CN110422758A - By the construction tool and construction method of the mobile installation component of basal orbit - Google Patents
By the construction tool and construction method of the mobile installation component of basal orbit Download PDFInfo
- Publication number
- CN110422758A CN110422758A CN201910447102.0A CN201910447102A CN110422758A CN 110422758 A CN110422758 A CN 110422758A CN 201910447102 A CN201910447102 A CN 201910447102A CN 110422758 A CN110422758 A CN 110422758A
- Authority
- CN
- China
- Prior art keywords
- type frame
- door type
- side door
- channel steel
- vertical beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C25/00—Cranes not provided for in groups B66C17/00 - B66C23/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C5/00—Base supporting structures with legs
- B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/08—Runners; Runner bearings
Abstract
The present invention relates to a kind of construction tools and construction method by the mobile installation component of basal orbit, are laid with Left-side support guide rail and Right side support guide rail;Left side door type frame and right side door type frame are respectively arranged on Left-side support guide rail and Right side support guide rail;Left side door type frame is connected with the top middle portion of right side door type frame by horizontal beam;Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal;Lifting lug is provided on horizontal beam.The present invention solves the problems, such as that narrow space is not available mechanical hoisting by the construction method of the mobile installation component of basal orbit;Labor intensity of workers is reduced, securely and reliably, construction efficiency is improved, reduces construction cost.
Description
Technical field
The present invention relates to a kind of construction techniques, in particular to a kind of by the mobile installation structure of basal orbit
The construction method of part.
Background technique
The converter of industrial steelshop, the road LF refining furnace Lu Xia basis pit, due to being often subject to high-temperature steel grain slag calcination
And the destruction that cleaning is mechanical, the inside sidewalls of pit usually hang cast iron plate by bolt to protect concrete.The road Dan Luxia week
Side narrow space, every block casting iron plate is heavier (1.2 tons or so), and crane can not be lifted in narrow space, this installation is brought
It is difficult.
Summary of the invention
In view of the deficiency of the prior art, the present invention provides a kind of reduction labor intensity of workers, securely and reliably, improves
Construction efficiency reduces the construction method by the mobile installation component of basal orbit of construction cost.
The technical solution used in the present invention is:
A kind of construction tool by the mobile installation component of basal orbit,
Including left side door type frame and right side door type frame;Left side door type frame and right side door type frame are symmetrical set;
Left side door type frame and right side door type frame respectively include lower beam and upper beam;
Lower beam is connected with upper beam by vertical beam;
Vertical beam includes front vertical beam and front vertical beam;
Front vertical beam is connected with upper beam by support rod;
Front vertical beam is connected with upper beam by support rod;
Lower beam includes left side channel steel and right side channel steel;
Left side channel steel is with right side channel steel by being connected back-to-back;
Gap is provided between the bottom and right side channel steel bottom of left side channel steel;
The lower part of left side channel steel and right side channel steel is provided with roller shaft;
Idler wheel is provided on roller shaft;
Idler wheel is arranged on supporting guide;
Left side door type frame is connected with the top middle portion of right side door type frame by horizontal beam;
Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal;
Lifting lug is provided on horizontal beam.
A kind of construction method by the mobile installation component of basal orbit, includes the following steps:
It is laid with Left-side support guide rail and Right side support guide rail;
Left side door type frame and right side door type frame are respectively arranged on Left-side support guide rail and Right side support guide rail;
Left side door type frame is connected with the top middle portion of right side door type frame by horizontal beam;
Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal;
Lifting lug is provided on horizontal beam.
Left side door type frame and right side door type frame respectively include lower beam and upper beam;
Lower beam is connected with upper beam by vertical beam;
Vertical beam includes front vertical beam and front vertical beam;
Front vertical beam is connected with front vertical beam by support rod;
Lower beam includes left side channel steel and right side channel steel;
Left side channel steel is with right side channel steel by being connected back-to-back;
Gap is provided between the bottom and right side channel steel bottom of left side channel steel;
The lower part of left side channel steel and right side channel steel is provided with roller shaft;
Idler wheel is provided on roller shaft;
Idler wheel is arranged on supporting guide;
Electric block is installed on lifting lug;
Weight is sling by electric block;
Push left side door type frame and right side door type frame;Left side door type frame and right side door type frame move on supporting guide;
Left side door type frame and right side door type frame are moved to position;
Weight is discharged on ground or means of transport by electric block.
