Prior art keywords
connecting beam
dovetail
water outlet
side slope
planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021441625.9U
Other languages
Chinese (zh)
Inventor
蔡华强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lechang Residential Construction Engineering Co Ltd
Original Assignee
Lechang Residential Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lechang Residential Construction Engineering Co Ltd filed Critical Lechang Residential Construction Engineering Co Ltd
Priority to CN202021441625.9U priority Critical patent/CN212801585U/en
Application granted granted Critical
Publication of CN212801585U publication Critical patent/CN212801585U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The application relates to an ecological environment-friendly assembled municipal slope reinforcement structure, which comprises a plurality of anchoring connecting pieces for fixing with a slope soil body, wherein a prefabricated connecting beam is arranged between every two adjacent anchoring connecting pieces, each prefabricated connecting beam is provided with a dovetail groove, and dovetail tenons matched with the dovetail grooves are integrally formed on the anchoring connecting pieces; the prefabricated connecting beam is divided into a transverse connecting beam and a longitudinal connecting beam, and the transverse connecting beam is provided with a limiting assembly for preventing the dovetail joint from being separated from the dovetail groove. This application has the effect of shortening side slope construction cycle.

Description

Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure
Technical Field
The application relates to the field of municipal slope engineering construction, in particular to an ecological environment-friendly assembled municipal slope reinforcing structure.
Background
The side slope refers to an inclined plane with a certain gradient formed on two sides of the roadbed to ensure the stability of the roadbed; however, the side slope has the characteristic of instability, when the side slope is subjected to rain wash, water and soil loss is easily caused, landslide occurs in serious cases, landslide disasters seriously affect the safety of vehicles and pedestrians, and even traffic interruption can be caused; currently, to reduce the possibility of landslide of a side slope, reinforcement measures are usually taken on the side slope.
At present, the most common measure for reinforcing slope surfaces of slope surfaces in building engineering is a concrete skeleton, and as disclosed in chinese patent with publication number CN109024634A, an ecological slope protection structure is disclosed, which includes an anchoring component, an anchor cable component and a green plant component, the anchoring component includes a first steel bar frame, a second steel bar frame and a concrete body, the first steel bar frame is connected with the second steel bar frame, and the first steel bar frame, the second steel bar frame and the slope are enclosed to form the holding tank, the first steel bar frame is cast in the first steel bar frame and the second steel bar frame, and the other end of the free anchor cable section is fixed to the concrete body.
The anchoring assembly needs to be erected with a steel bar framework and poured with a concrete body and needs to be maintained for a certain time, so that the construction period of the integral concrete framework is long.
SUMMERY OF THE UTILITY MODEL
In order to solve the longer problem of construction cycle of whole concrete skeleton, this application provides an ecological environmental protection pin-connected panel municipal administration side slope reinforced structure.
The application provides a pair of municipal slope reinforced structure of ecological environmental protection pin-connected panel adopts following technical scheme:
an ecological environment-friendly assembled municipal slope reinforcement structure comprises a plurality of anchor connecting pieces for fixing with a slope soil body, a prefabricated connecting beam is arranged between every two adjacent anchor connecting pieces, each prefabricated connecting beam is provided with a dovetail groove, and dovetail tenons matched with the dovetail grooves are integrally formed on the anchor connecting pieces; the prefabricated connecting beam is divided into a transverse connecting beam and a longitudinal connecting beam, and the transverse connecting beam is provided with a limiting assembly for preventing the dovetail joint from being separated from the dovetail groove.
By adopting the technical scheme, firstly, anchor rods are drilled on the side slope soil body, then the exposed ends of the anchor rods are cast and formed with the anchoring connecting pieces, the anchoring connecting pieces are arranged in a longitudinal and transverse mode at intervals, then the prefabricated connecting beams and the anchoring connecting pieces are clamped through the matching of the dovetail joints and the dovetail grooves along the direction perpendicular to the inclined plane of the side slope soil body, so that the preliminary installation is completed, then the limiting assembly is used for further limiting, the clamping stability between the prefabricated connecting beams and the anchoring connecting pieces is improved, and the final installation is completed; the construction of the whole side slope frame is completed by arranging the transverse connecting beams and the longitudinal connecting beams which are prefabricated and formed and matching with the anchoring connecting pieces, so that the maintenance period is shortened, the clamping mode is convenient, the construction difficulty is further reduced, and the construction period is shortened; and the connection node of the whole side slope frame at the anchoring connecting piece is in anchoring combination with the side slope soil body, so that the connection stability between the whole side slope frame and the side slope soil body is ensured.
Preferably, the two adjacent transverse connecting beams and the two adjacent longitudinal connecting beams surround to form a planting area, a green plant tray for planting green plants is placed in the planting area, and a plurality of through holes are formed in the bottom of the green plant tray.
By adopting the technical scheme, the planting area is arranged, so that the greening of the side slope can be facilitated, and meanwhile, the green root system in the planting area can extend into the soil body of the side slope through the through hole, so that the water and soil of the soil body of the side slope can be maintained; meanwhile, the green plant tray is arranged, so that green plants can be transplanted conveniently, and the construction period is further shortened.
Preferably, the device also comprises a watering assembly for watering the green plants; the irrigation assembly comprises a water outlet main pipe and a water storage tank, wherein the water outlet main pipe and the water storage tank are transversely arranged, the water storage tank is provided with an upper opening, the water outlet main pipe and the water storage tank are sequentially connected through a water inlet hose and a delivery pump, and the water storage tank is connected with an external water pipe; the water outlet main pipe is connected with a water outlet branch pipe which is longitudinally arranged, and the water outlet branch pipe is provided with an atomizing nozzle which is positioned in the planting area.
By adopting the technical scheme, the water in the water storage tank passes through the water inlet hose, the water outlet main pipe and the water outlet branch pipe in sequence by starting the delivery pump, and the green plants in the planting area are irrigated by the atomizing nozzle so as to ensure the healthy growth of the green plants; and the water storage tank can introduce an external water source through an external water pipe and can be supplemented by receiving rainwater, so that water resources are saved, and the water storage tank is green and environment-friendly.
Preferably, the transverse connecting beam is provided with a mounting hole for the water outlet branch pipe to longitudinally penetrate through.
Through adopting above-mentioned technical scheme, through setting up the mounting hole for go out water branch pipe and transverse connection roof beam and realize being connected, go out water branch pipe promptly and play the structural strength effect of strengthening the side slope frame.
Preferably, the limiting assembly comprises an insertion rod, the side wall of the transverse connecting beam is provided with a sliding groove along the length direction of the transverse connecting beam, and the insertion rod is connected with the sliding groove in a sliding manner; the lateral wall of vertical tie-beam is seted up the confession the inserted jack that the inserted bar slided, the slot has been seted up with the forked tail that is used for being connected of vertical tie-beam to anchor connecting piece, the inserted bar slides and passes the jack and with slot plug-in connection.
Through adopting above-mentioned technical scheme, through setting up the inserted bar that can respectively with jack and slot connection, the grafting direction of inserted bar is mutually perpendicular with the joint direction between forked tail tenon and the dovetail, and then the grafting of inserted bar can prevent the breaking away from between forked tail tenon and the dovetail, and then ensures whole side slope frame's connection steadiness.
Preferably, the cross section of the mounting hole is rectangular, the mounting hole is communicated with the sliding groove, the outer wall of the water outlet branch pipe is convexly provided with a limiting block filled in the mounting hole, and when one end of the inserted link is inserted into the slot, the side wall of the limiting block is abutted to the end part of the inserted link far away from the slot.
By adopting the technical scheme, the limiting function of the inserted bar is achieved by the abutting of the limiting block and the end part of the inserted bar, namely, the inserted bar is limited to be separated from the slot; and the limiting block can also enhance the connection strength between the water outlet branch pipe and the transverse connecting beam.
Preferably, the upper surface of the longitudinal connecting beam is provided with grouting holes, and the grouting holes are communicated with the jacks.
Through adopting above-mentioned technical scheme, treat whole side slope frame equipment back that finishes, pour the clean sand of cement toward the slip casting downthehole to fill the jack, thereby improve the connection steadiness between inserted bar and the jack.
Preferably, the bottom of the prefabricated connecting beam is provided with a ground nail for inserting a slope soil body.
Through adopting above-mentioned technical scheme, when prefabricated tie-beam and anchor connecting piece joint, the ground nail on the prefabricated tie-beam inserts in the side slope soil body, and then has improved the connection steadiness between prefabricated tie-beam and the side slope soil body.
In summary, the present application includes at least one of the following beneficial technical effects:
the construction of the whole side slope frame is completed by arranging the transverse connecting beams and the longitudinal connecting beams which are prefabricated and formed and matching with the anchoring connecting pieces, so that the maintenance period is shortened, the clamping mode is convenient, the construction difficulty is further reduced, and the construction period is shortened;
the limiting block is abutted against the end part of the inserted link to limit the inserted link, namely, the inserted link is limited to be separated from the slot; and the limiting block can also enhance the connection strength between the water outlet branch pipe and the transverse connecting beam.
Drawings
Fig. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a schematic view of a green plant tray of the present embodiment;
FIG. 3 is a schematic view showing a state in which the prefabricated coupling beams of the present embodiment are coupled to the anchor connection members;
fig. 4 is an exploded view of the embodiment for showing the connection relationship between the transverse connection beam and the longitudinal connection beam.
Description of reference numerals: 1. an anchor connection; 2. a transverse connecting beam; 3. a longitudinal connecting beam; 4. a watering assembly; 5. a green plant tray; 6. a limiting component; 10. a slope soil body; 11. dovetail joints; 12. an anchor rod; 21. a dovetail groove; 22. a ground nail; 41. a main water outlet pipe; 42. a water storage tank; 43. a water inlet hose; 44. a delivery pump; 45. is externally connected with a water pipe; 46. a water outlet branch pipe; 47. an atomizing spray head; 48. a limiting block; 51. a through hole; 61. inserting a rod; 62. a chute; 63. a jack; 64. a slot; 65. mounting holes; 66. and (4) grouting holes.
Detailed Description
The present application will be described in further detail below with reference to the accompanying drawings.
The embodiment of the application discloses municipal slope reinforced structure of ecological environmental protection pin-connected panel. Referring to fig. 1 and 2, the slope-type irrigation device comprises an irrigation assembly 4 and a plurality of anchor connecting pieces 1 for fixing with a slope soil body 10, wherein the anchor connecting pieces 1 are connected with the slope soil body 10 through anchor rods 12 (see fig. 3), and a prefabricated connecting beam is clamped between every two adjacent anchor connecting pieces 1; prefabricated tie-beam divide into transverse connection roof beam 2 and longitudinal tie roof beam 3, surrounds between two adjacent transverse connection roof beams 2, two adjacent longitudinal tie roof beams 3 and forms kind district, and it has been used for planting green tray 5 of planting to place in the kind district, and a plurality of through-holes 51 have been seted up to green tray 5 bottom of planting, and watering subassembly 4 is used for watering green planting in the green tray 5 of planting.
As shown in fig. 1, the irrigation assembly 4 comprises a main outlet pipe 41 and a water storage tank 42 with an upper opening, which are arranged along the transverse direction, wherein the main outlet pipe 41 and the water storage tank 42 are connected through a water inlet hose 43 and a delivery pump 44 in sequence, and the water storage tank 42 is connected with an external water pipe 45; the main water outlet pipe 41 is connected with a stainless steel branch water outlet pipe 46 which is arranged longitudinally, the branch water outlet pipe 46 is penetrated through the transverse connecting beam 2, the lower end of the branch water outlet pipe 46 is abutted with the transverse connecting beam 2 at the lowest position, and the branch water outlet pipe 46 is provided with an atomizing nozzle 47 which is positioned in the planting area.
Water in the water storage tank 42 passes through the water inlet hose 43, the water outlet main pipe 41 and the water outlet branch pipe 46 in sequence through the delivery pump 44, and green plants in the planting area are irrigated by the atomizing nozzle 47 so as to ensure the healthy growth of the green plants; and the water storage tank 42 can introduce external water source through the external water pipe 45 and can also be supplemented by receiving rainwater, so that water resources are saved, and the environment is protected.
As shown in fig. 3, the bottom of the prefabricated connecting beam is provided with a ground nail 22 for inserting into the slope soil 10, the prefabricated connecting beam is provided with a dovetail groove 21, and the anchor connecting piece 1 is integrally formed with a dovetail 11 matched with the dovetail groove 21, i.e. the prefabricated connecting beam is respectively connected with the slope soil 10 and the anchor connecting piece 1 through the ground nail 22 and the dovetail groove 21; at the same time, the transverse connection beam 2 is provided with a stop assembly 6 which prevents the dovetail 11 from disengaging from the dovetail slot 21.
As shown in fig. 3 and 4, the limiting assembly 6 includes an insertion rod 61, a T-shaped sliding groove 62 is formed in the side wall of the transverse connecting beam 2 along the length direction thereof, and the insertion rod 61 is connected with the sliding groove 62 in a sliding manner; the lateral wall of vertical tie-beam 3 is seted up and is supplied the inserted jack 63 that slides of inserted bar 61, anchor connecting piece 1 be used for with the dovetail 11 that vertical tie-beam 3 is connected seted up slot 64, inserted bar 61 slides and passes jack 63 and with slot 64 plug connection, because the grafting direction of inserted bar 61 is mutually perpendicular with the joint direction between dovetail 11 and the dovetail 21, and then the grafting of inserted bar 61 can prevent breaking away from between dovetail 11 and the dovetail 21, and then ensures whole side slope frame's connection steadiness.
In order to further improve the connection stability between the insertion rod 61 and the insertion slot 64, as shown in fig. 3 and 4, the transverse connecting beam 2 is provided with a rectangular mounting hole 65, and the water outlet branch pipe 46 is connected with the transverse connecting beam 2 through the mounting hole 65; the mounting hole 65 is communicated with the sliding groove 62, the outer wall of the water outlet branch pipe 46 is convexly provided with a limiting block 48 filled in the mounting hole 65, when one end of the inserting rod 61 is inserted into the inserting groove 64, the side wall of the limiting block 48 is abutted against the end part of the inserting rod 61 far away from the inserting groove 64, and then the limiting block 48 prevents the inserting rod 61 from separating from the inserting groove 64; and the upper surface of the longitudinal connecting beam 3 is provided with a grouting hole 66, the grouting hole 66 is communicated with the jack 63, and cement sand is injected into the grouting hole 66 to fill the jack 63 and reinforce the connection between the inserted rod 61 and the jack 63.
The implementation principle of the embodiment of the application is as follows: firstly, arranging anchor rods 12 towards a side slope soil body 10, then pouring and forming anchor connecting pieces 1 at exposed ends of the anchor rods 12, arranging a plurality of anchor connecting pieces 1 in a longitudinal and transverse mode at intervals, moving a prefabricated connecting beam along a direction vertical to an inclined plane of the side slope soil body 10, enabling the prefabricated connecting beam to be clamped with the anchor connecting pieces 1 through the matching of a dovetail joint 11 and a dovetail groove 21, completing primary installation, then sliding an inserting rod 61, enabling the inserting rod 61 to slide to penetrate through an inserting hole 63 and be in inserted connection with an inserting groove 64 so as to prevent the dovetail joint 11 from being separated from the dovetail groove 21, then installing a water outlet branch pipe 46 through the matching of a limiting block 48 and an installing hole 65, enabling the side wall of the limiting block 48 to be abutted against the end part of the inserting rod 61 far away from the inserting groove 64, further enabling the limiting block 48 to prevent the inserting rod 61 from being separated from the inserting groove 64, and finally injecting cement clean, the connection between the inserted rod 61 and the inserting hole 63 is reinforced, so that the construction of the whole slope frame is completed; through setting up prefabricated profiled's transverse connection roof beam 2 and longitudinal connection roof beam 3 to and adopt the joint cooperation mode to realize the installation of whole side slope frame, shortened construction cycle greatly, and still compromise the firm and structural strength of connection of whole side slope frame.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an ecological environmental protection pin-connected panel municipal administration side slope reinforced structure which characterized in that: the side slope anchoring device comprises a plurality of anchoring connectors (1) used for being fixed with a side slope soil body (10), a prefabricated connecting beam is arranged between every two adjacent anchoring connectors (1), each prefabricated connecting beam is provided with a dovetail groove (21), and dovetail tenons (11) matched with the dovetail grooves (21) are integrally formed on the anchoring connectors (1); the prefabricated connecting beam is divided into a transverse connecting beam (2) and a longitudinal connecting beam (3), and the transverse connecting beam (2) is provided with a limiting assembly (6) for preventing the dovetail joint (11) from being separated from the dovetail groove (21).
2. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 1, characterized in that: two adjacent horizontal coupling roof beam (2), two adjacent vertical coupling roof beam (3) enclose between and form planting the district, and planting is placed and is used for planting green tray (5) of planting in the district, and a plurality of through-holes (51) have been seted up to green tray (5) bottom of planting.
3. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 2, characterized in that: also comprises a watering assembly (4) for watering the green plants; the irrigation assembly (4) comprises a water outlet main pipe (41) and a water storage tank (42) with an upper opening, the water outlet main pipe (41) and the water storage tank (42) are connected with a delivery pump (44) through a water inlet hose (43) in sequence, and the water storage tank (42) is connected with an external water pipe (45); the water outlet main pipe (41) is connected with a water outlet branch pipe (46) which is longitudinally arranged, and an atomizing nozzle (47) which is positioned in the planting area is arranged on the water outlet branch pipe (46).
4. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 3, characterized in that: the transverse connecting beam (2) is provided with a mounting hole (65) for the water outlet branch pipe (46) to longitudinally penetrate through.
5. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 4, characterized in that: the limiting assembly (6) comprises an inserting rod (61), a sliding groove (62) is formed in the side wall of the transverse connecting beam (2) along the length direction of the transverse connecting beam, and the inserting rod (61) is connected with the sliding groove (62) in a sliding mode; the confession has been seted up to the lateral wall of vertical tie-beam (3) inserted hole (63) are slided in inserted rod (61), slot (64) have been seted up in anchor connecting piece (1) dovetail (11) that are used for being connected with vertical tie-beam (3), inserted rod (61) slide pass jack (63) and with slot (64) plug-in connection.
6. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 5, characterized in that: the transversal rectangle of personally submitting of mounting hole (65), just mounting hole (65) with spout (62) intercommunication, the outer wall protrusion of outlet branch pipe (46) be constructed and fill in stopper (48) in mounting hole (65), work as when the one end of inserted bar (61) is inserted in slot (64), the lateral wall of stopper (48) with the tip looks butt of slot (64) is kept away from in inserted bar (61).
7. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 5, characterized in that: and grouting holes (66) are formed in the upper surface of the longitudinal connecting beam (3), and the grouting holes (66) are communicated with the insertion holes (63).
8. The ecological environment-friendly assembled municipal slope reinforcement structure according to claim 1, characterized in that: the bottom of the prefabricated connecting beam is provided with a ground nail (22) for inserting into a side slope soil body (10).
CN202021441625.9U 2020-07-18 2020-07-18 Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure Active CN212801585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021441625.9U CN212801585U (en) 2020-07-18 2020-07-18 Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021441625.9U CN212801585U (en) 2020-07-18 2020-07-18 Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure

Publications (1)

Publication Number Publication Date
CN212801585U true CN212801585U (en) 2021-03-26

Family

ID=75101897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021441625.9U Active CN212801585U (en) 2020-07-18 2020-07-18 Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure

Country Status (1)

Country Link
CN (1) CN212801585U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250213A (en) * 2021-05-21 2021-08-13 三峡大学 Slope protection structure with irrigation function for soil-rock mixed side slope and construction method
CN113463611A (en) * 2021-07-09 2021-10-01 内蒙古中盛立德环境工程有限公司 Mine treatment system and treatment method
CN114775525A (en) * 2022-04-19 2022-07-22 聂鑫鑫 Hydraulic engineering uses ecological bank protection device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250213A (en) * 2021-05-21 2021-08-13 三峡大学 Slope protection structure with irrigation function for soil-rock mixed side slope and construction method
CN113463611A (en) * 2021-07-09 2021-10-01 内蒙古中盛立德环境工程有限公司 Mine treatment system and treatment method
CN114775525A (en) * 2022-04-19 2022-07-22 聂鑫鑫 Hydraulic engineering uses ecological bank protection device

Similar Documents

Publication Publication Date Title
CN212801585U (en) Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN109594568B (en) Rock slope ecological protection structure and method thereof
CN103046746A (en) Construction method of conversion beam reinforcing bars for tall building structure
CN112482405A (en) Prefabricated slope protection device and construction method thereof
CN213926311U (en) Slope protection reinforced structure
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction
CN107044132B (en) A kind of construction method of quake-resistant safety ground
CN210459280U (en) Drip irrigation type plant-planting ecological earth-retaining giant block and paving structure thereof
CN210459282U (en) Assembled gravity retaining wall
CN112921994A (en) Lattice beam structure and construction method thereof
KR20130027354A (en) Nocement concrete breast block using furnace slag for reinforcement soil
CN113174974A (en) Prefabricated structure for supporting side slope
CN102758520B (en) First level of scaffold during freezing and thawing period of soil body and building method
CN214169093U (en) A side slope reinforcerment system for basic building engineering
CN215926039U (en) Assembled plate type foundation connected by sleeve
CN111244825A (en) Road-crossing cable laying structure and construction method thereof
CN109235444A (en) A kind of prismatic prestressing force support pile, piling wall and its construction method
CN214460595U (en) Assembled cantilever retaining wall structure
CN219952025U (en) Prefabricated assembly type inclined plugboard greening ecological retaining wall construction structure
CN215977363U (en) Composite ecological landscape assembled retaining wall prefabricated part
CN110424637A (en) Bar planting and attachment device inside pre-cast concrete walling
CN205172029U (en) False hillstone in gardens connects reinforced structure
CN216515660U (en) Side slope ecological remediation structure of damaged mountain
CN212867118U (en) Assembled enclosure wall capable of being repeatedly disassembled and assembled for use

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant