CN108170836A - A kind of processing method and its system of cables of nuclear power termination big data - Google Patents

A kind of processing method and its system of cables of nuclear power termination big data Download PDF

Info

Publication number
CN108170836A
CN108170836A CN201810031502.9A CN201810031502A CN108170836A CN 108170836 A CN108170836 A CN 108170836A CN 201810031502 A CN201810031502 A CN 201810031502A CN 108170836 A CN108170836 A CN 108170836A
Authority
CN
China
Prior art keywords
data
module
cable
database
cable termination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810031502.9A
Other languages
Chinese (zh)
Inventor
刘肇阳
汪显明
潘民政
江添明
李爱丽
齐杨
刘伦健
刘跃辛
田骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201810031502.9A priority Critical patent/CN108170836A/en
Publication of CN108170836A publication Critical patent/CN108170836A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of processing system and its method of cables of nuclear power termination big data, processing system include information module;Module is established, for establising or updating cable termination database according to the data stored in information module;Template generation module, for establishing cable system artwork plate;Graphic plotting module establishes module and the template generation module is connected with described, for importing the data in cable termination database in cable system artwork plate to draw cable system figure.The present invention is by establishing the cable termination database of entire nuclear power plant, mathematical logic is regular between setting each subclassification, ensure cable termination data correctness, it realizes and effective management is concentrated to cables of nuclear power terminating data, realize that one key of cable system figure goes out figure in cable termination Basis of Database simultaneously so that it is simpler quick to go out figure.

Description

A kind of processing method and its system of cables of nuclear power termination big data
Technical field
The present invention relates to technical field of nuclear power more particularly to a kind of cables of nuclear power termination big data processing method and its System.
Background technology
With the development of digitizing technique, modern nuclear power generator generally monitors Power Plant operating status using DCS And control.Safety is the first requirement of nuclear power station design, needs to carry out redundancy and diverse designs to key safety measure, largely Information need through cable teletransmission to DCS control systems.Nuclear Power Station Factory Building is numerous, and civil engineering structure is complicated, nuclear power generating equipment dispersion And it is various, existing common practice is to collect the scattered signal in scene respectively by workshop region, by remittance line cabinet (case) on the spot It is middle to be sent signal to DCS control racks using multicore bunched cable, to achieve the purpose that reduce number of cables to the greatest extent.Although such as This, nuclear power station single unit is average still to have measurement, control cable to amount to more than 20,000 roots, more than 10,000 root of power cable, all kinds of wiring Thus case, remittance line cabinet and nearly 2000 of DCS switch boards generate the cable termination data of magnanimity.It is how huge multiple to nuclear power station Miscellaneous cable termination information carries out unified coordinated management, and then achievees the purpose that optimization design, is face in nuclear power station design process The major issue faced.
During termination design is carried out, each system engineer independently establishes each system cable termination according to design input Then table includes cable termination by the combination cable termination table hand drawn generation of the third parties such as Auto CAD mapping software Cable system figure including construction drawing.There are following defects for the prior art:First, each system engineer builds alone each system Terminating data library particularly across the termination information of system signal can not effectively understand and manage to full factory's cable termination data Reason.Secondly, based on third party mapping software hand drawn cable system figure, it is less efficient to go out figure.Finally, construction drawing goes out figure process In can not accomplish collaborative design between each system, be also easy to produce design mistake that design is brought repeatedly and by people by factor etc. and ask Topic.
Invention content
Therefore, in order to solve the above technical problems, the present invention provides a kind of processing side of cables of nuclear power termination big data Method and its system can carry out entire nuclear power plant's cable termination database unified coordinated management, and can be according to the cable Terminating data library disposably goes out figure.
The technical solution that the present invention solves more than technical problem is to provide a kind of processing of cables of nuclear power termination big data System obtains cable, electric power factory equipment, arrangement terminal and the data of construction drawing filename and the information mould of correspondence including storage Block further includes:Module is established, for establising or updating cable termination database according to the data stored in information module;
Template generation module, for establishing cable system artwork plate;
Graphic plotting module establishes module and the template generation module is connected with described, for by cable termination data Data in library import in cable system artwork plate to draw cable system figure.
Optionally, module is established to include:Object type creation module, for creating several object classifications;
Object data editor module is connected with information module and object type creation module, for according in information module Data creation and edit several subclassifications in each object classification;
Major key chooses module, is connected with the object data editor module, and each subclassification is characterized for choosing Data and be asserted Major key;
Database generation module chooses module with the object editing module and Major key respectively and is connected, for according to institute It states subclassification and Major key generates the cable termination database.
Optionally, the object classification includes:Tables of data classification, for obtaining and preserving obtain to come from information module Data;
Classification is inquired, is connected with tables of data classification, for searching for, sorts and retrieve the information needed in tables of data classification;
Report classification is connected with tables of data classification, is shown and output format for the data in tables of data classification Data.
Optionally, the processing system further includes graphic plotting module, is connected with the module of establishing, for according to cable Draw cable system figure in terminating data library.
Optionally, the graphic plotting module includes:Template generation module is stored with cable system artwork plate;Figure number According to acquisition module, it is connected with the module of establishing, for obtaining the data in cable termination database;Graph generation module, with The template generation module is connected with the graph data acquisition module, and the Data Matching in the cable termination database is arrived Disposably to generate the cable system figure in cable system artwork plate.
The processing system further includes rule and sets up module, is connected with the module of establishing, for according to the cut cable It connects the logic restricting relation between form, threshold value and the data of the data in database and creates mathematical logic rule;
Monitoring modular establishes module and the rule sets up module and is connected, for monitoring cable termination database with described In or renewal process in data whether meet mathematical logic rule, if not satisfied, then sending out prompt message.
The present invention also provides a kind of processing methods of cables of nuclear power termination big data, include the following steps:
S100, the data that cable, electric power factory equipment, arrangement terminal and construction drawing filename are obtained from information bank and corresponding pass System establishes cable termination database;
S400, cable system artwork plate is established;
S500, for the data in cable termination database to be imported in cable system artwork plate to draw cable system Figure.
Optionally, step S100 includes the following steps:
S110, several object classifications are created;
S120, the data creation in information module and several subclassifications in each object classification of editor;
S130, the data for characterizing each subclassification are chosen and are asserted Major key;
S140, the cable termination database is generated according to the subclassification and Major key.
Optionally, the form of the data of the cable termination database, threshold value include Major key form, threshold rule;Institute The logic restricting relation stated between the data of cable termination database includes the logic restricting relation between several subclassifications.
Optionally, the step S500 includes:
Data in S510, acquisition cable termination database;
S520, by the Data Matching in the cable termination database to cable system artwork plate disposably to generate institute State cable system figure.
Optionally, processing method is further comprising the steps of between the step S100 and step S400:
Logic between S200, the form of data in the cable termination database, threshold value and data, which restricts, closes System creates mathematical logic rule;
Whether the data in S300, monitoring cable termination database or in renewal process meet mathematical logic rule, if not Meet, then send out prompt message.
Optimization system and method using the present invention, can be by the management to subclassification and Major key, successfully to whole A factory of nuclear power plant cable termination database carries out unified coordinated management, and builds cable system artwork plate by establishing, and realizes base Go out figure in a key of cable termination database generation cable system figure so that cable termination data base administration is more efficient, cable It is simpler quick that system diagram goes out figure.
Description of the drawings
Below in conjunction with accompanying drawings and embodiments, the invention will be further described, in attached drawing:
Fig. 1 is the processing system structure chart that cables of nuclear power provided by the invention terminates big data;
Fig. 2 is the processing system concrete structure diagram that cables of nuclear power provided by the invention terminates big data;
Fig. 3 is the processing system concrete structure of the cables of nuclear power termination big data in another preferred embodiment of the present invention Figure;
The step of Fig. 4 is the processing method that cables of nuclear power provided by the invention terminates big data is schemed;
Fig. 5 is the particular flow sheet for the processing method that cables of nuclear power provided by the invention terminates big data;
Fig. 6 is the schematic diagram of the cable system artwork plate of one embodiment of the present invention;
Fig. 7 is the schematic diagram of the cable system figure of one embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art that the present invention is more clearly understood, below in conjunction with attached drawing and specific implementation Example does further detailed description to the present invention.
The present invention provides a kind of processing system of cables of nuclear power termination big data, as shown in Figure 1, the processing system packet It includes storage and obtains cable, electric power factory equipment, arrangement terminal and the data of construction drawing filename and the information module 100 of correspondence; Module 200 is established, for establising or updating cable termination database according to the data stored in information module 100;Template is given birth to Into module 500, for establishing cable system artwork plate;Graphic plotting module 600 establishes module 200 and the template with described Generation module 500 is connected, for importing the data in cable termination database in cable system artwork plate to draw cable system System figure.Specifically, cable inventory is stored in information module 100, vendor equipment terminal figure, termination design tutorial program, is set Count cable attribute list and cable termination file.It is to be appreciated that cable termination database needs constantly to be updated, work as needs During update, it is only necessary to the above-mentioned five classes data in information module 100 are updated, newer data will be via establishing module 200 are updated into cable termination database, so as to fulfill the update to entire cable termination database.
Include as shown in Fig. 2, establishing module 200:Object type creation module 210, object data editor module 220, master Key assignments chooses module 230 and database generation module 240.Wherein, object type creation module 210, for creating several objects Classification.These object classifications are the important information elements of database, relate generally to following object classification:Tables of data classification, inquiry Classification and report classification.Tables of data classification, for obtaining and preserving the data for obtaining and in information module 100.Classification is inquired, is used In search, the information needed in sequence and retrieval tables of data classification.Include input instruction, scan instruction and defeated in inquiry classification Go out instruction, wherein, input instructs to input information needed;Scan instruction, for according to information needed scan data table classification, And it extracts and the matched data of information needed;Output order, output and the matched data of information needed.Report classification, with data Table classification is connected, and is shown and output format data for the data in tables of data classification so that subsequently through cut cable It connects Data Matching cable system artwork plate in database and carries out disposably going out figure and be possibly realized.
Object data editor module 220 is connected with information module 100 and object type creation module 210, for according to letter Cease several subclassifications in each object classification of data edition in module 100.For example, it is wrapped under this classification of tables of data classification Several subclassifications included are data element table, these data element tables are each important components for forming database.Major key Choose module 230, be connected with object data editor module 220, for the data of choosing each subclassification of characterization and by its It is asserted Major key.For example, in cable attribute list, the data that can most characterize cable attribute list are cable attribute, therefore, are chosen Major key of the data of cable attribute as cable attribute list.The selection of Major key is conducive to establish mathematical logic rule follow-up During by the requirements such as the data format of Major key and threshold value be established as mathematical logic rule so that Major key can be in cable By whole-process automatic inspection and monitoring in terminating data library.Database generation module 240, respectively with object editing module and Major key It chooses module 230 to be connected, for generating the cable termination database according to subclassification and Major key.It is preferred real in the present invention one It applies in example, the Major key of specific data element table table name and each list of elements is as shown in table 1.
Table name Major key
Cable attribute list Cable attribute
Cable and device relationships table Cable and device relationships
Document No. table Filename
File device table Filename and device relationships
Equipment end sublist Arrangement terminal
2 database element library table of table and Major key
Template generation module 500 is stored with cable system artwork plate.According to actual requirement of engineering, required data are determined Type, and pass through template generation module 500 and establish cable system artwork plate.
Graphic plotting module 600 is connected with establishing module 200, for drawing cable system according to cable termination database Figure.Specifically, graphic plotting module 600 includes:Graph data acquisition module 610 is connected with the module 200 of establishing, is used for Obtain the data in cable termination database;Graph generation module 620, with the template generation module 500 and the figure number According to acquisition module 610 be connected, by the Data Matching in the cable termination database to cable system artwork plate with disposable Generate the cable system figure.
As shown in figure 3, processing system, which further includes rule, sets up module 300, it is connected with the module 200 of establishing, for root Mathematical logic rule are created according to the logic restricting relation between the form of the data in the cable termination database, threshold value and data Then;Monitoring modular 400 establishes module 200 and the rule sets up module 300 and is connected, for monitoring cut cable in real time with described Connect whether the data in database or in cable termination data base updating procedure meet mathematical logic rule, if not satisfied, then sending out Go out prompt message.
Rule sets up module 300, is connected with establishing module 200, specifically, is connected with database generation module, for root Mathematical logic rule is created according to the logic restricting relation between the form of the data in cable termination database, threshold value and data. The form of data in cable termination database creation process, threshold value include but not limited to Major key format convention, can also be Major key threshold value etc..Logic restricting relation between data in cable termination database creation process includes several subclassifications Between logic restricting relation, for example, relation of equality, multiple proportion, functional relation etc..
In a preferred embodiment, the step of setting mathematical logic rule includes:First, it selectes in a subclassification Reference Major key, then, the field in other subclassifications in scan database, search it is identical or pre- with reference to Major key Deposit with reference to the associated field of Major key, if find with reference to the identical field of Major key, what is found Field is neutralized with reference to establishing corresponding relation of equality between Major key, if find prestore it is associated with reference Major key Field, then in the field found and with reference to establishing corresponding mapping relations between Major key.It is associated to include multiple The relationships such as relationship, functional relation.For example, the cable attribute in extraction cable attribute list is with reference to Major key, other sons point are scanned The field of cable attribute is included in class, can be found in cable and device relationships table for the data of input cable attribute Column, then in the field and with reference to correspondent equal relationship is established between Major key, this is one in logic restricting relation Kind.Logic restricting relation can also include the multiple proportion between data, and the restriction even between the data such as functional relation is closed System.
Monitoring modular 400 establishes module 200 and the rule sets up module 300 and is connected, for monitoring electricity in real time with described Whether the data that cable-end is connect in database meet mathematical logic rule, if not satisfied, then sending out prompt message.Monitoring modular 400 After sending out prompt message, technical staff is unsatisfactory for the data of mathematical logic rule according to prompt message corrigendum.In monitoring modular 400 Comprising the instruction using programmed method setting, for example, being looked into using programmed method design design iterations polling routine, inconsistent design Program is ask, so as to fulfill in the automatic audit function of correctness of cable termination database itself, so as to change cable termination in update The automatic audit function of correctness is realized in data base procedure.Certainly, which (can not also scheme including automatic repairing module Show), it sets up module 300 with the rule and the module 200 of establishing is connected, for according to mathematical logic rule searching electricity Cable-end is connect with the presence or absence of corresponding data in database, if in the presence of corresponding data is directly invoked automatically to being unsatisfactory for mathematical logic The data of rule are repaired;If being not present, prompting message is sent out, reminding technology personnel are repaired.In cable termination number During being updated the data according to library, monitoring modular 400 can monitor cable termination database update in real time according to mathematical logic rule Data in the process, it is ensured that it meets mathematical logic rule, if not satisfied, then sending out prompt message.
Above-mentioned setting enables the processing system of the present invention to realize based on cable termination database generation cable system figure A key go out figure, eliminate in the prior art according to the third parties such as Auto CAD mapping software combination cable termination table hand drawn The step of generating cable system figure, has greatly improved the efficiency of figure;Simultaneously as there is processing system correctness to examine automatically Brake goes out during figure the collaborative design that can not accomplish between each system therefore, it is possible to be effectively prevented from construction drawing, is also easy to produce The problems such as design mistake that design is brought repeatedly and by people by factor, improves the accuracy of cable system figure.
As shown in figure 4, the present invention also provides a kind of processing method of cables of nuclear power termination big data, including following step Suddenly:
S100, the data that cable, electric power factory equipment, arrangement terminal and construction drawing filename are obtained from information bank and corresponding pass System establishes cable termination database;
S400, cable system artwork plate is established;
S500, for the data in cable termination database to be imported in cable system artwork plate to draw cable system Figure.
As shown in figure 5, step S100 includes the following steps:
S110, several object classifications are created;
S120, the data creation in information module and several subclassifications in each object classification of editor;
S130, the data for characterizing each subclassification are chosen and are asserted Major key;
S140, the cable termination database is generated according to the subclassification and Major key.
Object classification includes:Tables of data classification, is connected with information module, obtains to come in information module for obtaining and preserving Data;Classification is inquired, is connected with tables of data classification, for searching for, sorts and retrieve the information needed in tables of data classification, is wrapped It includes:Input instruction instructs for inputting the input of information needed;Scan instruction is connected with tables of data classification, for according to input The information needed scan data table classification inputted in instruction, and extract with the matched data of information needed, output order, output with The matched data of information needed;Report classification is connected with tables of data classification, show for the data in tables of data classification and Output format data.The form of data in the cable termination database creation process, threshold value are advised including Major key form Then;The logic restricting relation between data in the cable termination database creation process is included between several subclassifications Logic restricting relation.
The step S500 further comprises:
Data in S510, acquisition cable termination database;
S520, by the Data Matching in the cable termination database to cable system artwork plate disposably to generate institute State cable system figure.
The processing method of the present invention, it is further comprising the steps of:
Logic between S200, the form of data in the cable termination database, threshold value and data, which restricts, closes System creates mathematical logic rule;
Whether the data in S300, monitoring cable termination database or in renewal process meet mathematical logic rule, if not Meet, then send out prompt message.
Fig. 6 shows the embodiment of cable system artwork plate, and the cable system figure on the figure is cable termination construction drawing. The top of template is Header Section, including room, equipment, terminal block information;It is the body part of construction drawing in middle section, From left to right once include inlet wire cable and initial plant information, core wire information, signal message, terminal information, signal message, go out Line cable and end device information;It is Footer Section in the lower part of template, from left to right once includes version information, document coding Information, page number information, heading message and LOGO information.Matching obtains information above one by one from cable termination database respectively.
Fig. 7 shows the embodiment of cable system figure, and the cable system figure on the figure is cable termination construction drawing.It can see It arrives, in the Header Section of construction drawing, with accordingly showing room, equipment, terminal block information;In body part, from left to right Once include inlet wire cable and initial plant information, core wire information, signal message, terminal information, signal message, outlet cable and End device information;It is Footer Section in the lower part of template, from left to right once includes version information, document coding information, page Code information, heading message and LOGO information.Information above is obtained from cable termination database respectively.
In conclusion the present invention combines cable termination important element, several subclassifications are established to register cable termination weight Information is wanted, these important informations are the Major key of each subclassification simultaneously, by setting logical relation between each subclassification so that each Subclassification mutually restricts, and ensures cable termination data correctness.This method, which can be realized, carries out cables of nuclear power terminating data Effectively management, while secondary development is carried out on the basis of cable termination Database Report classification function is concentrated, creates cable system Artwork plate in the Data Matching in cable termination database to cable system artwork plate, will realize that one key of cable system figure goes out figure, So that cable termination data base administration is more efficient, it is simpler quick that cable system figure goes out figure.
It should be understood that for those of ordinary skills, can be improved or converted according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (10)

1. a kind of processing system of cables of nuclear power termination big data, including storage obtain cable, electric power factory equipment, arrangement terminal and The data of construction drawing filename and the information module (100) of correspondence, which is characterized in that further include:Module (200) is established, For establising or updating cable termination database according to the data stored in information module (100);
Template generation module (500), for establishing cable system artwork plate;
Graphic plotting module (600) establishes module (200) and the template generation module (500) is connected with described, for will be electric The data that cable-end is connect in database import in cable system artwork plate to draw cable system figure.
2. processing system according to claim 1, which is characterized in that establish module (200) and include:Object type creation module (210), for creating several object classifications;
Object data editor module (220) is connected with information module (100) and object type creation module (210), for basis Several subclassifications in data creation and each object classification of editor in information module (100);
Major key chooses module (230), is connected with the object data editor module (220), each described for choosing characterization The data of subclassification are simultaneously asserted Major key;
Database generation module (240) chooses module 230 with the object editing module and Major key respectively and is connected, for root The cable termination database is generated according to the subclassification and Major key.
3. processing system according to claim 2, which is characterized in that the object classification includes:Tables of data classification, for obtaining And it preserves and the data of coming is obtained from information module (100);
Classification is inquired, is connected with tables of data classification, for searching for, sorts and retrieve the information needed in tables of data classification;
Report classification is connected with tables of data classification, is shown and output format data for the data in tables of data classification.
4. processing system according to claim 1, which is characterized in that the graphic plotting module (600) includes:Graph data obtains Modulus block (610) is connected with the module (200) of establishing, for obtaining the data in cable termination database;Graphic hotsopt mould Block (620) is connected with the template generation module (500) and the graph data acquisition module (610), by the cable termination Disposably to generate the cable system figure in Data Matching to cable system artwork plate in database.
5. processing system according to claim 4, which is characterized in that the processing system further includes rule and sets up module (300), Be connected with the module (200) of establishing, for the data in the cable termination database form, threshold value and data it Between logic restricting relation create mathematical logic rule;
Monitoring modular (400) establishes module (200) and the rule sets up module (300) and is connected, for monitoring cable with described Whether the data in terminating data library or in renewal process meet mathematical logic rule, if not satisfied, then sending out prompt message.
6. a kind of processing method of cables of nuclear power termination big data, which is characterized in that include the following steps:
S100, obtained from information bank cable, electric power factory equipment, arrangement terminal and construction drawing filename data and correspondence build Vertical cable termination database;
S400, cable system artwork plate is established;
S500, for the data in cable termination database to be imported in cable system artwork plate to draw cable system figure.
7. processing method according to claim 6, which is characterized in that step S100 includes the following steps:
S110, several object classifications are created;
S120, the data creation in information bank and several subclassifications in each object classification of editor;
S130, the data for characterizing each subclassification are chosen and are asserted Major key;
S140, the cable termination database is generated according to the subclassification and Major key.
8. processing method according to claim 6, which is characterized in that the form of the data of the cable termination database, threshold value Including Major key form, threshold rule;Logic restricting relation between the data of the cable termination database includes several Logic restricting relation between subclassification.
9. processing method according to claim 8, which is characterized in that the step S500 includes:
Data in S510, acquisition cable termination database;
S520, by the Data Matching in the cable termination database to cable system artwork plate disposably to generate the electricity Cable system diagram.
10. processing method according to claim 6, which is characterized in that further included between the step S100 and step S400 Following steps:
Logic restricting relation wound between S200, the form of data in the cable termination database, threshold value and data Build mathematical logic rule;
Whether the data in S300, monitoring cable termination database or in renewal process meet mathematical logic rule, if not satisfied, Then send out prompt message.
CN201810031502.9A 2018-01-12 2018-01-12 A kind of processing method and its system of cables of nuclear power termination big data Pending CN108170836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810031502.9A CN108170836A (en) 2018-01-12 2018-01-12 A kind of processing method and its system of cables of nuclear power termination big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810031502.9A CN108170836A (en) 2018-01-12 2018-01-12 A kind of processing method and its system of cables of nuclear power termination big data

Publications (1)

Publication Number Publication Date
CN108170836A true CN108170836A (en) 2018-06-15

Family

ID=62514657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810031502.9A Pending CN108170836A (en) 2018-01-12 2018-01-12 A kind of processing method and its system of cables of nuclear power termination big data

Country Status (1)

Country Link
CN (1) CN108170836A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112397210A (en) * 2020-10-28 2021-02-23 中广核工程有限公司 Digital design system, method and equipment for nuclear power plant control system of database

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100163615A1 (en) * 2008-12-26 2010-07-01 Toshimi Yokota Cabling work aiding system and work aiding method
CN103853859A (en) * 2012-11-30 2014-06-11 中广核工程有限公司 Mapping method and mapping system for drawing nuclear power plant terminating map
CN104571016A (en) * 2014-12-02 2015-04-29 中广核工程有限公司 Nuclear power station DCS (digital control system) visual operation and maintenance operating method and system
CN106383957A (en) * 2016-09-23 2017-02-08 中广核工程有限公司 Nuclear power design achievement release system and method
CN106547729A (en) * 2016-12-01 2017-03-29 长城计算机软件与系统有限公司 A kind of dynamic creation method and system of data sheet
CN106682218A (en) * 2016-12-30 2017-05-17 冶金自动化研究设计院 Industrial enterprise Web data graphical system and generation method
CN107153740A (en) * 2017-05-18 2017-09-12 国家测绘地理信息局第四地形测量队 One kind is based on the linkage of AutoCAD picture libraries and data set accepted way of doing sth Underground Pipeline Data processing system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100163615A1 (en) * 2008-12-26 2010-07-01 Toshimi Yokota Cabling work aiding system and work aiding method
CN103853859A (en) * 2012-11-30 2014-06-11 中广核工程有限公司 Mapping method and mapping system for drawing nuclear power plant terminating map
CN104571016A (en) * 2014-12-02 2015-04-29 中广核工程有限公司 Nuclear power station DCS (digital control system) visual operation and maintenance operating method and system
CN106383957A (en) * 2016-09-23 2017-02-08 中广核工程有限公司 Nuclear power design achievement release system and method
CN106547729A (en) * 2016-12-01 2017-03-29 长城计算机软件与系统有限公司 A kind of dynamic creation method and system of data sheet
CN106682218A (en) * 2016-12-30 2017-05-17 冶金自动化研究设计院 Industrial enterprise Web data graphical system and generation method
CN107153740A (en) * 2017-05-18 2017-09-12 国家测绘地理信息局第四地形测量队 One kind is based on the linkage of AutoCAD picture libraries and data set accepted way of doing sth Underground Pipeline Data processing system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112397210A (en) * 2020-10-28 2021-02-23 中广核工程有限公司 Digital design system, method and equipment for nuclear power plant control system of database
CN112397210B (en) * 2020-10-28 2024-04-30 中广核工程有限公司 Digital design system, method and equipment for nuclear power plant control system of database

Similar Documents

Publication Publication Date Title
US10325062B2 (en) Method and device for generating engineering topology of digital substation
CN105914892B (en) A kind of secondary maintenance peace arranges bill system and its implementation
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN106021203B (en) Intelligent substation anti-misoperation lockout logic graphical expression method
CN109146089A (en) A kind of life period of an equipment management method based on BIM
CN109389326B (en) Monitoring event-oriented object modeling method, device and system
CN106383958A (en) Intelligent check and acceptance system of substation anti-misoperation locking logic
CN101853438A (en) Management system for product test information of electric energy meter
CN105701289A (en) Integrated solution method for full-automatic harness processing device
CN112397210B (en) Digital design system, method and equipment for nuclear power plant control system of database
CN112100992A (en) Substation site table generation and checking method
CN108170836A (en) A kind of processing method and its system of cables of nuclear power termination big data
CN106022580A (en) Secondary system data control method covering whole process of intelligent substation
CN111340253B (en) Analysis method and system for main network maintenance application form
CN112101916A (en) Method and device for quickly standardizing monitoring information point table and computer readable storage medium
CN108563898B (en) Man-machine interactive single-line digital modeling method for power grid
CN109710669B (en) Method for improving accuracy of full power grid model data based on check rule base
CN116227003A (en) BIM-based construction method for material attribute information data structure of power transformation engineering equipment
CN105868410A (en) Model-driven intelligent SCD (substation configuration description) file and CIM/E (common information model/efficiency) file conversion tool and method
CN111783391B (en) Online artificial text marking system and method
CN212135221U (en) Centralized control system of thermal power plant
CN113887754A (en) Construction method and system of power distribution terminal unified operation and maintenance platform and constructed platform
KR101864982B1 (en) Apparatus and method for constructing common database for distribution management system and microgrid energy management system
CN111126798A (en) Intelligent station secondary safety measure method and system based on primary and secondary simulation
CN110688824A (en) Method and system for generating state evaluation report of power grid equipment

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615

RJ01 Rejection of invention patent application after publication