CN207143929U - A kind of Dragsaw type steel-pipe pile - Google Patents

A kind of Dragsaw type steel-pipe pile Download PDF

Info

Publication number
CN207143929U
CN207143929U CN201720930619.1U CN201720930619U CN207143929U CN 207143929 U CN207143929 U CN 207143929U CN 201720930619 U CN201720930619 U CN 201720930619U CN 207143929 U CN207143929 U CN 207143929U
Authority
CN
China
Prior art keywords
pipe pile
pile
type steel
steel
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720930619.1U
Other languages
Chinese (zh)
Inventor
张建东
付浩
刘朵
张晖
季超
韩依璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
JSTI Group Co Ltd
Original Assignee
Nanjing Tech University
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University, JSTI Group Co Ltd filed Critical Nanjing Tech University
Priority to CN201720930619.1U priority Critical patent/CN207143929U/en
Application granted granted Critical
Publication of CN207143929U publication Critical patent/CN207143929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of Dragsaw type steel-pipe pile is the utility model is related to, is designed to promote Piling speed.The utility model Dragsaw type steel-pipe pile, steel pipe pile body, the pile crown being connected with the steel pipe pile body, the piling end of the pile crown is laciniation.The utility model Dragsaw type steel-pipe pile, when half reciprocating rotary is driven piles, moved back and forth using between the sawtooth of stake end come quick fragment earth or hard interbedded layer.

Description

A kind of Dragsaw type steel-pipe pile
Technical field
It the utility model is related to a kind of Dragsaw type steel-pipe pile.
Background technology
Steel-pipe pile is that China's civil construction develops rapidly, and it is mainly used as the basis in the engineering constructions such as bunder, mesh Preceding steel-pipe pile during piling construction, although typically further improving the superiority of press-in using static pressure method, durable resistance carries It is high, smaller to surrounding environment influence, greatly shorten the construction period, it is but hard being pressed with the grains of sand layer laccolite that is mixed with cobble etc. The barrier of reinforced concrete structure be present in geology or underground, so as to increase end resistance, can cause bigger vibration and Piling speed, certain soil compaction amount can be also produced in piling, the environment of surrounding can be impacted.
The defects of for above-mentioned prior art, is, it is necessary to propose that one kind can reduce pile side friction and end resistance, and can Quick penetration hard interbedded layer, the method for Piling speed can be promoted.
Utility model content
In order to solve the above technical problems, the purpose of this utility model, which is to provide one kind, can reduce pile side friction and stake end Resistance, the Dragsaw type steel-pipe pile of and can quick penetration hard interbedded layer.
To reach above-mentioned purpose of utility model, the utility model Dragsaw type steel-pipe pile, including:Steel pipe pile body, with the steel The pile crown of pile tube body connection, the piling end of the pile crown is laciniation.
Further, the laciniation is outwards chamfer by the side wall of pile crown, the space that the pile crown side wall fences up To be interior, side wall is outer using the external space.
Further, the angle between the laciniation and the pile crown side wall is α, and α is 30 ° ~ 45 °
Further, the laciniation is fleam-tooth, and the drift angle of the fleam-tooth is 30 °
Further, the steel pipe pile body and the pile crown are split-type structural.
Further, the side wall of the steel pipe pile body is provided with internal thread, and the pile crown is provided with external screw thread, the pile crown It is set in the pile crown, the pile crown passes through the embedded connection of screw thread rotation with the pile crown.
Further, the steel pipe pile body is structure as a whole with the pile crown.
Compared with prior art, the utility model Dragsaw type steel-pipe pile has advantages below:
The jagged pile crown of steel pipe pile body connection, is designed to isosceles zigzag, when mainly considering reciprocating rotation, both sides Suffered frictional resistance be identical.
Angle between laciniation and the pile crown side wall is α, and α is 30 ° ~ 45 ° the most suitable, both can guarantee that sawtooth Hardness also can guarantee that its penetration power.
Triangle sawtooth in laciniation is isosceles triangle, and the drift angle of triangle sawtooth is 30 °, mainly for ensureing to saw The hardness of tooth also can guarantee that its penetration power.
When half reciprocating rotary is driven piles, moved back and forth using between the sawtooth of stake end come quick fragment earth or hard interbedded layer.Both Pile side friction and end resistance, and can quick penetration hard interbedded layer can be reduced, and then the method for Piling speed can be promoted, shortens work Phase.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model Dragsaw type steel-pipe pile embodiment 1;
Fig. 2 is the structural representation of the utility model Dragsaw type steel-pipe pile embodiment 2;
Fig. 3 is the floor map of the utility model Dragsaw type steel-pipe pile Fig. 2 pile crowns;
Fig. 4 is the diagrammatic cross-section of the utility model Dragsaw type steel-pipe pile Fig. 2 pile crowns;
Fig. 5 the utility model Dragsaw type steel-pipe pile Fig. 2 steel pipes pile body rotates the schematic diagram of embedded connection with pile crown.
Embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to the scope of the utility model.
Embodiment 1
As shown in figure 1, the present embodiment Dragsaw type steel-pipe pile, including:Steel pipe pile body, the stake being connected with the steel pipe pile body Head, the piling end of the pile crown is laciniation 1.In the present embodiment, between the laciniation and the pile crown side wall Angle be α, α is 30 °.
The present embodiment operation instruction, the laciniation of pile crown end set, when half reciprocating rotary is driven piles, utilize stake end Moved back and forth between sawtooth and come quick fragment earth or hard interbedded layer.In the present embodiment, steel pipe pile body and sawtooth pile crown are integral. Advantage is directly to use, and on-site construction time is reduced without installing;Shortcoming can not be reused after an end sawtooth damages.
Embodiment 2
As shown in Fig. 2 to 5, the present embodiment Dragsaw type steel-pipe pile, including:Steel pipe pile body 2, it is connected with the steel pipe pile body Pile crown, the piling end of the pile crown is laciniation 1.As different from Example 1:Steel pipe pile body described in the present embodiment and institute It is split-type structural to state pile crown.The side wall of the steel pipe pile body is provided with internal thread, and the pile crown is provided with external screw thread, the stake Headgear is located in the pile crown, and the pile crown passes through the embedded connection of screw thread rotation with the pile crown.In the present embodiment, institute It is α to state the angle between laciniation and the pile crown side wall, and α is 45 °.
The present embodiment operation instruction, need steel pipe pile body and sawtooth pile crown during site operation by rotating embedded company Connect.Advantage is when being damaged when piling in stake tooth, can recycle steel-pipe pile by changing tooth, save material environment friendly, shortcoming It is to need to lose time to combine early stage in piling.
In the various embodiments described above, the laciniation is outwards chamfer by the side wall of pile crown, be prefabricated in the factory steel-pipe pile when, Zigzag fashion is del from plan, and is then to chamfer from inside to outside in terms of the profile of stake.
In the various embodiments described above, the angle between laciniation and the pile crown side wall is α, and α is 30 ° ~ 45 ° and closed the most It is suitable, it both can guarantee that the hardness of sawtooth or can guarantee that its penetration power.
In the various embodiments described above, the triangle sawtooth in the laciniation is isosceles triangle, the base angle of triangle sawtooth For 30 °
Described above is only preferred embodiment of the present utility model, is not limited to the utility model, it is noted that For those skilled in the art, on the premise of the utility model technical principle is not departed from, can also do Go out some improvement and modification, these improvement and modification also should be regarded as the scope of protection of the utility model.

Claims (7)

1. a kind of Dragsaw type steel-pipe pile, including:Steel pipe pile body, the pile crown being connected with the steel pipe pile body, it is characterised in that described The piling end of pile crown is laciniation.
2. Dragsaw type steel-pipe pile according to claim 1, it is characterised in that the laciniation from pile crown side wall to Outer beveling, the space that the pile crown side wall fences up are interior, and side wall is outer using the external space.
3. Dragsaw type steel-pipe pile according to claim 2, it is characterised in that the laciniation and the pile crown side wall Between angle be α, α is 30 ° ~ 45 °.
4. Dragsaw type steel-pipe pile according to claim 1, it is characterised in that the laciniation is sawed for isosceles triangle Tooth, the drift angle of the fleam-tooth is 30 °.
5. Dragsaw type steel-pipe pile according to claim 1, it is characterised in that the steel pipe pile body and the pile crown are split Formula structure.
6. Dragsaw type steel-pipe pile according to claim 5, it is characterised in that the side wall of the steel pipe pile body is provided with interior spiral shell Line, the pile crown are provided with external screw thread, and the pile crown is set in the pile crown, and the pile crown passes through spiral shell with the pile crown Line rotates embedded connection.
7. Dragsaw type steel-pipe pile according to claim 1, it is characterised in that the steel pipe pile body is integrated with the pile crown Structure.
CN201720930619.1U 2017-07-28 2017-07-28 A kind of Dragsaw type steel-pipe pile Active CN207143929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720930619.1U CN207143929U (en) 2017-07-28 2017-07-28 A kind of Dragsaw type steel-pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720930619.1U CN207143929U (en) 2017-07-28 2017-07-28 A kind of Dragsaw type steel-pipe pile

Publications (1)

Publication Number Publication Date
CN207143929U true CN207143929U (en) 2018-03-27

Family

ID=61673609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720930619.1U Active CN207143929U (en) 2017-07-28 2017-07-28 A kind of Dragsaw type steel-pipe pile

Country Status (1)

Country Link
CN (1) CN207143929U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119168A (en) * 2020-01-03 2020-05-08 广西盛虎建筑科技有限公司 Post-grouting construction method for spinning enlarged-head steel pipe pile
CN111549764A (en) * 2020-05-29 2020-08-18 中铁十一局集团第五工程有限公司 Trestle steel pipe pile bottom anchoring joint

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119168A (en) * 2020-01-03 2020-05-08 广西盛虎建筑科技有限公司 Post-grouting construction method for spinning enlarged-head steel pipe pile
CN111549764A (en) * 2020-05-29 2020-08-18 中铁十一局集团第五工程有限公司 Trestle steel pipe pile bottom anchoring joint

Similar Documents

Publication Publication Date Title
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN205399418U (en) Sharp structure of stake that reinforcing PHC tubular pile pile sinking broke ground
CN207143929U (en) A kind of Dragsaw type steel-pipe pile
CN103485339B (en) Static pressure expanded foot prestress high strength concrete pipe pile
CN105525619A (en) Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN102619521B (en) Construction method for vertical shaft bedrock section wall structure
CN102220764B (en) Construction method of deep foundation pit bracing system
CN101798823A (en) Construction method of performing remote deviation rectification by passageway method
CN106917402B (en) A kind of CFG pile precast pile head and CFG pile construction method
CN103147435A (en) Method for treating construction engineering foundation in gob
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN209621322U (en) A kind of guide table structure missed the stop suitable for rock tunnel(ling) machine
CN101838987A (en) Operation method of piles with variable cross section for reinforcing shield end soil body
CN207109805U (en) Wear the compound isolation pile of bridge pier in a kind of tunnel side
CN105840209A (en) Construction method for controlling deformation of anchor piles at barrel segment of tunnel
CN202755385U (en) Anti-floating structure of shallow-buried shield tunnel
CN206768832U (en) Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
CN209873784U (en) Open cut underground structure diaphragm wall groove wall reinforced structure
CN103603356A (en) Annular post-grouting device for lower pile tips under sandstone geological conditions
CN203499692U (en) Special-shaped shaft adopted for subway construction under pipeline conditions