The present invention compared with the prior art the utility model has the advantages that
The present invention solves the difficulty that narrow space is not available mechanical hoisting by the construction method of the mobile installation component of basal orbit
Topic;Labor intensity of workers is reduced, securely and reliably, construction efficiency is improved, reduces construction cost.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the present invention by the constructing device of the mobile installation component of basal orbit;
Fig. 2 is side structure schematic view of the present invention by the constructing device of the mobile installation component of basal orbit;
Fig. 3 is overlooking structure diagram of the present invention by the constructing device of the mobile installation component of basal orbit.
Main component symbol description in attached drawing:
In figure:
1, lower beam 2, upper beam
3, vertical beam 4, support rod
5, roller shaft 6, idler wheel
7, supporting guide 8, left side door type frame
9, right side door type frame 10, horizontal beam
11, left side channel steel 12, right side channel steel
21, bearing diagonal 22, lifting lug.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-3 it is found that a kind of construction tool by the mobile installation component of basal orbit,
Including left side door type frame 8 and right side door type frame 9;Left side door type frame 8 and right side door type frame 9 are symmetrical set;
Left side door type frame and right side door type frame respectively include lower beam 1 and upper beam 2;
Lower beam is connected with upper beam by vertical beam 3;
Vertical beam 3 includes front vertical beam and front vertical beam;
Front vertical beam is connected with upper beam 2 by support rod 4;
Front vertical beam is connected with upper beam 2 by support rod 4;
Lower beam 1 includes left side channel steel 11 and right side channel steel 12;
Left side channel steel 11 is with right side channel steel 12 by being connected back-to-back;
Gap is provided between 12 bottom of bottom and right side channel steel of left side channel steel 11;
The lower part of left side channel steel and right side channel steel is provided with roller shaft 5;
Idler wheel 6 is provided on roller shaft 5;
Idler wheel 6 is arranged on supporting guide 7;
Left side door type frame 8 is connected with the top middle portion of right side door type frame 9 by horizontal beam 10;
Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal 21;
Lifting lug 22 is provided on horizontal beam 21.
A kind of construction method by the mobile installation component of basal orbit, includes the following steps:
It is laid with Left-side support guide rail and Right side support guide rail;
Left side door type frame and right side door type frame are respectively arranged on Left-side support guide rail and Right side support guide rail;
Left side door type frame is connected with the top middle portion of right side door type frame by horizontal beam;
Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal;
Lifting lug is provided on horizontal beam.
Left side door type frame and right side door type frame respectively include lower beam and upper beam;
Lower beam is connected with upper beam by vertical beam;
Vertical beam includes front vertical beam and front vertical beam;
Front vertical beam is connected with front vertical beam by support rod;
Lower beam includes left side channel steel and right side channel steel;
Left side channel steel is with right side channel steel by being connected back-to-back;
Gap is provided between the bottom and right side channel steel bottom of left side channel steel;
The lower part of left side channel steel and right side channel steel is provided with roller shaft;
Idler wheel is provided on roller shaft;
Idler wheel is arranged on supporting guide;
Electric block is installed on lifting lug;
Weight is sling by electric block;
Push left side door type frame and right side door type frame;Left side door type frame and right side door type frame move on supporting guide;
Left side door type frame and right side door type frame are moved to position;
Weight is discharged on ground or means of transport by electric block.
The present invention solves narrow space and is not available mechanical hoisting by the construction method of the mobile installation component of basal orbit
Problem;Labor intensity of workers is reduced, securely and reliably, construction efficiency is improved, reduces construction cost.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention
Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention,
Belong within the scope of technical solution of the present invention.
Claims (2)
1. a kind of construction tool by the mobile installation component of basal orbit, which is characterized in that
Including left side door type frame and right side door type frame;
Left side door type frame and right side door type frame respectively include lower beam and upper beam;
Lower beam is connected with upper beam by vertical beam;
Vertical beam includes front vertical beam and front vertical beam;
Front vertical beam is connected with upper beam by support rod;
Front vertical beam is connected with upper beam by support rod;
Lower beam includes left side channel steel and right side channel steel;
Left side channel steel is with right side channel steel by being connected back-to-back;
Gap is provided between the bottom and right side channel steel bottom of left side channel steel;
The lower part of left side channel steel and right side channel steel is provided with roller shaft;
Idler wheel is provided on roller shaft;
Idler wheel is arranged on supporting guide;
Left side door type frame is connected with the top middle portion of right side door type frame by horizontal beam;
Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal;
Lifting lug is provided on horizontal beam.
2. a kind of construction method by the mobile installation component of basal orbit, it is characterised in that include the following steps:
It is laid with Left-side support guide rail and Right side support guide rail;
Left side door type frame and right side door type frame are respectively arranged on Left-side support guide rail and Right side support guide rail;
Left side door type frame is connected with the top middle portion of right side door type frame by horizontal beam;
Front vertical beam and front vertical beam are connected with horizontal beam by bearing diagonal;
Lifting lug is provided on horizontal beam;
Left side door type frame and right side door type frame respectively include lower beam and upper beam;
Lower beam is connected with upper beam by vertical beam;
Vertical beam includes front vertical beam and front vertical beam;
Front vertical beam is connected with front vertical beam by support rod;
Lower beam includes left side channel steel and right side channel steel;
Left side channel steel is with right side channel steel by being connected back-to-back;
Gap is provided between the bottom and right side channel steel bottom of left side channel steel;
The lower part of left side channel steel and right side channel steel is provided with roller shaft;
Idler wheel is provided on roller shaft;
Idler wheel is arranged on supporting guide;
Electric block is installed on lifting lug;
Weight is sling by electric block;
Push left side door type frame and right side door type frame;Left side door type frame and right side door type frame move on supporting guide;
Left side door type frame and right side door type frame are moved to position;
Weight is discharged on ground or means of transport by electric block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910447102.0A CN110422758A (en) | 2019-05-27 | 2019-05-27 | By the construction tool and construction method of the mobile installation component of basal orbit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910447102.0A CN110422758A (en) | 2019-05-27 | 2019-05-27 | By the construction tool and construction method of the mobile installation component of basal orbit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110422758A true CN110422758A (en) | 2019-11-08 |
Family
ID=68407516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910447102.0A Withdrawn CN110422758A (en) | 2019-05-27 | 2019-05-27 | By the construction tool and construction method of the mobile installation component of basal orbit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110422758A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11200320A (en) * | 1998-01-19 | 1999-07-27 | Maeda Corp | Execution method of horizontal beam of concrete main tower |
CN206255786U (en) * | 2016-11-29 | 2017-06-16 | 中国建筑第七工程局有限公司 | One kind sliding hanging device |
CN209835437U (en) * | 2019-05-27 | 2019-12-24 | 中国二十二冶集团有限公司 | Construction tool for moving a mounting element by means of a base rail |
-
2019
- 2019-05-27 CN CN201910447102.0A patent/CN110422758A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11200320A (en) * | 1998-01-19 | 1999-07-27 | Maeda Corp | Execution method of horizontal beam of concrete main tower |
CN206255786U (en) * | 2016-11-29 | 2017-06-16 | 中国建筑第七工程局有限公司 | One kind sliding hanging device |
CN209835437U (en) * | 2019-05-27 | 2019-12-24 | 中国二十二冶集团有限公司 | Construction tool for moving a mounting element by means of a base rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105071604B (en) | Replace the device and method of vibrating motor | |
CN204384698U (en) | Sheet billet continuous casting machine equipment mounting hanger | |
CN213771074U (en) | Combined hand-pulling type hoisting monorail trolley | |
CN209835437U (en) | Construction tool for moving a mounting element by means of a base rail | |
CN211644394U (en) | Installation device of ditch cable duct cover plate | |
CN110422758A (en) | By the construction tool and construction method of the mobile installation component of basal orbit | |
CN205087879U (en) | A lift dolly for at container internally mounted power unit | |
CN103898270A (en) | Flip-over type installation method of steel converter | |
CN202279833U (en) | Simple converter flue transition carriage | |
CN106829778B (en) | A kind of horizontal pump maintenance maintenance unit | |
CN211769751U (en) | Hanging beam device for lifting double overhead travelling cranes | |
CN210973587U (en) | Small-size removal hoisting machine | |
CN213059894U (en) | Hoisting tool for motor transfer in limited space | |
CN106121254A (en) | Heavy component transportation system and construction method after a kind of contrary sequence method dismounting | |
CN208120540U (en) | Tunnel construction trestle hoisting mechanism | |
CN207209840U (en) | A kind of Multifunctional suspension bracket | |
CN202542732U (en) | Mechanism for replacing auxiliary hoisting wire rope of four-beam four-rail dual-trolley bridge crane | |
CN201380286Y (en) | Special lifting tool for entirely hoisting bale rotary table | |
CN101537983B (en) | Hoisting method of large-scale equipment in factory building for high-altitude positioning | |
CN201598117U (en) | Hoisting device for installing blast furnace | |
CN204906129U (en) | Change vibrating motor's device | |
CN210825224U (en) | Multifunctional trolley for overhauling | |
CN204549893U (en) | A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing | |
CN216426505U (en) | Auxiliary bracket for mounting track beam in limited space | |
CN211219529U (en) | A dismouting equipment for bearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191108 |