CN110401556B - Visual automatic scheduling device of IDC computer lab cable - Google Patents

Visual automatic scheduling device of IDC computer lab cable Download PDF

Info

Publication number
CN110401556B
CN110401556B CN201811566984.4A CN201811566984A CN110401556B CN 110401556 B CN110401556 B CN 110401556B CN 201811566984 A CN201811566984 A CN 201811566984A CN 110401556 B CN110401556 B CN 110401556B
Authority
CN
China
Prior art keywords
cable
cables
machine room
scheduling
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811566984.4A
Other languages
Chinese (zh)
Other versions
CN110401556A (en
Inventor
黄勇刚
丁兆青
游江
陆青健
杜文亚
罗枫
刘文博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Haixu Software Co ltd
Original Assignee
Shanghai Haixu Software Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Haixu Software Co ltd filed Critical Shanghai Haixu Software Co ltd
Priority to CN201811566984.4A priority Critical patent/CN110401556B/en
Publication of CN110401556A publication Critical patent/CN110401556A/en
Application granted granted Critical
Publication of CN110401556B publication Critical patent/CN110401556B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/085Retrieval of network configuration; Tracking network configuration history
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/22Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks comprising specially adapted graphical user interfaces [GUI]

Abstract

The invention discloses a visual automatic scheduling method for IDC machine room cables, which comprises the following steps: establishing a unified view: the method comprises the steps of realizing multi-dimensional association of resources, services and clients by uniformly modeling IDC related resources, establishing a set of unified view based on a machine room and cables based on daily operation and maintenance requirements, comprehensively analyzing and displaying the resource providing capability of IDC, and performing multi-dimensional association analysis and display; the method comprises the steps of automatically scheduling cables based on established unified views, abstracting a scheduling rule template by analyzing a daily operation and maintenance cable scheduling scene, packaging rules and setting priorities, and achieving automatic scheduling based on a rule algorithm. The invention improves the service opening capability, improves the resource utilization rate, reduces the unit service cost and innovatively improves the operation and maintenance capability through the visual and automatic scheduling based on the rule base.

Description

Visual automatic scheduling device of IDC computer lab cable
Technical Field
The invention relates to the field of photoelectricity, in particular to a visual automatic scheduling device for cables of an IDC machine room.
Background
IDC traffic is one of the fastest growing services in the last five years. In most IDCs, the cable and cable usage is five-thousand, while in some data centers, cable usage may reach 70% or more. In the face of a large number of high-density optical cables in a data center, a data center administrator needs to deal with the following different challenges, which not only affect the work efficiency of the data center administrator and increase the operation cost, but also may cause network downtime and huge economic loss.
Figure GDA0003698747560000011
Figure GDA0003698747560000021
Therefore, how to better manage cables is an important issue facing IDC data centers. At present, IDC cables are mainly managed by the following means: 1. recording paper: and recording the conditions of the rack, the cable and the client through the excel, and manually updating the rack, the cable and the client when the service is opened and the daily operation and maintenance are carried out. 2. And (3) fault driving: and after the cable fault occurs, analyzing corresponding cable routing information and making an adjustment measure. 3. And (3) service driving: after a customer puts forward a service requirement, when resources are lacked or a route cannot meet the requirement, an engineering construction requirement is put forward to a design unit, and corresponding cable information is perfected. 4. And (3) reverse loading: firstly, on-site cable construction is carried out, and then information updating is carried out. 5. 3D view: the 3D view can beautifully show the point (frame, computer lab) and the line information (single with or many lines, unable quantitative global analysis show), more be used for the show, unable automatic scheduling guide production.
In the operation and maintenance method, firstly, a unified view is not available, and multi-dimensional association display cannot be performed. And secondly, related resources of the IDC are not uniformly modeled, the rules are not uniformly combed and abstracted, and automatic scheduling based on the rules is not available. And thirdly, local points and lines are displayed, global analysis cannot be performed, and rapid service opening and operation and maintenance efficiency improvement cannot be supported. Through modes such as manual observation, inverted installation, excel inquiry and the like, the workload is large, and the effectiveness and the correctness are difficult to ensure.
In the prior art, a manual method or 3D display is adopted, a unified global view is not provided, services, resources and clients are not associated, closed-loop management is not performed on scheduling, uniform modeling and abstraction are not performed on scheduling rules, and the daily operation and maintenance management requirements cannot be met. Daily service provisioning and operation maintenance both need operating personnel to have very strong technical capability, are very smart to the present network data, carry out data maintenance across the system/form, utilize experience and memory to realize service provisioning and cable operation and maintenance, increased a large amount of maintenance work for the maintainer, can't realize the fine management to the cable, lead to the low cost of resource utilization ratio, open the inefficiency and customer satisfaction is poor. The management goals of cable manageability, analyzability and maintainability cannot be realized.
Disclosure of Invention
The invention aims to provide a visual automatic scheduling method for IDC machine room cables, which can solve the problems that the prior art does not have a unified view and cannot perform multi-dimensional association display; the rules are not uniformly combed and abstracted, and the problem of automatic scheduling based on the rules is solved.
The invention adopts the following technical scheme:
a visual automatic scheduling method for IDC machine room cables comprises
1) Establishing a unified view: through unified modeling of IDC related resources, floors, racks, DDF racks, ODF racks, U positions, optical cables/electric cables, optical cable sections/electric cable sections, optical fibers/electric cables, optical paths/electric circuits, orders, work orders, customers and the like are covered, multi-dimensional association of resources, services and customers is achieved, a set of unified view based on the machine room and the cables is established based on daily operation and maintenance requirements, resource providing capacity of IDCs is comprehensively analyzed and displayed, and multi-dimensional association analysis and display are carried out;
2) the method comprises the steps of automatically scheduling cables based on established unified views, abstracting a scheduling rule template by analyzing a daily operation and maintenance cable scheduling scene, packaging rules and setting priorities, and achieving automatic scheduling based on a rule algorithm.
The method specifically comprises the following steps:
step S101: unified modeling of IDC resources;
step S102: the method comprises the steps of resource association, namely associating resources to form a multidimensional associated view of the resources, clients and services;
step S103: analyzing resources to form a unified view based on a machine room and cables;
step S104: performing scheduling rule abstraction according to the operation and maintenance scene;
step S105: packaging the scheduling rules and setting priority;
step S106: performing automatic scheduling based on the packaged scheduling rule with the set priority to generate a scheduling result;
step S107: if the scheduling result is not satisfactory, the rule can be modified, and automatic scheduling is carried out again;
step S108: and implementing according to the scheduling result, and updating the connection condition, the use condition and the service condition of the resources.
In step S101, the IDC resource object covers a floor, a machine room, a floor, a rack, a DDF rack, an ODF rack, a U-position, an optical cable, a cable, an optical cable segment, a cable segment, an optical fiber, an optical path, a circuit, an order, a work order, and a customer.
In step S102: the resource association specifically comprises:
floor-machine room: the floors comprise a plurality of machine rooms, and the machine rooms must belong to a certain floor;
machine room-floor: the machine room comprises a plurality of floors, the floors belong to a certain machine room, and for floors other than the machine room, such as the floors of corridors, the floors are not managed because the placement of the rack/ODF rack is not involved;
floor-rack/ODF/DDF rack: the floor and the rack/ODF/DDF frame are in a many-to-many relationship, one floor can be used for placing a plurality of racks, and one rack can be placed on a plurality of floors;
Rack/ODF Rack-ODF/DDF terminal: the rack comprises a plurality of ODF/DDF modules and a plurality of ODF/DDF terminals, and the ODF/DDF terminals are necessary to belong to a certain rack/ODF/DDF rack;
cable-cable segment: a cable may contain a plurality of cable segments, one cable segment belonging to only one cable.
Cable segment-fiber/cable: a cable segment may contain multiple fibers/cables, one fiber/cable belonging to only one cable segment;
fiber/cable-jumper/splice-fiber/cable inside building: the optical fibers/cables are subjected to jumper connection or fusion connection on the ODF/DDF frame, so that the connection of a plurality of optical fibers/cables is realized, and the optical fibers in the building are connected from end (ODF/DDF terminal) to end (ODF/DDF terminal);
customer-order: a customer may contain multiple orders, with an order belonging to only one customer;
order-rack: the order may contain a plurality of racks, the racks rented by the customer;
rack-user equipment: user equipment contained on the rack;
light path: (ii) a The optical path comprises a starting user device, a stopping user device, a plurality of ODF terminals and a plurality of in-building optical fibers connected with the optical path;
the circuit comprises: the circuit includes a plurality of DDF terminals through which originating and terminating user equipment are routed, and a plurality of cables within a building to which the circuits are connected.
The step S104 comprises the following specific steps:
packaging the 5 rules of S104, selecting several scheduling rules to package and setting priority, adopting AND logic operation rule among the packaging rules on the basis of the priority, and for the rule needing to set parameters, "appoint routing node": the appointed machine room needs to be selected, and the cable sequence selection: it is necessary to select one of "minimum core order", "minimum continuous core order", and "maximum continuous core order".
And searching the machine rooms where the start end and the stop end are located according to the start end and the stop end of the service requirement, and automatically scheduling the route according to the rule based on the preset rule to search the cable route meeting the requirement.
An IDC cable visual automatic scheduling device comprises a resource modeling module, an association management module, a rule packaging module, an automatic scheduling module and a scheduling result display module.
The resource modeling module is used for uniformly modeling related resources of the IDC;
and the association management module is used for associating the resources and realizing association management of the resources, the services and the clients.
The rule management module abstracts the rules to form a rule base: the method comprises the following steps of minimizing transfer points, minimizing routes, designating a route machine room, selecting redundancy of cables and cable sequences;
the rule encapsulation module sets parameters by selecting rules in the rule management module;
the automatic scheduling module carries out automatic routing scheduling according to the rules set in the rule packaging module;
and the dispatching result display module is used for respectively finishing the routing dispatching of the starting end-appointed routing machine room and the appointed routing machine room-terminating end according to the dispatching result of the automatic dispatching module, and forming a graphical end-to-end route through the dispatching result display module.
The automatic scheduling module specifically comprises the following steps:
1) acquiring a designated router room, and acquiring the designated router room in the rule setting;
2) and (3) automatically scheduling by taking the appointed routing machine room as an end point: routing scheduling is respectively carried out in an initial end-designated routing machine room and a designated routing machine room-termination end, and the operations of the designated routing machine room and the termination end are the same by taking the initial end-designated routing machine room as an example;
3) acquiring a transfer point: obtaining different routes existing in a starting end-designated route machine room through an algorithm;
4) calculating the number of the transfer points: calculating the number of the transfer points of different routes in the module;
5) transfer point minimum rule: selecting the route with the least switching points as the optimal route according to the module calculation result;
6) acquiring a routing cable: based on the optimal routes obtained by the modules, the length of each cable in the routes is obtained;
7) calculating the length of the cable: summing the lengths of the cables in each route in the module;
8) shortest route rule: selecting the route with the minimum cable length as the optimal route according to the module calculation result;
9) acquiring a routing cable: based on the optimal routes obtained by the modules, acquiring information of cables in the routes, wherein the information comprises an initial machine room, a termination machine room and cable occupancy rates;
10) and (3) cable redundancy calculation: and starting and stopping the cables in the modules to search the cables in the machine rooms so as to judge whether a plurality of cables exist in the two machine rooms. When the number of the optical cables in the machine room is greater than 1, the redundancy of the optical cables in the machine room is represented; when the number of cables in the machine room is greater than 2, the redundancy of the cables in the machine room is represented; further calculating the occupancy rate of fiber cores/cables in the optical cable, and calculating the number of used fiber cores/total fiber cores in the optical cable for the fiber cores, wherein 80% of the optical cable meets the redundancy requirement; for cables, the cable occupancy rate between computer rooms is equal to the number of idle cables/the total number of cables, and more than 80% of cables in computer rooms meet redundancy requirements;
11) cable redundancy selection rules: selecting the optical cable/electric cable with redundancy according to the calculation result;
12) acquiring a routing optical fiber: obtaining fiber core use information in the optical cable based on the obtained optimal route;
13) calculating the core order of the optical fiber: according to the routing scheduling requirement, the number of the scheduling fiber cores is single fiber/double fibers/multi fibers; based on the fiber core using information, searching idle fiber core numbers in the optical cable and continuous fiber core numbers of single fibers/double fibers/multi fibers;
14) cable sequence selection rules: and according to the calculation result, selecting single fiber/double fiber/multi fiber with the minimum core sequence or the minimum continuous core sequence or the maximum continuous core sequence according to the rule setting requirement.
The rule encapsulation module comprises:
1) and (3) assigning a routing machine room: only the machine room existing in the resource modeling module can be selected;
2) cable redundancy selection: whether the cable needs redundancy; and whether the cable occupancy rate is required or not is judged, and the occupancy rate is set for the required cable occupancy rate.
3) Cable sequence selection: the core order is minimum, the continuous core order is minimum, and the continuous core order is maximum.
The invention has the advantages that: the method solves the technical problems that the IDC machine room resource management lacks a uniform global view, lacks uniform management and lacks automatic support, improves the service opening capability, improves the resource utilization rate, reduces the unit service cost and innovatively improves the operation and maintenance capability through visual and automatic scheduling based on the rule base.
Drawings
The invention is described in detail below with reference to embodiments and the attached drawings, wherein:
fig. 1 is a schematic flow chart of a method for visually and automatically scheduling cables in an IDC room according to the present invention.
FIG. 2 is a schematic diagram of the resource association of the present invention.
Fig. 3 is a schematic diagram of the optical path of the present invention.
Figure 4 is a unified view of the machine room and cables of the present invention.
Fig. 5 is a schematic flow diagram of visualization automatic scheduling of IDC room optical paths in the present invention.
Fig. 6 is a flow chart of an example of automatic scheduling of the present invention.
Fig. 7A is a diagram of an ODF panel of the present invention.
Fig. 7B is a plan view of the machine room of the present invention.
Fig. 8 is a schematic diagram of the structure of the graphical route of the present invention.
Fig. 9 is a schematic structural diagram of the visual automatic scheduling device for the IDC room cable of the present invention.
Detailed Description
The following further illustrates embodiments of the invention:
according to the visual automatic cable scheduling device for the IDC machine room, the automatic scheduling of cables can be realized based on rules by uniformly modeling and abstracting scheduling rules including the rules of shortest route, the fewest switching points, designated routing nodes, redundant cable selection, cable and cable sequence selection and the like.
Through unified modeling of IDC related resources, association of a machine room, a rack, a light path, a customer and an order and automatic layout of the machine room, IDC global analysis and multidimensional association visual management are realized, and IDC unified view is realized.
Through unified modeling of IDC related resources, based on daily operation and maintenance requirements, a unified view based on a machine room and cables is established, analysis and display can be carried out globally, multi-dimensional association analysis can be carried out, and the problems that no unified view exists and multi-dimensional association display cannot be carried out are solved.
By abstracting out a scheduling rule template, the rule comprises: the method has the advantages that the routing is shortest, the number of transfer points is minimum, routing nodes are designated, cable redundancy selection and cable sequence selection are carried out, rules are packaged and priority is set, automatic scheduling is achieved based on a resource unified model, the problems that uniform carding and abstraction are not carried out on the rules, and automatic scheduling based on the rules is not achieved are solved.
As shown in fig. 1, a method for visually and automatically scheduling cables in an IDC room according to an embodiment of the present invention includes:
step S101: unified modeling of IDC resources:
resource objects encompass floors, rooms, floors, racks, DDF racks, ODF racks, U-places, cables/cables, cable segments/fibers, optical paths/circuits, orders, work orders, customers, etc.
Step S102: resource association:
and associating the resources to form a multidimensional associated view of the resources, the clients and the services, as shown in fig. 2.
Floor-machine room: the floor contains a plurality of computer rooms, and the computer room must belong to a certain floor.
Machine room-floor: the machine room comprises a plurality of floors, and the floors belong to a certain machine room. For floors other than machine rooms, such as hallways, no management is done as there is no involvement of rack/ODF racks.
floor-rack/ODF/DDF rack: the floor is in a many-to-many relationship with the racks/ODF/DDF racks, and one floor can accommodate multiple racks, as can multiple floors.
Rack/ODF Rack-ODF/DDF terminals: the rack comprises a plurality of ODF/DDF modules and a plurality of ODF/DDF terminals, and the ODF/DDF terminals must belong to a certain rack/ODF/DDF rack.
Cable-cable segment: a cable may contain a plurality of cable segments, one cable segment belonging to only one cable.
Cable segment-fiber/cable: a cable segment may contain multiple fibers/cables, with one fiber/cable belonging to only one cable segment.
Fiber/cable-jumper/splice-fiber/cable inside building: and the optical fibers/cables are subjected to jumper connection or fusion connection on the ODF/DDF frame to realize the connection of a plurality of optical fibers/cables, and the optical fibers in the building are connected from end (ODF/DDF terminal) to end (ODF/DDF terminal).
Customer-order: a customer may contain multiple orders, with an order belonging to only one customer.
Order-rack: the order may contain a plurality of racks, the racks rented by the customer.
Rack-user equipment: user equipment contained on the rack.
Light path: as shown in fig. 3, the optical path includes the originating and terminating user equipment, ODF terminals (which may be multiple), and the connected in-building optical fibers (which may be multiple segments).
The circuit comprises: the circuit contains the originating and terminating subscriber equipment, the DDF terminals (which may be multiple), and the in-building cables (which may be multiple segments) to which they are connected.
Step S103: and (3) analyzing resources to form a unified view based on the machine room and the cables:
based on the resource unified model established in S101 and the resource association model established in S102, the IDC can be globally analyzed to form a unified view, and early warning is performed on resources. As in fig. 4, the following information is included:
1) machine room rack condition: a total number representing the total number of racks in the room; used, indicates the number of racks used in the room. Through the machine room-floor, the floors in the machine room can be obtained; through the floor-racks, it is possible to obtain that those racks are placed on the floor; thus, the association of machine room-floor-rack can obtain the total number of racks in the machine room. Through customer-orders, it is possible to get which orders the customer has; through the order-racks, it is possible to obtain the racks contained in the order; thus, the customer-order-rack association can obtain the racks occupied by the customer in each machine room, thereby counting the number of used racks in a certain machine room.
2) Optical cable in the machine room: the number represents the number of the connection optical cables between the machine rooms; a total number representing a total number of optical fibers in the optical cable; used, indicates the number of fibers used. According to the initial/termination ODF terminal information of the optical fiber in the building, the number information of the optical cable sections corresponding to the optical fiber in the building can be obtained through the optical fiber-jumping connection/fusion connection-optical fiber-optical cable sections in the building. The total number of fibers can be obtained by summing the cores in each cable segment. Through the incidence relation of the optical path and the optical fiber in the building, the used quantity of the fiber cores can be obtained.
3) Cable between computer lab: the number represents the number of the connecting cables between the machine rooms; a total number representing a total number of cables in the cable; used, indicates the number of cables used. According to the initial/termination DDF terminal information of the cable in the building, the quantity information of the cable sections corresponding to the cable can be obtained through cable-jumping/welding-cable sections in the building. By summing up the cables in the individual cable sections, the total number of cables can be obtained. Through the circuit-cable association, it is possible to obtain how many of these cables have been used.
4) Machine room layout: the machine room is automatically local. The machine rooms on the same floor can be arranged in the same row through the relationship between the floor and the machine rooms; the machine rooms can be arranged on the same horizontal axis in sequence according to the arrangement of the machine room numbers from small to large, such as D401, D402, D403 and D404; meanwhile, the machine rooms with the same machine room number and different floors can be arranged on the same longitudinal axis.
5) Machine room cable connection: connected by a fold line. Connecting lines of the machine rooms are connected through broken lines according to the design drawing requirements of the communication machine room; when the connection lines of the machine rooms are overlapped, the connection lines are displayed in a staggered mode at certain intervals through an algorithm.
6) Resource early warning: including the early warning index, the early warning value and the color. The early warning indexes are early warning indexes to be analyzed and comprise machine room rack utilization rate, optical cable and optical fiber utilization rate, cable utilization rate, optical cable redundancy and cable redundancy;
the utilization rate of the machine room frames is obtained by using the used quantity/total number obtained by calculation in the step 1), and an early warning value and an early warning color are set, wherein if the used quantity/total number is less than 80% of blue, 80% -90% of orange and more than 90% of red, the early warning color is set on the number of the frames displayed in the machine room;
the utilization rate of optical fibers of the optical cable is obtained by the total number of used fiber cores/fiber cores obtained by calculation in the step 2), an early warning value and an early warning color are set, if the light is blue at the rate of 80 percent, orange at the rate of 80-90 percent and red at the rate of 90 percent, the capacity expansion of the optical cable is required to be carried out as soon as possible in the later period, and the early warning color is set on the optical cable connecting line of the machine room;
the cable utilization rate, 3) the number of idle cables in the machine room/the total number of cables obtains the cable redundancy rate, an early warning value and an early warning color are set, if the number of idle cables in the machine room is less than 80% of blue, the number of idle cables in the machine room is 80% -90% of orange, and the number of idle cables in the machine room is more than 90% of red, cable expansion needs to be carried out as soon as possible in the later period, and the early warning color is set on a connecting line of the machine room;
optical cable redundancy, 2) in the machine room optical cable quantity >1 is blue, 1 is orange, which indicates that the machine room can not realize optical cable main use/standby, needs to be expanded as soon as possible, 0 is red, which indicates that no optical cable exists in the machine room, and red warning is given.
And 3) the number of idle cables in the machine room is more than 2 and is blue, the number of idle cables is equal to 2 and is orange, the number of idle cables is equal to 1 or 0 and is red, and the early warning color is set on the machine room connecting line.
Step S104: and abstracting the scheduling rule according to the operation and maintenance scene.
In daily scheduling, in order to ensure the line quality and reduce the routing loss, service scheduling needs to be performed according to a certain rule. The following scheduling scenarios are included:
1) the number of transfer points is minimum: the switching points are the most likely to cause breakpoint faults, and the fewer the switching points ODF/DDF passed by the scheduling route, the better.
2) The shortest route: the length of the optical fiber/cable through which the dispatch route passes is the shortest, usually short, i.e., there is little probability of a failure occurring.
3) And (3) specifying a routing machine room: the scheduled route must pass through a certain designated machine room, usually an MMR (meetmeroom) machine room for the switching of the optical/electrical cables of each machine room, so that the MMR machine room is often set as a designated routing node during scheduling.
4) Cable redundancy selection: when the scheduled route has been determined according to the above rules, there will typically be multiple optical/electrical cables available for selection (the routes are identical). Cable redundancy selection is mainly used to set: the cable can not be selected without redundancy, namely the optical cable redundancy early warning/the cable redundancy early warning can not be selected; cable fiber usage/cable usage > 80% is not selectable, even if rate warning is not selectable.
5) Cable sequence selection of cables: this rule is only applicable to optical path scheduling and does not apply to circuit (cable) scheduling. After the selection is completed according to the four rules, multiple optical fibers of the same optical cable can be selected for a certain section of scheduling route (the route is completely the same, and the optical cables are also the same). The cable sequence selection rule is mainly used for setting: the core order is minimum: the fiber core with the minimum fiber core sequence number in the same optical cable, for example, 4 fiber cores are scheduled, and the 4 fiber cores with the minimum fiber core sequence in the optical cable are found, wherein the fiber core sequence can be discontinuous; the continuous core order is minimum: the fiber cores in the same optical cable have the continuous minimum numbered fiber cores, and the core sequence must be continuous; the continuous core order is maximum: the fiber cores in the same optical cable have the maximum serial numbers, and the core sequence must be continuous.
Step S105: the scheduling rules are encapsulated and set priorities.
And (5) packaging the 5 rules of the S104, selecting a plurality of scheduling rules for packaging and setting priorities, and adopting an AND logic operation rule among the packaging rules on the basis of the priorities. For a rule requiring parameter setting, "routing node designated": the appointed machine room needs to be selected, and the cable sequence selection: it is necessary to select one of "minimum core order", "minimum continuous core order", and "maximum continuous core order".
Step S106: and performing automatic scheduling based on the packaged scheduling rule with the set priority to generate a scheduling result.
And searching the machine rooms where the start end and the stop end are located according to the start end and the stop end of the service requirement, and automatically scheduling the route according to the rule based on the preset rule to search the cable route meeting the requirement. The scheduling result is directly shown on the route in fig. 4.
Step S107: and if the scheduling result is not satisfactory, such as too many transfer points (>3) passed by the cable route generated by scheduling or route repetition, the rule can be modified, and the automatic scheduling is carried out again.
When the result of the scheduling is not satisfactory, the scheduling rule can be modified, and the system carries out rescheduling according to the newly set rule.
In fig. 4, a new designated routing node may be selected, the system automatically reschedules, and the scheduling result is directly shown in fig. 4.
Step S108: and implementing according to the scheduling result, and updating the connection condition, the use condition and the service condition of the resources.
And generating a construction order according to a scheduling result, wherein the construction order comprises jumper connection information, cable routing information and start/stop end information, carrying out field construction by constructors, carrying out construction backfill after the construction is finished, updating the state of resources in time and finishing the closed-loop circulation of services.
Example 2
The invention covers the automatic scheduling of routes such as light paths, circuits and the like, and the example shows the visual automatic scheduling of the light paths.
Fig. 5 is a schematic flow chart of visual automatic scheduling of an IDC room optical path according to a second embodiment of the present invention. FIG. 6 is an example of automatic scheduling, which is needed to automatically schedule an end-to-end dual fiber route from ODF-A-001/002 to ODF-Z-001/002, based on the following rules (rules are ordered by priority):
1) and (3) specifying a routing machine room: d is the machine room that must be passed through.
2) Minimum number of transfer points
3) Shortest route
4) And (3) optical cable redundancy selection: the cables must be redundant and the occupancy cannot exceed 80%.
5) Cable sequence selection: and selecting a continuous core sequence to be minimum in the cable sequence.
The method comprises the following specific steps:
s2001: and uniformly modeling resources, including floors, machine rooms, floors, racks, DDF racks, ODF racks, U bits, optical cables/cables, optical cable sections/optical fibers, optical paths/circuits, orders, work orders, clients and the like. The machine room A (DH304)/B1/B2/C1/C2/D/E1/E2/E3/E4/Z, the optical cable L1/L2, ODF-A (3F/DH304/DD01-ODF-1), ODF-Z and the like in the example are modeled and managed in the system.
S2002: and (4) modeling by a rule base, wherein the rules such as minimum switching points, shortest route, redundant selection of optical cables, sequential selection of cables and the like are modeled and managed in the system.
S2003: rule encapsulation, setting the starting end of a route as 3F/DH304/DD01-ODF-1-001/002 and the terminating end as ODF-Z-001/002, designating a route machine room as D, and automatically scheduling rules according to the priority as follows: the number of transfer points is the minimum, the route is the shortest, the optical cable redundancy selection and the cable sequence selection are the minimum continuous core sequence.
S2004: fig. 7A and 7B are schematic diagrams illustrating operations of start and end terminals in visual scheduling, and an ODF terminal to be scheduled is selected from a machine room plan view. The device where the terminal is located is obtained as 3F/DH304/DD01-ODF-1 and ODF-Z through the starting terminal 3F/DH304/DD01-ODF-1-001/002 and the terminating terminal ODF-Z-001/002.
S2005: the machine rooms where the 3F/DH304/DD01-ODF-1 and the ODF-Z are obtained are machine rooms DH304 and Z respectively.
S2006: and acquiring a designated router room D. And carrying out automatic scheduling among the DH304-D according to rules, carrying out automatic scheduling among the D-Z according to the rules, and completing all scheduling to form the end-to-end route of the DH 304-D-Z.
Route auto-search is performed between the DH 304-D. The presence of DH304-L1 (Cable) -D route, DH304-L2 (Cable) -D route, DH304-B1-C1-D route was found.
And performing automatic route searching between D-Z. D-M1 (fiber optic cable) -E1 (machine room) -Z, D-M2 (fiber optic cable) -E1 (machine room) -Z, D-M3 (fiber optic cable) -E2 (machine room) -Z routing was found to exist.
S2007: according to the transfer point minimum rule.
In the route of DH304-D, DH304-L1-D route and DH304-L2-D route are direct routes, there is no transfer point, DH304-B1-C1-D route has two transfer points, therefore DH304-B1-C1-D is not the best route. Three routes in Z-D are all two transit points and therefore all pass the rule.
S2008: according to the shortest route rule. In the route of DH304-D, the route length L1 of DH304-L1-D is 500 meters, and the route length L2 of DH304-L2-D is 800 meters, so the DH304-L1-D route is selected. Of the routes of D-Z, all three are 600 meters in length and therefore all pass this rule.
S2009: and selecting rules according to the cable redundancy. The cables that are routed must be redundant, and the DH304-D routes are routed so that the rule and subsequent rules are not used because one route has been uniquely identified according to the rule priority. In the D-Z route, M1 and M2 optical cables are optical cables between D-E1 rooms, redundancy exists, that is, switching under a fault condition can be realized, and the D-M3-E2-Z route is not the optimal route because only one M3 optical cable between D-E2 cannot realize redundancy backup.
Further analysis shows that the optical cable occupancy rate of the M1 optical cable is 88%, and the requirement that the optical cable occupancy rate cannot exceed 80% is not met. Thus D-M1-E1-Z failed the rule and D-M2-E1-Z was the best route.
From the above analysis, the optimal route for DH304-Z has been found to be DH 304-L1-D-M2-E1-Z.
S2010: and the cable sequence of the installation cable is regular, and the continuous core sequence is minimum. And selecting two continuous cores with the minimum core sequence in the optimal route DH 304-L1-D-M2-E1-Z.
In the L1 cable, 25/31/47-96 cores were all vacant, 25/31 were single core, non-continuous cores, and thus the rule was not passed, the smallest continuous core in the L1 cable was 47/48 cores.
In the M2 optical cable, 25-48 cores are all vacant, and the smallest continuous core is 25/26 cores.
Through the analysis, the optimal route of A-Z can be obtained to be 3F/DH304/DD01-ODF-1-001/002- - -L1(47/28 core) - -D- - -M2(25/26 core) - -E1- - -ODF-Z-001/002, and a graphical route is generated, as shown in FIG. 8.
The invention also discloses a device for visually and automatically scheduling the IDC cables, which is used for executing the processes, and is a structural schematic diagram of the device for visually and automatically scheduling the IDC cables in the IDC machine room, as shown in FIG. 9.
The invention comprises a resource modeling module 91, an association management module 92, a rule management module 93, a rule packaging module 94, an automatic scheduling module 95 and a scheduling result display module 96.
The working process of the device is as follows:
the resource modeling module 91 is used for uniformly modeling IDC related resources, and covers floors, machine rooms, floors, racks, DDF frames, ODF frames, U bits, optical cables/cables, optical cable sections/optical fibers, optical paths/circuits, orders, work orders, customers and the like. A unified view of resources is formed as in fig. 4.
And the association management module 92 associates resources, associates machine room resources (floors, machine rooms, floors, racks/ODF racks/DDF racks, ODF terminals/DDF terminals), cable resources (optical cables/cables, optical cable sections/cable sections, optical fibers/cables, jumper/fusion splices, in-building optical fibers/cables), customers (customers, orders, customer racks, user equipment), optical circuits/circuits (ODF terminals/DDF terminals, in-building optical fibers/cables, user equipment), and implements association management of resources, services and customers.
The rule management module 93 abstracts the rules to form a rule base: the method comprises the steps of minimum switching points, shortest route, designated route machine room, cable redundancy selection and cable sequence selection.
The rule encapsulation module 94 sets parameters by selecting the rule in the rule management module 93:
1) and (3) specifying a routing machine room: only the rooms present in the resource modeling module 91 can be selected.
2) Cable redundancy selection: whether the cable needs redundancy, yes/no; whether the cable occupancy is required or not, yes/no, and for the required occupancy, the occupancy proportion can be set, such as 80%, which means that the selected cable occupancy cannot exceed 80%.
3) Cable sequence selection of cables: the core order is minimum, the continuous core order is minimum, and the continuous core order is maximum.
And an automatic scheduling module 95 for performing automatic routing scheduling according to the rule set in the rule encapsulation module 94.
1) The designated router room 9511 is obtained, and the designated router room in the rule setting is obtained.
2) Automatic scheduling 9512 by taking a designated routing machine room as an end point: routing scheduling is respectively carried out in a starting end-designated routing machine room and a designated routing machine room-terminating end, and the starting end-designated routing machine room is taken as an example for explanation, and the designated routing machine room-terminating end is operated identically.
3) Get transfer point 9521: and obtaining different routes which may exist in a starting end-designated route computer room through an algorithm.
4) Transit point number calculation 9522: the number of transit points for different routes in module 9521 is calculated.
5) Transit point minimum rule 9523: based on the calculation result of the block 9522, the route with the least number of forwarding points is selected as the best route.
6) Acquisition routing cable 9531: based on the plurality of best routes obtained by module 9523, the length of each wire in the route is obtained.
7) Cable length calculation 9532: the lengths of the cables in each route in module 9531 are summed.
8) Shortest routing rule 9533: from the results of the calculation in block 9532, the route with the smallest cable length is selected as the best route.
9) Acquisition routing cable 9541: based on the multiple best routes obtained by the module 9533, information of cables in the routes, including starting equipment room, terminating equipment room, and cable occupancy rate, is obtained.
10) Cable redundancy calculation 9542: a cable search is performed with the cable start and stop rooms in block 9541 to determine if multiple cables are present in both rooms. When the number of the optical cables in the machine room is greater than 1, the redundancy of the optical cables in the machine room is represented; when the number of cables in the machine room is greater than 2, the redundancy of the cables in the machine room is represented; further calculating the occupancy rate of fiber cores/cables in the optical cable, and calculating the number of used fiber cores/total fiber cores in the optical cable for the fiber cores, wherein 80% of the optical cable meets the redundancy requirement; for cables, the cable occupancy rate between computer rooms is equal to the number of idle cables/the total number of cables, and more than 80% of cables in computer rooms meet redundancy requirements.
11) Cable redundancy selection rule 9543: based on the results of the module 9542 calculations, cables/cables are selected for redundancy. As for the cable, any cable that satisfies the requirements may be selected. For the optical cable, further cable sequence selection rule analysis is required.
12) Acquisition routing fiber 9551: core usage information in the fiber optic cable is obtained based on the optimal routing obtained by block 9543.
13) Fiber core order calculation 9552: and according to the routing scheduling requirement, the number of the scheduled fiber cores is single fiber/double fiber/multi-fiber. Based on the fiber core usage information of the module 9551, the idle fiber core numbers and the continuous single fiber/double fiber/multi fiber core numbers in the optical cable are found.
14) Cable order selection rule 9553: according to the calculation result of the module 9552, the single fiber/double fiber/multi fiber with the minimum core sequence or the minimum continuous core sequence or the maximum continuous core sequence is selected according to the rule setting requirement.
The scheduling result display module 96 completes routing scheduling of the start end-designated routing room and the designated routing room-termination end respectively according to the scheduling result of the module 95. And forming a graphical end-to-end route through a scheduling result display module. An example is shown in fig. 8.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (2)

1. An IDC cable visual automatic scheduling device is characterized by comprising a resource modeling module, an association management module, a rule encapsulation module, an automatic scheduling module and a scheduling result display module,
the resource modeling module is used for uniformly modeling related resources of the IDC;
the association management module is used for associating resources to realize association management of the resources, the services and the clients;
the rule management module abstracts the rules to form a rule base: the method comprises the following steps of minimizing transfer points, minimizing routes, designating a route machine room, selecting redundancy of cables and cable sequences;
the rule encapsulation module is used for setting parameters by selecting rules in the rule management module;
the automatic scheduling module carries out automatic routing scheduling according to the rules set in the rule packaging module;
the dispatching result display module is used for respectively finishing the routing dispatching of the starting end-appointed routing machine room and the appointed routing machine room-terminating end through the dispatching result of the automatic dispatching module, and forming graphical end-to-end routing through the dispatching result display module;
the automatic scheduling module specifically comprises the following steps:
1) acquiring a designated router room, and acquiring the designated router room in the rule setting;
2) and (3) automatically scheduling by taking the appointed routing machine room as an end point: respectively carrying out route scheduling in an initial end-appointed route machine room and an appointed route machine room-termination end;
3) acquiring a transfer point: obtaining different routes existing in a starting end-designated route machine room through an algorithm;
4) calculating the number of the transfer points: calculating the number of the transfer points of different routes in the module;
5) transfer point minimum rule: selecting the route with the least switching points as the optimal route according to the module calculation result;
6) acquiring a routing cable: based on the optimal routes obtained by the modules, the length of each cable in the routes is obtained;
7) calculating the length of the cable: summing the lengths of the cables in each route in the module;
8) shortest route rule: selecting the route with the minimum cable length as the optimal route according to the module calculation result;
9) acquiring a routing cable: based on the optimal routes obtained by the modules, acquiring information of cables in the routes, wherein the information comprises an initial machine room, a termination machine room and cable occupancy rates;
10) and (3) cable redundancy calculation: cable searching is carried out by starting and stopping cables in the module to judge whether a plurality of cables exist in two machine rooms, and when the number of the optical cables in the machine rooms is greater than 1, redundancy exists in the optical cables in the machine rooms; when the number of cables in the machine room is greater than 2, the redundancy of the cables in the machine room is represented; further calculating the occupancy rate of fiber cores/cables in the optical cable, and calculating the number of used fiber cores/total fiber cores in the optical cable for the fiber cores, wherein 80% of the optical cable meets the redundancy requirement; for cables, the cable occupancy rate between computer rooms is equal to the number of idle cables/the total number of cables, and more than 80% of cables in computer rooms meet redundancy requirements;
11) cable redundancy selection rules: selecting the optical cable/electric cable with redundancy according to the calculation result;
12) obtaining a routing optical fiber: obtaining fiber core use information in the optical cable based on the obtained optimal route;
13) calculating the core order of the optical fiber: according to the routing scheduling requirement, the number of the scheduled fiber cores is single fiber/double fiber/multi-fiber; based on the fiber core using information, searching idle fiber core numbers in the optical cable and continuous fiber core numbers of single fibers/double fibers/multi fibers;
14) cable sequence selection rules: and according to the calculation result, selecting single fiber/double fiber/multi fiber with the minimum core sequence or the minimum continuous core sequence or the maximum continuous core sequence according to the rule setting requirement.
2. IDC cable visualization auto-scheduling apparatus according to claim 1,
the rule encapsulation module comprises:
1) and (3) specifying a routing machine room: only the machine room existing in the resource modeling module can be selected;
2) cable redundancy selection: whether the cable needs redundancy; whether the cable occupancy rate is required or not is judged, and the occupancy rate proportion is set for the required cable occupancy rate;
3) cable sequence selection: the core order is minimum, the continuous core order is minimum, and the continuous core order is maximum.
CN201811566984.4A 2018-12-20 2018-12-20 Visual automatic scheduling device of IDC computer lab cable Active CN110401556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811566984.4A CN110401556B (en) 2018-12-20 2018-12-20 Visual automatic scheduling device of IDC computer lab cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811566984.4A CN110401556B (en) 2018-12-20 2018-12-20 Visual automatic scheduling device of IDC computer lab cable

Publications (2)

Publication Number Publication Date
CN110401556A CN110401556A (en) 2019-11-01
CN110401556B true CN110401556B (en) 2022-08-16

Family

ID=68322177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811566984.4A Active CN110401556B (en) 2018-12-20 2018-12-20 Visual automatic scheduling device of IDC computer lab cable

Country Status (1)

Country Link
CN (1) CN110401556B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111787433B (en) * 2020-06-10 2022-09-23 烽火通信科技股份有限公司 Optical distribution network visual light path scheduling method and system
CN114125597A (en) * 2021-10-28 2022-03-01 珠海大横琴科技发展有限公司 Optical fiber scheduling method and device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103324535B (en) * 2012-03-23 2017-02-08 百度在线网络技术(北京)有限公司 Method and device for allocating computing resources
US8630741B1 (en) * 2012-09-30 2014-01-14 Nest Labs, Inc. Automated presence detection and presence-related control within an intelligent controller
CN103345664A (en) * 2013-05-31 2013-10-09 华为技术有限公司 Method and system for adaptation between workflow and task scheduling
CN105306267A (en) * 2015-10-15 2016-02-03 广东电网有限责任公司电力调度控制中心 Optical cable network management system
CN108683187A (en) * 2018-06-12 2018-10-19 国网河南省电力公司濮阳供电公司 A kind of EMS grid monitoring systems based on big data

Also Published As

Publication number Publication date
CN110401556A (en) 2019-11-01

Similar Documents

Publication Publication Date Title
CN103166774B (en) With route arrange distinguish method and device
CN107070724B (en) Method for monitoring end-to-end service communication state of power communication network
CN110401556B (en) Visual automatic scheduling device of IDC computer lab cable
CN105007220B (en) Inter-domain routing manages system, method, field adapter and transmission network
CN101944150B (en) Method for automatically generating wave channel graph by programming in wavelength division system
CN104348691A (en) Fiber link scheduling method, equipment and system
CN103853859A (en) Mapping method and mapping system for drawing nuclear power plant terminating map
CN110474801A (en) Powerline network fault simulation method based on service reliability
CN108174314B (en) Method and device for scheduling optical cross-network service
US20180096286A1 (en) Workflow labor optimization system
CN106506190B (en) A kind of communication network operating system and operation method
CN104394027A (en) Method and device of detecting network quality based on metadata
CN106685521A (en) Method and apparatus of predicting resource margin early warning for optical communication network
CN110519084A (en) Circuit management method and apparatus for operator's transmission Packet Transport Network
CN102035749B (en) Optical line automatic switching protection (OLP) equipment route monitoring method and device
CN109740789A (en) Cable management method, apparatus, equipment and storage medium
CN115361063A (en) Intelligent optical fiber distribution management method and system
CN104243218A (en) Power system communication mode bill compilation method based on multi-scheduling constraints
CN111458801B (en) Optical fiber fusion welding and end-forming data display method, device, equipment and storage medium
CN104537090B (en) User profile standardized data treating method and apparatus
CN102868563A (en) Cross layer mapping management method of share risk link group
CN112969109A (en) Digitizer system for optical distribution facilities and application thereof
JP4562125B2 (en) Medium inventory totalizing apparatus and method, and program
US20020094798A1 (en) Forming a communication network
CN110737962B (en) Intelligent judging method and system for network wiring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant