CN103853859A - Mapping method and mapping system for drawing nuclear power plant terminating map - Google Patents

Mapping method and mapping system for drawing nuclear power plant terminating map Download PDF

Info

Publication number
CN103853859A
CN103853859A CN201210505071.8A CN201210505071A CN103853859A CN 103853859 A CN103853859 A CN 103853859A CN 201210505071 A CN201210505071 A CN 201210505071A CN 103853859 A CN103853859 A CN 103853859A
Authority
CN
China
Prior art keywords
termination
terminal
nuclear power
cable
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210505071.8A
Other languages
Chinese (zh)
Other versions
CN103853859B (en
Inventor
夏祖国
任立永
钟斌
汪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201210505071.8A priority Critical patent/CN103853859B/en
Publication of CN103853859A publication Critical patent/CN103853859A/en
Application granted granted Critical
Publication of CN103853859B publication Critical patent/CN103853859B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The invention discloses a mapping method for drawing a nuclear power plant terminating map. The mapping method comprises the steps of S1, importing preset terminating data into a mapping system, S2, selecting cables and apparatuses in the mapping system and then establishing a logical connection relationship between the apparatuses by virtue of connection of the cables, S3, after allowing the preset number of terminals for the apparatuses, automatically distributing the terminals of a control cabinet according to the preset terminating data and establishing a logical connection relationship between the terminals of the cables and the apparatuses and the terminals of the control cabinet, S4, completing the drawing of the minimum unit map of the nuclear power terminating map, and S5, automatically copying the minimum unit map and completing the drawing the the nuclear power terminating map. The invention also provides a mapping system for drawing the nuclear power plant terminating map, and the mapping system is used for implementing the method. The mapping method and the mapping system for drawing the nuclear power plant terminating map are quick in mapping and high in accuracy.

Description

A kind of nuclear power station termination figure drawing methods and system
Technical field
The present invention relates to nuclear power field, in particular, relate to a kind of nuclear power station termination figure drawing methods and system.
Background technology
The whole measurement control of nuclear power station protection system is very huge, needs cable on-the-spot measuring point on hardware, operation valve, and motor, DCS controls rack etc., and each equipment and control rack couples together, and nuclear power station could move according to control strategy.Between cable and equipment, express its annexation by termination figure, current termination figure draws most of by general drawing instrument manual drawing, and it has expressed local devices termination information, not directly perceived.The connection standard number that passes through having is expressed, and needs combined standard figure identification.Can not, with upstream DCS supplier's termination inventory from being dynamically connected, by manually understanding after termination data, be depicted as termination figure.
In every cable, the annexation of each heart yearn is expressed by penetration piece equipment end map interlinking sample, and cable and next equipment connection, expressed by an other figure equally.Need multiple similar termination figure could express the annexation of whole signal from scene to switch board.
Owing to only expressing local devices termination information, can not fully understand the information of whole signalling channel, Installation and Debugging are safeguarded and made troubles.
The general relation of expressing cable and connection device by list form in existing scheme, express termination relation by connection standard number again, wherein standard No. need to be identified in conjunction with termination standard drawing, but maximum problem be express not directly perceived, annexation indigestion.
A signal is from on-site transfer to switch board, and possible intermediate demand penetration piece or patchcord switching, multiple equipment, multi-cable to complete.Need multiple inventory records and standard drawing to express, work loaded down with trivial details.
Summary of the invention
The technical problem to be solved in the present invention is, for defect of the prior art, provides a kind of nuclear power station termination figure drawing methods and system.
The technical solution adopted for the present invention to solve the technical problems is: a kind of nuclear power station termination figure drawing methods is provided, comprises the following steps:
S1, will preset termination data importing drawing formation system;
S2, in drawing formation system, select, after cable and equipment, to connect the logic connecting relation between apparatus for establishing by cable;
S3, automatically distribute according to described default termination data between the terminal of the terminal controlling the terminal of rack or equipment and set up cable, equipment and control rack and be connected logical relation;
S4, complete the minimum unit figure that draws nuclear power termination figure;
S5, multiple described minimum unit figure are merged and complete draw described nuclear power termination figure.
In nuclear power station termination figure drawing methods of the present invention, step S1, after described default termination data importing drawing formation system, identifies the termination figure field information in described default termination data automatically;
In step S2, at the row of selecting when cable the color identification cable by cable in drawing formation system not and security packet.
In nuclear power station termination figure drawing methods of the present invention, in step S3, flow to each heart yearn two ends of setting up cable respectively with the terminal of equipment and control the logical relation that is connected between the terminal of rack according to described termination figure field information and signal.
In nuclear power station termination figure drawing methods of the present invention, in step S4, complete the described minimum unit figure of drafting according to the logic connecting relation between described equipment and size positions information, described size positions information comprises the distance between terminal, terminal length and terminal number.
In nuclear power station termination figure drawing methods of the present invention, in step S5 according to each heart yearn two ends of the logic connecting relation between described equipment, cable respectively with the terminal of equipment and control and be connected logical relation and described size positions information between the terminal of rack, automatically merge all described minimum unit figure and complete and draw described nuclear power termination figure.
The present invention also provides a kind of nuclear power station termination figure drawing formation system, comprising:
Data importing module, for importing default termination data;
The first logic link block, for selecting, after cable and equipment, to connect the logic connecting relation between apparatus for establishing by cable;
The second logic link block, is connected logical relation for automatically distributing according to described default termination data between the terminal of the terminal controlling the terminal of rack or equipment and set up cable, equipment and control rack;
The first drafting module, for completing the minimum unit figure that draws nuclear power termination figure; And
The second drafting module, draws described nuclear power termination figure for the multiple described minimum unit figure that completes drafting being merged and completing.
In nuclear power station termination figure drawing formation system of the present invention, described data importing module also, for importing after described default termination data, is identified the termination figure field information in described default termination data automatically;
Described the first logic link block is not also at the row of selecting when cable the color identification cable by drawing formation system cable and security packet.
In nuclear power station termination figure drawing formation system of the present invention, described the second logic link block is also for flowing to each heart yearn two ends of setting up cable respectively with the terminal of equipment and control the logical relation that is connected between the terminal of rack according to described termination figure field information and signal.
In nuclear power station termination figure drawing formation system of the present invention, described the first drafting module is also for completing the described minimum unit figure of drafting according to the logic connecting relation between described equipment and size positions information, described size positions information comprises the distance between terminal, terminal length and terminal number.
In nuclear power station termination figure drawing formation system of the present invention, described the second drafting module also for according to each heart yearn two ends of the logic connecting relation between described equipment, cable respectively with the terminal of equipment and control and be connected logical relation and described size positions information between the terminal of rack, automatically merge all described minimum unit figure and complete and draw described nuclear power termination figure.
Nuclear power station termination figure drawing methods of the present invention and system have following beneficial effect: by importing supplier's termination information, thereby obtain the logical relation between terminal, reduce artificial cognition and draw connection procedure, also the error of having avoided manual operation to bring, simple, intuitive, efficiency is high, do not worry the Vector Message of drawing, termination figure is by the logic connecting relation of software analysis cable and equipment room, the logic connecting relation of cable core and arrangement terminal, automatic mapping, reduces artificial complicated processes of drawing and has simplified design process.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the process flow diagram of an embodiment of a kind of nuclear power station termination figure drawing methods according to the present invention;
Fig. 2 is the theory diagram of an embodiment of a kind of nuclear power station termination figure drawing formation system according to the present invention.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
As shown in Figure 1 be a kind of nuclear power station termination figure drawing methods, the method comprises the following steps:
S1, will preset termination data importing drawing formation system;
S2, in drawing formation system, select, after cable and equipment, to connect the logic connecting relation between apparatus for establishing by cable;
S3, configuring for equipment after default number of terminals, automatically distributing according to default termination data between the terminal of the terminal controlling the terminal of rack or equipment and set up cable, equipment and control rack and be connected logical relation;
S4, complete the minimum unit figure that draws nuclear power termination figure;
S5, multiple described minimum unit figure are merged and complete and draw nuclear power termination figure.
Wherein, default termination data generally refer to the termination listings data that supplier provides, and have provided the corresponding relation of arrangement terminal that supplier provides and the terminal of switch board, in order to annexation to be between the two described in termination listings data; Can certainly be other termination data that set in advance as required.Should be understood that, the said equipment, control rack etc. is the schematic block diagram in system, and cable comprises multiple battery cores, and battery core is generally represented by lines.In step S2, the annexation between equipment is carried out to preliminary confirmation, also can arrange to device location.
Owing to being only the annexation having reflected between equipment in step S2; the corresponding signal of reflection that can not be concrete flows to; in step S3, increase terminal cashier's office in a shop at corresponding equipment and controller; comprise quantity and the position of terminal, by heart yearn, terminal is connected with terminal, the very huge measurement control of nuclear power station protection system; need to express the termination relation of up to a million cables core; complete in manually drawing by drawing instrument, efficiency is low, easily makes mistakes.In step S3 of the present invention, according to the annexation between the automatic distribution terminal of termination data and terminal, and select heart yearn used, improved greatly the efficiency of one-tenth figure and the accuracy of one-tenth figure.If certainly indivedual cables exist one end Non-precondition termination data, also can manually carry out the terminal of distributing equipment.
In step S4, preferentially complete a minimum unit figure, step S5 repeats to draw other minimum units figure according to the method in step S2-S4, and finally connects into figure, has improved one-tenth figure efficiency.Certainly in the method, minimum unit figure can draw successively, also can multiplely draw simultaneously, and in step S5, completes the whole termination figure of drafting.
Further, step S1 is after default termination data importing drawing formation system, and the termination figure field information in termination data is preset in identification automatically.Accordingly, in step S3, flow to each heart yearn two ends of setting up cable respectively with the terminal of equipment and control the logical relation that is connected between the terminal of rack according to termination figure field information and signal.
Further, in step S2, at the row of selecting when cable the color identification cable by cable in drawing formation system not and security packet, because dissimilar cable identifies by different colors, its row not and security packet information just can reflect very intuitively.
Concrete, in step S4, complete drafting minimum unit figure according to the logic connecting relation between equipment and size positions information, size positions information comprises the distance between terminal, terminal length and terminal number, and the minimum unit figure becoming also can take into account arranging and position relationship of equipment room simultaneously.
Accordingly, in step S5 according to each heart yearn two ends of the logic connecting relation between equipment, cable respectively with the terminal of equipment and control and be connected logical relation and size positions information between the terminal of rack, automatically merge each minimum unit figure and complete and draw nuclear power termination figure.
In addition, in the time that termination figure version changes, import that termination inventory information that termination information in drawing formation system and DCS database deposit compares and when inconsistent, can carry out accordingly mark, also handled easily personnel revise it, as:
1, the version in DCS database and drawing formation system is inconsistent, and [Version] status word is inconsistent, and (actual termination data consistent), can identify with yellow frame in CAD;
2, in drawing formation system, have certain signal, but this signal not in DCS termination data that is to say in DCS and deletes, can be by grey box band fork mark in drawing formation system;
3, same signal when in DCS termination data and drawing formation system, termination information is inconsistent, when room number, switch board number, terminal row number, terminal number change, can identify by red block in drawing formation system;
4, in DCS termination data, there is certain signal, and in drawing formation system this signal not, drawing formation system is not used, and can show deriving form;
In EXCEL derived information, choose after certain cell when handle, in REMARK, can there is following situation:
[terminal variation]; [version variation]; [using]; [not using]; [deleting].
As shown in Figure 2 be a kind of nuclear power station termination figure drawing formation system, this system comprises:
Data importing module 1, for importing default termination data;
The first logic link block 2, for selecting, after cable and equipment, to connect the logic connecting relation between apparatus for establishing by cable;
The second logic link block 3, automatically distributes according to default termination data between the terminal of the terminal controlling the terminal of rack or equipment and set up cable, equipment and control rack and is connected logical relation;
The first drafting module 4, for completing the minimum unit figure that draws nuclear power termination figure; And
The second drafting module 5, repeating step S2-S4 until complete the drafting of all minimum unit figure, merges multiple described minimum unit figure and completes and draw nuclear power termination figure.
Wherein, default termination data generally refer to the termination listings data that supplier provides, and have provided the corresponding relation of arrangement terminal that supplier provides and the terminal of switch board, in order to annexation to be between the two described in termination listings data; Can certainly be other termination data that set in advance as required.Should be understood that, the said equipment, control rack etc. is the schematic block diagram in system, and cable comprises multiple battery cores, and battery core is generally represented by lines.The first logic link block 2 is carried out preliminary confirmation to the annexation between equipment, also can arrange to device location.
Because the first logic link block 2 is only the annexation having reflected between equipment; the corresponding signal of reflection that can not be concrete flows to; the second logic link block 3 increases terminal cashier's office in a shop at corresponding equipment and controller; comprise quantity and the position of terminal, by heart yearn, terminal is connected with terminal, the very huge measurement control of nuclear power station protection system; need to express the termination relation of up to a million cables core; complete in manually drawing by drawing instrument, efficiency is low, easily makes mistakes.The present invention's the second logic link block 3 is according to the annexation between the automatic distribution terminal of termination data and terminal, and selects heart yearn used, improved greatly the efficiency of one-tenth figure and the accuracy of one-tenth figure.
The first drafting module 4 preferentially completes a minimum unit figure, and then the second drafting module 5 step S5 repeat to draw other minimum units figure according to the method in step S2-S4, and finally connect into figure, have improved one-tenth figure efficiency.
Further, data importing module 1 is also for importing after default termination data, and the termination figure field information in termination data is preset in identification automatically.Accordingly, the second logic link block 3 is also for flowing to each heart yearn two ends of setting up cable respectively with the terminal of equipment and control the logical relation that is connected between the terminal of rack according to termination figure field information and signal.
Further, the second logic link block 2 is not at the row of selecting when cable the color identification cable by cable in drawing formation system and security packet, because dissimilar cable identifies by different colors, it is listed as not and security packet information just can reflect very intuitively.
Concrete, the first drafting module 4 is also for completing drafting minimum unit figure according to the logic connecting relation between equipment and size positions information, size positions information comprises the distance between terminal, terminal length and terminal number, the minimum unit figure becoming also can take into account arranging and position relationship of equipment room simultaneously.
Concrete, the second drafting module 5 also for according to each heart yearn two ends of the logic connecting relation between equipment, cable respectively with the terminal of equipment and control and be connected logical relation and size positions information between the terminal of rack, automatically merge each minimum unit figure and complete and draw nuclear power termination figure.
Nuclear power station termination figure drawing methods of the present invention and system can be brought following technique effect:
By conventional software engineering, import DCS supplier's termination information, allow drawing formation system decode itself and the logical relation of terminal, reduce artificial cognition and drafting connection procedure, the error of also having avoided manual operation to bring.
Artificial by operating form distribution terminal and being connected logical relation from on-the-spot cable core, simple, intuitive, efficiency is high, need not be concerned about the Vector Message of drafting, termination figure is by the logic connecting relation of software analysis cable and equipment room, the logic connecting relation of cable core and arrangement terminal, generating vector diagram automatically, reduces artificial complicated processes of drawing and has simplified design process.
Termination graph expression the annexation in any one on-the-spot measuring control signal and the whole signalling channel of control gear, improved drawing and expressed quantity of information, reduced drawing quantity, design, installs, debugging, maintainer is readily appreciated that, has improved the work efficiency of links.
Although the present invention describes by specific embodiment, it will be appreciated by those skilled in the art that, without departing from the present invention, can also carry out various conversion and be equal to alternative the present invention.In addition, for particular condition or material, can make various modifications to the present invention, and not depart from the scope of the present invention.Therefore, the present invention is not limited to disclosed specific embodiment, and should comprise the whole embodiments that fall within the scope of the claims in the present invention.

Claims (10)

1. a nuclear power station termination figure drawing methods, is characterized in that, comprises the following steps:
S1, will preset termination data importing drawing formation system;
S2, in drawing formation system, select, after cable and equipment, to connect the logic connecting relation between apparatus for establishing by cable;
S3, automatically distribute according to described default termination data between the terminal of the terminal controlling the terminal of rack or equipment and set up cable, equipment and control rack and be connected logical relation;
S4, complete the minimum unit figure that draws nuclear power termination figure; S5, multiple described minimum unit figure are merged and complete draw described nuclear power termination figure.
2. nuclear power station termination figure drawing methods according to claim 1, is characterized in that, step S1, after described default termination data importing drawing formation system, identifies the termination information in described default termination data automatically;
In step S2, at the row of selecting when cable the color identification cable by cable in drawing formation system not and security packet.
3. nuclear power station termination figure drawing methods according to claim 2, it is characterized in that, in step S3, flow to each heart yearn two ends of setting up cable respectively with the terminal of equipment and control the logical relation that is connected between the terminal of rack according to described termination figure field information and signal.
4. nuclear power station termination figure drawing methods according to claim 3, it is characterized in that, in step S4, complete the described minimum unit figure of drafting according to the logic connecting relation between described equipment and size positions information, described size positions information comprises the distance between terminal, the connected mode of terminal, terminal length and terminal number.
5. nuclear power station termination figure drawing methods according to claim 4, it is characterized in that, in step S5 according to each heart yearn two ends of the logic connecting relation between described equipment, cable respectively with the terminal of equipment and control and be connected logical relation and described size positions information between the terminal of rack, automatically merge all described minimum unit figure and complete and draw described nuclear power termination figure.
6. a nuclear power station termination figure drawing formation system, is characterized in that, comprising:
Data importing module (1), for importing default termination data;
The first logic link block (2), for selecting, after cable and equipment, to connect the logic connecting relation between apparatus for establishing by cable;
The second logic link block (3), is connected logical relation for automatically distributing according to described default termination data between the terminal of the terminal controlling the terminal of rack or equipment and set up cable, equipment and control rack;
The first drafting module (4), for completing the minimum unit figure that draws nuclear power termination figure; And
The second drafting module (5), draws described nuclear power termination figure for the multiple described minimum unit figure that completes drafting being merged and completing.
7. nuclear power station termination figure drawing formation system according to claim 6, is characterized in that, described data importing module (1) also, for importing after described default termination data, is identified the termination figure field information in described default termination data automatically;
Described the first logic link block (2) is not also at the row of selecting when cable the color identification cable by drawing formation system cable and security packet.
8. nuclear power station termination figure drawing formation system according to claim 7, it is characterized in that, described the second logic link block (3) is also for flowing to each heart yearn two ends of setting up cable respectively with the terminal of equipment and control the logical relation that is connected between the terminal of rack according to described termination figure field information and signal.
9. nuclear power station termination figure drawing formation system according to claim 6, it is characterized in that, described the first drafting module (4) is also for completing the described minimum unit figure of drafting according to the logic connecting relation between described equipment and size positions information, described size positions information comprises the distance between terminal, the connected mode of terminal, terminal length and terminal number.
10. nuclear power station termination figure drawing formation system according to claim 6, it is characterized in that, described the second drafting module (5) also for according to each heart yearn two ends of the logic connecting relation between described equipment, cable respectively with the terminal of equipment and control and be connected logical relation and described size positions information between the terminal of rack, automatically merge all described minimum unit figure and complete and draw described nuclear power termination figure.
CN201210505071.8A 2012-11-30 2012-11-30 Mapping method and mapping system for drawing nuclear power plant terminating map Active CN103853859B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210505071.8A CN103853859B (en) 2012-11-30 2012-11-30 Mapping method and mapping system for drawing nuclear power plant terminating map

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210505071.8A CN103853859B (en) 2012-11-30 2012-11-30 Mapping method and mapping system for drawing nuclear power plant terminating map

Publications (2)

Publication Number Publication Date
CN103853859A true CN103853859A (en) 2014-06-11
CN103853859B CN103853859B (en) 2017-01-25

Family

ID=50861514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210505071.8A Active CN103853859B (en) 2012-11-30 2012-11-30 Mapping method and mapping system for drawing nuclear power plant terminating map

Country Status (1)

Country Link
CN (1) CN103853859B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104504214A (en) * 2015-01-06 2015-04-08 北京京诚瑞达电气工程技术有限公司 Electrical schematic diagram generation method
CN104750927A (en) * 2015-03-30 2015-07-01 浪潮通信信息系统有限公司 Graphical optical cable terminating relation display method
CN105094829A (en) * 2015-07-29 2015-11-25 北京空间飞行器总体设计部 Method for automatically generating satellite measurement and control information flow diagram
CN105373612A (en) * 2015-11-23 2016-03-02 苏州同元软控信息技术有限公司 Automatic generation system and method of spacecraft earthing diagram
CN106897521A (en) * 2017-02-27 2017-06-27 北京润科通用技术有限公司 The generation method and device of a kind of cable connection table
CN108170836A (en) * 2018-01-12 2018-06-15 中广核工程有限公司 A kind of processing method and its system of cables of nuclear power termination big data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4977529A (en) * 1973-02-23 1990-12-11 Westinghouse Electric Corp. Training simulator for a nuclear power plant
CN102184750A (en) * 2011-04-11 2011-09-14 北京广利核系统工程有限公司 Testing device of nuclear power station digitized instrument and control system
CN102360571A (en) * 2011-10-20 2012-02-22 中广核工程有限公司 Simulation device and simulation method of on-site driving apparatus of nuclear power station
CN102412003A (en) * 2011-09-20 2012-04-11 中广核工程有限公司 Nuclear power station DCS debugging system and method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4977529A (en) * 1973-02-23 1990-12-11 Westinghouse Electric Corp. Training simulator for a nuclear power plant
CN102184750A (en) * 2011-04-11 2011-09-14 北京广利核系统工程有限公司 Testing device of nuclear power station digitized instrument and control system
CN102412003A (en) * 2011-09-20 2012-04-11 中广核工程有限公司 Nuclear power station DCS debugging system and method thereof
CN102360571A (en) * 2011-10-20 2012-02-22 中广核工程有限公司 Simulation device and simulation method of on-site driving apparatus of nuclear power station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘肇阳 等: "台山EPR电缆施工设计工具应用研究", 《核科学与工程》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104504214A (en) * 2015-01-06 2015-04-08 北京京诚瑞达电气工程技术有限公司 Electrical schematic diagram generation method
CN104504214B (en) * 2015-01-06 2018-04-27 北京京诚瑞达电气工程技术有限公司 The generation method of electrical schematic diagram
CN104750927A (en) * 2015-03-30 2015-07-01 浪潮通信信息系统有限公司 Graphical optical cable terminating relation display method
CN104750927B (en) * 2015-03-30 2018-03-27 浪潮天元通信信息系统有限公司 A kind of patterned optic fiber distribution relation methods of exhibiting
CN105094829A (en) * 2015-07-29 2015-11-25 北京空间飞行器总体设计部 Method for automatically generating satellite measurement and control information flow diagram
CN105094829B (en) * 2015-07-29 2018-03-20 北京空间飞行器总体设计部 A kind of method for automatically generating Satellite TT information flow chart
CN105373612A (en) * 2015-11-23 2016-03-02 苏州同元软控信息技术有限公司 Automatic generation system and method of spacecraft earthing diagram
CN105373612B (en) * 2015-11-23 2018-09-18 苏州同元软控信息技术有限公司 A kind of spacecraft ground connection figure automatic creation system and its method
CN106897521A (en) * 2017-02-27 2017-06-27 北京润科通用技术有限公司 The generation method and device of a kind of cable connection table
CN106897521B (en) * 2017-02-27 2020-05-05 北京润科通用技术有限公司 Method and device for generating cable connection table
CN108170836A (en) * 2018-01-12 2018-06-15 中广核工程有限公司 A kind of processing method and its system of cables of nuclear power termination big data

Also Published As

Publication number Publication date
CN103853859B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN103853859A (en) Mapping method and mapping system for drawing nuclear power plant terminating map
CN107292003B (en) Automatic generation method of power grid station wiring diagram
CN105680568A (en) Automatic mapping monitoring system and method of intelligent substation secondary virtual loop
CN102360398B (en) IEC61850-based CAD electric power graphic generation analysis method
CN104767280A (en) Method for realizing the visualization of secondary virtual circuit in intelligent substation
CN105022874A (en) Digital simulation automatic modeling method and system for power distribution network
CN106296467B (en) A method of generating operation order
CN201673299U (en) Optical fiber distribution device with intelligent optical fiber management and identification functions
CN104361190B (en) The method and device of empty terminal automation connection in electrical secondary system
CN112531886B (en) Power distribution station mobile monitoring platform device, system and method
CN110288176A (en) Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
CN100470976C (en) Integrated automation converting station debugging apparatus
CN103927698A (en) Automatic identification method of intelligent substation virtual terminal correlated device
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN102916489B (en) Virtual terminal automatic wiring method based on primary system structure of regional power grid
CN105785170B (en) A kind of data flow panorama display device and method towards intelligent substation
CN106910143A (en) Power distribution network artwork multi-edition control method and system
CN110401556B (en) Visual automatic scheduling device of IDC computer lab cable
CN103714201B (en) Substation secondary wiring collaborative design method based on PROMIS E design environment
CN103955870A (en) Automatic distribution method for optical cables of process layer of intelligent substation secondary system
CN104486117B (en) A kind of the configuration order exchange method and system of more board core switch
CN113259204B (en) Train Ethernet universal ground test system and test method thereof
CN102435793B (en) Intelligent switching device suitable for aviation cable reflection measurement
CN209911827U (en) Automatic checking device for clamping piece channel of power plant DCS system
CN107920230A (en) Video monitoring image secondary-confirmation system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee after: CHINA GENERAL NUCLEAR POWER Corp.

Patentee after: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

Address before: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee before: CHINA GUANGDONG NUCLEAR POWER GROUP Co.,Ltd.

Patentee before: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder