CN110399510A - A kind of the check of drawings method for pushing and system of engineering drawing - Google Patents

A kind of the check of drawings method for pushing and system of engineering drawing Download PDF

Info

Publication number
CN110399510A
CN110399510A CN201910498655.9A CN201910498655A CN110399510A CN 110399510 A CN110399510 A CN 110399510A CN 201910498655 A CN201910498655 A CN 201910498655A CN 110399510 A CN110399510 A CN 110399510A
Authority
CN
China
Prior art keywords
check
attention
points
drawings
item list
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910498655.9A
Other languages
Chinese (zh)
Inventor
夏晨曦
田岱
曹民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanyi Technology Co Ltd
Original Assignee
Wanyi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanyi Technology Co Ltd filed Critical Wanyi Technology Co Ltd
Priority to CN201910498655.9A priority Critical patent/CN110399510A/en
Publication of CN110399510A publication Critical patent/CN110399510A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/51Indexing; Data structures therefor; Storage structures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/58Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
    • G06F16/5866Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using information manually generated, e.g. tags, keywords, comments, manually generated location and time information

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Library & Information Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to management of blueprint fields, and in particular to a kind of the check of drawings method for pushing and system of engineering drawing, the check of drawings method for pushing is the following steps are included: inquire engineering drawing, and push an item list;Wherein, the item list includes multiple points for attention recorded about check of drawings process;Compared with prior art, the present invention is by designing the check of drawings method for pushing and system of a kind of engineering drawing, for cooperating check of drawings, accelerate check of drawings speed, so that check of drawings is more efficient, and further, automatic push item list, it effectively prevents misjudgment or under-enumeration situation during check of drawings to occur, so that check of drawings quality is higher.

Description

A kind of the check of drawings method for pushing and system of engineering drawing
Technical field
The present invention relates to management of blueprint fields, and in particular to a kind of the check of drawings method for pushing and system of engineering drawing.
Background technique
With the economic growth and social progress in China, living standards of the people are continuously improved, and urban construction is maked rapid progress, In A large amount of drawing can be generated in each City Construction Project.
Wherein, the quality of drawing be related to construction quality in a most important ring, due to architectural drawing diversity and It examines the complexity of rule, currently, the audit of architectural drawing commonly relies on manually, i.e., manually consults all in engineering drawing Content, and check of drawings is carried out about the examination standard of engineering drawing according in working experience or books;Which there are many drawbacks, One side checking process is time-consuming and laborious, high labor cost and low efficiency, on the other hand, manual review is unstable, brain be easy by It influences, be easy to cause misjudgment or under-enumeration, influence to examine quality.
Therefore, the problem of designing a kind of check of drawings method for pushing and system for cooperating check of drawings, being always this field primary study.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, a kind of cooperation check of drawings is provided Check of drawings method for pushing and system solve artificial check of drawings at high cost, low efficiency and easy fault and cause misjudgment or under-enumeration Defect.
The technical solution adopted by the present invention to solve the technical problems is: providing a kind of check of drawings push side of engineering drawing Method, preferred embodiment be, the check of drawings method for pushing the following steps are included:
Engineering drawing is inquired, and pushes an item list;
Wherein, the item list includes multiple points for attention recorded about check of drawings process.
Wherein, preferred version is the label that the engineering drawing all has at least one reflection self attributes, the item column The establishment step of table includes:
It is stored with multiple points for attention recorded about check of drawings process;
The points for attention are paired in corresponding label by the label of incorporation engineering drawing;
Multiple item lists based on label are established, each item list includes multiple and the label matches Points for attention.
Wherein, preferred version is the establishment step of the item list further include:
Points for attention library is established/improved to all points for attention according to recorded in check of drawings process;
Points for attention in points for attention library are paired in corresponding label by the label of incorporation engineering drawing respectively;
Multiple item lists based on label are established, each item list includes multiple and the label matches Points for attention.
Wherein, preferred version is the establishment step in the points for attention library further include:
The engineering drawing examined is checked, and annotates the points for attention in the engineering drawing;
All points for attention annotated in engineering drawing are aggregated, points for attention library is established.
Wherein, preferred version is the establishment step of the item list further include:
Points for attention in each item list are aggregated, and obtain key point item;
Points for attention are ranked up from high to low according to the frequency that key point item occurs.
Wherein, preferred version be the item list to improve step further comprising the steps of:
The item list pushed in engineering drawing is checked and carries out evaluation feedback.
Wherein, preferred version be the item list to improve step further comprising the steps of:
According to the content information of evaluation feedback, the points for attention in corresponding item list are modified/supplemented, thing is improved Item list.
Wherein, preferred version improves step for the points for attention library further include:
If there are the points for attention being not shown in item list in engineering drawing in being checked, then will newly pay attention to Item increases to points for attention library, and then improves points for attention library.
Wherein, preferred version is that the intelligent check of drawings method is further comprising the steps of:
New points for attention are paired in corresponding label, and are increased to the item list established based on the label In.
To solve defect of the existing technology, the present invention also provides a kind of intelligent Audit System, preferred embodiment is: The check of drawings supplying system includes processing unit and memory module, and the processing unit is stored with computer program, the calculating Machine program can be performed to realize such as the step of the above method, dependency number caused by the memory module storage processing unit It is believed that breath.
The beneficial effects of the present invention are compared with prior art, the present invention is by designing the check of drawings of engineering drawing a kind of Method for pushing and system accelerate check of drawings speed for cooperating check of drawings, so that check of drawings is more efficient, further, automatic push Item list effectively prevents misjudgment or under-enumeration situation during check of drawings and occurs, so that check of drawings quality is more It is high.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is a kind of flow diagram of the check of drawings method for pushing of engineering drawing in the present invention;
Fig. 2 is a kind of system block diagram of the check of drawings supplying system of engineering drawing in the present invention;
Fig. 3 is the flow diagram one that item list is established in the present invention;
Fig. 4 is the flow diagram two that item list is established in the present invention;
Fig. 5 is the flow diagram three that item list is established in the present invention;
Fig. 6 is the flow diagram four that item list is established in the present invention;
Fig. 7 is the flow diagram one that item list is improved in the present invention;
Fig. 8 is the flow diagram two that item list is improved in the present invention;
Fig. 9 is the flow diagram three that item list is improved in the present invention.
Specific embodiment
Now in conjunction with attached drawing, elaborate to presently preferred embodiments of the present invention.
As Figure 1-Figure 2, the present invention provides the check of drawings method for pushing of engineering drawing and the most preferred embodiment of system.
With reference to Fig. 1, a kind of check of drawings method for pushing of engineering drawing, the engineering drawing all has at least one reflection and itself belongs to The label of property, the check of drawings method for pushing the following steps are included:
S1, incorporation engineering drawing label establish the item list based on label;
S2, inquiry engineering drawing, and push an item list;
Wherein, the item list includes multiple points for attention recorded about check of drawings process.
Further, the check of drawings method for pushing of the engineering drawing is further comprising the steps of:
S3, the item list pushed in engineering drawing is checked and carries out evaluation feedback.
Further, a kind of check of drawings supplying system of engineering drawing is provided in the present embodiment, also for realizing this implementation The check of drawings method for pushing of one of example engineering drawing, the check of drawings supplying system includes processing unit 100 and memory module 200, the processing unit 100 is stored with computer program, and the computer program can be performed to realize in the present embodiment A kind of engineering drawing check of drawings method for pushing the step of, correlation caused by 200 storage processing unit 100 of memory module Data information.
Wherein, engineering drawing refers to the inside deployment scenarios for indicating building, outer shape, and fit up, construct, The related drawing of the contents such as construction requirement is divided into architectural working drawing, structural working drawing, equipment construction figure, it is also examination & approval building The foundation of engineering project;In production and construction, it is the foundation of stock and construction;It, be according to engineering drawing when completion of works Design requirement carries out quality inspection and acceptance, and with this evaluation engineering quality good or not;Architectural drawings still work out Budgetary Estimates, Budget and final accounts and the foundation for auditing project cost;Architectural drawings are the technological documents with legal effect;Usually to throw Based on shadow principle, by the drafting standard of national regulation, having built up or shape, the size of still unestablished architectural engineering etc. Pattern in the plane is accurately expressed, and indicates the requirement of material used in engineering and production, installation etc. simultaneously, due to work The mission requirements in Cheng Jianshe each stage are different, and content, depth and mode expressed by all kinds of drawings also have difference.
Preferably, the engineering drawing is the drawing of PDF format.
Wherein, the label is to be arranged and generated to match and be used to corresponding engineering drawing to drawing information area information Reflecting in the label, in particular to the engineering drawing information area of the drawing self attributes can be used for reflecting the engineering drawing category The noun of property type, including information content vocabulary included in generic items noun and generic items, the generic items noun packet Such as designation of drawing, drawing type, designer's name, the organization or drawing date etc. vocabulary is included, it is described general The information content included in is then specific designation of drawing XXX, drawing type XXX, designer's name XXX, the unit name Claiming XXX or drawing date XXX etc., common drawing type includes: architectural working drawing, structural working drawing and equipment construction figure, Its architectural working drawing includes site plan, architectural plan, architectural elevation, architectural section and building detail drawing;Structure Construction drawing includes foundation plan, basic sectional view, roof structure layout drawing, floor structure arrangement figure, column beam slab arrangement of reinforcement, building Ladder figure, structural elements figure or table and necessary detail drawing;Equipment construction figure includes heating construction drawing, electric appliance construction drawing, divulges information and apply Work figure and water supply and drainage construction figure;The label knows automatic acquisition after drawing system is scanned engineering drawing for intelligence, and every One engineering drawing corresponds to multiple labels.
Wherein, the processing unit 100 is computer or dedicated identification device.
Computer is by hardware system (hardwaresystem) and software systems (softwaresystem) two parts group At, the hardware unit of conventional computer system generally can be divided into input unit, output unit, arithmetic logic unit, control list Member and memory unit, wherein arithmetic logic unit and control unit be collectively referred to as central processing unit (CenterProcessingUnit, CPU), i.e., the processing unit being previously mentioned in the present embodiment, the storage unit being wherein previously mentioned in memory unit, that is, the present embodiment.
Wherein, item list is multiple points for attention of record during check of drawings, and points for attention refer to artificial/intelligence to work After journey drawing carries out check of drawings, check of drawings is generated as a result, further artificial/intelligence checks check of drawings result, and the root in review According to its examination result, what is marked in the engineering drawing one should also note that item when auditing the engineering drawing.
Specifically, 100 incorporation engineering drawing label of processing module establishes the item list based on label, and by multiple items List is stored in memory module 200;When check of drawings person inquires a certain engineering drawing at that time, in the current page automatic push engineering On the one hand the item list of drawing accelerates check of drawings speed for cooperating check of drawings person's check of drawings, on the other hand improve check of drawings matter Amount;Further, evaluation feedback is checked the item list pushed in engineering drawing and carried out, item list can be made It more improves and push content is more accurate, so that entire check of drawings supplying system is more perfect.
As shown in figures 3 to 6, the present invention provides the most preferred embodiment for establishing item list.
With reference to Fig. 3, the establishment step of the item list includes:
S11, multiple points for attention recorded about check of drawings process are stored with;
The points for attention are paired in corresponding label by the label of S12, incorporation engineering drawing;
S13, multiple item lists based on label are established, each item list includes multiple matching with the label Pair points for attention.
Specifically, points for attention recorded in check of drawings process refer to during artificial/intelligent check of drawings, to check of drawings result After being checked, then the review result of acquisition is arranged, and analyzes it, check of drawings is being carried out to current engineering drawing When the problem of being easy to appear be marked, form points for attention;Further, it in conjunction with the label of current engineering drawing, is infused Meaning item is matched with its label, establishes the item list of current engineering drawing, wherein the corresponding mark of each item list Label, each item list includes multiple points for attention;Its object is to cooperate subsequent artificial/intelligent check of drawings, in subsequent people When work/intelligence examines a certain engineering drawing, the item list of the current engineering drawing of system automatic push, artificial in this way/intelligence is examined Figure is with regard to without checking all particular contents in current engineering drawing and examining it, it is only necessary to be arranged according to the item of push It in table, and is examined for the points for attention in the item list, improves the examination efficiency of artificial/intelligent check of drawings, and Reduce fault, to improve check of drawings quality.
Further, and Fig. 4, the establishment step of the item list are referred to further include:
Points for attention library is established/improved to S111, all points for attention according to recorded in check of drawings process;
Points for attention in points for attention library are paired to corresponding mark respectively by the label of S112, incorporation engineering drawing In label;
S113, multiple item lists based on label are established, each item list includes multiple and the label The points for attention of pairing.
Specifically, the points for attention library refers to processing module 100 to all points for attention recorded in check of drawings process After data carry out finishing analysis, store it in memory module 200, and formed in memory module 200 a content is complete Portion is the database of points for attention, the purpose is to carry out classified finishing to all points for attention, further, according to different engineerings Each points for attention in points for attention library are respectively matched under corresponding label, wherein Mei Gebiao by the different labels of drawing Label can be matched to multiple points for attention, finally, multiple points for attention under the label are arranged to form item list, wherein The engineering drawing of different classes of attribute corresponds to different labels, and different labels correspond to different item lists.
Further, and Fig. 5, the establishment step in the points for attention library are referred to further include:
S1111, the engineering drawing examined is checked, and annotates the points for attention in the engineering drawing;
S1112, all points for attention annotated in engineering drawing are aggregated, establishes points for attention library.
Specifically, after the completion of artificial/intelligent check of drawings, a check of drawings can be generated as a result, being further advanced by artificial/intelligence Check of drawings result is checked, and is marked in the engineering drawing multiple when the audit work in review according to its examination result Journey drawing one should also note that item, further, and the multiple points for attention marked in engineering drawing be carried out finishing analysis, shape At item list, wherein different engineering drawings have different classes of attribute, the corresponding mark of the engineering drawing of each category attribute Label do not have the corresponding item list of a label.
Further, and Fig. 6, the establishment step of the item list are referred to further include:
S114, the points for attention in each item list are aggregated, and obtains key point item;
S115, points for attention are ranked up from high to low according to the frequency that key point item occurs.
Specifically, it obtains key point item and it is ranked up from high to low according to its frequency of occurrences, it is therefore intended that make It obtains in artificial/intelligent check of drawings, more representative, more targeted points for attention can be pushed at first, to mention High artificial/intelligent check of drawings efficiency.
As shown in Figs. 7-8, the present invention provides the specific embodiment for improving item list.
With reference to Fig. 7, the item list to improve step further comprising the steps of:
S14, the item list pushed in engineering drawing is checked and carries out evaluation feedback.
Points for attention in corresponding item list are modified/are supplemented by S15, the content information fed back according to evaluation, complete Good deed item list.
Wherein, it constantly checks and constantly feeds back, so that the points for attention content in item list has constantly updated It is kind, so that the points for attention in each item list are more accurate, more targeted, so that in artificial/intelligent check of drawings In, the item list content of push has more referential, and the accuracy by improving push content further increases check of drawings quality.
Further, and Fig. 8 is referred to, step is improved in the points for attention library further include:
If S16, in being checked, there are the points for attention being not shown in item list in engineering drawing, then it will be new Points for attention increase to points for attention library, and then improve points for attention library.
Further, and Fig. 9 is referred to, step is improved in the points for attention library further include:
S161, new points for attention are paired in corresponding label, and are increased to the thing established based on the label In item list.
Wherein, it constantly checks and constantly feeds back, and constantly improve points for attention library, so that the note in item list Item content of anticipating is constantly perfect, so that the points for attention in each item list are more comprehensive, so that in artificial/intelligence In check of drawings, the item list content of push is more comprehensive, further increases check of drawings quality by pushing the comprehensive of content.
As described above, only preferred embodiment is not intended to limit the scope of the present invention, Fan Yibenfa Equivalent change or modification made by bright claim is all that the present invention is covered.

Claims (10)

1. a kind of check of drawings method for pushing of engineering drawing, which is characterized in that the check of drawings method for pushing the following steps are included:
Engineering drawing is inquired, and pushes an item list;
Wherein, the item list includes multiple points for attention recorded about check of drawings process.
2. check of drawings method for pushing according to claim 1, which is characterized in that the engineering drawing all has at least one reflection The establishment step of the label of self attributes, the item list includes:
It is stored with multiple points for attention recorded about check of drawings process;
The points for attention are paired in corresponding label by the label of incorporation engineering drawing;
Multiple item lists based on label are established, each item list includes multiple attentions with label pairing Item.
3. check of drawings method for pushing according to claim 2, which is characterized in that the establishment step of the item list also wraps It includes:
Points for attention library is established/improved to all points for attention according to recorded in check of drawings process;
Points for attention in points for attention library are paired in corresponding label by the label of incorporation engineering drawing respectively;
Multiple item lists based on label are established, each item list includes multiple attentions with label pairing Item.
4. check of drawings method for pushing according to claim 3, which is characterized in that the establishment step in the points for attention library also wraps It includes:
The engineering drawing examined is checked, and annotates the points for attention in the engineering drawing;
All points for attention annotated in engineering drawing are aggregated, points for attention library is established.
5. check of drawings method for pushing according to claim 2, which is characterized in that the establishment step of the item list also wraps It includes:
Points for attention in each item list are aggregated, and obtain key point item;
Points for attention are ranked up from high to low according to the frequency that key point item occurs.
6. check of drawings method for pushing according to claim 5, which is characterized in that the step of improving of the item list further includes Following steps:
The item list pushed in engineering drawing is checked and carries out evaluation feedback.
7. check of drawings method for pushing according to claim 6, which is characterized in that the step of improving of the item list further includes Following steps:
According to the content information of evaluation feedback, the points for attention in corresponding item list are modified/supplemented, improves item column Table.
8. the check of drawings method for pushing according to claim 4 or 6, which is characterized in that step is improved in the points for attention library Further include:
If there are the points for attention being not shown in item list in engineering drawing, then by new points for attention in being checked Points for attention library is increased to, and then improves points for attention library.
9. check of drawings method for pushing according to claim 8, which is characterized in that the intelligence check of drawings method further includes following step It is rapid:
New points for attention are paired in corresponding label, and are increased in the item list established based on the label.
10. a kind of check of drawings supplying system, it is characterised in that: the check of drawings supplying system includes processing unit and memory module, institute It states processing unit and is stored with computer program, the computer program can be performed to realize such as any one of claim 1 to 9 The step of the method, related data information caused by the memory module storage processing unit.
CN201910498655.9A 2019-06-10 2019-06-10 A kind of the check of drawings method for pushing and system of engineering drawing Pending CN110399510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910498655.9A CN110399510A (en) 2019-06-10 2019-06-10 A kind of the check of drawings method for pushing and system of engineering drawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910498655.9A CN110399510A (en) 2019-06-10 2019-06-10 A kind of the check of drawings method for pushing and system of engineering drawing

Publications (1)

Publication Number Publication Date
CN110399510A true CN110399510A (en) 2019-11-01

Family

ID=68324104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910498655.9A Pending CN110399510A (en) 2019-06-10 2019-06-10 A kind of the check of drawings method for pushing and system of engineering drawing

Country Status (1)

Country Link
CN (1) CN110399510A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111047274A (en) * 2019-11-12 2020-04-21 深圳市毕美科技有限公司 Method and system for examining engineering design drawing
CN111831616A (en) * 2020-06-24 2020-10-27 万翼科技有限公司 Picture examination problem display method, related device and equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1410917A (en) * 2001-09-28 2003-04-16 华为技术有限公司 Circuit principle graph automatic checking method
CN104036060A (en) * 2013-03-07 2014-09-10 纬衡浩建科技(深圳)有限公司 Online auditing method and system for engineering drawing
CN106503930A (en) * 2016-11-29 2017-03-15 北京优易惠技术有限公司 A kind of Note Auditing method and device
CN108564300A (en) * 2018-04-26 2018-09-21 福建积微科技有限公司 A kind of efficiently DWG drawings based on flow engine cooperate with school to examine method online
CN109146419A (en) * 2018-08-17 2019-01-04 四川网道科技发展有限公司 Drawing classification auditing system based on artificial intelligence

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1410917A (en) * 2001-09-28 2003-04-16 华为技术有限公司 Circuit principle graph automatic checking method
CN104036060A (en) * 2013-03-07 2014-09-10 纬衡浩建科技(深圳)有限公司 Online auditing method and system for engineering drawing
CN106503930A (en) * 2016-11-29 2017-03-15 北京优易惠技术有限公司 A kind of Note Auditing method and device
CN108564300A (en) * 2018-04-26 2018-09-21 福建积微科技有限公司 A kind of efficiently DWG drawings based on flow engine cooperate with school to examine method online
CN109146419A (en) * 2018-08-17 2019-01-04 四川网道科技发展有限公司 Drawing classification auditing system based on artificial intelligence

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111047274A (en) * 2019-11-12 2020-04-21 深圳市毕美科技有限公司 Method and system for examining engineering design drawing
CN111047274B (en) * 2019-11-12 2023-08-11 深圳市毕美科技有限公司 Engineering design drawing examination method and system
CN111831616A (en) * 2020-06-24 2020-10-27 万翼科技有限公司 Picture examination problem display method, related device and equipment

Similar Documents

Publication Publication Date Title
CN100568243C (en) The method and system of a kind of data mining and modeling
CN104699611B (en) A kind of defect information extracting method that pattern is changed based on open source software defect code
CN110399509A (en) It is a kind of intelligently to know drawing system and method
CN110378206B (en) Intelligent image examination system and method
CN101059688A (en) KBE and WEB technology based stamping design and production system
CN102208064A (en) Administrative collaborative approval system and approval method
CN114219217B (en) Parallel disassembly line setting method for non-merged priority relation matrix
Zhang et al. A holistic literature review of building information modeling for prefabricated construction
CN110399510A (en) A kind of the check of drawings method for pushing and system of engineering drawing
CN110096569A (en) A kind of crowd survey personnel set recommended method
CN112258061B (en) Intelligent risk analysis early warning system and early warning method for whole process of project
KR102465451B1 (en) Process knowledge push method based on machining characteristics
CN110362596A (en) A kind of control method and device of text Extracting Information structural data processing
CN115168971A (en) Component parameter library-based integrated collaborative method for design and construction of fabricated building
CN103077255B (en) Identification method and system for 3D (three-dimensional) model of nuclear power station
CN102799627A (en) Data association method based on first-order logic and nerve network
CN109947914B (en) Automatic software defect question-answering method based on template
Liu et al. Quantitative evaluation of policy based on PMC index model: a case study of China’s textile industry policy
CN110806977A (en) Test case set generation method and device based on product requirements and electronic equipment
CN110399787A (en) A kind of management system and method for engineering drawing
CN112069314B (en) Specific field situation analysis system based on scientific and technical literature data
CN102208065A (en) Intelligent navigation system and method for administrative approval
CN110377768A (en) It is a kind of intelligently to know drawing system and method
CN103810243A (en) Innovative hotspot pre-warning recognition system and method
CN115511357A (en) Method and system for judging carbon emission influence factors in operation and maintenance stage of building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101