CN107882023A - Resistance to plucking bending resistance quick union and concrete precast pile - Google Patents
Resistance to plucking bending resistance quick union and concrete precast pile Download PDFInfo
- Publication number
- CN107882023A CN107882023A CN201711122320.4A CN201711122320A CN107882023A CN 107882023 A CN107882023 A CN 107882023A CN 201711122320 A CN201711122320 A CN 201711122320A CN 107882023 A CN107882023 A CN 107882023A
- Authority
- CN
- China
- Prior art keywords
- plug
- chipware
- resistance
- plucking
- host cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005452 bending Methods 0.000 title claims abstract description 36
- 239000004567 concrete Substances 0.000 title claims abstract description 11
- 230000007246 mechanism Effects 0.000 claims abstract description 42
- 230000008859 change Effects 0.000 claims abstract description 10
- 238000003780 insertion Methods 0.000 claims description 22
- 230000037431 insertion Effects 0.000 claims description 22
- 239000012634 fragment Substances 0.000 claims description 8
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000009183 running Effects 0.000 description 1
- 238000009987 spinning Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Pencils And Projecting And Retracting Systems Therefor, And Multi-System Writing Instruments (AREA)
Abstract
A kind of resistance to plucking bending resistance quick union and concrete precast pile, resistance to plucking bending resistance quick union includes socket, plug, plug is from the tapered rod-like element of head to root gradual change, socket includes the jack sleeve with host cavity, the spool mechanism being slideably positioned in host cavity, is arranged between jack sleeve and spool mechanism so that elastic component of the spool mechanism with the top mobile trend towards jack sleeve, the cross section of host cavity is gradually small from the gradual change of bottom of chamber to opening portion, and spool mechanism includes the chipware of multiple host cavity side walls for being arranged at jack sleeve.When plug is with socket connection status, plug is restricted in host cavity, chipware is just located between plug and jack sleeve, the lateral wall of plug and the madial wall of chipware are inconsistent, the lateral wall of chipware and the madial wall of jack sleeve are inconsistent, contact of the face with face make it that twisting can not be bent between plug and socket, and the head asperities of plug and it is minimum at host cavity oral area at the top of socket so that the more pull out the more tight between plug and socket.
Description
Technical field
The present invention relates to a kind of resistance to plucking bending resistance quick union and concrete precast pile.
Background technology
It is essential process by two concrete precast pile head and the tail docking in construction.Traditional concrete
Prefabricated pile docking mode is to be welded in end perimeter using steel plate, and uses engagement class connector enhancing resistance to plucking.Construction is complicated,
Time is longer.Currently on the market using being more the snap joint that can quickly connect.As patent publication No. is【CN
204728315 U】In disclose a kind of precast concrete pile snap joint, including tensioning positioning sleeve I and tensioning positioning sleeve II, institute
It is sleeve shaped structure to state tensioning positioning sleeve I and tensioning positioning sleeve II, the bottom of the tensioning positioning sleeve I and tensioning positioning sleeve II
Being equipped with can be by the spacing positive stop end in it of steel bar end, in addition to is oriented to buckle and spring left-hand thread pin, the guiding buckle
Coordinated with tensioning positioning sleeve I by screw thread;The spring left-hand thread pin includes spinning base and at least three are fixed on the base that spins
On left-hand thread tooth, left-hand thread tooth can by being extruded through being oriented to buckle, and by being oriented to after buckle bounce-back so as to being limited in
Guide card is buckled, and the base that spins is coordinated with tensioning positioning sleeve II by screw thread.Snap joint in an assembling process, the structure
Mainly buckled by left-hand thread tooth overhead kick in guide card, prevent tensioning positioning sleeve I and tensioning positioning sleeve II from being separated, play resistance to plucking
Effect, it is simple to operate, mode is flexible.But a little contacted because left-hand thread tooth falls to belong to guiding buckle, thus bending resistance is imitated after connection
Fruit is poor.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of resistance to plucking bending resistance quick union.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of resistance to plucking bending resistance quick union, including
Forbid the plug outwards extracted after socket, the insertion socket, the plug is cross section from the head of the plug to root
The tapered rod-like element of gradual change, the socket include with host cavity jack sleeve, can be along the center line side of the jack sleeve
To the spool mechanism being slideably positioned in the host cavity, be arranged in the host cavity cause the spool mechanism have towards
The elastic component of the top mobile trend of jack sleeve, the cross section of the host cavity from bottom up to the opening gradual change at top gradually
Small, the spool mechanism includes the chipware in multiple host cavity side walls for being arranged at the jack sleeve, and the resistance to plucking bending resistance connects soon
Joint has not-connected status and connection status, when the resistance to plucking bending resistance quick union is under not-connected status, the valve element
Mechanism surrounds the insertion chamber for plug insertion, when the resistance to plucking close to the top of the jack sleeve between multiple chipwares
Bending resistance quick union is under connection status, and the spool mechanism is inserted in institute close to the top of the jack sleeve, the plug
Insertion intracavitary is stated, the chipware is filled between the lateral wall of the plug and the host cavity side wall.
In some embodiments, the insertion chamber circular in cross-section, the plug circular in cross-section.
In some embodiments, the madial wall of the chipware is arcwall face, the plug circular in cross-section, when described
Resistance to plucking bending resistance quick union is under connection status, and the madial wall of the chipware fits with the plug lateral wall.
In some embodiments, it is two neighboring described when the resistance to plucking bending resistance quick union is under not-connected status
It is mutually close between chipware.
In some embodiments, the upper surface of the chipware is to be tilted down towards insertion chamber, consequently facilitating by described in
Plug imports the slope of the insertion chamber.
In some embodiments, loop-shaped outside the cross section at the chipware of the spool mechanism, it is horizontal with the host cavity
Cross sectional shape is consistent.
In some embodiments, the spool mechanism also includes the combination bottom plate below multiple chipwares, institute
Stating has a circle bottom plate back-up ring protruding upward on combination bottom plate, the bottom of each chipware be inserted in the host cavity side wall with
In the stopper slot that the bottom plate back-up ring is formed, the elastic component is arranged at the lower surface of the combination bottom plate and the collecting of jack sleeve
Between bottom of chamber.
In some embodiments, the chipware is slideably positioned in the host cavity side wall by sliding rail.
In some embodiments, the spool mechanism also includes the chipware chassis below multiple chipwares, institute
State and be connected between chipware chassis and multiple chipwares, the elastic component is arranged at lower surface and the socket of the chipware chassis
Between the host cavity bottom of set.
In some further embodiments, the chipware chassis includes the base portion positioned at middle part, the side by the base portion
The multi-disc slender type shell fragment bar that portion is outwards stretched out upwards, the shell fragment bar top corresponds with the chipware bottom and mutually fixed
Form an entirety.
In some further embodiments, offered on the base portion through upper and lower guide through hole, the host cavity
Bottom has the guide rod stretched out upwards, and the guide rod is inserted in the guide through hole.
The invention solves another technical problem be to provide a kind of concrete precast pile.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of concrete precast pile, include with
Resistance to plucking bending resistance quick union described in upper any one, in addition to pile body, the socket are respectively arranged in institute with the plug
The both ends of pile body are stated, the center line of the jack sleeve is consistent with the centerline direction of the corresponding plug, the plug
Protruding from the end face of the pile body, the root of the plug is fixed with the pile body, and the top of the socket is not
Stretch out the other end of the pile body.
The scope of the present invention, however it is not limited to the technical scheme that the particular combination of above-mentioned technical characteristic forms, while should also contain
Cover the other technical schemes for being combined and being formed by above-mentioned technical characteristic or its equivalent feature.Such as features described above and sheet
Disclosed in application(But it is not limited to)Technical scheme that technical characteristic with similar functions is replaced mutually and formed etc..
Because above-mentioned technical proposal is used, the present invention has following advantages compared with prior art:The invention provides one
The technical scheme of the new quick union of kind, when plug is with socket connection status, plug is restricted in host cavity, and chipware is just pressed from both sides
Between plug and jack sleeve, the lateral wall of plug and the madial wall of chipware are inconsistent, the lateral wall of chipware and jack sleeve
Madial wall is inconsistent, and contact of the face with face make it that twisting can not be bent between plug and socket, and the head asperities of plug and
It is minimum at host cavity oral area at the top of the socket so that the more to pull out the more tight between plug and socket.
Brief description of the drawings
Accompanying drawing 1 is in schematic perspective view under connection status for the present invention;
Accompanying drawing 2 is longitudinal sectional drawing of the present invention(Embodiment one);
Accompanying drawing 3 is decomposing schematic representation of the present invention(Embodiment one);
Accompanying drawing 4 is the longitudinal schematic diagram of the present invention(Embodiment three);
Accompanying drawing 5 is spool mechanism schematic diagram of the present invention(Example IV);
Wherein:1st, socket;11st, jack sleeve;12nd, host cavity;13rd, spool mechanism;131st, chipware;1311st, slope;132nd, insert
Chamber;133rd, bottom plate is combined;1331st, bottom plate back-up ring;133 ', chipware chassis;1331 ', base portion;1332 ', shell fragment bar;14th, it is elastic
Part;15th, guide rod;2nd, plug.
Embodiment
Concrete precast pile, there are to save timber and steel, durable in use, cheap, be widely used in
Waterwork, industrial building, the foundation engineering of civil buildings and bridge, be also commonly used for side slope and pattern foundation pit supporting structure antiskid or every
Water.For the ease of stake is longitudinally connected with stake, in the both ends difference mounting receptacle 1 and plug of the pile body of concrete precast pile
2, the center line of jack sleeve 11 is consistent with the centerline direction of corresponding plug 2, and or phase parallel with the center line of pile body
Overlap.Plug 2 is protruding from the end face of pile body, and root and the pile body of plug 2 are fixed, and the top of socket 1 is not stretched out
The other end of pile body, so as to when the plug of two stakes is connected with socket, plug is just inserted in socket, two stakes
End face and end face offset cooperation.Cooperation is close, resistance to plucking is counter-bending, intensity is high.
As shown in the drawings, forbid what is outwards extracted after a kind of resistance to plucking bending resistance quick union, including socket 1, insertion socket 1
Plug 2, plug 2 be cross section from the tapered rod-like element of the head of plug 2 to root gradual change, socket 1 includes having host cavity 12
Jack sleeve 11, can be slideably positioned in along the centerline direction of jack sleeve 11 in host cavity 12 spool mechanism 13, set
Cause spool mechanism 13 that there is the elasticity towards the top mobile trend of jack sleeve 11 between jack sleeve 11 and spool mechanism 13
Part 14, the cross section of host cavity 12 is gradually small from bottom of chamber to opening gradual change, and spool mechanism 13 is arranged at jack sleeve 11 including multiple
Host cavity side wall chipware 131.As shown in Figure 2-4, the bottom of jack sleeve 11, which has, is used to connect reinforcing bar end inside pile body
The limit chamber of head.The root of plug can be connected with reinforcing bar inside pile body.
Resistance to plucking bending resistance quick union has not-connected status and connection status:
When resistance to plucking bending resistance quick union is under not-connected status, spool mechanism 13 is upspring by elastic component 14, and spool mechanism 13 leans on
It is bordering on the top of jack sleeve 11, it is mutually close between two neighboring chipware 131, surround what is inserted for plug 2 between multiple chipwares 131
Insert chamber 132.
When resistance to plucking bending resistance quick union is under connection status, spool mechanism 13 is close to the top of jack sleeve 11, plug 2
It is inserted in insertion chamber 132, chipware 131 is filled between the lateral wall of plug 2 and host cavity side wall.
Insert the cross section of chamber 132 and the shape of cross section of plug 2 is all consistent, also, the upper surface of chipware 131 is towards insertion
The slope 1311 that chamber 132 tilts down.It is all rounded in the present embodiment, when plug 2 inserts against spool mechanism 13, very
Easily plug 2 is imported in insertion chamber 132.The madial wall of chipware 131 is arcwall face, the circular in cross-section of plug 2, when resistance to plucking resists
Curved quick union is under connection status, and madial wall and the lateral wall of plug 2 of chipware 131 fit, and chipware 131 is real with plug 2
Existing face contact.
Loop-shaped outside cross section at the chipware 131 of spool mechanism 13, it is consistent with the shape of cross section of host cavity 12.As received
The cross section of cavity volume 12 is square, and the cross section of spool mechanism 13 is also in conformality, and spool mechanism 13 can be prevented in host cavity
Horizontal looseness in 12.In this implementation, the cross section of host cavity 12 and the cross section of spool mechanism 13 are all rounded.
Spool mechanism 13 has various embodiments:
Embodiment one:As shown in accompanying drawing 2,3, the chipware 131 of spool mechanism 13 has four, and spool mechanism 13 also includes being located at four
The combination bottom plate 133 of the individual lower section of chipware 131, combines the bottom plate back-up ring 1331, Mei Gexin for having a circle protruding upward on bottom plate 133
The bottom of part 131 is inserted in the stopper slot that host cavity side wall is formed with bottom plate back-up ring 1331, and elastic component 14 is arranged at combination bottom plate
Between 133 lower surface and the host cavity bottom 15 of jack sleeve 11.
Embodiment two:Not shown, chipware 131 is slideably positioned in host cavity side wall by sliding the track of extension up and down.
Elastic component can be set between single chipware 131 and jack sleeve 11, can also be participated in implementing one, in multiple chipwares 131
Lower section sets a combination bottom plate, and elastic component is arranged between the lower surface of combination bottom plate and the host cavity bottom of jack sleeve.Chipware
131 runnings are relatively stable.
Embodiment three:As shown in Figure 4, spool mechanism 13 also includes the chipware chassis positioned at multiple lower sections of chipware 131
133 ', mutually it is fixedly connected between chipware chassis 133 ' and multiple chipwares 131.Elastic component 14 is arranged at the following table of chipware chassis 133 '
Between face and the host cavity bottom 15 of jack sleeve 11.Chipware chassis 133 ' includes the base portion 1331 ' positioned at middle part, by base portion 1331 '
The multi-disc slender type shell fragment bar 1332 ' that outwards stretches out upwards of edge, shell fragment bar 1332 ' is slender type, and elasticity is larger, does not influence
Displacement or elastic deformation caused by chipware 131 during the insertion insertion chamber 132 of plug 2.The top of shell fragment bar 1332 ' and the bottom of chipware 131
Correspond and mutually one entirety of fixed composition, fixed form such as screw are fixed, weld, be integrally formed.Opened on base portion 1331 '
Provided with through upper and lower guide through hole, host cavity bottom 15 has the guide rod 151 stretched out upwards, and it is logical that guide rod 151 is inserted in guiding
In hole, so that spool mechanism 13 is relatively stable when moving up and down.Elastic component 14 is sheathed on guide rod 151.
Example IV:As shown in Figure 5, the difference of example IV and embodiment three is, is not oriented on base portion 1331 '
Through hole, there is no guide rod 151 on host cavity bottom 15, elastic component is directly contacted between host cavity bottom 15 and base portion 1331 ' yet.
Operation principle:The host cavity oral area of jack sleeve is small and gradually big to the gradual change of intracavitary bottom, pin head it is big and to root
Gradual change is tapered, and when plug 2 inserts, the head of plug 2 contradicts the top of spool mechanism 13, overcomes the elastic force of elastic component 14,
Spool mechanism 13 is promoted to be moved to bottom, as host cavity lower space becomes big, the top of the insertion chamber 132 of spool mechanism 13 is opened
Expanding at mouthful, it is allowed to plug 2 enters insertion chamber 132, and spool mechanism 13 just moves in the presence of elastic component 14 to top to be resetted,
When plug is with socket connection status, chipware is just located between plug and jack sleeve, because the host cavity top of jack sleeve is small,
Plug is just restricted in host cavity, and the lateral wall of plug and the madial wall of chipware are inconsistent, the lateral wall and jack sleeve of chipware
Madial wall it is inconsistent, contact of the face with face make it that twisting can not be bent between plug and socket, and plug head it is thick and
It is minimum at host cavity oral area at the top of socket so that the more to pull out the more tight between plug and socket.
As above, we are illustrated fully according to spirit of the invention, but the present invention is not limited to above-described embodiment
And implementation.The practitioner of correlative technology field can carry out different changes in the range of the technological thought license of the present invention
And implement.
Claims (12)
1. a kind of resistance to plucking bending resistance quick union, including socket(1), the insertion socket(1)Forbid the plug outwards extracted afterwards
(2), it is characterised in that:The plug(2)It is cross section from the plug(2)The tapered rod-like element of head to root gradual change,
The socket(1)Including with host cavity(12)Jack sleeve(11), can be along the jack sleeve(11)Centerline direction
It is slideably positioned in the host cavity(12)Interior spool mechanism(13), be arranged at the host cavity(12)It is interior so that the valve element machine
Structure(13)With towards jack sleeve(11)Top mobile trend elastic component(14), the host cavity(12)Cross section the bottom of from
The opening gradual change that portion is upwardly into top is gradually small, the spool mechanism(13)The jack sleeve is arranged at including multiple(11)Receipts
Chipware in cavity volume side wall(131), the resistance to plucking bending resistance quick union has not-connected status and connection status, when the resistance to plucking
Bending resistance quick union is under not-connected status, the spool mechanism(13)Close to the jack sleeve(11)Top, it is multiple
Chipware(131)Between surround for the plug(2)The insertion chamber of insertion(132), connect when the resistance to plucking bending resistance quick union is in
Connect under state, the spool mechanism(13)Close to the jack sleeve(11)Top, the plug(2)It is inserted in the insertion chamber
(132)It is interior, the chipware(131)It is filled at the plug(2)Lateral wall and the host cavity side wall between.
2. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The insertion chamber(132)Cross section is in
Circle, the plug(2)Circular in cross-section.
3. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The chipware(131)Madial wall be
Arcwall face, the plug(2)Circular in cross-section, when the resistance to plucking bending resistance quick union is under connection status, the chipware
(131)Madial wall and the plug(2)Lateral wall fits.
4. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:At the resistance to plucking bending resistance quick union
Under not-connected status, the two neighboring chipware(131)Between it is mutually close.
5. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The chipware(131)Upper surface be
Towards insertion chamber(132)Tilt down, consequently facilitating by the plug(2)Import the insertion chamber(132)Slope
(1311).
6. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The spool mechanism(13)Chipware
(131)Loop-shaped outside the cross section at place, with the host cavity(12)Shape of cross section is consistent.
7. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The spool mechanism(13)Also include position
In multiple chipwares(131)The combination bottom plate of lower section(133), the combination bottom plate(133)It is upper to have a circle protruding upward
Bottom plate back-up ring(1331), each chipware(131)Bottom be inserted in the host cavity side wall and the bottom plate back-up ring(1331)
In the stopper slot of formation, the elastic component(14)It is arranged at the combination bottom plate(133)Lower surface and jack sleeve(11)Receipts
Cavity volume bottom(15)Between.
8. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The chipware(131)By sliding rail
Road is slideably positioned in the host cavity side wall.
9. resistance to plucking bending resistance quick union according to claim 1, it is characterised in that:The spool mechanism(13)Also include position
In multiple chipwares(131)The chipware chassis of lower section(133’), the chipware chassis(133’)With multiple chipwares(131)
Between be connected, the elastic component(14)It is arranged at the chipware chassis(133’)Lower surface and jack sleeve(11)Host cavity
Bottom(15)Between.
10. resistance to plucking bending resistance quick union according to claim 9, it is characterised in that:The chipware chassis(133’)Including
Base portion positioned at middle part(1331’), by the base portion(1331’)The multi-disc slender type shell fragment bar that outwards stretches out upwards of edge
(1332’), the shell fragment bar(1332’)Top and the chipware(131)Bottom, which corresponds and mutually fixed, forms an entirety.
11. resistance to plucking bending resistance quick union according to claim 10, it is characterised in that:The base portion(1331’)On open up
Have and run through upper and lower guide through hole, the host cavity bottom(15)With the guide rod stretched out upwards(151), the guide rod
(151)It is inserted in the guide through hole.
12. a kind of concrete precast pile for including the resistance to plucking bending resistance quick union in claim 1-11 described in any one,
It is characterized in that:Including pile body, the socket(1)With the plug(2)It is respectively arranged in the both ends of the pile body, institute
State jack sleeve(11)Center line and the corresponding plug(2)Centerline direction it is consistent, the plug(2)From the stake sheet
The end face of body is protruding, the plug(2)Root fixed with the pile body, the socket(1)Top do not stretch out
The other end of the pile body.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2017108291687 | 2017-09-14 | ||
CN201710829168 | 2017-09-14 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107882023A true CN107882023A (en) | 2018-04-06 |
Family
ID=61776591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711122320.4A Pending CN107882023A (en) | 2017-09-14 | 2017-11-14 | Resistance to plucking bending resistance quick union and concrete precast pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107882023A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629589A (en) * | 2018-12-29 | 2019-04-16 | 国网山东省电力公司烟台供电公司 | A kind of plug-in type prefabricated pile basis |
CN110409432A (en) * | 2019-07-23 | 2019-11-05 | 吴义珑 | A kind of prestressed steel pipe of concrete guard wall |
CN111101503A (en) * | 2019-12-24 | 2020-05-05 | 嘉兴欣创混凝土制品有限公司 | Quick butt joint subassembly and quick butt joint mechanism |
CN112942329A (en) * | 2021-01-26 | 2021-06-11 | 中国矿业大学 | A connection structure for precast concrete stake |
CN115075235A (en) * | 2022-07-23 | 2022-09-20 | 江苏远瀚建筑设计有限公司 | Prestressed concrete pipe pile splicing structure and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1288382A2 (en) * | 2001-08-28 | 2003-03-05 | Emeca Oy | A joint for reinforced concrete pile sections |
GB201304092D0 (en) * | 2013-03-07 | 2013-04-24 | Sea Ltd | Improved collect connector for concrete piles |
CN204780879U (en) * | 2015-06-09 | 2015-11-18 | 周兆弟 | A prefabricated component for connecting connecting piece of two objects and connecting with this connecting piece |
CN105756054A (en) * | 2016-01-05 | 2016-07-13 | 袁江 | Uplift pile mixed connection structure |
CN205444181U (en) * | 2016-01-05 | 2016-08-10 | 袁江 | Cast member connector |
CN207525742U (en) * | 2017-09-14 | 2018-06-22 | 江苏麦廊新材料科技有限公司 | Resistance to plucking bending resistance quick union and concrete precast pile |
-
2017
- 2017-11-14 CN CN201711122320.4A patent/CN107882023A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1288382A2 (en) * | 2001-08-28 | 2003-03-05 | Emeca Oy | A joint for reinforced concrete pile sections |
GB201304092D0 (en) * | 2013-03-07 | 2013-04-24 | Sea Ltd | Improved collect connector for concrete piles |
CN204780879U (en) * | 2015-06-09 | 2015-11-18 | 周兆弟 | A prefabricated component for connecting connecting piece of two objects and connecting with this connecting piece |
CN105756054A (en) * | 2016-01-05 | 2016-07-13 | 袁江 | Uplift pile mixed connection structure |
CN205444181U (en) * | 2016-01-05 | 2016-08-10 | 袁江 | Cast member connector |
CN207525742U (en) * | 2017-09-14 | 2018-06-22 | 江苏麦廊新材料科技有限公司 | Resistance to plucking bending resistance quick union and concrete precast pile |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629589A (en) * | 2018-12-29 | 2019-04-16 | 国网山东省电力公司烟台供电公司 | A kind of plug-in type prefabricated pile basis |
CN109629589B (en) * | 2018-12-29 | 2024-01-16 | 国网山东省电力公司烟台供电公司 | Inserted prefabricated pile foundation |
CN110409432A (en) * | 2019-07-23 | 2019-11-05 | 吴义珑 | A kind of prestressed steel pipe of concrete guard wall |
CN110409432B (en) * | 2019-07-23 | 2021-01-15 | 上海建元工程股份有限公司 | Prestressed steel pipe pile of concrete dado |
CN111101503A (en) * | 2019-12-24 | 2020-05-05 | 嘉兴欣创混凝土制品有限公司 | Quick butt joint subassembly and quick butt joint mechanism |
CN112942329A (en) * | 2021-01-26 | 2021-06-11 | 中国矿业大学 | A connection structure for precast concrete stake |
CN115075235A (en) * | 2022-07-23 | 2022-09-20 | 江苏远瀚建筑设计有限公司 | Prestressed concrete pipe pile splicing structure and construction method thereof |
CN115075235B (en) * | 2022-07-23 | 2023-09-01 | 江苏远瀚建筑设计有限公司 | Pile splicing structure of prestressed concrete pipe pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107882023A (en) | Resistance to plucking bending resistance quick union and concrete precast pile | |
CN105019445A (en) | Semicircular connector pile forming machine | |
CN106049689A (en) | Anchoring rail for anchoring in concrete | |
CN208056316U (en) | The dry type connecting structure of full precast floor slab | |
CN207525742U (en) | Resistance to plucking bending resistance quick union and concrete precast pile | |
CN206346205U (en) | Sawtooth anchor type miniature steel pipe concrete pile for slope treatment | |
CN210766746U (en) | Pressure pile foundation | |
CN206015678U (en) | A kind of hydraulic pile driver piling mechanism | |
CN207828962U (en) | A kind of barb type construction pile that stability is good | |
CN104831726B (en) | Barb grouting formula anchor pole and construction method thereof | |
CN208277135U (en) | A kind of split type prefabricated board core model mold | |
CN212984164U (en) | Archaize building structure | |
CN207159993U (en) | A kind of civil engineering built pile used temporarily | |
CN207131769U (en) | Parking brake assembly | |
CN205913216U (en) | Clothes hanger of adjustable height and length | |
CN112252303B (en) | Precast pile mounting structure | |
CN209277193U (en) | A kind of cast-in-place green concrete barricade | |
CN207435893U (en) | Across the bridge steel anticollision wall construction of high-speed railway on a kind of highway | |
CN208996394U (en) | A kind of reinforcing welded plate for steel structure lift shaft | |
CN206667282U (en) | Column foundation and foundation structure of building | |
CN216075096U (en) | High-pressure jet grouting enlarged footing anchor rod structure | |
CN109826206A (en) | The outer supporting construction of foundation pit | |
CN211571767U (en) | Combined pile for building foundation engineering | |
CN211368689U (en) | Novel conical tubular pile side opening pointed pile | |
CN208685355U (en) | A kind of railway run-resistant railway spike |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |