CN110405461A - The tooling being aligned for flange with pipeline - Google Patents
The tooling being aligned for flange with pipeline Download PDFInfo
- Publication number
- CN110405461A CN110405461A CN201910649314.7A CN201910649314A CN110405461A CN 110405461 A CN110405461 A CN 110405461A CN 201910649314 A CN201910649314 A CN 201910649314A CN 110405461 A CN110405461 A CN 110405461A
- Authority
- CN
- China
- Prior art keywords
- flange
- mounting
- pipeline
- support base
- slideway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000000712 assembly Effects 0.000 claims abstract description 41
- 238000000429 assembly Methods 0.000 claims abstract description 41
- 210000000078 claw Anatomy 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 6
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 230000005526 G1 to G0 transition Effects 0.000 claims 1
- 238000000034 method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 4
- 230000033001 locomotion Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000000354 decomposition reaction Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 241000237858 Gastropoda Species 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 241000233855 Orchidaceae Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000000498 cooling water Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000002918 waste heat Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
- B23P19/10—Aligning parts to be fitted together
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automatic Assembly (AREA)
Abstract
The present invention relates to a kind of toolings being aligned for flange with pipeline, including the first skid assemblies, have two groups and are parallel to each other, and each first skid assemblies include first slideway or at least two the first slideways being parallel to each other;Mounting rack, there are two, each corresponding sliding of aforementioned mounting rack is set in one group of first skid assemblies, and the ring flange for mounting flange is equipped on each mounting rack.Tooling of the invention includes that there are two the mounting racks for being used for mounting flange, each mounting rack is slidably mounted in one group of first skid assemblies, mounting rack can move biggish distance along the first skid assemblies, so by adjusting the relative position between two mounting racks, the alignment assembly being applicable not only between flange and straight tube, the alignment assembly being also applied between flange and bend pipe or shape tube.
Description
Technical field
The present invention relates to pipe fitting mounting technology fields, and in particular to a kind of tooling being aligned for flange with pipeline.
Background technique
Ship pipeline is the pipe fitting for being used to connect various mechanical equipments on ship, for transmitting various Jie such as water, oil, gas
Matter.Ship pipeline has two major classes: power pipeline and marine system pipeline.Power pipeline is to for each of main and auxiliaries service
Kind pipeline, there is the pipelines such as fuel oil, lubricating oil, cooling water, compressed air, exhaust, waste heat;Marine system pipeline is to improve ship
Unsinkability, stability, in order to meet the normal life needs of crewman, passenger.Wherein, flanged joint is that these current pipelines are most main
The type of attachment wanted, advantage is that pipe fitting bond strength is high, convenient for disassembly and assembly, applied widely, almost can be applied to a Pipe Cutting
The connection on road.
Pipe flange needs flange to be mutually perpendicular to pipeline in the welding process, and the central axis of pipeline needs and method
Blue center is consistent, if not having auxiliary device when welding, is difficult to realize really to just, for this problem, Patent No.
" to top formula flange, straight tube group pair disclosed in the Chinese invention patent of ZL20190174511.8 (publication No. CN109822249A)
Equipment " this problem can be solved, which includes the setting of two time intervals and the flange branch fastener to carry flange
It frame and is set between the two flange branch fastener framves to carry straight tube and limit the straight tube bracket of direction before and after the straight tube,
Each flange branch fastener frame includes head frame ontology, is set to the head frame ontology towards straight tube bracket side for pressing from both sides
It enforces the law and orchid and keeps the flange chuck of direction before and after the flange axial line;The flange branch fastener frame, which also has, adjusts the method
The position adjusting mechanism of blue position;Based on it is involved in the present invention to top formula flange, straight tube group to the structure of equipment, in flange and straight
The group of pipe in the process, by flange branch fastener frame can from the positional relationship between multiple angular adjustment flanges and straight tube, from
And ensure the assembling precision between flange and straight tube, and when straight tube both ends are required to be grouped with flange, it can effectively mention
High group to efficiency.
Above equipment has problems in that: the tooling is by the movement of flange chuck come the position of regulating flange, and
Flange chuck is mobile relative to flange support head frame, rather than passes through the movement of flange branch fastener frame, therefore is only finely tuned, mobile
Less, in other words, which is only applicable in straight tube to distance, and is not suitable for bend pipe or other shape tubes.
Summary of the invention
The technical problem to be solved by the invention for the present situation of prior art is to provide one kind for flange and pipeline pair
Two mounting racks for being equipped with ring flange of quasi- tooling, the correspondence pipe ends of the tooling can relatively move, so as to be adapted to not
The pipeline of similar shape.
The technical scheme of the invention to solve the technical problem is: a kind of work being aligned for flange with pipeline
Dress, it is characterised in that: including
First skid assemblies have two groups and are parallel to each other, and each first skid assemblies include first slideway or at least
Two the first slideways being parallel to each other;
Mounting rack, there are two, each corresponding sliding of aforementioned mounting rack is set in one group of first skid assemblies, and each installation
The ring flange for mounting flange is equipped on frame.
In order to enable the tooling can be adapted to the installation of flange and special-shaped pipeline, each mounting rack is sliding by support base
It is dynamic to be set in corresponding first skid assemblies, and be equipped in each support base and can mounting rack be circumferentially rotated with respect to support base
The first rotary components, the mounting rack and corresponding first rotary components are connected.So that mounting rack can circumferentially rotate,
Increase the adjustment dimension of mounting rack.
First rotary components can have a variety of structures form, for the ease of the first rotary components are placed in support base
It is interior, it is preferable that first rotary components include the first worm gear and the first worm screw for being connected with the first worm-drive, the first snail
Take turns the first index dial for being connected with corresponding mounting rack and being equipped with synchronous rotation therebetween, first index dial and peace
It shelves connected.Worm gear, the fit system of worm screw are compact-sized, and by can intuitively know mounting rack on the first index dial
Rotational angle and rotational angle is accurately controlled, improve ring flange and pipe fitting alignment precision.
In order to support base it is mobile in place when it is positioned, prevent it from moving in nonessential situation, each support base with
At least one first locking device is connected, corresponding first slideway of each first locking device, and each first locking device includes
The first positioning plate being connected with support base, is threaded with the first positioning pin on first positioning plate, the first positioning pin can with it is right
The side wall of the first slideway is answered to offset.So when support base moves in place, by being locked at the first positioning pin on the first slideway,
Support base is positioned and cannot arbitrarily be moved.
In order to accurately control the shift motion of support base, at least one corresponding first locking device of each support base
In, it is connected between the first positioning plate and corresponding support base at least one first locking device by the first screw rod, this
One screw rod first end is threadedly coupled with support base, and second end passes through the first positioning plate and limit the first of the first positioning plate outer wall
Locating part is fixedly linked.So by the first screw rod of rotation, the position of support base can be finely adjusted.
In order to enable ring flange can be in different height, in order to construction personnel's operation, flange and pipeline are welded, institute
Stating mounting rack includes the frame body being connected with support base and the mounting base being set on frame body that can be slided up and down, in the mounting base
Ring flange is installed, and the mounting base is connected with the lifting assembly that it can be driven to move up and down.Otherwise flange position it is excessively high or
It is too low, it can all cause construction personnel inconvenient or difficult.
The adjustment dimension of ring flange in order to further increase, adapts to the pipeline of different size and shape, and the frame body is in U
Type, including being oppositely arranged and the side wall that extends and the bottom wall being connected between two sidewalls, aforementioned bottom wall and support base phase up and down
Even;
The mounting base is U-shaped, including two installing arms being oppositely arranged and the peace being connected between two installing arms
Loading board, the ring flange are set on mounting plate, and both of the aforesaid installing arm passes through the respective side of a sliding seat Yu the frame body respectively
Side walls be connected, at least one of which sliding seat is driven by the lifting assembly;
The installing arm rotational installation of the mounting base is on the sliding seat of respective side, in sliding seat described at least one of which
Equipped with the second rotary components that mounting base can be made to rotate relative to sliding seat, second rotary components and corresponding installing arm phase
Even.The mounting base for being so equipped with ring flange can be similar to " playing on a swing " and equally swing, to change the deflection angle of ring flange,
Adaptation flange is connect with the pipeline of different shape and specification.
In order to enable the mounting hole on ring flange is aligned with the connecting hole on flange, the mounting plate and flange of the mounting base
It is connected between disk by terminal pad, the third rotation group of energy driving flange coiling own axis is equipped in the terminal pad
Part, the ring flange are connected with third rotary components.Rotate ring flange by third rotary components, so that ring flange turns to
Mounting hole thereon is in suitable position.
In order to be adapted to the pipeline of different length, which further includes pedestal and two group of second slideway being fixed on pedestal
Group, aforementioned two group of second skid assemblies are parallel and interval is arranged, and each second skid assemblies include second slideway or two
Second slideway disposed in parallel, first slideway and the second slideway are vertically arranged, and each first Slide Group is erected at two groups
It can slide in second skid assemblies and along the second skid assemblies.
In order to enable the flange of different size can be firmly assemblied on ring flange, the ring flange includes chuck, edge
At least two claws chuck circumferentially spaced at least two sliding rail and be correspondingly arranged in each sliding rail, each sliding rail is along chuck
It radially extends, claw can be movably set in corresponding sliding rail.The flange of different-diameter is so capable of clamping by the movement of claw, and
And several claws can support flange periphery wall simultaneously to grip to flange formation by ecto-entad, be also possible to simultaneously by introversion
Outer abutting flange internal perisporium is to hold out against fixation to flange formation.
Compared with prior art, advantages of the present invention: 1, tooling of the invention includes that there are two for mounting flange
Mounting rack, each mounting rack are slidably mounted in one group of first skid assemblies, and mounting rack can move biggish along the first skid assemblies
Distance, so by adjusting the relative position between two mounting racks, the alignment assembly being applicable not only between flange and straight tube,
The alignment assembly being also applied between flange and bend pipe or shape tube;2, tooling of the invention can adjust two from multiple dimensions
Positional relationship between ring flange effectively ensures the group between flange and pipeline to be adapted to the pipeline of different size and shape
To precision, so that flange and pipeline have more before being welded and fixed, accurately group adjusts ring flange position so that method to relationship
Blue disk axial line and pipeline axial line are overlapped, and high-efficient and operating accuracy is high.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the partial structural diagram of Fig. 1;
Fig. 3 is the decomposition diagram of Fig. 2;
Fig. 4 is the structural schematic diagram of the mounting base in Fig. 2;
Fig. 5 is the decomposition diagram of Fig. 4;
Fig. 6 is the structural schematic diagram for removing mounting rack in Fig. 2;
Fig. 7 is the decomposition diagram of Fig. 6;
Fig. 8 is enlarged drawing at the B of Fig. 6;
Fig. 9 is enlarged drawing at the A of Fig. 1.
Specific embodiment
The present invention will be described in further detail below with reference to the embodiments of the drawings.
What the tooling being aligned with pipeline for flange of the present embodiment can be used for various occasions needs welded flange and pipe
The situation in road, for example, can be applied in the process restored based on photogrammetric pipe fitting and flange pose, it is aforementioned based on photography
The method of pipe fitting and flange the pose reduction of measurement, comprising the following steps:
S1: measurement tooling is filled in into flange bolt hole progress scene and is layouted;
S2: up short is carried out to acquire the three-dimensional coordinate of pipe fitting and flange by camera;
S3: extracting flange information in the database, and carry out three-dimensional modeling, generates and now matches tube model;
S4: judgement now is compared with pipe standards are actually closed up with tube model by what is generated in step S3, if meeting reality
Border closes up pipe standards and then exports manuscript, is manually adjusted if not meeting and actually closing up pipe standards, generates new showing and matches
Tube model actually closes up pipe standards until complying with;Wherein, the setting for actually closing up pipe standards is based in step S3
The flange information extracted in database;
S5: according to the data information of output manuscript, " tooling being aligned for flange with pipeline " is used to make production tube
Section, in-site installation.
As shown in figure 1-9, the tooling being aligned for flange with pipeline of this preferred embodiment includes pedestal A, the first slideway
Group 1a, the second skid assemblies 9a and mounting rack 2.It is X to the second slideway with the length direction of the first skid assemblies 1a in the present embodiment
The length direction of group 9a is Y-direction, using up and down direction as Z-direction.
First skid assemblies 1a has two groups and is parallel to each other, and each first skid assemblies 1a includes two the first cunnings being parallel to each other
Road 1, two the first slideways 1 positioned at same first skid assemblies 1a are connected by connecting plate 12, and certain first slideway 1 can also only have
One.It is equipped with a mounting rack 2 on each first skid assemblies 1a, one is correspondingly provided on each mounting rack 2 for mounting flange
Ring flange 3.
For relative distance pipeline to adapt to different length of two ring flanges 3 in Y-direction can be adjusted:
It is parallel to each other and spaced second skid assemblies 9a as shown in Figure 1, being fixed with two groups on pedestal A, each second
Skid assemblies 9a includes second slideway 9, and the first slideway 1 and the second slideway 9 are vertically arranged.
Each first Slide Group frame 1a is erected on two the second slideways 9, and each first slideway 1 by the first sliding block with it is right
The second slideway 9 sliding answered is connected, to enable the first slideway 1 to slide along the second slideway 9, and settable on the second slideway 9
Scale, so as to which the first Slide Group frame 1a is pushed at scheduled scale according to the data on output manuscript.Certainly, respectively
Second skid assemblies 9a may also comprise a plurality of the second slideway 9 being parallel to each other, to enhance the sliding stationarity of the first skid assemblies 1a.
As shown in Fig. 1,9, each first skid assemblies 1a is connected with the second locking device 0, so that the first skid assemblies 1a be made to exist
When moving in place along the second slideway 9, first skid assemblies 1a is positioned by the second locking device 0.Second locking device 0 packet
Include the second positioning plate 01 being connected with one of them first slideway 1 in each first skid assemblies 1a, spiral shell on second positioning plate 01
Line is connected with the second positioning pin 02, and the second positioning pin 02 can offset with the side wall of the second slideway 9, preferably, in the second slideway 9
The second recess 91 is offered on side wall, the second positioning pin 02 is plugged and is locked in the second recess 91.
In addition, passing through 03 phase of the second screw rod between the second positioning plate 01 of the second locking device 0 and corresponding first slideway 1
Even, which is threadedly coupled with the first slideway 1, and it is fixed second with limit that second end passes through the second positioning plate 01
Second locating part 04 of position 01 outer wall of plate is fixedly linked, so after the first Slide Group frame 1a is moved to Position Approximate, by second
Positioning pin 02 is locked, and is then finely adjusted by the rotation of the second screw rod 03 to the position of corresponding first slideway 1.Because of same
Two the first slideways 1 of one skid assemblies 1a are connected by connecting plate 12, therefore to wherein the first slideway 1 positioning or fine tuning, separately
One the first slideway 1 can synchronizing moving.
For two ring flanges 3 can be adjusted in X upward relative distance to adapt to straight tube or bend pipe:
As shown in Fig. 2, each mounting rack 2 is connected with a support base 4, and each support base 4 by the second sliding block with it is corresponding
First skid assemblies 1a is slidably connected, and in the present embodiment, because the first slideway 1 of every one first skid assemblies 1a has two, support base 4 is sliding
Moving frame is located on two the first slideways 1.In addition, settable scale on the first slideway 1, so as to according on output manuscript
Support base 4 is pushed at scheduled scale by data.
As shown in Fig. 2,6,8, each correspondence of support base 4 is connected with two the first locking devices 5, each first locking device 5
Corresponding first slideway 1 passes through 5 pairs of branch of the first locking device to make support base 4 when moving in place along the first slideway 1
Support seat 4 is positioned.
Each first locking device 5 includes the first positioning plate 51 being connected with support base 4, and screw thread connects on first positioning plate 51
It is connected to the first positioning pin 52, the first positioning pin 52 can offset with the side wall of corresponding first slideway 1, preferably, in the first slideway 1
The first recess 11 is offered on side wall, the first positioning pin 52 is plugged and is locked in the first recess 11.
In 4 corresponding two the first locking devices 5 of each support base, the first positioning plate of one of them the first locking device 5
It is connected between 51 and corresponding support base 4 by the first screw rod 53, which is threadedly coupled with support base 4,
Second end passes through first locating part 54 of first positioning plate 51 with limit in 51 outer wall of the first positioning plate and is fixedly linked, and is so propping up
After support seat 4 is moved to Position Approximate, the first positioning pin 52 is locked, then by the rotation of the first screw rod 53 to support base 4
Position is finely adjusted.
To enable ring flange 3 to deflect to adapt to shape tube:
As shown in Fig. 2,6,7, being equipped in each support base 4 can make mounting rack 2 with respect to the first rotation that support base 4 circumferentially rotates
Turning component 4a, first rotary components 4a includes the first worm gear 41 and is driven the first worm screw 42 being connected with the first worm gear 41,
The end of first worm screw 42 extends support base 4 and is connected with first handle 43, the first worm gear 41 and corresponding mounting rack 2 be connected and
Therebetween it is equipped with the first index dial 44 of synchronous rotation, the first index dial 44 is connected with mounting rack 2.Operate first handle
43 drive the rotation of the first worm screw 42, and the first worm screw 42 drives the first worm gear 41 to rotate when rotating, the first worm gear 41 drives when rotating
The rotation of first index dial 44, and mounting rack 2 is driven to rotate simultaneously, mounting rack 2 can intuitively be known by the first index dial 44
Rotational angle and rotational angle is accurately controlled, improve ring flange 3 and pipeline alignment precision.In practical operation
When, according to the data information on output manuscript, the first index dial 44 is made to rotate scheduled angle.
For relative position of two ring flanges 3 in Y-direction can be adjusted, so that ring flange 3 is made to be located at suitable height, with
Just assembly flange and pipeline, otherwise ring flange 3 is too high or too low is all not easy to construction personnel's operation:
As shown in Figure 2,3, mounting rack 2 include the frame body 21 being connected with support base 4 and can slide up and down be set to frame body
Mounting base 22 on 21, and frame body 21 is equipped with and drives the lifting assembly 6 being connected with mounting base 22.
In the present embodiment, frame body 21 is U-shaped, including being oppositely arranged and the side wall 211 that extends and being connected to two sides up and down
Bottom wall 212 between wall 211, bottom wall 212 are connected with support base 4.
Mounting base 22 is U-shaped, including the mounting plate 221 of ring flange 3 is installed and be oppositely arranged and with mounting plate 221
Two connected installing arms 222, two installing arms 222 are connected with a sliding seat 7, and each sliding seat 7 passes through third slideway 213
It is connected with third sliding block 214 with the sliding of the side wall 211 of the frame body 21 of respective side, third slideway 213 is set on side wall 211, third
Sliding block 214 is connected with sliding seat 7, and one of sliding seat 7 moves up and down under the action of lifting assembly 6.
Lifting assembly 6 include motor 61 and by motor 61 driving rotation the 4th screw rod 62, the 4th screw rod 62 with it is right
The sliding seat 7 answered is threadedly coupled, and the 4th screw rod 62 vertically extends.When 4th screw rod 62 rotates, about 7 sliding seat is driven
It is mobile, scale can be set on third slideway 213, according to the data information on output manuscript, sliding seat 7 be made to drive installation
Seat 22 is moved at scheduled position.
To enable ring flange 3 to overturn to adapt to shape tube:
As shown in Figure 2,3, the installing arm 222 of the mounting base 22 is rotatablely installed on the sliding seat 7 of respective side, wherein
The second rotary components 7a, the second rotary components 7a that mounting base 22 can be made to rotate relative to sliding seat 7 is equipped in one sliding seat 7
It is driven the second worm screw 72 being connected including the second worm gear 71 and with the second worm gear 71, sliding seat is extended in 72 end of the second worm screw
7 are connected with second handle 73, the second worm gear 71 and the installing arm 222 of corresponding mounting base 22 be connected and be equipped with therebetween and its
The second index dial 74 rotated synchronously, the second index dial 74 are connected with installing arm 222.It operates second handle 73 and drives the second worm screw
72 rotations, the second worm screw 72 drive the second worm gear 71 to rotate when rotating, the second worm gear 71 drives 74 turns of the second index dial when rotating
It is dynamic, and mounting base 22 is driven to rotate simultaneously, the rotational angle of mounting base 22 can intuitively be known simultaneously by the second index dial 74
Rotational angle is accurately controlled, the alignment precision of ring flange 3 and pipe fitting is improved.In practical operation, added according to output
Data information on work figure makes the second index dial 74 rotate scheduled angle.
To enable ring flange 3 around own axis, convenient for the company on 34 alignment flange of mounting hole on ring flange 3
Hole is connect to which flange to be assemblied on ring flange 3:
As shown in Figure 2-5, it is connected between mounting base 22 and ring flange 3 by terminal pad 8, being equipped in terminal pad 8 can drive
Third rotary components 8a of the ring flange 3 around own axis.Third rotary components 8a includes third worm gear 81 and and third
The connected third worm screw 82 of the transmission of worm gear 81,82 end of third worm screw extend terminal pad 8 and are connected with third handle 83, third snail
Wheel 81 is connected with corresponding ring flange 3 and is equipped with the third index dial 84 of synchronous rotation, third index dial 84 therebetween
It is connected with ring flange 3.Operating third handle 83 drives third worm screw 82 to rotate, and third worm gear 81 is driven when third worm screw 82 rotates
Rotation drives third index dial 84 to rotate when third worm gear 81 rotates, and ring flange 3 is driven to rotate simultaneously, is indexed by third
Disk 84 can intuitively see the rotational angle of ring flange 3 and accurately be controlled rotational angle, improve ring flange 3 and pipe
The alignment precision in road.In practical operation, according to the data information on output manuscript, rotate third index dial 84 scheduled
Angle.
In the present embodiment, the first rotary components 4a, the second rotary components 7a, the structure of third rotary components 8a are identical, this
The tooling of embodiment carries out accurate control to flange face angle, distance by using index dial, accurately reappears in-site installation item
Part realizes that flanged pipe fast and accurately completes.
As shown in Figure 4,5, in the present embodiment, ring flange 3 includes chuck 31, along chuck 31 circumferentially spaced at least two
A sliding rail 32 and at least two claws 33 being correspondingly arranged in each sliding rail 32, each sliding rail 32 are radially extended along chuck 31, claw
33 movably (can be manually operated claw 33 to move it) in corresponding sliding rail 32 in the present embodiment, several claws 33 can
Flange periphery wall is supported to grip to flange formation with ecto-entad simultaneously, is also possible to abut in flange from inside to outside simultaneously
Peripheral wall is to hold out against fixation to flange formation.
In addition, connecting hole 34 on ring flange 3 there are three and be evenly distributed.
From the foregoing, it will be observed that the tooling of the present embodiment can adjust the positional relationship between two ring flanges from multiple dimensions, from
And it is adapted to the pipeline of different size and shape, effectively ensure the assembling precision between flange and pipeline, so that flange and pipeline exist
Have before being welded and fixed more accurately group to relationship.
Claims (10)
1. a kind of tooling being aligned for flange with pipeline, it is characterised in that: including
First skid assemblies (1a) have two groups and are parallel to each other, and each first skid assemblies (1a) include first slideway (1)
Or at least two the first slideways (1) being parallel to each other;
Mounting rack (2), there are two, each corresponding sliding of aforementioned mounting rack (2) is set on one group of first skid assemblies (1a), and each institute
State the ring flange (3) being equipped on mounting rack (2) for mounting flange.
2. the tooling according to claim 1 being aligned for flange with pipeline, it is characterised in that: each mounting rack (2)
It is set on corresponding first skid assemblies (1a) by support base (4) sliding, and interior be equipped with of each support base (4) can to pacify
(2) are shelved with respect to the first rotary components (4a) that support base (4) circumferentially rotate, the mounting rack (2) rotates with corresponding first
Component (4a) is connected.
3. the tooling according to claim 2 being aligned for flange with pipeline, it is characterised in that: first rotary components
(4a) includes the first worm gear (41) and is driven the first worm screw (42) for being connected with the first worm gear (41), the first worm gear (41) with it is right
The mounting rack (2) answered is connected and is equipped with the first index dial (44) of synchronous rotation, first index dial therebetween
(44) it is connected with mounting rack (2).
4. the tooling according to claim 2 being aligned for flange with pipeline, it is characterised in that: each support base (4)
It is connected at least one first locking device (5), corresponding first slideway (1) of each first locking device (5), each first
Locking device (5) includes the first positioning plate (51) being connected with support base (4), and is threaded on first positioning plate (51)
One positioning pin (52), first positioning pin (52) can offset with the side wall of corresponding first slideway (1).
5. the tooling according to claim 4 being aligned for flange with pipeline, it is characterised in that: each support base (4)
In at least one corresponding first locking device (5), the first positioning plate (51) at least one first locking device (5) with it is right
It is connected between the support base (4) answered by the first screw rod (53), the first screw rod (53) first end and support base (4) screw thread connect
It connects, second end passes through the first positioning plate (51) and limit in the first locating part (54) stationary phase of the first positioning plate (51) outer wall
Even.
6. the tooling according to claim 2 being aligned for flange with pipeline, it is characterised in that: mounting rack (2) packet
Include the frame body (21) being connected with support base (4) and be set to frame body (21) on mounting base (22), and the mounting base (22) with
It can be driven to be connected along the lifting assembly (6) that frame body (21) slides up and down, the ring flange (3) is set on mounting base (22).
7. the tooling according to claim 6 being aligned for flange with pipeline, it is characterised in that: the frame body (21) is in U
Type, it is aforementioned including being oppositely arranged and the side wall (211) that extends and the bottom wall (212) being connected between two sidewalls (211) up and down
Bottom wall (212) is connected with support base (4);
The mounting base (22) is U-shaped, two installing arms (222) including being oppositely arranged and is connected to two installing arms
(222) mounting plate (221) between, the ring flange (3) are set on mounting plate (221), and both of the aforesaid installing arm (222) is respectively
It is connected by a sliding seat (7) with the sliding of the side wall (211) of the respective side of the frame body (21), at least one of which sliding seat
(7) it is driven by the lifting assembly (6);
Installing arm (222) rotational installation of the mounting base (22) is on the sliding seat (7) of respective side, described at least one of which
The second rotary components (7a) that mounting base (22) can be made to rotate relative to sliding seat (7), second rotation are equipped in sliding seat (7)
Turn component (7a) to be connected with corresponding installing arm (222).
8. the tooling according to claim 9 being aligned for flange with pipeline, it is characterised in that: the mounting base (22)
It is connected between mounting plate (221) and ring flange (3) by terminal pad (8), being equipped in the terminal pad (8) can driving flange disk
(3) around the third rotary components (8a) of own axis, the ring flange (3) is connected with third rotary components (8a).
9. the tooling being aligned for flange with pipeline described in any claim according to claim 1~8, feature exist
In: the ring flange (3) includes chuck (31), along circumferentially spaced at least two sliding rail (32) of chuck (31) and correspondence
At least two claws (33) in each sliding rail (32), each sliding rail (32) radially extend along chuck (31), and claw (33) can move
It is set in corresponding sliding rail (32) dynamicly.
10. the tooling being aligned for flange with pipeline described in any claim according to claim 1~8, feature exist
In: it further include pedestal (A) and two group of second skid assemblies (9a) being fixed on pedestal (A), aforementioned two group of second skid assemblies
(9a) is parallel and interval is arranged, and each second skid assemblies (9a) include that second slideway (9) or at least two set in parallel
The second slideway (9) set, first slideway (1) and the second slideway (9) are vertically arranged, and each first Slide Group (1a) sets up
It can slide on two group of second skid assemblies (9a) and along the second skid assemblies (9a).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910649314.7A CN110405461A (en) | 2019-07-18 | 2019-07-18 | The tooling being aligned for flange with pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910649314.7A CN110405461A (en) | 2019-07-18 | 2019-07-18 | The tooling being aligned for flange with pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110405461A true CN110405461A (en) | 2019-11-05 |
Family
ID=68361923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910649314.7A Pending CN110405461A (en) | 2019-07-18 | 2019-07-18 | The tooling being aligned for flange with pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110405461A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110926772A (en) * | 2019-11-26 | 2020-03-27 | 北京工业大学 | Slider formula flange bolt fastening experimental apparatus |
CN111678692A (en) * | 2020-05-11 | 2020-09-18 | 山东泰展机电科技股份有限公司 | Passenger car transfer case performance detection system and application thereof |
CN115106960A (en) * | 2021-03-22 | 2022-09-27 | 中冶宝钢技术服务有限公司 | Installation tool and installation method of refining dip pipe |
CN115447892A (en) * | 2022-09-29 | 2022-12-09 | 中国舰船研究设计中心 | Storage rack device capable of transversely moving |
CN118463833A (en) * | 2024-07-12 | 2024-08-09 | 青岛海徕天创科技有限公司 | Pipe inner diameter detection device and method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201172160Y (en) * | 2008-04-01 | 2008-12-31 | 郑辉杰 | Large steel structure parts |
CN201863051U (en) * | 2010-06-17 | 2011-06-15 | 安徽省鸿庆精机有限公司 | Computer numerical control machine tool double sided dividing disc structure |
WO2013026573A2 (en) * | 2011-08-24 | 2013-02-28 | Wartmann Technologie Ag | Method and system for the creation of a butt joint between rotationally symmetrical members |
KR20140102601A (en) * | 2013-02-14 | 2014-08-22 | 케펠 오프쇼어 앤드 마린 테크놀로지 센터 피티이 엘티디. | Apparatus and method for flange-pipe alignment |
CN106002071A (en) * | 2016-07-06 | 2016-10-12 | 上海中船三井造船柴油机有限公司 | Positioning device for welding pipe fitting flange at any angle in three-dimensional space |
CN206305696U (en) * | 2016-12-26 | 2017-07-07 | 江苏阳明船舶装备制造技术有限公司 | A kind of reproduction machine installed for gathering pipe peculiar to vessel |
CN208118648U (en) * | 2017-05-27 | 2018-11-20 | 孙国民 | A kind of roller positioning device |
CN109093317A (en) * | 2018-09-26 | 2018-12-28 | 昆山华恒焊接股份有限公司 | Pipe fitting group is to equipment |
CN211305461U (en) * | 2019-07-18 | 2020-08-21 | 舟山中远海运重工有限公司 | Tool for aligning flange and pipeline |
-
2019
- 2019-07-18 CN CN201910649314.7A patent/CN110405461A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201172160Y (en) * | 2008-04-01 | 2008-12-31 | 郑辉杰 | Large steel structure parts |
CN201863051U (en) * | 2010-06-17 | 2011-06-15 | 安徽省鸿庆精机有限公司 | Computer numerical control machine tool double sided dividing disc structure |
WO2013026573A2 (en) * | 2011-08-24 | 2013-02-28 | Wartmann Technologie Ag | Method and system for the creation of a butt joint between rotationally symmetrical members |
KR20140102601A (en) * | 2013-02-14 | 2014-08-22 | 케펠 오프쇼어 앤드 마린 테크놀로지 센터 피티이 엘티디. | Apparatus and method for flange-pipe alignment |
CN106002071A (en) * | 2016-07-06 | 2016-10-12 | 上海中船三井造船柴油机有限公司 | Positioning device for welding pipe fitting flange at any angle in three-dimensional space |
CN206305696U (en) * | 2016-12-26 | 2017-07-07 | 江苏阳明船舶装备制造技术有限公司 | A kind of reproduction machine installed for gathering pipe peculiar to vessel |
CN208118648U (en) * | 2017-05-27 | 2018-11-20 | 孙国民 | A kind of roller positioning device |
CN109093317A (en) * | 2018-09-26 | 2018-12-28 | 昆山华恒焊接股份有限公司 | Pipe fitting group is to equipment |
CN211305461U (en) * | 2019-07-18 | 2020-08-21 | 舟山中远海运重工有限公司 | Tool for aligning flange and pipeline |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110926772A (en) * | 2019-11-26 | 2020-03-27 | 北京工业大学 | Slider formula flange bolt fastening experimental apparatus |
CN110926772B (en) * | 2019-11-26 | 2021-07-23 | 北京工业大学 | Slider formula flange bolt fastening experimental apparatus |
CN111678692A (en) * | 2020-05-11 | 2020-09-18 | 山东泰展机电科技股份有限公司 | Passenger car transfer case performance detection system and application thereof |
CN115106960A (en) * | 2021-03-22 | 2022-09-27 | 中冶宝钢技术服务有限公司 | Installation tool and installation method of refining dip pipe |
CN115106960B (en) * | 2021-03-22 | 2023-09-19 | 中冶宝钢技术服务有限公司 | Installation tool and installation method for refining dip pipe |
CN115447892A (en) * | 2022-09-29 | 2022-12-09 | 中国舰船研究设计中心 | Storage rack device capable of transversely moving |
CN118463833A (en) * | 2024-07-12 | 2024-08-09 | 青岛海徕天创科技有限公司 | Pipe inner diameter detection device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110405461A (en) | The tooling being aligned for flange with pipeline | |
CN104808691B (en) | A kind of circumferentially positioned formula motor experiment stand multiple degrees of freedom quick centering device | |
CN208344387U (en) | Vehicle door mounting apparatus and vehicle mounted devices | |
CN105750163B (en) | Full automatic point adhesive dispenser and dispensing method | |
CN211305461U (en) | Tool for aligning flange and pipeline | |
CN114850971B (en) | Multi-robot array cooperative processing device and method for large-diameter thin-wall cylinder section part | |
CN216082505U (en) | Five detection device based on vision | |
CN109894841A (en) | Bushing press-mounting equipment and bushing press-mounting method | |
CN117444912A (en) | Vehicle component mounting device and vehicle component mounting method | |
CN114714073B (en) | Nut fixing and mounting equipment and nut fixing and mounting method | |
CN209439718U (en) | Bushing press-mounting equipment | |
CN215616206U (en) | A tripodia levelling device for evaporimeter maintenance | |
CN214311453U (en) | Multidirectional slip table device with freely adjustable multidimension degree | |
CN208992571U (en) | Roller slag cooler pipe row and helical blade assembling recruitment fill mould | |
CN209532719U (en) | A kind of fixture database sliding rail of the main spelling system of automobile flexible | |
CN116652548B (en) | Magnet assembling device and magnet assembling method | |
CN109433540A (en) | Screw rod fixing mechanism and screw rod oiling station | |
CN210604868U (en) | Turret IC module detection device | |
CN220532853U (en) | Cable cutting device | |
CN212946222U (en) | Pipe fitting angle welding equipment | |
CN114633284B (en) | Industrial robot load detection device based on complicated integrated flange end | |
CN219443915U (en) | Welding robot with accurate positioning function | |
CN221519490U (en) | Vehicle-mounted 360-degree panoramic image calibration device | |
CN218987872U (en) | Rotating mechanism and suspension type conveying equipment | |
CN118204420B (en) | Automatic positioning type punching machine for punching metal parts and punching method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |