note Slurry pipe tube body and the bottom pyramidal plug for being fixed on its bottom, it is characterised in that the Grouting Pipe further includes that top is driven by electricity rotation Rotation structure, it includes that power driver external structure is tied with power driver outside is set to that the top, which is driven by electricity rotational structure, Internal fixing device in structure, rotating hand bar are fixed at the top of power driver external structure by top fixing end, slip casting Pipe main structure is driven by electricity rotational structure with top by the internal fixing device and is connected, and the top is driven by electricity rotation Structure is connected by connecting electric wire with generator.
2. hydrology special project as described in claim 1 tests inverted well Grouting Pipe, it is characterised in that the Grouting Pipe main body knot Structure includes Grouting Pipe tube body, and Grouting Pipe top structure is set at the top of Grouting Pipe tube body, is and electricity on the outside of the Grouting Pipe top structure The hexagonal structure that the internal fixing device of power drive external structure matches, Grouting Pipe top structure inside is circle, and If internal screw thread, the Grouting Pipe bottom sets external screw thread, so that several Grouting Pipes can be connected through a screw thread.
3. hydrology special project as claimed in claim 2 tests inverted well Grouting Pipe, it is characterised in that Grouting Pipe tube body lower part is set Two sides connector, bottom pyramidal the upper part of the plug set the upper part of the plug device, and lantern ring is fixed by welding on the upper part of the plug device, spiral shell The lantern ring on the two sides connector and bottom pyramidal plug of Grouting Pipe tube body lower part is followed closely, so that bottom pyramidal plug be fixed In Grouting Pipe bottom.
4. hydrology special project as claimed in claim 2 tests inverted well Grouting Pipe, it is characterised in that every Grouting Pipe tube body is long Degree is 1m, and has scale value on the outside of tube body, convenient for the control in construction drilling for depth, it is ensured that the accuracy of slip casting depth.
5. a kind of operating method of hydrology special project test inverted well Grouting Pipe, it is characterised in that the method includes following steps It is rapid:
A, lower taper plug is fixed on the two sides connector of slip casting main body tube lower part by screw and screw fixing device;
B, top is fixed on by upper top fixing end to be driven by electricity in rotational structure;
C, generator is opened, under the driving of electric power, starts to carry out under the drilling that Grouting Pipe creeps into screw thread outside taper plug Drilling continues growing second Grouting Pipe after first Grouting Pipe is crept into, and second Grouting Pipe passes through on the outside of Grouting Pipe Rotation is fixed in fixing end inside thread at the top of screw thread and first Grouting Pipe, it is ensured that after stabilization, then is driven by top electric power Dynamic rotational structure carries out being driven by electricity drilling, successively carries out, until stopping drilling after reaching slip casting depth;
D, Grouting Pipe bottom pyramidal plug and slip casting tube body in drilling process is in closed state, after stopping drilling, will modulate Good mud is injected by Grouting Pipe, and bottom pyramidal plug is pushed out in the effect of pressure, but under the fixation of lantern ring and screw It will not fall off, it is ensured that construction is gone on smoothly.
CN201910712434.7A 2019-08-02 2019-08-02 A kind of hydrology special project test inverted well Grouting Pipe and its operating method Pending CN110424397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910712434.7A CN110424397A (en) 2019-08-02 2019-08-02 A kind of hydrology special project test inverted well Grouting Pipe and its operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910712434.7A CN110424397A (en) 2019-08-02 2019-08-02 A kind of hydrology special project test inverted well Grouting Pipe and its operating method

Publications (1)

Publication Number Publication Date
CN110424397A true CN110424397A (en) 2019-11-08

Family

ID=68412353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910712434.7A Pending CN110424397A (en) 2019-08-02 2019-08-02 A kind of hydrology special project test inverted well Grouting Pipe and its operating method

Country Status (1)

Country Link
CN (1) CN110424397A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614008A (en) * 2009-07-21 2009-12-30 苏州二建建筑集团有限公司 The casting head that is used for compaction grouting
CN202450511U (en) * 2012-03-06 2012-09-26 新蒲建设集团有限公司 Grouting device
US20130272799A1 (en) * 2011-08-26 2013-10-17 American Piledriving Equipment, Inc. Apparatus and methods for pipe piling placement with continuous grouting
CN206681760U (en) * 2017-04-28 2017-11-28 中铁十八局集团有限公司 Deep hole grouting device after shield duct piece wall
CN210887222U (en) * 2019-08-02 2020-06-30 上海市政工程设计研究总院(集团)有限公司 Grouting pipe for hydrologic special test recharge well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614008A (en) * 2009-07-21 2009-12-30 苏州二建建筑集团有限公司 The casting head that is used for compaction grouting
US20130272799A1 (en) * 2011-08-26 2013-10-17 American Piledriving Equipment, Inc. Apparatus and methods for pipe piling placement with continuous grouting
CN202450511U (en) * 2012-03-06 2012-09-26 新蒲建设集团有限公司 Grouting device
CN206681760U (en) * 2017-04-28 2017-11-28 中铁十八局集团有限公司 Deep hole grouting device after shield duct piece wall
CN210887222U (en) * 2019-08-02 2020-06-30 上海市政工程设计研究总院(集团)有限公司 Grouting pipe for hydrologic special test recharge well

Similar Documents

Publication Publication Date Title
CN106193030B (en) A kind of prestressing force grouted anchor bar and construction method with hangnail head
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN206681760U (en) Deep hole grouting device after shield duct piece wall
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN206646541U (en) A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN208605162U (en) A kind of shield tunnel geological prospecting borehole hole sealing structure
CN110424397A (en) A kind of hydrology special project test inverted well Grouting Pipe and its operating method
CN103114576A (en) Post grouting construction method for cast-in-place concrete pile
CN202441403U (en) High-pressure water self-drilling grouting anchor rod for mine
CN210887222U (en) Grouting pipe for hydrologic special test recharge well
CN208441096U (en) Soil nailing port closing device
CN207673287U (en) A kind of jet-propelled high-efficiency helical drilling tool
CN207143929U (en) A kind of Dragsaw type steel-pipe pile
RU78230U1 (en) SCREW ANCHOR
CN115199296A (en) Disassembly-free grouting and tapping method for shield segment
CN210975737U (en) Reservoir dam body culvert pipe transformation structure
CN108118684A (en) A kind of Tidal Flat Reclamation blowing-filling sludge burning into sand layer foundation reinforcing structure and construction method
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill
CN207512714U (en) Soil pressure sensor embedded device
CN106948768A (en) A kind of auger stem and steel pipe pile construction method
CN213773428U (en) Underwater reinforced foundation with drainage channel
CN207392201U (en) A kind of packaged type slip casting platform
CN208502673U (en) Waste residue recycling pours hole wall ultrasonic drill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination