CN110388058A CN201910516289.5A CN201910516289A CN110388058A CN 110388058 A CN110388058 A CN 110388058A CN 201910516289 A CN201910516289 A CN 201910516289A CN 110388058 A CN110388058 A CN 110388058A
Authority
CN
China
Prior art keywords
pump line
fixed
floor
clips
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910516289.5A
Other languages
Chinese (zh)
Inventor
薛庆文
石伟
刘刚
林裕
田泽辉
吴思杉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Engineering Second Construction Engineering Co Ltd
Original Assignee
Chengdu Construction Engineering Second Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Engineering Second Construction Engineering Co Ltd filed Critical Chengdu Construction Engineering Second Construction Engineering Co Ltd
Priority to CN201910516289.5A priority Critical patent/CN110388058A/en
Publication of CN110388058A publication Critical patent/CN110388058A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of construction methods of floor delivering concrete pump line, comprising: determines pump line through-flooring fixed point, the horizontal fixed point of pump line, pump line turning fixed point on each floor in advance;The fixed device of setting first in the position of the pump line through-flooring fixed point, in the fixed device of the horizontal pump line fixed point setting second, in the fixed device of pump line turning fixed point setting third;Pump line through-flooring section is fixed by the first fixed device;The parallel floor section of pump line is fixed by the second fixed device;The pump line turnaround section of connection pump line through-flooring section floor section parallel with pump line is fixed by the fixed device of third.Through the invention the construction method of floor delivering concrete pump line enable to concrete delivery pump pipe realize quickly, firm installation, can be used in turn repeatedly, convenient disassembly, concrete lift formwork-support will not be collided, thus improve storey building construction efficiency.

Description

The construction method of floor delivering concrete pump line
Technical field
The invention belongs to architecture storey technical field of construction, and in particular to a kind of construction party of floor delivering concrete pump line Method.
Background technique
In high-building construction, usually conveyed using concrete delivery pipe.Conventional concrete pump line fixation It is set up and is fixed using steel pipe frame, set up time-consuming and laborious, set up extremely unstable, be easy collision concreting Layer formwork-support so as to cause a series of safety problem, and unsightly with economy.
Summary of the invention
The main purpose of the present invention is to provide the construction methods of floor delivering concrete pump line, to solve in the prior art The problem of construction method of floor delivering concrete pump line.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of floor delivering concrete pump line Construction method, comprising:
Pump line through-flooring fixed point, the horizontal fixed point of pump line, pump line turning fixed point are determined on each floor in advance;
The fixed device of setting first in the position of the pump line through-flooring fixed point, is arranged in the horizontal pump line fixed point Second fixed device, in the fixed device of pump line turning fixed point setting third;
Pump line through-flooring section is fixed by the first fixed device;
The parallel floor section of pump line is fixed by the second fixed device;
The pump line turnaround section of connection pump line through-flooring section floor section parallel with pump line is fixed by the fixed device of third;
Described first fixed device includes for the first pump line clips of the fixed pump line through-flooring section of banding, for assisting The locating auxiliary structure of first pump line clips positioning, the locating auxiliary structure include the first bottom plate, are vertically installed in first The connector of side plate, connecting lateral plate and the first pump line clips on bottom plate edge is set on the first bottom plate for positioning Supplementary structure is fixed on the first fixing bolt on floor, vertical first bottom plate of the first pump line clips and connector phase Even;
The second fixed device includes for the second pump line clips of the parallel floor section of the fixed pump line of banding, for the First support location structure of two pump line clips support positioning, the support location structure include the second bottom plate, are vertically arranged In on the second bottom plate the first supporting element, be set on the second bottom plate be fixed on floor for locating auxiliary structure it is second fixed Bolt, the second pump line clips are horizontally placed on the first supporting element;
The fixed device of the third includes pumping for the third pump line clips of the fixed pump line turnaround section of banding, for third Second support location structure of pipe clips support positioning, the support location structure include third bottom plate, are fixed on third bottom The second supporting element of third pump line clips is connected for rotatably support on plate, is set on third bottom plate for positioning auxiliary knot Structure is fixed on the third fixing bolt on floor, the center in face where the supporting element rotation direction and the fixed hole of third pump line Axis is parallel.
Further, the first fixing bolt, the second fixing bolt, the corresponding position of third fixing bolt on floor Prefabricated fixing bolt installation passage respectively.
Further, the method for prefabricated fixing bolt installation passage include before concreting on building template One fixing bolt, the second fixing bolt, the corresponding position of third fixing bolt according to floor plan thickness installing pipe structure, Pipe structure to constitute the fixing bolt installation passage installed for fixing bolt on floor during casting concrete later.
Further, the pipe structure is that the pvc pipe structure on building template, the pvc pipe structure are fixed in lower end.
Further, petal-shaped hatch frame is made in pvc pipe structure lower end, each on the petal-shaped hatch frame A limb is fixed on building template by screw.
Further, steel is fixed on after floor bar binding finishes and before casting concrete by pvc pipe structure It is further fixed on muscle.
Further, the connector is the junction steel plate of connecting lateral plate and the first pump line clips outer wall, junction steel plate It is connected by welding with side plate, the first pump line clips.
Further, first supporting element is the inverted T shaped of support connection the second bottom plate and the second pump line clips outer wall Junction steel plate, inverted T shaped junction steel plate are connected by welding with the second bottom plate, the second pump line clips.
Further, second supporting element includes a pair of of the otic placode being vertically installed on bottom plate, one end by bolt knot Structure is articulated with the connecting plate between the otic placode, and the other end and the third pump line clips outer wall of the connecting plate are weldingly connected.
Further, the inner ring of the first pump line clips, the inner ring of the second pump line clips, third pump line clips Inner ring be equipped with cushion rubber layer.
The present invention is a little compared with the prior art, through the invention the construction method energy of floor delivering concrete pump line Enough so that concrete delivery pump pipe realization is quick, firm installation, can be used in turn repeatedly, convenient disassembly, will not collide concrete Thus pouring layer formwork-support improves storey building construction efficiency.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to assist the understanding of the present invention, content provided in attached drawing and its Related explanation can be used for explaining the present invention in the present invention, but not constitute an undue limitation on the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of the mounting structure of floor delivering concrete pump line of the present invention.
Fig. 2 is the installation side view of pipe structure in the construction method of floor delivering concrete pump line of the present invention.
Fig. 3 is the installation top view of pipe structure in the construction method of floor delivering concrete pump line of the present invention.
Fig. 4 is the first fixture structure schematic diagram in the construction method of floor delivering concrete pump line of the present invention.
Fig. 5 is the second fixture structure schematic diagram in the construction method of floor delivering concrete pump line of the present invention.
Fig. 6 is third fixture structure schematic diagram in the construction method of floor delivering concrete pump line of the present invention.
Specific embodiment
Clear, complete explanation is carried out to the present invention with reference to the accompanying drawing.Those of ordinary skill in the art are being based on these The present invention will be realized in the case where explanation.Before in conjunction with attached drawing, the present invention will be described, of particular note is that:
The technical solution provided in each section including following the description and technical characteristic in the present invention are not rushing In the case where prominent, these technical solutions and technical characteristic be can be combined with each other.
In addition, the embodiment of the present invention being related in following the description is generally only the embodiment of a branch of the invention, and The embodiment being not all of.Therefore, based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, should fall within the scope of the present invention under the premise of labour.
About term in the present invention and unit.Term in description and claims of this specification and related part " comprising ", " having " and their any deformation, it is intended that cover and non-exclusive include.
The construction method of floor delivering concrete pump line of the present invention, comprising:
Pump line through-flooring fixed point, the horizontal fixed point of pump line, pump line turning fixed point are determined on each floor in advance;
The fixed device of setting first in the position of the pump line through-flooring fixed point, is arranged in the horizontal pump line fixed point Second fixed device, in the fixed device of pump line turning fixed point setting third;
Pump line through-flooring section is fixed by the first fixed device;
The parallel floor section of pump line is fixed by the second fixed device;
The pump line turnaround section of connection pump line through-flooring section floor section parallel with pump line is fixed by the fixed device of third;
Described first fixed device includes for the first pump line clips 1a of the fixed pump line through-flooring section of banding, for auxiliary The locating auxiliary structure for helping the first pump line clips 1a to position, the locating auxiliary structure include the first bottom plate 2a, are vertically arranged In side plate 3a, connecting lateral plate 3a and the first pump line clips 1a on the first edge bottom plate 2a connector, be set to the It is vertical that for locating auxiliary structure the first fixing bolt 4a, the first pump line clips 1a on floor is fixed on one bottom plate 2a First bottom plate 2a is connected with connector;
Described second fixed device includes fixing the second pump line clips 1b of the parallel floor section of pump line for banding, being used for First support location structure of the second pump line clips 1b support positioning, the support location structure include the second bottom plate 2b, hang down Straight the first supporting element being set on the second bottom plate 2b is set on the second bottom plate 2b and is fixed on floor for locating auxiliary structure The second fixing bolt 4b, the second pump line clips 1b is horizontally placed on the first supporting element;
The fixed device of the third includes for the third pump line clips 1c of the fixed pump line turnaround section of banding, for third Second support location structure of pump line clips 1c support positioning, the support location structure include third bottom plate 2c, are fixed on The second supporting element of third pump line clips 1c is connected for rotatably support on third bottom plate 2c, is set to third bottom plate 2c The third fixing bolt 3c on floor, face and third where the second supporting element rotation direction are fixed on for locating auxiliary structure The central axis at the hole pump line clips 1c is parallel.
The corresponding position point the first fixing bolt 4a, the second fixing bolt 4b, third fixing bolt 3c on floor Not prefabricated fixing bolt installation passage.
The method of prefabricated fixing bolt installation passage include before concreting on building template the first fixed spiral shell Bolt 4a, the second fixing bolt 4b, the corresponding position third fixing bolt 3c according to floor plan thickness installing pipe structure, it Pipe structure to constitute the fixing bolt installation passage installed for fixing bolt on floor in after-pouring Concrete.
The pipe structure is that pvc pipe structure 1d, the pvc pipe structure 1d on building template are fixed in lower end.
Petal-shaped hatch frame, each limb on the petal-shaped hatch frame is made in the lower end pvc pipe structure 1d 1b is fixed on building template by screw 1c.
It is fixed on reinforcing bar further after floor bar binding finishes and before casting concrete by pvc pipe structure It is fixed.
The connector be connecting lateral plate 3a and the first pump line clips 1a outer wall junction steel plate 5a, junction steel plate 5a and Side plate 3a, the first pump line clips 1a are connected by welding.
First supporting element is the inverted T shaped connection steel of support connection the second bottom plate 2b and the second pump line clips 1b outer wall Plate 3b, inverted T shaped junction steel plate 3b and the second bottom plate 2b, the second pump line clips 1b are connected by welding.
Second supporting element includes that a pair of of the otic placode 4c being vertically installed on bottom plate 2c, one end are cut with scissors by bolt arrangement 5c The other end and third pump line clips 1c outer wall for being connected to the connecting plate 6c, the connecting plate 6c between the otic placode 4c weld phase Even.
The inner ring of the first pump line clips 1a, the inner ring of the second pump line clips 1b, third pump line clips 1c Inner ring is equipped with cushion rubber layer.
As shown in Figure 1, present embodiment conveys coagulation to carry out floor between the floor D in floor and floor E The invention will be further described for the construction of native pump line.
Pump line through-flooring fixed point is determined on floor D in advance, determines that the horizontal fixed point of pump line, pump line turn on floor E Crook fixed point;
The fixed device of setting first in the position of the pump line through-flooring fixed point, is arranged in the horizontal pump line fixed point Second fixed device, in the fixed device of pump line turning fixed point setting third;
Pump line through-flooring section A is fixed by the first fixed device;
The parallel floor section B of pump line is fixed by the second fixed device;
The pump line turnaround section C of connection pump line through-flooring section A floor section B parallel with pump line is fixed by the fixed device of third;
Described first fixed device includes for the first pump line clips 1a of the fixed pump line through-flooring section of banding, for auxiliary The locating auxiliary structure for helping the first pump line clips 1a to position, the locating auxiliary structure include the first bottom plate 2a, are vertically arranged In side plate 3a, connecting lateral plate 3a and the first pump line clips 1a on the first edge bottom plate 2a connector, be set to the It is vertical that for locating auxiliary structure the first fixing bolt 4a, the first pump line clips 1a on floor is fixed on one bottom plate 2a First bottom plate 2a is connected with connector;
Described second fixed device includes fixing the second pump line clips 1b of the parallel floor section of pump line for banding, being used for First support location structure of the second pump line clips 1b support positioning, the support location structure include the second bottom plate 2b, hang down Straight the first supporting element being set on the second bottom plate 2b is set on the second bottom plate 2b and is fixed on floor for locating auxiliary structure The second fixing bolt 4b, the second pump line clips 1b is horizontally placed on the first supporting element;
The fixed device of the third includes for the third pump line clips 1c of the fixed pump line turnaround section of banding, for third Second support location structure of pump line clips 1c support positioning, the support location structure include third bottom plate 2c, are fixed on The second supporting element of third pump line clips 1c is connected for rotatably support on third bottom plate 2c, is set to third bottom plate 2c The third fixing bolt 3c on floor, face and third where the second supporting element rotation direction are fixed on for locating auxiliary structure The central axis at the hole pump line clips 1c is parallel.
First supporting element is the inverted T shaped connection steel of support connection the second bottom plate 2b and the second pump line clips 1b outer wall Plate 3b, inverted T shaped junction steel plate 3b and the second bottom plate 2b, the second pump line clips 1b are connected by welding.
Second supporting element includes that a pair of of the otic placode 4c being vertically installed on bottom plate 2c, one end are cut with scissors by bolt arrangement 5c The other end and third pump line clips 1c outer wall for being connected to the connecting plate 6c, the connecting plate 6c between the otic placode 4c weld phase Even.
The inner ring of the first pump line clips 1a, the inner ring of the second pump line clips 1b, third pump line clips 1c Inner ring is equipped with cushion rubber layer.
The corresponding position point the first fixing bolt 4a, the second fixing bolt 4b, third fixing bolt 3c on floor Not prefabricated fixing bolt installation passage.The method of prefabricated fixing bolt installation passage is included in front of concreting in building mould The upper first fixing bolt 4a of plate F, the second fixing bolt 4b, the corresponding position third fixing bolt 3c are according to floor plan thickness Installing pipe structure is spent, pipe structure to constitute the fixing bolt installed for fixing bolt on floor during casting concrete later Installation passage.As shown in Figure 2 and Figure 3, the pipe structure is that pvc pipe structure 1d, the PVC on building template F are fixed in lower end Pipe structure 1d.Petal-shaped hatch frame, each limb on the petal-shaped hatch frame is made in the lower end pvc pipe structure 1d 1b is fixed on building template F by screw 1c.
It is fixed on reinforcing bar further after floor bar binding finishes and before casting concrete by pvc pipe structure It is fixed.
The connector be connecting lateral plate 3a and the first pump line clips 1a outer wall junction steel plate 5a, junction steel plate 5a and Side plate 3a, the first pump line clips 1a are connected by welding.
Before floor concrete casting, according to pump line periphery slab thickness, fixing bolt is designed and produced out;It is straight according to pump line Diameter designs and produces out pump line clips, and above-mentioned fixing bolt upper end is equipped with screw thread, is equipped with hexagonal (hexagon)nut and gasket uses, screw rod Lower end carries a fixed hexagonal (hexagon)nut;Pump line clips are equipped with cushion rubber layer and use, and cushion rubber layer is in this specific implementation It is rubber washer in mode, pump line clips are fixedly connected by each two screw rods in both ends, pump line is lockked.
Above-mentioned component is embedded in floor after the completion of floor bar is bound with the pvc pipe more slightly larger than fixing bolt, pre-buried Mode carries out after using above-mentioned fixing bolt installation passage setting method fixing PVC pipe, is fixed on floor bar, pvc pipe Quantity and position with the reserved screw rod hole of steel plate 104 of quantity and position.
As shown in figure 4, the fixed device of the concrete delivery pump pipe of through-flooring, i.e., the first fixed device includes being used for band tightener The first pump line clips 1a, the locating auxiliary structure for assisting the first pump line clips 1a to position for determining pump line through-flooring section, Side plate 3a, the connecting lateral plate 3a that the locating auxiliary structure includes the first bottom plate 2a, is vertically installed on the first edge bottom plate 2a With the connector of the first pump line clips 1a, be set on the first bottom plate 2a and be fixed on floor for locating auxiliary structure The vertical first bottom plate 2a of first fixing bolt 4a, the first pump line clips 1a is connected with connector;
The first bottom plate 2a uses specification for 300 × 500 ㎜, the steel plate of 15-20 ㎜ thickness.
The connector be connecting lateral plate 3a and the first pump line clips 1a outer wall junction steel plate 5a, junction steel plate 5 and Side plate 3a, the first pump line clips 1a are connected by welding.
The junction steel plate 5a with a thickness of 15-20mm.
The side plate 3a specification is 180 × 180 ㎜, the steel plate of 15-20mm thickness.
The diameter of the first fixing bolt 4a is 18mm.
The inner ring of the first pump line clips 1a is equipped with the first cushion rubber layer 6a.
The side plate 3a is welded in the middle position at the first edge bottom plate 2a.
Wherein, the locating auxiliary structure include the first bottom plate 2a, the side plate that is vertically installed on the first edge bottom plate 2a The connector of 3a, connecting lateral plate 3a and the first pump line clips 1a are set on the first bottom plate 2a for locating auxiliary structure The vertical first bottom plate 2a of the first fixing bolt 4a being fixed on floor, the first pump line clips 1a is connected with connector. The connector is the junction steel plate 5 of connecting lateral plate 3a and the first pump line clips 1a outer wall, junction steel plate 5 and side plate 3, first Pump line clips 1a is connected by welding.The inner ring of the first pump line clips 1a is equipped with the first cushion rubber layer 6a.First Two are fixed on bottom plate 2a ranked first fixing bolt 4a, there are three a row is each.The first pump line clips 1a uses existing skill Pump line clips in art, this will not be repeated here.
Wherein, the side plate 3a is welded in the middle position at the first edge bottom plate 2a.The first bottom plate 2a uses specification For 300 × 500 ㎜, the steel plate of 15-20 ㎜ thickness.The junction steel plate 5a with a thickness of 15-20mm.The side plate 3a specification is The steel plate of 180 × 180 ㎜, 15-20mm thickness.The diameter of the first fixing bolt 4a is 18mm.
Such as Fig. 5, fixation device of the concrete delivery pump pipe on floor, the described second fixed device includes being used for band tightener Determine the second pump line clips 1b of the parallel floor section of pump line, support positioning for the first of the second pump line clips 1b support positioning Structure, the support location structure include the second bottom plate 2b, the first supporting element being vertically installed on the second bottom plate 2b, are set to The second fixing bolt 4b on floor, the second pump line clips 1b water are fixed on for locating auxiliary structure on second bottom plate 2b It is flat to be set on the first supporting element;Second pump line clips 1b, for the fixed pump line of banding;First support location structure, is used for The support of second pump line clips 1b positions;Wherein, the first support location structure includes the second bottom plate 2b, is vertically installed in Supporting element on second bottom plate 2b is set to the second fixed spiral shell being fixed on floor on the second bottom plate 2b for locating auxiliary structure Bolt 4ba, the second pump line clips 1b are horizontally placed on supporting element.The supporting element be support connection the second bottom plate 2b with Inverted T shaped junction steel plate 3b, inverted T shaped junction steel plate 3b and the second bottom plate 2b, the second pump line of second pump line clips 1b outer wall are solid Surely hoop 1b is connected by welding.The inner ring of the second pump line clips 1b is equipped with the second cushion rubber layer 5b.Second bottom plate 2b On be fixed with two and ranked second fixing bolt 4b, there are three a row is each.The second pump line clips 1b is using in the prior art Pump line clips, this will not be repeated here.
Wherein, the second bottom plate 2b uses specification for 300 × 500 ㎜, the steel plate of 15-20 ㎜ thickness.Described first is fixed The diameter of bolt 4a is 18mm.
As shown in fig. 6, device is fixed at concrete delivery pump pipe turning, i.e., the described fixed device of third includes being used for banding The third pump line clips 1c of fixed pump line turnaround section, the second support positioning knot for third pump line clips 1c support positioning Structure, the support location structure include third bottom plate 2c, are fixed on third bottom plate 2c for rotatably support connection third pump The second supporting element of pipe clips 1c is set to the third being fixed on floor on third bottom plate 2c for locating auxiliary structure and fixes Bolt 3c, face where the second supporting element rotation direction are parallel with the central axis at the hole third pump line clips 1c.
Third pump line clips 1c, for the fixed pump line turning of banding;Second support location structure, is used for third pump line The support of clips 1c positions;Wherein, the second support location structure includes third bottom plate 2c, is fixed on third bottom plate 2c For rotatably supporting the supporting element of connection third pump line clips 1c, being set on bottom plate 2 and be fixed on for locating auxiliary structure Third fixing bolt 3c on floor, where the second supporting element rotation direction in face and the hole third pump line clips 1c Mandrel is parallel.The supporting element includes a pair of of the otic placode 4c being vertically installed on third bottom plate 2c, one end by bolt arrangement 5c The other end and third pump line clips 1c outer wall for being articulated with the connecting plate 6c, the connecting plate 6c between the otic placode 4c weld It is connected.The otic placode 4c disposed in parallel of a pair of of otic placode 4c i.e. two.The otic placode 4c is the steel plate being welded on third bottom plate 2c.The Two are fixed on three bottom plate 2c ranked third fixing bolt 3c, there are three a row is each.The inner ring of the third pump line clips 1c is set There is third cushion rubber layer 7c.The third pump line clips 1c uses pump line clips in the prior art, does not do herein superfluous It states.
Wherein, the spacing between two otic placode 4c is 25mm-30mm.The otic placode 4c is with a thickness of 15-20mm.The bolt Structure 5c is M30 high-strength bolt.The connecting plate 6c is with a thickness of 20mm.The third bottom plate 2c uses specification for 300 × 500 The steel plate of ㎜, 15-20 ㎜ thickness.The inner ring of the third pump line clips 1c is equipped with third cushion rubber layer 7c.The third is solid The diameter for determining bolt 3c is 25mm.
Related content of the invention is illustrated above.Those of ordinary skill in the art are in the feelings illustrated based on these The present invention will be realized under condition.Based on above content of the invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, should fall within the scope of the present invention under the premise of labour.

Claims (10)

1. the construction method of floor delivering concrete pump line, comprising:
Pump line through-flooring fixed point, the horizontal fixed point of pump line, pump line turning fixed point are determined on each floor in advance;
The fixed device of setting first in the position of the pump line through-flooring fixed point, in the horizontal pump line fixed point setting second Fixed device, in the fixed device of pump line turning fixed point setting third;
Pump line through-flooring section is fixed by the first fixed device;
The parallel floor section of pump line is fixed by the second fixed device;
The pump line turnaround section of connection pump line through-flooring section floor section parallel with pump line is fixed by the fixed device of third;
Described first fixed device includes for the first pump line clips (1a) of the fixed pump line through-flooring section of banding, for assisting The locating auxiliary structure of first pump line clips (1a) positioning, the locating auxiliary structure include the first bottom plate (2a), vertically set It is placed in the connection of the side plate (3a), connecting lateral plate (3a) and the first pump line clips (1a) on the edge the first bottom plate (2a) Part is set on the first bottom plate (2a) the first fixing bolt (4a) being fixed on floor for locating auxiliary structure, and described first Vertical first bottom plate (2a) of pump line clips (1a) is connected with connector;
The second fixed device includes for the second pump line clips (1b) of the parallel floor section of the fixed pump line of banding, for the Two pump line clips (1b) support positioning first support location structure, the support location structure including the second bottom plate (2b), The first supporting element for being vertically installed on the second bottom plate (2b) is set on the second bottom plate (2b) and is fixed on for locating auxiliary structure The second fixing bolt (4b) on floor, the second pump line clips (1b) are horizontally placed on the first supporting element;
The fixed device of the third includes pumping for the third pump line clips (1c) of the fixed pump line turnaround section of banding, for third Second support location structure of pipe clips (1c) support positioning, the support location structure include third bottom plate (2c), fix In on third bottom plate (2c) for rotatably support connection third pump line clips (1c) the second supporting element, be set to third bottom The third fixing bolt (3c) on floor, the second supporting element rotation direction institute are fixed on for locating auxiliary structure on plate (2c) It is parallel with the central axis at the hole third pump line clips (1c) in face.
2. the construction method of floor delivering concrete pump line as described in claim 1, which is characterized in that first is solid on floor Determine the corresponding position of bolt (4a), the second fixing bolt (4b), third fixing bolt (3c) and distinguishes prefabricated fixing bolt peace Fill channel.
3. the construction method of floor delivering concrete pump line as claimed in claim 2, which is characterized in that prefabricated fixing bolt peace Dress channel method include before concreting on building template the first fixing bolt (4a), the second fixing bolt (4b), the corresponding position of third fixing bolt (3c) are according to floor plan thickness installing pipe structure, casting concrete later Pipe structure to constitute the fixing bolt installation passage installed for fixing bolt on floor in the process.
4. the construction method of floor delivering concrete pump line as claimed in claim 3, which is characterized in that under the pipe structure is Hold the pvc pipe structure (1d) being fixed on building template, the pvc pipe structure (1d).
5. the construction method of floor delivering concrete pump line as claimed in claim 4, which is characterized in that the pvc pipe structure Petal-shaped hatch frame is made in the lower end (1d), and each limb (1b) on the petal-shaped hatch frame is fixed by screw (1c) In on building template.
6. the construction method of floor delivering concrete pump line as claimed in claim 5, which is characterized in that bound in floor bar After finishing and pvc pipe structure is fixed on reinforcing bar before casting concrete and is further fixed.
7. the construction method of floor delivering concrete pump line as described in claim 1, which is characterized in that the connector is to connect Meet the junction steel plate (5a) of side plate (3a) Yu first pump line clips (1a) outer wall, junction steel plate (5a) and side plate (3a), first Pump line clips (1a) are connected by welding.
8. the construction method of floor delivering concrete pump line as described in claim 1, which is characterized in that first supporting element For the inverted T shaped junction steel plate (3b) of support connection the second bottom plate (2b) and second pump line clips (1b) outer wall, inverted T shaped connection steel Plate (3b) is connected by welding with the second bottom plate (2b), the second pump line clips (1b).
9. the construction method of floor delivering concrete pump line as described in claim 1, which is characterized in that second supporting element The otic placode (4c) is articulated with by bolt arrangement (5c) including a pair of of otic placode (4c) for being vertically installed on bottom plate (2c), one end Between connecting plate (6c), the other end and third pump line clips (1c) outer wall of the connecting plate (6c) be weldingly connected.
10. the construction method of floor delivering concrete pump line as described in claim 1, which is characterized in that first pump line The inner ring of clips (1a), the inner ring of the second pump line clips (1b), third pump line clips (1c) inner ring be equipped with rubber Buffer layer.
CN201910516289.5A 2019-06-14 2019-06-14 The construction method of floor delivering concrete pump line Pending CN110388058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910516289.5A CN110388058A (en) 2019-06-14 2019-06-14 The construction method of floor delivering concrete pump line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910516289.5A CN110388058A (en) 2019-06-14 2019-06-14 The construction method of floor delivering concrete pump line

Publications (1)

Publication Number Publication Date
CN110388058A true CN110388058A (en) 2019-10-29

Family

ID=68285374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910516289.5A Pending CN110388058A (en) 2019-06-14 2019-06-14 The construction method of floor delivering concrete pump line

Country Status (1)

Country Link
CN (1) CN110388058A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895182A (en) * 2020-07-13 2020-11-06 中国二十二冶集团有限公司 Vertical pump pipe fixer and using method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106286991A (en) * 2016-08-09 2017-01-04 江苏南通二建集团有限公司 A kind of canalization concrete delivery pump pipe fixing means
CN206802482U (en) * 2017-03-20 2017-12-26 江苏南通二建集团有限公司 A kind of concrete delivery pump pipe
CN207813015U (en) * 2017-12-29 2018-09-04 四川航天建筑工程有限公司 Floor slab preformed hole tool-typed formwork support construction
CN109307108A (en) * 2018-11-07 2019-02-05 中建四局第建筑工程有限公司 A kind of concrete delivery pump pipe angle turning tool formula fixed structure and its construction method
JP2020153074A (en) * 2019-03-18 2020-09-24 清水建設株式会社 High head concrete placement device, and placement method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106286991A (en) * 2016-08-09 2017-01-04 江苏南通二建集团有限公司 A kind of canalization concrete delivery pump pipe fixing means
CN206802482U (en) * 2017-03-20 2017-12-26 江苏南通二建集团有限公司 A kind of concrete delivery pump pipe
CN207813015U (en) * 2017-12-29 2018-09-04 四川航天建筑工程有限公司 Floor slab preformed hole tool-typed formwork support construction
CN109307108A (en) * 2018-11-07 2019-02-05 中建四局第建筑工程有限公司 A kind of concrete delivery pump pipe angle turning tool formula fixed structure and its construction method
JP2020153074A (en) * 2019-03-18 2020-09-24 清水建設株式会社 High head concrete placement device, and placement method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895182A (en) * 2020-07-13 2020-11-06 中国二十二冶集团有限公司 Vertical pump pipe fixer and using method

Similar Documents

Publication Publication Date Title
CN108678258A (en) Large span hemispherical armored concrete dome structure and its construction method
CN102383593B (en) Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN207211464U (en) A kind of new reinforcing steel bar truss plate
CN211396286U (en) Unbonded prestressed steel strand positioning bracket
CN106032706A (en) Integrated casting molding construction method of reinforced concrete shear wall
CN109403545A (en) A kind of high assembly rate concrete-filled steel tubular frame structural system and connection method
CN215760447U (en) Reinforcing structure for anti-ridge template device and anti-ridge template device
CN110388058A (en) The construction method of floor delivering concrete pump line
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN211421637U (en) Connecting structure of prefabricated gutter
CN217999064U (en) Reinforced structure of brick-concrete structure wall
CN206158192U (en) Concrete pump pipe's simple easily fixable device on concrete face
CN110524678A (en) The oblique prefabricated superimposed sheet of muscle out of one kind and preload are to drawing formwork erecting structure and construction method
CN107142834B (en) A kind of Through Steel pipe concrete tie-rod arch bridge abutment steel pipe location structure and its construction method
CN211447283U (en) Connecting beam of main building and skirt house
CN109989577A (en) It solves shear wall and vertically connects the swollen mould in batch position, spillage easy device
CN205712733U (en) Super-section strengthening concrete conversion beam formwork system
CN212388738U (en) Column foot structure of steel pipe concrete column
CN214195007U (en) Combined connection node of steel reinforced concrete beam and column
CN114075871A (en) Triangular overhanging support base for slip form
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN204402035U (en) Shear wall template support structure
CN111719773B (en) Floor type support for roof and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029

RJ01 Rejection of invention patent application after publication