CN110524678A - The oblique prefabricated superimposed sheet of muscle out of one kind and preload are to drawing formwork erecting structure and construction method - Google Patents

The oblique prefabricated superimposed sheet of muscle out of one kind and preload are to drawing formwork erecting structure and construction method Download PDF

Info

Publication number
CN110524678A
CN110524678A CN201910923598.4A CN201910923598A CN110524678A CN 110524678 A CN110524678 A CN 110524678A CN 201910923598 A CN201910923598 A CN 201910923598A CN 110524678 A CN110524678 A CN 110524678A
Authority
CN
China
Prior art keywords
muscle
beard
superimposed sheet
beard muscle
bending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910923598.4A
Other languages
Chinese (zh)
Other versions
CN110524678B (en
Inventor
鲍丹宇
叶帝江
高新宇
赵子钦
黄其敏
庄金平
陈剑星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd
Fujian University of Technology
Original Assignee
FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd, Fujian University of Technology filed Critical FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd
Priority to CN201910923598.4A priority Critical patent/CN110524678B/en
Publication of CN110524678A publication Critical patent/CN110524678A/en
Application granted granted Critical
Publication of CN110524678B publication Critical patent/CN110524678B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention relates to a kind of oblique prefabricated superimposed sheets of muscle out, including superimposed sheet ontology, the oblique bending of the beard muscle of superimposed sheet ontology cohesive end has bending part, compared with traditional straight beard muscle, the superimposed sheet beard muscle of the application has bending part, reduces extension, superimposed sheet can be with Fast Installation by slant setting, it avoids the top longitudinal reinforcement of superimposed sheet beard muscle and Vierendeel girder from generating collision, accelerates construction efficiency, reduce labor workload.

Description

The oblique prefabricated superimposed sheet of muscle out of one kind and preload are to drawing formwork erecting structure and construction method
Technical field
The present invention relates to a kind of oblique prefabricated superimposed sheet of muscle out and pre-tighten to drawing formwork erecting structure and construction method.
Background technique
Assembly concrete building is referred in body structure portion or is all assembled using precast concrete Reinforced concrete structure building.In order to guarantee that the holistic resistant behavior of precast reinforced concrete structure is equal with whole structure of pouring, It needs to take corresponding reliable construction measure and construction method, pre-erection, cast-in-place part, node in guarantee fabricated construction Etc. can cooperate, and ensure that its stress performance pours structure at or above whole.
Currently, beam column uses cast-in-place construction, plate is also one of common form of construction work now using prefabricated superimposed sheet, still Prefabricated superimposed sheet and beams of concrete are used in floor when cast-in-place concrete beam width is larger, to need to use in cast-in-place system When four limbs stirrup, there are collision problems for back longitudinal reinforcement and superimposed sheet overhanging " beard muscle ".
Summary of the invention
In view of the deficiencies in the prior art, technical problem to be solved by the invention is to provide a kind of oblique prefabricated overlappings of muscle out Plate and preload are not only simple in structure, and convenient and efficient to formwork erecting structure and construction method is drawn.
In order to solve the above-mentioned technical problem, the technical scheme is that it is a kind of it is oblique go out the prefabricated superimposed sheet of muscle, including it is folded Plywood ontology, the oblique bending of the beard muscle of superimposed sheet ontology cohesive end have bending part.
Preferably, bending part is bent downwardly 45 degree.
It is a kind of using it is oblique go out the prefabricated superimposed sheet of muscle preload to drawing formwork erecting structure, including beam forms and be symmetrically positioned in beam The plank sheathing of template two sides is provided with unidirectional superimposed sheet on plank sheathing, and two unidirectional superimposed sheets include superimposed sheet ontology, overlapping The oblique bending of the beard muscle of plate ontology cohesive end has a bending part, between the correspondence bending part of the adjacent cohesive end of two unidirectional superimposed sheets It is pre-tightened through hoop body and drawing is connected.
Preferably, plank sheathing upper surface is provided with foam glue strip at the beam forming cavity accent edge of beam forms, unidirectional folded Plywood is both placed in plank sheathing upper surface, and foam glue strip is pressed on unidirectional superimposed sheet lower surface.
Preferably, plank sheathing is symmetricly set on the two opposite edges side of beam forming cavity accent of beam forms;Beam forms includes perpendicular To support frame, vertical supporting top of the trellis is provided with keel, woodbox is provided at the top of keel, being provided at the top of woodbox has to lacing wire Beam forming cavity;Plank sheathing bottom is provided with keel, the cohesive end of plank sheathing with the beam forming cavity accent of ipsilateral beam forms Edge flushes;It is disposed with beam in the beam forming cavity of beam forms and indulges muscle and beam stirrup, is to pacify between longitudinal two adjacent beam stirrups Fill the space of hoop body.
Preferably, hoop body is lacing wire sleeve, and lacing wire sleeve includes sleeve body, and the inside both ends of sleeve body are equipped with spiral shell To opposite internal thread hole, every end internal thread hole is bolted with the pull hook in " J " font, the hook part of pull hook and ipsilateral bending part To hook.
Preferably, hoop body is common stirrup.
It is a kind of using it is oblique go out the prefabricated superimposed sheet of muscle preload to draw formwork erecting structure construction method, according to the following steps into Row: (1) in precast plant, on the basis of traditional unidirectional superimposed sheet, the extension elongation of beard muscle is reduced, and inside superimposed sheet The beard muscle of board ends is bent downward 45 degree in advance in reinforcing bar process of binding;(2) the vertical supporting frame of beam forms is arranged, then Keel are installed on vertical supporting frame, and arrange two pieces of rectangle woodboxs in beam forming cavity bottom template to guarantee that load is uniform It is delivered on beam bottom keel, then lacing wire support drawing by rectangle woodbox in the setting of beam forming cavity both sides side template The lateral pressure of template when anti-casting concrete, the deformation of beam when preventing casting concrete, finally from beam forming cavity accent side Foam glue strip is placed in plank sheathing upper surface at edge, then according to conventional construction method, first interts beam and indulges muscle, then bind beam hoop Muscle;(3) transport superimposed sheet carries out crane vertical lifting to construction site, since the superimposed sheet beard muscle of design is more general short, And it bends downward, therefore can be with Fast Installation by slant setting;(4) inadequate if there is some leakages bending or bending degree Beard muscle, it would still be possible to the case where there are reinforcing bar collisions, then using dedicated steel pipe to beard muscle carry out it is downward 45 degree be bent Form bending part;It pre-tightens through hoop body between the correspondence bending part of the adjacent cohesive end of (5) two unidirectional superimposed sheets and connects to drawing;(6) Then pouring for concrete, maintenance a period of time are carried out according to a conventional method.
Preferably, in step (4), need to install protruding bar bending anticracking before carrying out downward 45 degree of bendings to beard muscle Auxiliary tool, protruding bar bending anticracking auxiliary tool include bracket, and bracket is supported in being equipped in the same direction for beard muscle bending side Support rod on beard muscle inflection point, bracket are reversed equipped with the support for being supported in the nearly root of beard muscle beard muscle bending side Plate, support plate are the axial arc panel parallel with beard muscle, and arc panel is parallel to axial two opposite sides towards beard muscle direction Bending, support plate along the in the same direction of beard muscle bending side or are reversed sliding adjusting through a regulating mechanism, and regulating mechanism includes one Hold the stripe board being installed on the non-beard muscle contact surface of support plate, oppositely extending, bar shaped of the stripe board along beard muscle bending side The plate other end is vertically installed with handle, the non-end of stripe board offer with its it is co-extensive to groove bar hole, be installed with one on bracket Pass perpendicularly through the screw rod in groove bar hole, screw rod is successively arranged with the first gasket in groove bar hole side from-inner-to-outer, is bolted with locking screw Mother, screw rod are installed with the second gasket in the groove bar hole other side, and the width of the first gasket and the second gasket is all larger than the width in groove bar hole Degree, support rod is the round bar being installed on bracket, is axially perpendicular to beard muscle, and beard muscle is worn between support rod and support plate It crosses;The overhanging beard muscle of superimposed sheet passes through between support rod and support plate when use, so that support rod is located at beard muscle bending side same To and be supported on beard muscle inflection point, it is reversed and be supported in the nearly root of beard muscle that support plate is located at beard muscle bending side, when opening When beginning bending beard muscle, beard muscle is bent by fulcrum of support rod, the nearly root of beard muscle by the support of support plate be difficult to Superfluous deformation is bent, when preventing bending beard muscle, beard muscle destroys root concrete extrusion;By unscrewing locking nut, prop up Fagging and stripe board, handle are integrally able to carry out sliding adjusting position, to change the spacing between support plate and support rod, a side Face facilitates the beard muscle for adapting to various outer diameter, can tune up the spacing between support plate and support rod first on the other hand to facilitate recklessly Sub- muscle passes through, and beard muscle, which passes through, to be made support rod be located at beard muscle bending side in the same direction later and be supported on beard muscle inflection point, props up Fagging is located at beard muscle bending side reversely and is supported in the nearly root of beard muscle, then locks locking nut again.
Preferably, in step (5), when hoop body is lacing wire sleeve, lacing wire sleeve includes sleeve body, sleeve body Inside both ends be equipped with spiral shell to opposite internal thread hole, every end internal thread hole is bolted with the pull hook in " J " font, the crotch of pull hook Portion and ipsilateral bending part rotate intermediate sleeve body, are pre-tightened the beard muscle of beam two sides to drawing to hook;When hoop body is When common stirrup, knocking-up is carried out to the stirrup of connection when needing to install, it is intended to tense the curved beard muscle in two sides, guarantee recklessly The sub- good connection of muscle.
Compared with prior art, the invention has the following advantages: simple structure, compared with traditional straight beard muscle, this The superimposed sheet beard muscle of application has bending part, reduces extension, and superimposed sheet can be kept away by slant setting with Fast Installation The top longitudinal reinforcement for exempting from superimposed sheet beard muscle and Vierendeel girder generates collision, accelerates construction efficiency, reduces labor workload.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Detailed description of the invention
Fig. 1 is the organigram of superimposed sheet.
Fig. 2 is the Construction State schematic diagram one of formwork erecting structure.
Fig. 3 is the Construction State schematic diagram two of formwork erecting structure.
Fig. 4 is the Construction State schematic diagram three of formwork erecting structure.
Fig. 5 is the structural schematic diagram one that protruding bar bends anticracking auxiliary tool.
Fig. 6 is the structural schematic diagram two that protruding bar bends anticracking auxiliary tool.
Fig. 7 uses schematic diagram for protruding bar bending anticracking auxiliary tool.
Fig. 8 is the Construction State schematic diagram four of formwork erecting structure.
Fig. 9 is the top view of Fig. 8 central sill forming cavity.
Figure 10 is the organigram of lacing wire sleeve.
Figure 11 is the organigram of pull hook.
Figure 12 is the organigram of sleeve body.
Figure 13 is the organigram of formwork erecting structure.
Figure 14 is organigram when hoop body uses common stirrup.
Specific embodiment
To make the foregoing features and advantages of the present invention clearer and more comprehensible, special embodiment below, and cooperate attached drawing, make detailed Carefully it is described as follows.
As shown in Fig. 1 ~ 14, a kind of oblique prefabricated superimposed sheet of muscle, including superimposed sheet ontology out, superimposed sheet ontology cohesive end The oblique bending of beard muscle has bending part.
In embodiments of the present invention, bending part is bent downwardly 45 degree.
It is a kind of using it is oblique go out the prefabricated superimposed sheet of muscle preload to drawing formwork erecting structure, including beam forms 13 and be symmetrically positioned in The plank sheathing 14 of beam forms two sides is provided with unidirectional superimposed sheet 15 on plank sheathing, and two unidirectional superimposed sheets include superimposed sheet sheet Body, the oblique bending of the beard muscle of superimposed sheet ontology cohesive end have a bending part 16, the correspondence of the adjacent cohesive end of two unidirectional superimposed sheets It is pre-tightened through hoop body between bending part and drawing is connected.Can connection beard muscle efficiently and quickly, the globality of reinforcement structure makes Preload processing can be carried out to beard muscle to drawing connection by being pre-tightened with hoop body, improve the bearing capacity of plate.
In embodiments of the present invention, plank sheathing upper surface is provided with foamed glue at the beam forming cavity accent edge of beam forms Item 17, unidirectional superimposed sheet are both placed in plank sheathing upper surface, and foam glue strip is pressed on unidirectional superimposed sheet lower surface.
In embodiments of the present invention, plank sheathing is symmetricly set on the two opposite edges side of beam forming cavity accent of beam forms.
In embodiments of the present invention, beam forms includes vertical supporting frame 18, and vertical supporting top of the trellis is provided with keel 19, dragon It is provided with woodbox 20 at the top of bone, is provided at the top of woodbox with the beam forming cavity 22 to lacing wire 21;Plank sheathing bottom is provided with Keel, the cohesive end of plank sheathing are flushed with the beam forming cavity accent edge of ipsilateral beam forms.
In embodiments of the present invention, it is disposed with beam in the beam forming cavity of beam forms and indulges muscle 23 and beam stirrup 24, longitudinal two-phase For to the space for installing hoop body between adjacent beam stirrup.
In embodiments of the present invention, hoop body is lacing wire sleeve, and lacing wire sleeve includes sleeve body 25, sleeve body it is interior Portion both ends are equipped with spiral shell to opposite internal thread hole, and every end internal thread hole is bolted with the pull hook 26 in " J " font, the hook part of pull hook With ipsilateral bending part to hook.
In embodiments of the present invention, hoop body is common stirrup 27.
It is a kind of using it is oblique go out the prefabricated superimposed sheet of muscle preload to draw formwork erecting structure construction method, according to the following steps into Row: (1) in precast plant, on the basis of traditional unidirectional superimposed sheet, the extension elongation of beard muscle is reduced, and inside superimposed sheet The beard muscle of board ends is bent downward 45 degree in advance in reinforcing bar process of binding;(2) the vertical supporting frame of beam forms is arranged, then Keel are installed on vertical supporting frame, and arrange two pieces of rectangle woodboxs in beam forming cavity bottom template to guarantee that load is uniform It is delivered on beam bottom keel, then lacing wire support drawing by rectangle woodbox in the setting of beam forming cavity both sides side template The lateral pressure of template when anti-casting concrete, the deformation of beam when preventing casting concrete, finally from beam forming cavity accent side Foam glue strip is placed in plank sheathing upper surface at edge, then according to conventional construction method, first interts beam and indulges muscle, then bind beam hoop Muscle;(3) transport superimposed sheet carries out crane vertical lifting to construction site, since the superimposed sheet beard muscle of design is more general short, And it bends downward, therefore can be with Fast Installation by slant setting;(4) inadequate if there is some leakages bending or bending degree Beard muscle, it would still be possible to the case where there are reinforcing bar collisions, then using dedicated steel pipe to beard muscle carry out it is downward 45 degree be bent Form bending part;It pre-tightens through hoop body between the correspondence bending part of the adjacent cohesive end of (5) two unidirectional superimposed sheets and connects to drawing;(6) Then pouring for concrete, maintenance a period of time are carried out according to a conventional method.
In embodiments of the present invention, in step (4), need to install overhanging steel before carrying out downward 45 degree of bendings to beard muscle Muscle bends anticracking auxiliary tool 28, and protruding bar bending anticracking auxiliary tool includes bracket 1, and bracket bends side in beard muscle 2 It is equipped with the support rod 3 being supported on beard muscle inflection point in the same direction, reversed be equipped with of the bracket in beard muscle bending side is supported in beard The support plate 4 of the nearly root of muscle, support plate are the axial arc panel parallel with beard muscle, and arc panel is parallel to axial two opposite sides It is bent towards beard muscle direction, support plate along the in the same direction of beard muscle bending side or is reversed sliding adjusting through a regulating mechanism, Regulating mechanism includes the stripe board 5 that one end is installed on the non-beard muscle contact surface of support plate, and stripe board bends side along beard muscle It is oppositely extending, the stripe board other end is vertically installed with handle 6, the non-end of stripe board offer with its it is co-extensive to groove bar hole 7, a screw rod 8 for passing perpendicularly through groove bar hole is installed on bracket, and screw rod is successively arranged with first in groove bar hole side from-inner-to-outer Gasket 9 is bolted with locking nut 10, and screw rod is installed with the second gasket 11, the first gasket and the second gasket in the groove bar hole other side Width be all larger than the width in groove bar hole, support rod is the round bar being installed on bracket, is axially perpendicular to beard muscle, beard muscle It is passed through between support rod and support plate;The overhanging beard muscle of superimposed sheet passes through between support rod and support plate when use, makes to prop up Strut is located at beard muscle bending side in the same direction and is supported on beard muscle inflection point, and support plate is located at beard muscle bending side reversely and props up Root close in beard muscle is supportted, when starting bending beard muscle, beard muscle is bent by fulcrum of support rod, the nearly root of beard muscle It is difficult to by the support of support plate with superfluous deformation of bending, when preventing bending beard muscle, beard muscle squeezes root concrete 12 broken It is bad;By unscrewing locking nut, support plate and stripe board, handle are integrally able to carry out sliding adjusting position, to change support plate Spacing between support rod, on the one hand facilitate adapt to various outer diameter beard muscle, on the other hand can first tune up support plate with For spacing between support rod to facilitate beard muscle to pass through, beard muscle passes through makes support rod be located at beard muscle bending side in the same direction simultaneously later It is supported on beard muscle inflection point, support plate is located at beard muscle bending side reversely and is supported in the nearly root of beard muscle, then locks again Tight locking nut.
In embodiments of the present invention, in step (5), when hoop body is lacing wire sleeve, lacing wire sleeve includes sleeve sheet Body, the inside both ends of sleeve body are equipped with spiral shell to opposite internal thread hole, and every end internal thread hole is bolted with the drawing in " J " font It hooks, the hook part of pull hook and ipsilateral bending part rotate intermediate sleeve body, pre-tighten to the beard muscle of beam two sides to hook To drawing;When hoop body is common stirrup, knocking-up is carried out to the stirrup of connection when needing to install, it is intended to it is curved to tense two sides Beard muscle guarantees the good connection of beard muscle.
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are each under the inspiration of the present invention The oblique prefabricated superimposed sheet of muscle out of kind form and preload are to drawing formwork erecting structure and construction method.It is all according to scope of the present invention patent The equivalent changes and modifications done, are all covered by the present invention.

Claims (10)

1. a kind of oblique prefabricated superimposed sheet of muscle out, it is characterised in that: including superimposed sheet ontology, the beard of superimposed sheet ontology cohesive end The oblique bending of muscle has bending part.
2. the oblique prefabricated superimposed sheet of muscle out according to claim 1, it is characterised in that: bending part is bent downwardly 45 degree.
3. it is a kind of using it is oblique go out the prefabricated superimposed sheet of muscle preload to drawing formwork erecting structure, including beam forms and be symmetrically positioned in beam form The plank sheathing of plate two sides, it is characterised in that: unidirectional superimposed sheet is provided on plank sheathing, two unidirectional superimposed sheets include superimposed sheet Ontology, the oblique bending of the beard muscle of superimposed sheet ontology cohesive end have a bending part, the correspondence of the adjacent cohesive end of two unidirectional superimposed sheets It is pre-tightened through hoop body between bending part and drawing is connected.
4. the preload according to claim 3 using the oblique prefabricated superimposed sheet of muscle out is to drawing formwork erecting structure, it is characterised in that: Plank sheathing upper surface is provided with foam glue strip at the beam forming cavity accent edge of beam forms, and unidirectional superimposed sheet is both placed in wooden model Plate upper surface, foam glue strip are pressed on unidirectional superimposed sheet lower surface.
5. the preload according to claim 3 using the oblique prefabricated superimposed sheet of muscle out is to drawing formwork erecting structure, it is characterised in that: Plank sheathing is symmetricly set on the two opposite edges side of beam forming cavity accent of beam forms;Beam forms includes vertical supporting frame, vertical to prop up It is provided with keel at the top of support, woodbox is provided at the top of keel, is provided at the top of woodbox with the beam forming cavity to lacing wire;Wooden model Board bottom portion is provided with keel, and the cohesive end of plank sheathing is flushed with the beam forming cavity accent edge of ipsilateral beam forms;Beam forms Beam forming cavity in be disposed with beam and indulge muscle and beam stirrup, for the space for installing hoop body between longitudinal two adjacent beam stirrups.
6. the preload according to claim 3 using the oblique prefabricated superimposed sheet of muscle out is to drawing formwork erecting structure, it is characterised in that: Hoop body is lacing wire sleeve, and lacing wire sleeve includes sleeve body, and the inside both ends of sleeve body are equipped with spiral shell to opposite internal screw thread Hole, every end internal thread hole are bolted with the pull hook in " J " font, and the hook part of pull hook and ipsilateral bending part are to hook.
7. the preload according to claim 3 using the oblique prefabricated superimposed sheet of muscle out is to drawing formwork erecting structure, it is characterised in that: Hoop body is common stirrup.
8. a kind of as drawing formwork erecting structure is applied in the preload as claimed in claim 3 to 5 using the oblique prefabricated superimposed sheet of muscle out Work method, which is characterized in that sequentially include the following steps: (1) in precast plant, on the basis of traditional unidirectional superimposed sheet, reduce The extension elongation of beard muscle, and the beard muscle of board ends is bent downward 45 in advance in reinforcing bar process of binding inside the superimposed sheet Degree;(2) the vertical supporting frame for arranging beam forms, then installs keel, and in beam forming cavity bottom mould on vertical supporting frame Plate arranges two pieces of rectangle woodboxs to guarantee that load uniformly transfers on beam bottom keel, and then on beam forming cavity both sides, side template is set It sets and lacing wire is carried out by rectangle woodbox to drawing, the lateral pressure of template, prevents casting concrete when resisting casting concrete The deformation of Shi Liang finally places foam glue strip in the plank sheathing upper surface from beam forming cavity accent edge, then according to tradition Construction method first interts beam and indulges muscle, then binds beam stirrup;(3) transport superimposed sheet carries out crane vertical lifting to construction site, It since the superimposed sheet beard muscle of design is more general short, and bends downward, therefore can be with Fast Installation by slant setting; (4) the beard muscle inadequate if there is some leakage bendings or bending degree, it would still be possible to which the case where there are reinforcing bar collisions then uses Dedicated steel pipe carries out downward 45 degree to beard muscle and is formed by bending bending part;The correspondence of the adjacent cohesive end of (5) two unidirectional superimposed sheets It is pre-tightened through hoop body between bending part and drawing is connected;(6) pouring for concrete is then carried out according to a conventional method, when conserving one section Between.
9. it is according to claim 8 using it is oblique go out the prefabricated superimposed sheet of muscle preload to draw formwork erecting structure construction method, It is characterized by: needing to install protruding bar bending anticracking auxiliary before carrying out downward 45 degree of bendings to beard muscle in step (4) Tool, protruding bar bending anticracking auxiliary tool include bracket, and bracket is supported in beard in being equipped in the same direction for beard muscle bending side Support rod on muscle inflection point, bracket is in the reversed equipped with the support plate for being supported in the nearly root of beard muscle, branch of beard muscle bending side Fagging is the axial arc panel parallel with beard muscle, and arc panel is parallel to axial two opposite sides and is bent towards beard muscle direction, Support plate along the in the same direction of beard muscle bending side or is reversed sliding adjusting through a regulating mechanism, and regulating mechanism includes that one end is fixed Stripe board on the non-beard muscle contact surface of support plate, stripe board is oppositely extending along beard muscle bending side, and stripe board is another End is vertically installed with handle, the non-end of stripe board offer with its it is co-extensive to groove bar hole, be installed with one on bracket and vertically wear Cross the screw rod in groove bar hole, screw rod is successively arranged with the first gasket in groove bar hole side from-inner-to-outer, is bolted with locking nut, screw rod The second gasket is installed in the groove bar hole other side, and the width of the first gasket and the second gasket is all larger than the width in groove bar hole, support Bar is the round bar being installed on bracket, is axially perpendicular to beard muscle, and beard muscle passes through between support rod and support plate;It uses When the overhanging beard muscle of superimposed sheet passed through between support rod and support plate, make support rod be located at beard muscle bending side in the same direction and support In on beard muscle inflection point, support plate is located at beard muscle bending side reversely and is supported in the nearly root of beard muscle, when beginning bending Hu When sub- muscle, beard muscle is bent by fulcrum of support rod, and the nearly root of beard muscle is difficult to by the support of support plate with superfluous of bending Deformation, when preventing bending beard muscle, beard muscle destroys root concrete extrusion;By unscrewing locking nut, support plate and item Shape plate, handle are integrally able to carry out sliding adjusting position, on the one hand convenient suitable to change the spacing between support plate and support rod The beard muscle of various outer diameter is answered, the spacing between support plate and support rod can be tuned up first on the other hand to facilitate beard muscle to wear It crosses, beard muscle, which passes through, to be made support rod be located at beard muscle bending side in the same direction later and be supported on beard muscle inflection point, support plate position Side is bent reversely in beard muscle and is supported in the nearly root of beard muscle, then locks locking nut again.
10. it is according to claim 8 using it is oblique go out the prefabricated superimposed sheet of muscle preload to draw formwork erecting structure construction method, It is characterized by: in step (5), when hoop body is lacing wire sleeve, lacing wire sleeve includes sleeve body, sleeve body it is interior Portion both ends are equipped with spiral shell to opposite internal thread hole, and every end internal thread hole is bolted with the pull hook in " J " font, the hook part of pull hook with Ipsilateral bending part rotates intermediate sleeve body, is pre-tightened the beard muscle of beam two sides to drawing to hook;When hoop body is common When stirrup, knocking-up is carried out to the stirrup of connection when needing to install, it is intended to tense the curved beard muscle in two sides, guarantee beard muscle Good connection.
CN201910923598.4A 2019-09-27 2019-09-27 Oblique reinforcement-out prefabricated laminated slab, pre-tightening opposite-pulling formwork structure and construction method Active CN110524678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910923598.4A CN110524678B (en) 2019-09-27 2019-09-27 Oblique reinforcement-out prefabricated laminated slab, pre-tightening opposite-pulling formwork structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910923598.4A CN110524678B (en) 2019-09-27 2019-09-27 Oblique reinforcement-out prefabricated laminated slab, pre-tightening opposite-pulling formwork structure and construction method

Publications (2)

Publication Number Publication Date
CN110524678A true CN110524678A (en) 2019-12-03
CN110524678B CN110524678B (en) 2024-07-19

Family

ID=68670604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910923598.4A Active CN110524678B (en) 2019-09-27 2019-09-27 Oblique reinforcement-out prefabricated laminated slab, pre-tightening opposite-pulling formwork structure and construction method

Country Status (1)

Country Link
CN (1) CN110524678B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982773A (en) * 2021-02-26 2021-06-18 重庆中科建筑科技(集团)有限公司 Construction method of prefabricated reinforced concrete composite slab with extending reinforcing steel bars
CN113609566A (en) * 2021-08-18 2021-11-05 上海中森建筑与工程设计顾问有限公司 Design method and assembly and disassembly method of prefabricated laminated slab and prefabricated laminated slab

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203394027U (en) * 2013-01-05 2014-01-15 贺育安 Semi-assembled construction system for frame-shear wall tube structure
CN203420486U (en) * 2013-07-29 2014-02-05 江苏南通三建集团有限公司 Plate-type prefabricated concrete structure
CN204413458U (en) * 2014-12-29 2015-06-24 安徽易特流焊割发展有限公司 Steel bar electric butt welding clamper
CN105256891A (en) * 2015-09-17 2016-01-20 东南大学 Prefabricated concrete frame structure with high-strength bottom bars
CN205147172U (en) * 2015-12-07 2016-04-13 中民筑友有限公司 Steel bar bending device
CN107700648A (en) * 2017-10-23 2018-02-16 浙江展诚建设集团股份有限公司 Prefabricated component and cast-in-place post assembled integral concrete frame structure construction
CN109098332A (en) * 2018-09-13 2018-12-28 东南大学 A kind of novel contignation and its method of construction towards marine environment
CN109113245A (en) * 2018-09-25 2019-01-01 中建四局第六建筑工程有限公司 A kind of construction method and device of reinforced concrete double plate
CN109440962A (en) * 2018-11-27 2019-03-08 刘祥锦 The horizontal joint connecting node and its height calculation method of precast shear wall edge member
KR20190077740A (en) * 2017-12-26 2019-07-04 목포대학교산학협력단 Half pc slab and producing method thereof
CN110093978A (en) * 2019-05-28 2019-08-06 广东联城住工装备信息科技有限公司 Connecting joint structure, the construction method of connecting joint structure and assembled architecture
CN211074020U (en) * 2019-09-27 2020-07-24 福建省二建建设集团有限公司 Prefabricated superimposed sheet of muscle and pretension are to drawing formwork structure are gone out to slant

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203394027U (en) * 2013-01-05 2014-01-15 贺育安 Semi-assembled construction system for frame-shear wall tube structure
CN203420486U (en) * 2013-07-29 2014-02-05 江苏南通三建集团有限公司 Plate-type prefabricated concrete structure
CN204413458U (en) * 2014-12-29 2015-06-24 安徽易特流焊割发展有限公司 Steel bar electric butt welding clamper
CN105256891A (en) * 2015-09-17 2016-01-20 东南大学 Prefabricated concrete frame structure with high-strength bottom bars
CN205147172U (en) * 2015-12-07 2016-04-13 中民筑友有限公司 Steel bar bending device
CN107700648A (en) * 2017-10-23 2018-02-16 浙江展诚建设集团股份有限公司 Prefabricated component and cast-in-place post assembled integral concrete frame structure construction
KR20190077740A (en) * 2017-12-26 2019-07-04 목포대학교산학협력단 Half pc slab and producing method thereof
CN109098332A (en) * 2018-09-13 2018-12-28 东南大学 A kind of novel contignation and its method of construction towards marine environment
CN109113245A (en) * 2018-09-25 2019-01-01 中建四局第六建筑工程有限公司 A kind of construction method and device of reinforced concrete double plate
CN109440962A (en) * 2018-11-27 2019-03-08 刘祥锦 The horizontal joint connecting node and its height calculation method of precast shear wall edge member
CN110093978A (en) * 2019-05-28 2019-08-06 广东联城住工装备信息科技有限公司 Connecting joint structure, the construction method of connecting joint structure and assembled architecture
CN211074020U (en) * 2019-09-27 2020-07-24 福建省二建建设集团有限公司 Prefabricated superimposed sheet of muscle and pretension are to drawing formwork structure are gone out to slant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵琦;: "预防预制空心板顺板裂缝的施工措施", 陕西建筑, no. 11, 15 November 2007 (2007-11-15) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982773A (en) * 2021-02-26 2021-06-18 重庆中科建筑科技(集团)有限公司 Construction method of prefabricated reinforced concrete composite slab with extending reinforcing steel bars
CN113609566A (en) * 2021-08-18 2021-11-05 上海中森建筑与工程设计顾问有限公司 Design method and assembly and disassembly method of prefabricated laminated slab and prefabricated laminated slab
CN113609566B (en) * 2021-08-18 2024-01-26 上海中森建筑与工程设计顾问有限公司 Design method of prefabricated laminated slab, assembly and disassembly method and prefabricated laminated slab

Also Published As

Publication number Publication date
CN110524678B (en) 2024-07-19

Similar Documents

Publication Publication Date Title
CN109885925B (en) Method for calculating bearing capacity of assembled PEC (reinforced concrete) composite beam
CN110984562B (en) Double-shear wall long and narrow deformation joint and construction method
CN110524678A (en) The oblique prefabricated superimposed sheet of muscle out of one kind and preload are to drawing formwork erecting structure and construction method
CN207513157U (en) A kind of expansion joint shear wall formwork
CN108978471A (en) A kind of support device and its installation method increasing cable-stayed bridge abnormity Sarasota rigidity
CN110512785A (en) A kind of end tongue and groove does not go out the unidirectional superimposed sheet of muscle and formwork erecting structure and construction method
CN214615591U (en) Reinforced concrete frame joist pulls out post and reforms transform reinforced structure
CN104929279A (en) Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN107829444B (en) Wind turbine generator system prestressing force foundation structure
CN109812010A (en) A kind of whole template of shear Wall steel joist exempts from aperture formwork and its construction method
CN211074020U (en) Prefabricated superimposed sheet of muscle and pretension are to drawing formwork structure are gone out to slant
CN106760105A (en) Assembled composite floor and its installation method
CN108517759B (en) Cable tower beam connecting system in corrugated steel web composite beam form and construction method
JP2015001102A (en) Form structure
CN110499857A (en) A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment
CN208685450U (en) Steel girder bridge assembling support system
CN114059715A (en) Formwork-supporting-free cast-in-situ inverted-trapezoid combined beam and construction method thereof
CN209686855U (en) A kind of shear wall exempts from aperture support template structure
CN216076396U (en) Device with positioning column rib and thickness of protective layer
CN207878945U (en) Shaped steel mixed mud beam steel bar colligation fixed structure
CN211080767U (en) Superposed beam, superposed beam and cast-in-place column connecting node
CN203625776U (en) Arch spring anchoring structure for concrete-filled steel tube arch bridge
CN112627510A (en) Structural deformation joint synchronous construction formwork reinforcing device and construction method
CN105887653A (en) Wide box girder bridge main beam bottom board structure and construction method thereof
CN205501789U (en) Broad width box girder bridge girder bottom plate structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant