CN110409432A - A kind of prestressed steel pipe of concrete guard wall - Google Patents

A kind of prestressed steel pipe of concrete guard wall Download PDF

Info

Publication number
CN110409432A
CN110409432A CN201910667776.1A CN201910667776A CN110409432A CN 110409432 A CN110409432 A CN 110409432A CN 201910667776 A CN201910667776 A CN 201910667776A CN 110409432 A CN110409432 A CN 110409432A
Authority
CN
China
Prior art keywords
steel pipe
fixed
connector
fixing
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910667776.1A
Other languages
Chinese (zh)
Other versions
CN110409432B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jianyuan Engineering Co., Ltd
Original Assignee
Wu Yi Long
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wu Yi Long filed Critical Wu Yi Long
Priority to CN201910667776.1A priority Critical patent/CN110409432B/en
Publication of CN110409432A publication Critical patent/CN110409432A/en
Application granted granted Critical
Publication of CN110409432B publication Critical patent/CN110409432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to steel-pipe pile technical fields, specifically a kind of prestressed steel pipe of concrete guard wall, including the first steel tube pile structure, connector, the second steel tube pile structure, support construction and fixed structure, first steel tube pile structure for slip casting, fixation is connected with the connector that half arcuate structure sliding slot is offered for the outer symmetrical of connection, and the connector is connected with second steel tube pile structure for extending steel-pipe pile;The first steel tube pile structure and the second steel tube pile structure are fixed on preferably on connector by fixed structure, fixed structure in the process of work alleviates the expansion force after the grout cures of connector inside, reduce the internal pressure of connector, pass through being used cooperatively for fixed structure and support construction, support construction carries out preferably support to connector inside and fixes, it prevents connector from being squeezed and damaging by stake holes external pressure, the first steel tube pile structure and the second steel pipe pile body is avoided to be disconnected head.

Description

A kind of prestressed steel pipe of concrete guard wall
Technical field
The present invention relates to steel-pipe pile technical field, specifically a kind of prestressed steel pipe of concrete guard wall.
Background technique
Steel-pipe pile is made of steel pipe, grooved tenon joining, tongue and groove draw pin, vertically connects tongue and groove on the left end tube wall of diameter of steel tube Slot, the cross section of rabbet groove are the square frame-shaped of openings at one side, are equipped with reinforcing rib, the right end pipe of diameter of steel tube in the side of rabbet groove On wall and radial location partially is vertically connected with tongue and groove pin, the channel section of tongue and groove pin be it is I-shaped, can play and enclose water, enclose soil, enclose sand The effects of.
When needing to squeeze into longer steel-pipe pile in some stake holes and carrying out solid soil, the length of a traditional steel-pipe pile cannot Meet longer stake holes, needs two steel-pipe piles to link together by connector and squeeze into inside stake holes, due to two steel-pipe piles After using connector connection filling concrete water mud, increases steel-pipe pile internal pressure after grout cures, be easy to cause Connector expansion damage, one causes two steel-pipe piles to be disconnected head, influences the solid native effect of steel-pipe pile.
Summary of the invention
For the problems of the prior art, the present invention provides a kind of prestressed steel pipes of concrete guard wall, by solid Determining structure is fixed on the first steel tube pile structure and the second steel tube pile structure preferably on connector, mistake of the fixed structure in work The expansion force after the grout cures of connector inside is alleviated in journey, reduces the internal pressure of connector, passes through fixation Structure and support construction are used cooperatively, and support construction carries out preferably support to connector inside and fixes, prevent connector by It squeezes and damages to stake holes external pressure, the first steel tube pile structure and the second steel pipe pile body is avoided to be disconnected head;Pass through branch The linkage of support structure and fixed structure, support construction enter cement slurry further preferably inside fixed structure, make to fix It fixes the first steel tube pile structure and the second steel tube pile structure with connector, while increasing inside fixed structure Intensity is supported connector inside.
The technical solution adopted by the present invention to solve the technical problems is: a kind of prestressed steel pipe of concrete guard wall, Institute including the first steel tube pile structure, connector, the second steel tube pile structure, support construction and fixed structure, for slip casting, fixation It states the first steel tube pile structure and is connected with the connector for offering half arcuate structure sliding slot for the outer symmetrical of connection, it is described Connector is connected with second steel tube pile structure for extending steel-pipe pile, and the connector is internally connected with for fixing The fixed structure of the first steel tube pile structure and second steel tube pile structure is stated, the fixed structure connects first steel Tube pile structure and second steel tube pile structure, the connector, which is internally connected with, to be used to support, increases the described of anti-pressure ability Support construction, the support construction connect the fixed structure.
Specifically, first steel tube pile structure includes fixing seat, injected hole, the first steel pipe pile body, elastic piece and limit Position slot, the first steel pipe pile body of inner hollow are fixed with the connector of inner hollow, the first steel-pipe pile sheet Body top is fixed with the fixing seat, and the fixing seat symmetrically opens up that there are two the injected hole, the first steel pipe pile bodies The limiting slot there are two symmetrically opening up, two limiting slots are respectively positioned on inside the connector, in two limiting slots Portion is symmetrically fixed with the elastic piece of domed structure.
Specifically, second steel tube pile structure includes the second steel pipe pile body, fixing head and slurry outlet, the connector It is fixed with the second steel pipe pile body, the minimum vertical between the second steel pipe pile body and the first steel pipe pile body Distance is less than the length of the connector, and the second steel pipe pile body is connected to the first steel pipe pile body, second steel Tubular pole ontology bottom end is fixed with the fixing head, and the fixing head is connected to the second steel pipe pile body, and the fixing head opens up There is the slurry outlet, the slurry outlet is connected to the second steel-pipe pile body interior, and the second steel pipe pile body is symmetrically opened If there are two the limiting slots, two limiting slots are respectively positioned on inside the connector, right inside two limiting slots Title is fixed, and there are two the elastic pieces.
Specifically, the fixed structure includes fixing pipe, fixed block, second spring and limited block, inside the connector It is symmetrically fixed with the fixing pipe that two sections are in zigzag shape structure, two fixing pipes are respectively positioned on first steel-pipe pile Between ontology and the second steel pipe pile body, the fixing pipe is connected to the first steel pipe pile body and second steel-pipe pile The limiting slot of body interior, being symmetrically slidably connected inside two fixing pipes, there are two the described solid of T-shaped structure Determine block, the arc-shaped structure in fixed block side, the minimum widith of the fixed block is greater than two institutes inside the limiting slot State the minimum perpendicular distance between elastic piece, the length of the fixed block is greater than the length of the limiting slot, in the fixing pipe Portion is fixed there are two the limited block, and two fixed blocks are slidably connected two limited blocks respectively, the fixed block and It is fixed with the second spring between the limited block, the fixed block is through inside the second spring.
Specifically, the support construction includes fixing sleeve, supporting block, the first spring and slurry-feeding hole, two fixing pipes It is respectively and fixedly provided with the fixing sleeve of inner hollow, two fixing sleeves are respectively communicated with two fixing pipes, and two described solid Fixed set is respectively positioned on inside the connector, and two fixing sleeves slidably connect the supporting block of T-shaped structure, described It is arcuate structure outside the fixing sleeve that supporting block, which is located at, and the minimum range between two supporting blocks is described less than two solid The distance between fixed set, is fixed with first spring between the supporting block and the fixing sleeve, the supporting block through First spring inner, two fixing sleeve top side walls offer the slurry-feeding hole, two slurry-feeding hole difference Two fixing pipes are connected to, internal diameter of the slurry-feeding hole from top to bottom end is gradually reduced.
Beneficial effects of the present invention:
(1) prestressed steel pipe of a kind of concrete guard wall of the present invention makes the first steel-pipe pile by fixed structure Structure and the second steel tube pile structure are preferably fixed on connector, and fixed structure is in the process of work to connector internal water Expansion force after slurry curing is alleviated, and the internal pressure of connector is reduced, and passes through matching for fixed structure and support construction It closes and uses, support construction carries out preferably support to connector inside and fixes, and prevents connector from being squeezed by stake holes external pressure And damage, avoid the first steel tube pile structure and the second steel pipe pile body from being disconnected head.
(2) prestressed steel pipe of a kind of concrete guard wall of the present invention passes through support construction and fixed structure Linkage, support construction enter cement slurry further preferably inside fixed structure, make the first steel after so that fixed structure is worked Tube pile structure and the second steel tube pile structure are fixed with connector, while increasing the intensity inside fixed structure, to connector inside It is supported.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of a kind of whole knot of preferred embodiment of the prestressed steel pipe of concrete guard wall provided by the invention The structural schematic diagram of structure;
Fig. 2 is the attachment structure schematic diagram of connector shown in FIG. 1, fixed structure and support construction;
Fig. 3 is the portion A shown in Fig. 2 enlarged structure schematic diagram;
Fig. 4 is the portion B shown in Fig. 2 enlarged structure schematic diagram;
Fig. 5 is the cross section structure schematic diagram of connector shown in FIG. 1.
In figure: 1, the first steel tube pile structure, 11, fixing seat, 12, injected hole, the 13, first steel pipe pile body, 14, elasticity Piece, 15, limiting slot, 2, connector, the 3, second steel tube pile structure, the 31, second steel pipe pile body, 32, fixing head, 33, slurry outlet, 4, support construction, 41, fixing sleeve, 42, supporting block, the 43, first spring, 44, slurry-feeding hole, 5, fixed structure, 51, fixing pipe, 52, Fixed block, 53, second spring, 54, limited block.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Specific embodiment is closed, the present invention is further explained.
As Figure 1-Figure 5, the prestressed steel pipe of a kind of concrete guard wall of the present invention, including the first steel-pipe pile Structure 1, connector 2, the second steel tube pile structure 3, support construction 4 and fixed structure 5, first steel for slip casting, fixation Tube pile structure is connected with the connector 2 that half arcuate structure sliding slot is offered for the outer symmetrical of connection, the connector 2 It is connected with second steel tube pile structure 3 for extending steel-pipe pile, the connector 2 is internally connected with for fixing described The fixed structure 5 of one steel tube pile structure 1 and second steel tube pile structure 3, the fixed structure 5 connect first steel Tube pile structure 1 and second steel tube pile structure 3, the connector 2 are internally connected with the institute for being used to support, increasing anti-pressure ability Support construction 4 is stated, the support construction 4 connects the fixed structure 5.
Specifically, first steel tube pile structure 1 includes fixing seat 11, injected hole 12, the first steel pipe pile body 13, elasticity Piece 14 and limiting slot 15, the first steel pipe pile body 13 of inner hollow is fixed with the connector 2 of inner hollow, described First steel pipe pile body, 13 top is fixed with the fixing seat 11, and the fixing seat 11 symmetrically opens up that there are two the injected holes 12, the first steel pipe pile body 13 is symmetrically opened up there are two the limiting slot 15, and two limiting slots 15 are respectively positioned on described Inside connector 2, the elastic piece 14 of domed structure is symmetrically fixed with inside two limiting slots 15;In order to pass through Cement slurry is filled into inside the first steel pipe pile body 13 and is solidified, is inserted into stake in the first steel pipe pile body 13 Behind the inside of hole, by the injected hole 12 by cement slurry be filled into 13 lateral wall of the first steel pipe pile body and stake holes inner sidewall it Between, it is fixed on the first steel pipe pile body 13 inside stake holes, further functions as the effect of solid soil.
Specifically, second steel tube pile structure 3 includes the second steel pipe pile body 31, fixing head 32 and slurry outlet 33, institute It states connector 2 and is fixed with the second steel pipe pile body 31, the second steel pipe pile body 31 and the first steel pipe pile body Minimum perpendicular distance between 13 is less than the length of the connector 2, and the second steel pipe pile body 31 is connected to first steel Tubular pole ontology 13,31 bottom end of the second steel pipe pile body are fixed with the fixing head 32, and the fixing head 32 is connected to described Two steel pipe pile bodies 31, the fixing head 32 offer the slurry outlet 33, and the slurry outlet 33 is connected to second steel pipe Inside pile body 31, the second steel pipe pile body 31 symmetrically opens up that there are two the limiting slot 15, two limiting slots 15 It is respectively positioned on inside the connector 2, two elastic pieces 14 is symmetrically fixed with inside two limiting slots 15;In order to institute It states the first steel pipe pile body 13 and the second steel pipe pile body 31 to connect by the connector 2, the length of Lai Zengjia steel-pipe pile Degree is convenient for by the fixing head 32 by the first steel pipe pile body 13 and second steel to adapt to longer stake holes Tubular pole ontology 31 is inserted into inside stake holes, by the slurry outlet 33 inside the fixing head 32, convenient for making some cement slurries Be flowed between the second steel pipe pile body 31 and stake holes, make second steel-pipe pile 31 preferably with the soil inside stake holes It is connected and fixed.
Specifically, the fixed structure 5 includes fixing pipe 51, fixed block 52, second spring 53 and limited block 54, the company 2 internal symmetry of connector is fixed there are two the fixing pipe 51 that section is in zigzag shape structure, and two fixing pipes 51 are respectively positioned on Between the first steel pipe pile body 13 and the second steel pipe pile body 31, the fixing pipe 51 is connected to first steel-pipe pile The limiting slot 15 inside ontology 13 and the second steel pipe pile body 31, symmetrical sliding inside two fixing pipes 51 Connection is there are two the fixed block 52 of T-shaped structure, and the arc-shaped structure in 52 side of fixed block, the fixed block 52 is most Small width is greater than the minimum perpendicular distance between two elastic pieces 14 inside the limiting slot 15, the fixed block 52 Length is greater than the length of the limiting slot 15, and there are two the limited blocks 54 for fixation inside the fixing pipe 51, and two described solid Determine block 52 to be slidably connected respectively two limited blocks 54, described is fixed between the fixed block 52 and the limited block 54 Two springs 53, the fixed block 52 is through inside the second spring 53;In order to by the first steel pipe pile body 13 After inside injection cement slurry, it is flowed by cement slurry self gravity from the slurry-feeding hole 44 of the 41 top side wall of fixing sleeve Behind 51 inside of fixing pipe, after cement slurry inside the fixing pipe 51 is cumulative, start to push two fixed blocks 52, it shrinks the second spring 53 and generates elastic force, two fixed blocks 52 are pushed into the first steel-pipe pile sheet respectively Inside the limiting slot 15 inside body 13 and the second steel pipe pile body 31, the fixed block 52 is made to start to squeeze the limit Two elastic pieces 14 inside the slot 15 of position make two elastic pieces 14 generate elastic force, enter in the fixed block 52 Behind 15 inside of limiting slot, is squeezed by the clamping of two elastic pieces 14 and the elastic force of the second spring 53, make institute It states fixed block 52 to be well fixed on inside the limiting slot 15, to make the first steel pipe pile body 13 and second steel Tubular pole ontology 31 can be more stably fixed on the connector 2, and the cement slurry inside the fixing pipe 51 is gradually solid After change, the expansion force after cement solidification is slowed down by the elastic force of the second spring 53, the cement after solidification continues to squeeze The fixed block 52 is pushed, makes the fixed block 52 without departing from the limiting slot 15, the connector 2 is enable preferably to consolidate The fixed first steel pipe pile body 13 and the second steel pipe pile body 31.
Specifically, the support construction 4 includes fixing sleeve 41, supporting block 42, the first spring 43 and slurry-feeding hole 44, two institutes The fixing sleeve 41 that fixing pipe 51 is respectively and fixedly provided with inner hollow is stated, two fixing sleeves 41 are respectively communicated with two fixations Pipe 51, two fixing sleeves 41 are respectively positioned on inside the connector 2, and two fixing sleeves 41 slidably connect T-shaped The supporting block 42 of structure, the supporting block 42 are located at outside the fixing sleeve 41 for arcuate structure, two supporting blocks Minimum range between 42 is less than the distance between two described fixing sleeves 41, between the supporting block 42 and the fixing sleeve 41 It is fixed with first spring 43, through inside first spring 43, two fixing sleeves 41 push up the supporting block 42 End side wall offers the slurry-feeding hole 44, and two slurry-feeding holes 44 are respectively communicated with two fixing pipes 51, described into slurry Internal diameter of the hole 44 from top to bottom end is gradually reduced;In order to which cement slurry is injected into the first steel pipe pile body 13 interrupted Behind inside, cement slurry is entered inside the fixing pipe 51 during falling from the slurry-feeding hole 44, while cement slurry falls During hit two 42 sides of supporting block arcuate structure, the supporting block 42 is pushed into the fixing sleeve 41 Behind portion, shrinks first spring 43 and generate elastic force, while the mistake that the supporting block 42 is slided to 51 direction of fixing pipe It will further be pushed inside the fixing pipe 51 from the cement slurry that the slurry-feeding hole 44 is fallen into journey, in the first steel-pipe pile sheet When the cement slurry injected in body 13 is reduced, the cement slurry for dropping into 42 arcuate structure of supporting block is reduced through first bullet The elastic force of spring 43 makes the supporting block 42 set back, and a large amount of cement slurries are injected into the first steel pipe pile body 13 again Afterwards, a part of cement slurry is flowed into inside the fixing pipe 51 from the slurry-feeding hole 44, and another part cement slurry, which falls, pushes institute It states supporting block 42 and is flowed into 31 bottom end of the second steel pipe pile body, slide the supporting block 42 back and forth on the fixing sleeve 41 It is dynamic to be pushed into inside the fixing pipe 51 from the cement slurry that the slurry-feeding hole is fallen into, make the cement slurry inside the fixing pipe 51 It measures more and more, increases the intensity inside the fixing pipe 51.
When in use, it is inserted into and beats after first connecting the first steel pipe pile body by connector with the second steel pipe pile body Inside stake holes after good, by discontinuously injecting cement slurry to the first steel-pipe pile body interior, inject cement slurry step by step To the first steel pipe pile body and the second steel-pipe pile body interior, cement slurry enters solid from slurry-feeding hole 44 during falling Determine inside pipe 51, while hitting the arcuate structure of two 42 sides of supporting block during cement slurry falls, supporting block 42 is pushed away Enter to after 41 inside of fixing sleeve, shrinks the first spring 43 and generate elastic force, while supporting block 42 is slided to 51 direction of fixing pipe It will further push inside fixing pipe 51 from the cement slurry that slurry-feeding hole 44 is fallen into, injected in the first steel pipe pile body 13 in the process Cement slurry when reducing, the cement slurry for dropping into 42 arcuate structure of supporting block, which is reduced, by the elastic force of the first spring 43 makes supporting block 42 set back, and after a large amount of cement slurries are injected into the first steel pipe pile body 13 again, a part of cement slurry is from slurry-feeding hole 44 It being flowed into inside fixing pipe 51, another part cement slurry, which falls, pushes supporting block 42 to be flowed into 31 bottom end of the second steel pipe pile body, Make supporting block 42 reciprocatingly slide on fixing sleeve 41 cement slurry fallen into from slurry-feeding hole is pushed into inside fixing pipe 51, makes to fix Cement slurry volume inside pipe 51 is more and more, increases the intensity inside fixing pipe 51, the cement slurry inside fixing pipe 51 it is more long-pending more After mostly, start to push two fixed blocks 52, shrink second spring 53 and generate elastic force, two fixed blocks 52 are pushed into the respectively Inside limiting slot 15 inside one steel pipe pile body 13 and the second steel pipe pile body 31, fixed block 52 is made to start to squeeze limiting slot 15 Two internal elastic pieces 14 make two elastic pieces 14 generate elastic force and pass through after fixed block 52 enters 15 inside of limiting slot The clamping of two elastic pieces 14 and the elastic force of second spring 53 squeeze, and are well fixed on fixed block 52 inside limiting slot 15, To enable the first steel pipe pile body 13 and the second steel pipe pile body 31 to be more stably fixed on connector 2, in fixation After cement slurry inside pipe 51 gradually solidifies, slow down the expansion force after cement solidification by the elastic force of second spring 53, Gu Cement after change, which continues to squeeze, pushes fixed block 52, makes fixed block 52 without departing from limiting slot 15, keeps connector 2 better Fix the first steel pipe pile body 13 and the second steel pipe pile body 31, after being filled up inside fixing pipe 51 by cement slurry, fixing pipe 51 Internal cement slurry starts to push two supporting blocks 42, and making two supporting blocks 42, sliding mutually contradicts in the same direction, to make connector 2 Inside is supported after the cement solidification inside two fixing pipes 51 with two supporting blocks 42, is further increased inside connector 2 Intensity avoids connector 2 from being squeezed and damaged by the soil and rock around stake holes, finally continues to inside the first steel pipe pile body 13 Cement slurry is injected, after the first steel pipe pile body 13 and the solid cement slurry of the second steel pipe pile body 31, completes steel-pipe pile It is inserted into stake holes.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the description in above embodiment and specification only illustrates the present invention Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these variation and Improvement is both fallen in the scope of protection of present invention.The claimed scope of the invention is by appended claims and its equivalent Object defines.

Claims (5)

1. a kind of prestressed steel pipe of concrete guard wall, it is characterised in that: including the first steel tube pile structure (1), connector (2), the second steel tube pile structure (3), support construction (4) and fixed structure (5), first steel-pipe pile for slip casting, fixation Structure is connected with the connector (2) that half arcuate structure sliding slot is offered for the outer symmetrical of connection, the connector (2) It is connected with second steel tube pile structure (3) for extending steel-pipe pile, the connector (2) is internally connected with for fixing The fixed structure (5) of the first steel tube pile structure (1) and second steel tube pile structure (3) is stated, the fixed structure (5) is even First steel tube pile structure (1) and second steel tube pile structure (3) are connect, the connector (2) is internally connected with for branch Support, the support construction (4) for increasing anti-pressure ability, the support construction (4) connect the fixed structure (5).
2. a kind of prestressed steel pipe of concrete guard wall according to claim 1, it is characterised in that: first steel pipe Pilework (1) includes fixing seat (11), injected hole (12), the first steel pipe pile body (13), elastic piece (14) and limiting slot (15), The first steel pipe pile body (13) of inner hollow is fixed with the connector (2) of inner hollow, first steel-pipe pile Ontology (13) top is fixed with the fixing seat (11), and the fixing seat (11) symmetrically opens up there are two the injected hole (12), The first steel pipe pile body (13) symmetrically opens up there are two the limiting slot (15), and two limiting slots (15) are respectively positioned on institute Connector (2) inside is stated, the elastic piece (14) of domed structure is symmetrically fixed with inside two limiting slots (15).
3. a kind of prestressed steel pipe of concrete guard wall according to claim 2, it is characterised in that: second steel pipe Pilework (3) includes the second steel pipe pile body (31), fixing head (32) and slurry outlet (33), and the connector (2) is fixed State the second steel pipe pile body (31), the minimum between the second steel pipe pile body (31) and the first steel pipe pile body (13) Vertical range is less than the length of the connector (2), and the second steel pipe pile body (31) is connected to the first steel pipe pile body (13), the second steel pipe pile body (31) bottom end is fixed with the fixing head (32), the fixing head (32) connection described the Two steel pipe pile bodies (31), the fixing head (32) offer the slurry outlet (33), and the slurry outlet (33) is connected to described Second steel pipe pile body (31) is internal, and the second steel pipe pile body (31) symmetrically opens up there are two the limiting slot (15), and two A limiting slot (15) is respectively positioned on the connector (2) inside, is symmetrically fixed with two inside two limiting slots (15) A elastic piece (14).
4. a kind of prestressed steel pipe of concrete guard wall according to claim 3, it is characterised in that: the fixed structure It (5) include fixing pipe (51), fixed block (52), second spring (53) and limited block (54), connector (2) internal symmetry is solid Section is in the fixing pipe (51) of zigzag shape structure there are two fixed, and two fixing pipes (51) are respectively positioned on first steel pipe Between pile body (13) and the second steel pipe pile body (31), the fixing pipe (51) is connected to the first steel pipe pile body (13) and the limiting slot (15) of the second steel pipe pile body (31) inside, two fixing pipes (51) are internal symmetrical Being slidably connected, there are two the fixed block (52) of T-shaped structure, the arc-shaped structure in fixed block (52) side, the fixations The minimum widith of block (52) is greater than the minimum perpendicular distance between two internal described elastic pieces (14) of the limiting slot (15), The length of the fixed block (52) is greater than the length of the limiting slot (15), fixes there are two described in inside the fixing pipe (51) Limited block (54), two fixed blocks (52) are slidably connected two limited blocks (54) respectively, the fixed block (52) and It is fixed with the second spring (53) between the limited block (54), the fixed block (52) is through the second spring (53) It is internal.
5. a kind of prestressed steel pipe of concrete guard wall according to claim 4, it is characterised in that: the support construction It (4) include fixing sleeve (41), supporting block (42), the first spring (43) and slurry-feeding hole (44), two fixing pipes (51) are solid Surely there is a fixing sleeve (41) of inner hollow, two fixing sleeves (41) are respectively communicated with two fixing pipes (51), and two A fixing sleeve (41) is respectively positioned on the connector (2) inside, and two fixing sleeves (41) slidably connect T-shaped knot The supporting block (42) of structure, it is arcuate structure, two branch outside the fixing sleeve (41) that the supporting block (42), which is located at, Minimum range between bracer (42) is less than the distance between two described fixing sleeves (41), the supporting block (42) and described solid First spring (43) is fixed between fixed set (41), the supporting block (42) is internal through first spring (43), Two fixing sleeve (41) top side walls offer the slurry-feeding hole (44), and two slurry-feeding holes (44) are respectively communicated with two A fixing pipe (51), internal diameter of the slurry-feeding hole (44) from top to bottom end are gradually reduced.
CN201910667776.1A 2019-07-23 2019-07-23 Prestressed steel pipe pile of concrete dado Active CN110409432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910667776.1A CN110409432B (en) 2019-07-23 2019-07-23 Prestressed steel pipe pile of concrete dado

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910667776.1A CN110409432B (en) 2019-07-23 2019-07-23 Prestressed steel pipe pile of concrete dado

Publications (2)

Publication Number Publication Date
CN110409432A true CN110409432A (en) 2019-11-05
CN110409432B CN110409432B (en) 2021-01-15

Family

ID=68362718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910667776.1A Active CN110409432B (en) 2019-07-23 2019-07-23 Prestressed steel pipe pile of concrete dado

Country Status (1)

Country Link
CN (1) CN110409432B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952536A (en) * 2019-12-17 2020-04-03 中交路桥建设有限公司 Steel pipe pile
CN113957889A (en) * 2021-11-17 2022-01-21 东莞嘉誉诚建设基础工程有限公司 Grouting type prestressed pipe pile and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205934910U (en) * 2016-08-08 2017-02-08 福建永强岩土股份有限公司 End board
CN206143757U (en) * 2016-05-31 2017-05-03 刘清洁 It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN107882023A (en) * 2017-09-14 2018-04-06 江苏麦廊新材料科技有限公司 Resistance to plucking bending resistance quick union and concrete precast pile
CN208219657U (en) * 2018-05-21 2018-12-11 山东威建岩土科技有限公司 A kind of closed type plug-in type slip casting foundation pile
JP2018197436A (en) * 2017-05-23 2018-12-13 旭化成建材株式会社 Steel pipe joint device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206143757U (en) * 2016-05-31 2017-05-03 刘清洁 It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN205934910U (en) * 2016-08-08 2017-02-08 福建永强岩土股份有限公司 End board
JP2018197436A (en) * 2017-05-23 2018-12-13 旭化成建材株式会社 Steel pipe joint device
CN107882023A (en) * 2017-09-14 2018-04-06 江苏麦廊新材料科技有限公司 Resistance to plucking bending resistance quick union and concrete precast pile
CN208219657U (en) * 2018-05-21 2018-12-11 山东威建岩土科技有限公司 A kind of closed type plug-in type slip casting foundation pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952536A (en) * 2019-12-17 2020-04-03 中交路桥建设有限公司 Steel pipe pile
CN113957889A (en) * 2021-11-17 2022-01-21 东莞嘉誉诚建设基础工程有限公司 Grouting type prestressed pipe pile and construction method thereof

Also Published As

Publication number Publication date
CN110409432B (en) 2021-01-15

Similar Documents

Publication Publication Date Title
CN207828965U (en) A kind of pouch expansion variable diameters steel reinforcement cage and anchor pole or pile foundation
CN110409432A (en) A kind of prestressed steel pipe of concrete guard wall
CN106836179B (en) The construction method of vertical strengthening ribs enhanced bellows grouting pile
CN109098358A (en) A kind of self-locking reinforcing bar connection grout sleeve
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
CN211368727U (en) Connection structure and reinforced concrete of fender post and waist rail
CN212801585U (en) Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure
JP5311453B2 (en) Ground reinforcement method
CN209523297U (en) The connection structure of primary-secondary beam
CN103867221B (en) The radial grouting anchor pole that supporting is advanced and construction method thereof
CN108118834B (en) Prefabricated assembled concrete structure card key formula reinforcing bar connecting structure
CN109680652A (en) River channel ecology slope protection and its construction method
KR101473704B1 (en) Soilnail with spring
CN110359447A (en) A kind of tubing string
CN209308047U (en) A kind of slope reinforcement device for foundation construction engineering
CN215165712U (en) Combined anti-slide pile
CN209353335U (en) A kind of soil nailing port closing device
CN209369830U (en) A kind of leading type no-dig technique tunnel construction structure of shell
CN204715348U (en) The Rapid Combination stake of a kind of Multifunction civil engineering
CN212200409U (en) Elevation mortar anchor rod
CN209942858U (en) Connector for recyclable anchor rod
CN209689859U (en) The lead pipe-shed support structure of its own vertical deflection can be measured by inclinometer
CN209620246U (en) A kind of assembling frame Structure Beam-column node
CN208152081U (en) Cell ecological retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201224

Address after: Room n2061, building 24, No.2, Xincheng Road, Nicheng Town, Pudong New Area, Shanghai, 200120

Applicant after: Shanghai Jianyuan Engineering Co., Ltd

Address before: 210000 room 103, building C, Xiaozhuang shop, magic cube apartment, Qixia District, Nanjing City, Jiangsu Province

Applicant before: Wu Yilong

GR01 Patent grant
GR01 Patent grant