CN110378801A - A kind of intelligent scheduling predetermined plan management method and platform - Google Patents
A kind of intelligent scheduling predetermined plan management method and platform Download PDFInfo
- Publication number
- CN110378801A CN110378801A CN201910467973.9A CN201910467973A CN110378801A CN 110378801 A CN110378801 A CN 110378801A CN 201910467973 A CN201910467973 A CN 201910467973A CN 110378801 A CN110378801 A CN 110378801A
- Authority
- CN
- China
- Prior art keywords
- module
- management module
- model
- function
- intelligent scheduling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 116
- 238000004458 analytical method Methods 0.000 claims abstract description 20
- 238000004891 communication Methods 0.000 claims abstract description 7
- 238000004364 calculation method Methods 0.000 claims abstract description 6
- 238000011156 evaluation Methods 0.000 claims abstract description 4
- 230000006870 function Effects 0.000 claims description 63
- 238000000034 method Methods 0.000 claims description 39
- 238000004088 simulation Methods 0.000 claims description 12
- 238000012423 maintenance Methods 0.000 claims description 9
- 238000012502 risk assessment Methods 0.000 claims description 9
- 238000012986 modification Methods 0.000 claims description 8
- 230000004048 modification Effects 0.000 claims description 8
- 230000008676 import Effects 0.000 claims description 6
- 238000013507 mapping Methods 0.000 claims description 6
- 238000012795 verification Methods 0.000 claims description 6
- 238000004590 computer program Methods 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims description 5
- 238000004422 calculation algorithm Methods 0.000 claims description 4
- 238000011217 control strategy Methods 0.000 claims description 3
- 230000005283 ground state Effects 0.000 claims description 3
- 238000007639 printing Methods 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 238000011002 quantification Methods 0.000 claims description 3
- 238000011158 quantitative evaluation Methods 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 claims description 3
- 230000001960 triggered effect Effects 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Geometry (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to dispatching of power netwoks technical fields, more particularly to a kind of intelligent scheduling predetermined plan management method and platform, by to the check of operation of power networks state and the emulation of power grid accident, establish various dimensions intelligent scheduling expert model, realize intellectual analysis power grid accident in logical communication link, and power grid security analytical calculation is combined, realize scheduling accident prediction dynamic generation and verifying function;The intelligent scheduling predetermined plan management method realizes its function by following module: EMS and BPA model management module, fault set management module, responsible consumer management module, safe operation of electric network check module, power networks risk evaluation module, intelligent scheduling expert model management module, operation of power networks accident handling scheme module, prediction scheme self checking management module.Beneficial effects of the present invention are to improve the management level of dispatching of power netwoks prediction scheme, realize the warning function of dispatching of power netwoks, so as to ensure the safe and stable operation of electric system.
Description
Technical field
The present invention relates to dispatching of power netwoks technical fields, and in particular to a kind of intelligent scheduling predetermined plan management method and platform.
Background technique
In order to quickly cope with power grid exception and failure, needs to write a large amount of dispatch reserve plan auxiliary and carry out at power grid accident
Reason, and lean on dispatcher's manual compiling entirely at present, not only writes that task is heavy, the actual effect of prediction scheme, accuracy, with physical fault
Objectively there is also different degrees of differences for the goodness of fit, cause prediction scheme operability not strong, are not achieved the functional requirement of prediction scheme, and one
Determine to delay accident treatment in degree.Currently, dispatching of power netwoks prediction scheme depends on artificial experience more, it is not accurate enough, it is difficult to ensure electricity
The safe and stable operation of Force system.
The present invention is by establishing various dimensions intelligent scheduling expert's mould to the check of operation of power networks state and the emulation of power grid accident
Type, realize intellectual analysis power grid accident in logical communication link, and combine power grid security analytical calculation, realize scheduling accident prediction
Dynamic generation and verifying function.
Summary of the invention
The embodiment of the present invention is designed to provide a kind of intelligent scheduling predetermined plan management method and platform, improves dispatching of power netwoks
The management of prediction scheme ensures the safe and stable operation of electric system.
To achieve the above object, in a first aspect, the embodiment of the invention provides a kind of intelligent scheduling predetermined plan management method, packet
It includes:
By establishing various dimensions intelligent scheduling expert model to the check of operation of power networks state and the emulation of power grid accident, intelligence is realized
Can analyze in power grid accident logical communication link, and combine power grid security analytical calculation, realize scheduling accident prediction dynamic generation
And verifying function;The intelligent scheduling predetermined plan management method realizes its function: EMS and BPA model management by following module
Module, fault set management module, responsible consumer management module, safe operation of electric network check module, power networks risk assesses mould
Block, intelligent scheduling expert model management module, operation of power networks accident handling scheme module, prediction scheme self checking management module.
Preferably, this method further include:
The EMS and BPA model management module, the module realize the mapping in tidal current analysis between EMS model and BPA model
Relation management provides the foundation support for intelligent scheduling predetermined plan management method, supports the newly-increased of data, editor, deletes and inquire
Function;
The EMS and BPA model management module establish reflecting between EMS model and BPA model by parsing EMS/CIM file
Relationship is penetrated, mapping relations unrecognized for system provide manual intervention function;
The EMS and BPA model management module have the management of equipment naming rule and verifying function, guarantee device name, website
Entitled Uniform Name mode;
The EMS and BPA model management module have and can control the permission for filling in field during modification, retain trace;
The EMS and BPA model management module have classified inquiry statistical function, have fuzzy search inquiry and accurate inquiry function
Can, and inquiry, export and printing function are provided.
Preferably, this method further include:
The fault set management module, the module have fault set maintenance management function, including to fault set it is newly-increased, delete,
Modification is consulted, query function;
The fault set management module further includes inquiry fault set function sub-modules, which can by input inquiry condition
The fault set information of corresponding conditions is consulted, click, which empties criteria button, can reset the inquiry content of filling;
The fault set management module further includes updating fault set function sub-modules, and the submodule is according to daily access system
CIM model carries out network topology, identifies the grid structure of current electric grid, and using fault set generating algorithm, simulation generates 220kV
Or more route N-1, route N-2, main transformer N-1, bus N-1, bus N-2 and with tower line fault card, for a few days ago or in short term
The pre-control of future risk provides base support;
The fault set management module further includes newly-increased fault set function sub-modules, the submodule realize maintenance to failure card,
Management and displaying function can specify failure card by route, main transformer or crew grouping is manually specified, be that daily power networks risk is pre-
Control provides base support.
Preferably, this method further include:
The responsible consumer management module is used to provide the importing of responsible consumer table, export, and to the increasing newly of responsible consumer table, delete
It removes, modify, query function;
The responsible consumer management module has responsible consumer query function, can consult corresponding conditions by input inquiry condition
Responsible consumer information, the inquiry content of filling can be reset by clicking reset button;
The responsible consumer management module has responsible consumer import feature, by the text for selecting the responsible consumer information that need to be imported
Part and path can import responsible consumer information;
The responsible consumer management module has newly-increased responsible consumer, editor and deletes function, can carry out to important user information
Increase, editor and delete operation;
The responsible consumer management module has responsible consumer export function, and responsible consumer information can be exported as to excel file.
Preferably, this method further include:
The safe operation of electric network checks module and is used to carry out safety check and early warning, the work of the module to power grid day-to-day operation
Step includes:
1) fault set, specified similar day are specified;
2) according to specified similar day, corresponding CIM file is obtained;
3) starting EMS model generates BPA model file to BPA model conversion program;
4) electric system simulation analysis is executed, ground state tidal current analysis result is returned;
5) forecast failure collection is integrated, Failure Simulation model is generated;
6) prepared auto restart Strategy Simulation and stability control strategy emulation are triggered;
7) breadth search, statistics loss website and load, responsible consumer, loss power output are used, carries out risk assessment, calculating meets accident
Therefore event class;
8) fault case tidal current analysis is carried out, limit information, including out-of-limit route, transformer, section information are got in judgement.
Preferably, this method further include:
The power networks risk evaluation module, the module are used for operation of power networks wind caused by under maintenance plan or specified failure
Danger is analyzed, and is evaluated damage sequence, is carried out the quantitative evaluation of power networks risk, venture influence and risk probability are determined etc.
Grade divides, and judges quantification gradation locating for venture influence and risk probability.
The intelligent scheduling expert model management module, the module are power grid for safeguarding intelligent scheduling expert model library
Interruption of service disposal method provides decision recommendation, comprising: whether preferably considers the adjustment method of operation, such as puts into route, or close
Bus connection switch;Whether preferentially element near adjustment faulty equipment, such as website or route near first search fault point;By equipment into
Row piece Division, the adjustment method of operation preferentially carry out section equipment adjustment;Whether adjustment voltage levels equipment is paid the utmost attention to;
The operation of power networks accident handling scheme module, the module are realized to the net in risk assessment there are power networks risk
Frame generates corresponding operation of power networks accident handling prediction scheme in conjunction with intelligent scheduling expert model;
The prediction scheme self checking management module, the module are realized based on the accident prediction self checking under present or future state;Work as electricity
After web frame changes, by artificial or regular setting, self checking will be carried out to the prediction scheme collection to enter into force in the past, discovery is not
Automatic prompt is alarmed when rationally, provides the more new suggested of prediction scheme, requests artificial check and approve;Rely on oneself of verification experts database progress prediction scheme
Unreasonable auxiliary strategy is fallen in dynamic verification assessment, locking, while prompting locking reason.
Preferably, this method further includes the intelligent early-warning function of dispatch reserve plan:
Obtain the dispatching of power netwoks prediction scheme data in certain period;The dispatching of power netwoks prediction scheme data include accident prediction title, prediction scheme
Number, summarize, in advance the method for operation, fault setting, the subsequent method of operation, subsequent risk analysis, mainly control target, at accident
Reason process and main points, accident impact assessment, remarks;
According to the Analysis of failure frequency in dispatching of power netwoks prediction scheme data, fault prediction model is established;
The dispatching of power netwoks prediction scheme data of current time are obtained, it is pre- by dispatching of power netwoks prediction scheme data and the failure of the current time
It surveys model to be compared, prejudges the value-at-risk of the dispatching of power netwoks prediction scheme data of current time, when value-at-risk is more than preset
Threshold value of warning then issues early warning report to administrator;
Fault prediction model is established according to the Analysis of failure frequency in dispatching of power netwoks prediction scheme data to specifically include:
Select different faulty equipments;By the statistical analysis to the faulty equipment, the occurrence frequency of the faulty equipment is obtained;Root
The fault prediction model of the faulty equipment is produced according to fault occurrence frequency.
On the other hand, the invention also provides a kind of intelligent scheduling program management platform, which realizes described one
Kind intelligent scheduling predetermined plan management method.
On the other hand, the invention also provides a kind of computer equipment, including memory, processor and it is stored in memory
Computer program that is upper and can running on a processor, the processor realize a kind of intelligence when executing described program
Dispatch reserve plan management method.
On the other hand, the invention also provides a kind of computer readable storage medium, it is stored thereon with computer program, it should
A kind of intelligent scheduling predetermined plan management method is realized when program is executed by processor.
Beneficial effects of the present invention are a kind of intelligent scheduling predetermined plan management method and platform proposed through the invention, complete
The way to manage of dispatching of power netwoks prediction scheme has been apt to it, has improved the management level of dispatching of power netwoks prediction scheme, by dispatching of power netwoks prediction scheme phase
It closes information to be analyzed, the warning function of dispatching of power netwoks may be implemented, so as to ensure the safe and stable operation of electric system.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar element
Or part is generally identified by similar appended drawing reference.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is the structural schematic diagram of a kind of intelligent scheduling predetermined plan management method and platform provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
Referring to FIG. 1, being the structural schematic diagram of a kind of intelligent scheduling predetermined plan management method and platform provided by the invention.This
Inventive embodiments provide a kind of intelligent scheduling predetermined plan management method, comprising:
By establishing various dimensions intelligent scheduling expert model to the check of operation of power networks state and the emulation of power grid accident, intelligence is realized
Can analyze in power grid accident logical communication link, and combine power grid security analytical calculation, realize scheduling accident prediction dynamic generation
And verifying function;The intelligent scheduling predetermined plan management method realizes its function: EMS and BPA model management by following module
Module, fault set management module, responsible consumer management module, safe operation of electric network check module, power networks risk assesses mould
Block, intelligent scheduling expert model management module, operation of power networks accident handling scheme module, prediction scheme self checking management module.
Preferably, this method further include:
The EMS and BPA model management module, the module realize the mapping in tidal current analysis between EMS model and BPA model
Relation management provides the foundation support for intelligent scheduling predetermined plan management method, supports the newly-increased of data, editor, deletes and inquire
Function;
The EMS and BPA model management module establish reflecting between EMS model and BPA model by parsing EMS/CIM file
Relationship is penetrated, mapping relations unrecognized for system provide manual intervention function;
The EMS and BPA model management module have the management of equipment naming rule and verifying function, guarantee device name, website
Entitled Uniform Name mode;
The EMS and BPA model management module have and can control the permission for filling in field during modification, retain trace;
The EMS and BPA model management module have classified inquiry statistical function, have fuzzy search inquiry and accurate inquiry function
Can, and inquiry, export and printing function are provided.
Preferably, this method further include:
The fault set management module, the module have fault set maintenance management function, including to fault set it is newly-increased, delete,
Modification is consulted, query function;
The fault set management module further includes inquiry fault set function sub-modules, which can by input inquiry condition
The fault set information of corresponding conditions is consulted, click, which empties criteria button, can reset the inquiry content of filling;
The fault set management module further includes updating fault set function sub-modules, and the submodule is according to daily access system
CIM model carries out network topology, identifies the grid structure of current electric grid, and using fault set generating algorithm, simulation generates 220kV
Or more route N-1, route N-2, main transformer N-1, bus N-1, bus N-2 and with tower line fault card, for a few days ago or in short term
The pre-control of future risk provides base support;
The fault set management module further includes newly-increased fault set function sub-modules, the submodule realize maintenance to failure card,
Management and displaying function can specify failure card by route, main transformer or crew grouping is manually specified, be that daily power networks risk is pre-
Control provides base support.
Preferably, this method further include:
The responsible consumer management module is used to provide the importing of responsible consumer table, export, and to the increasing newly of responsible consumer table, delete
It removes, modify, query function;
The responsible consumer management module has responsible consumer query function, can consult corresponding conditions by input inquiry condition
Responsible consumer information, the inquiry content of filling can be reset by clicking reset button;
The responsible consumer management module has responsible consumer import feature, by the text for selecting the responsible consumer information that need to be imported
Part and path can import responsible consumer information;
The responsible consumer management module has newly-increased responsible consumer, editor and deletes function, can carry out to important user information
Increase, editor and delete operation;
The responsible consumer management module has responsible consumer export function, and responsible consumer information can be exported as to excel file.
Preferably, this method further include:
The safe operation of electric network checks module and is used to carry out safety check and early warning, the work of the module to power grid day-to-day operation
Step includes:
1) fault set, specified similar day are specified;
2) according to specified similar day, corresponding CIM file is obtained;
3) starting EMS model generates BPA model file to BPA model conversion program;
4) electric system simulation analysis is executed, ground state tidal current analysis result is returned;
5) forecast failure collection is integrated, Failure Simulation model is generated;
6) prepared auto restart Strategy Simulation and stability control strategy emulation are triggered;
7) breadth search, statistics loss website and load, responsible consumer, loss power output are used, carries out risk assessment, calculating meets accident
Therefore event class;
8) fault case tidal current analysis is carried out, limit information, including out-of-limit route, transformer, section information are got in judgement.
Preferably, this method further include:
The power networks risk evaluation module, the module are used for operation of power networks wind caused by under maintenance plan or specified failure
Danger is analyzed, and is evaluated damage sequence, is carried out the quantitative evaluation of power networks risk, venture influence and risk probability are determined etc.
Grade divides, and judges quantification gradation locating for venture influence and risk probability.
The intelligent scheduling expert model management module, the module are power grid for safeguarding intelligent scheduling expert model library
Interruption of service disposal method provides decision recommendation, comprising: whether preferably considers the adjustment method of operation, such as puts into route, or close
Bus connection switch;Whether preferentially element near adjustment faulty equipment, such as website or route near first search fault point;By equipment into
Row piece Division, the adjustment method of operation preferentially carry out section equipment adjustment;Whether adjustment voltage levels equipment is paid the utmost attention to;
The operation of power networks accident handling scheme module, the module are realized to the net in risk assessment there are power networks risk
Frame generates corresponding operation of power networks accident handling prediction scheme in conjunction with intelligent scheduling expert model;
The prediction scheme self checking management module, the module are realized based on the accident prediction self checking under present or future state;Work as electricity
After web frame changes, by artificial or regular setting, self checking will be carried out to the prediction scheme collection to enter into force in the past, discovery is not
Automatic prompt is alarmed when rationally, provides the more new suggested of prediction scheme, requests artificial check and approve;Rely on oneself of verification experts database progress prediction scheme
Unreasonable auxiliary strategy is fallen in dynamic verification assessment, locking, while prompting locking reason.
Preferably, this method further includes the intelligent early-warning function of dispatch reserve plan:
Obtain the dispatching of power netwoks prediction scheme data in certain period;The dispatching of power netwoks prediction scheme data include accident prediction title, prediction scheme
Number, summarize, in advance the method for operation, fault setting, the subsequent method of operation, subsequent risk analysis, mainly control target, at accident
Reason process and main points, accident impact assessment, remarks;
According to the Analysis of failure frequency in dispatching of power netwoks prediction scheme data, fault prediction model is established;
The dispatching of power netwoks prediction scheme data of current time are obtained, it is pre- by dispatching of power netwoks prediction scheme data and the failure of the current time
It surveys model to be compared, prejudges the value-at-risk of the dispatching of power netwoks prediction scheme data of current time, when value-at-risk is more than preset
Threshold value of warning then issues early warning report to administrator;
Fault prediction model is established according to the Analysis of failure frequency in dispatching of power netwoks prediction scheme data to specifically include:
Select different faulty equipments;By the statistical analysis to the faulty equipment, the occurrence frequency of the faulty equipment is obtained;Root
The fault prediction model of the faulty equipment is produced according to fault occurrence frequency.
On the other hand, the invention also provides a kind of intelligent scheduling program management platform, which realizes described one
Kind intelligent scheduling predetermined plan management method.
On the other hand, the invention also provides a kind of computer equipment, including memory, processor and it is stored in memory
Computer program that is upper and can running on a processor, the processor realize a kind of intelligence when executing described program
Dispatch reserve plan management method.
On the other hand, the invention also provides a kind of computer readable storage medium, it is stored thereon with computer program, it should
A kind of intelligent scheduling predetermined plan management method is realized when program is executed by processor.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware
With the interchangeability of software, each exemplary composition and step are generally described according to function in the above description.This
A little functions are implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Specially
Industry technical staff can use different methods to achieve the described function each specific application, but this realization is not
It is considered as beyond the scope of this invention.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through it
Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only
Only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can be tied
Another system is closed or is desirably integrated into, or some features can be ignored or not executed.In addition, shown or discussed phase
Mutually between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication of device or unit
Connection is also possible to electricity, mechanical or other form connections.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.Some or all of unit therein can be selected to realize the embodiment of the present invention according to the actual needs
Purpose.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, is also possible to two or more units and is integrated in one unit.It is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can be personal computer, server or the network equipment etc.) executes each embodiment the method for the present invention
All or part of the steps.And storage medium above-mentioned includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store
The medium of program code.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace
It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right
It is required that protection scope subject to.
Claims (10)
1. a kind of intelligent scheduling predetermined plan management method characterized by comprising
By establishing various dimensions intelligent scheduling expert model to the check of operation of power networks state and the emulation of power grid accident, intelligence is realized
Can analyze in power grid accident logical communication link, and combine power grid security analytical calculation, realize scheduling accident prediction dynamic generation
And verifying function;The intelligent scheduling predetermined plan management method realizes its function: EMS and BPA model management by following module
Module, fault set management module, responsible consumer management module, safe operation of electric network check module, power networks risk assesses mould
Block, intelligent scheduling expert model management module, operation of power networks accident handling scheme module, prediction scheme self checking management module.
2. a kind of intelligent scheduling predetermined plan management method according to claim 1, which is characterized in that this method further include:
The EMS and BPA model management module, the module realize the mapping in tidal current analysis between EMS model and BPA model
Relation management provides the foundation support for intelligent scheduling predetermined plan management method, supports the newly-increased of data, editor, deletes and inquire
Function;
The EMS and BPA model management module establish reflecting between EMS model and BPA model by parsing EMS/CIM file
Relationship is penetrated, mapping relations unrecognized for system provide manual intervention function;
The EMS and BPA model management module have the management of equipment naming rule and verifying function, guarantee device name, website
Entitled Uniform Name mode;
The EMS and BPA model management module have and can control the permission for filling in field during modification, retain trace;
The EMS and BPA model management module have classified inquiry statistical function, have fuzzy search inquiry and accurate inquiry function
Can, and inquiry, export and printing function are provided.
3. a kind of intelligent scheduling predetermined plan management method according to claim 1, which is characterized in that this method further include:
The fault set management module, the module have fault set maintenance management function, including to fault set it is newly-increased, delete,
Modification is consulted, query function;
The fault set management module further includes inquiry fault set function sub-modules, which can by input inquiry condition
The fault set information of corresponding conditions is consulted, click, which empties criteria button, can reset the inquiry content of filling;
The fault set management module further includes updating fault set function sub-modules, and the submodule is according to daily access system
CIM model carries out network topology, identifies the grid structure of current electric grid, and using fault set generating algorithm, simulation generates 220kV
Or more route N-1, route N-2, main transformer N-1, bus N-1, bus N-2 and with tower line fault card, for a few days ago or in short term
The pre-control of future risk provides base support;
The fault set management module further includes newly-increased fault set function sub-modules, the submodule realize maintenance to failure card,
Management and displaying function can specify failure card by route, main transformer or crew grouping is manually specified, be that daily power networks risk is pre-
Control provides base support.
4. a kind of intelligent scheduling predetermined plan management method according to claim 1, which is characterized in that this method further include:
The responsible consumer management module is used to provide the importing of responsible consumer table, export, and to the increasing newly of responsible consumer table, delete
It removes, modify, query function;
The responsible consumer management module has responsible consumer query function, can consult corresponding conditions by input inquiry condition
Responsible consumer information, the inquiry content of filling can be reset by clicking reset button;
The responsible consumer management module has responsible consumer import feature, by the text for selecting the responsible consumer information that need to be imported
Part and path can import responsible consumer information;
The responsible consumer management module has newly-increased responsible consumer, editor and deletes function, can carry out to important user information
Increase, editor and delete operation;
The responsible consumer management module has responsible consumer export function, and responsible consumer information can be exported as to excel text
Part.
5. a kind of intelligent scheduling predetermined plan management method according to claim 1, which is characterized in that this method further include:
The safe operation of electric network checks module and is used to carry out safety check and early warning, the work of the module to power grid day-to-day operation
Step includes:
1) fault set, specified similar day are specified;
2) according to specified similar day, corresponding CIM file is obtained;
3) starting EMS model generates BPA model file to BPA model conversion program;
4) electric system simulation analysis is executed, ground state tidal current analysis result is returned;
5) forecast failure collection is integrated, Failure Simulation model is generated;
6) prepared auto restart Strategy Simulation and stability control strategy emulation are triggered;
7) breadth search, statistics loss website and load, responsible consumer, loss power output are used, carries out risk assessment, calculating meets accident
Therefore event class;
8) fault case tidal current analysis is carried out, limit information, including out-of-limit route, transformer, section information are got in judgement.
6. a kind of intelligent scheduling predetermined plan management method according to claim 1, which is characterized in that this method further include:
The power networks risk evaluation module, the module are used for operation of power networks wind caused by under maintenance plan or specified failure
Danger is analyzed, and is evaluated damage sequence, is carried out the quantitative evaluation of power networks risk, venture influence and risk probability are determined etc.
Grade divides, and judges quantification gradation locating for venture influence and risk probability.
The intelligent scheduling expert model management module, the module are operation of power networks for safeguarding intelligent scheduling expert model library
Accident handling scheme provides decision recommendation, comprising: whether preferably considers the adjustment method of operation, such as puts into route, or close mother
Switch;Whether preferentially element near adjustment faulty equipment, such as website or route near first search fault point;Equipment is subjected to piece
Division, the adjustment method of operation preferentially carry out section equipment adjustment;Whether adjustment voltage levels equipment is paid the utmost attention to;
The operation of power networks accident handling scheme module, the module are realized to the net in risk assessment there are power networks risk
Frame generates corresponding operation of power networks accident handling prediction scheme in conjunction with intelligent scheduling expert model;
The prediction scheme self checking management module, the module are realized based on the accident prediction self checking under present or future state;Work as electricity
After web frame changes, by artificial or regular setting, self checking will be carried out to the prediction scheme collection to enter into force in the past, discovery is not
Automatic prompt is alarmed when rationally, provides the more new suggested of prediction scheme, requests artificial check and approve;Rely on oneself of verification experts database progress prediction scheme
Unreasonable auxiliary strategy is fallen in dynamic verification assessment, locking, while prompting locking reason.
7. a kind of intelligent scheduling predetermined plan management method according to claim 1, which is characterized in that this method further includes scheduling
The intelligent early-warning function of prediction scheme:
Obtain the dispatching of power netwoks prediction scheme data in certain period;The dispatching of power netwoks prediction scheme data include accident prediction title, prediction scheme
Number, summarize, in advance the method for operation, fault setting, the subsequent method of operation, subsequent risk analysis, mainly control target, at accident
Reason process and main points, accident impact assessment, remarks;
According to the Analysis of failure frequency in dispatching of power netwoks prediction scheme data, fault prediction model is established;
The dispatching of power netwoks prediction scheme data of current time are obtained, it is pre- by dispatching of power netwoks prediction scheme data and the failure of the current time
It surveys model to be compared, prejudges the value-at-risk of the dispatching of power netwoks prediction scheme data of current time, when value-at-risk is more than preset
Threshold value of warning then issues early warning report to administrator;
Fault prediction model is established according to the Analysis of failure frequency in dispatching of power netwoks prediction scheme data to specifically include:
Select different faulty equipments;By the statistical analysis to the faulty equipment, the occurrence frequency of the faulty equipment is obtained;Root
The fault prediction model of the faulty equipment is produced according to fault occurrence frequency.
8. a kind of intelligent scheduling program management platform, it is characterised in that: the platform realizes one described in one of claim 1-7
Kind intelligent scheduling predetermined plan management method.
9. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, which is characterized in that the processor realizes a kind of intelligence described in one of claim 1-7 when executing described program
Dispatch reserve plan management method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor
A kind of intelligent scheduling predetermined plan management method described in one of claim 1-7 is realized when execution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910467973.9A CN110378801A (en) | 2019-05-31 | 2019-05-31 | A kind of intelligent scheduling predetermined plan management method and platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910467973.9A CN110378801A (en) | 2019-05-31 | 2019-05-31 | A kind of intelligent scheduling predetermined plan management method and platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110378801A true CN110378801A (en) | 2019-10-25 |
Family
ID=68248833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910467973.9A Pending CN110378801A (en) | 2019-05-31 | 2019-05-31 | A kind of intelligent scheduling predetermined plan management method and platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110378801A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110890755A (en) * | 2019-12-17 | 2020-03-17 | 国电南瑞科技股份有限公司 | Fault disposal plan online checking and intelligent compiling method and system |
CN111144747A (en) * | 2019-12-26 | 2020-05-12 | 广东电网有限责任公司 | Power dispatching overall process evaluation computer device, method and equipment |
CN113794273A (en) * | 2021-07-26 | 2021-12-14 | 国网天津市电力公司 | Power supply user intelligent risk monitoring and assistant decision making system and method |
CN114897247A (en) * | 2022-05-16 | 2022-08-12 | 湖北精准极速科技有限公司 | Smart power grid distribution network dispatching operation management method based on big data |
CN117057590A (en) * | 2023-10-11 | 2023-11-14 | 国网山东省电力公司博兴县供电公司 | Power grid overhaul management system and method |
-
2019
- 2019-05-31 CN CN201910467973.9A patent/CN110378801A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110890755A (en) * | 2019-12-17 | 2020-03-17 | 国电南瑞科技股份有限公司 | Fault disposal plan online checking and intelligent compiling method and system |
CN111144747A (en) * | 2019-12-26 | 2020-05-12 | 广东电网有限责任公司 | Power dispatching overall process evaluation computer device, method and equipment |
CN113794273A (en) * | 2021-07-26 | 2021-12-14 | 国网天津市电力公司 | Power supply user intelligent risk monitoring and assistant decision making system and method |
CN114897247A (en) * | 2022-05-16 | 2022-08-12 | 湖北精准极速科技有限公司 | Smart power grid distribution network dispatching operation management method based on big data |
CN117057590A (en) * | 2023-10-11 | 2023-11-14 | 国网山东省电力公司博兴县供电公司 | Power grid overhaul management system and method |
CN117057590B (en) * | 2023-10-11 | 2024-02-02 | 国网山东省电力公司博兴县供电公司 | Power grid overhaul management system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110378801A (en) | A kind of intelligent scheduling predetermined plan management method and platform | |
Taheri et al. | Distribution system resilience enhancement via mobile emergency generators | |
CN110428123A (en) | A kind of operation of power networks state is checked and accident prediction dynamic generating system | |
Zio | Challenges in the vulnerability and risk analysis of critical infrastructures | |
Eusgeld et al. | The role of network theory and object-oriented modeling within a framework for the vulnerability analysis of critical infrastructures | |
Gholami et al. | A hierarchical response-based approach to the load restoration problem | |
Wang et al. | Dynamic reserve zones for day-ahead unit commitment with renewable resources | |
CN111489091A (en) | Comprehensive evaluation method for restoring force of power system | |
CN106201722A (en) | The load regulation method of server and system | |
CN103761624A (en) | Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system | |
CN106681169B (en) | A kind of electric system peace controls emulation integrated platform and its emulation mode | |
CN103825755A (en) | Power secondary system modeling method and system | |
CN105184490B (en) | Forming Electrical Dispatching Command Tickets process risk assists Pre-control System | |
Dehghani et al. | Multi-stage resilience management of smart power distribution systems: A stochastic robust optimization model | |
CN111047143A (en) | Power grid OMS-based regional and county team index management system | |
CN115796399B (en) | Intelligent scheduling method, device, equipment and storage medium based on electric power supplies | |
CN110348674A (en) | A kind of power grid risk assessment method, system and computer readable storage medium | |
CN113852083A (en) | Automatic searching and early warning method, device and equipment for power grid cascading failure | |
CN115619162A (en) | Power supply service command system based on cloud platform and micro-service architecture | |
CN109002901A (en) | A kind of province ground county's integration electric network information total management system and device | |
CN103679557A (en) | Power grid operating mode data managing system based on C/S framework and achieving method for power grid operating mode data managing system | |
CN111582744A (en) | Fault disposal plan on-line checking parallel computing method and system | |
Zhou et al. | Robustness analysis of power system dynamic process and repair strategy | |
CN109038566A (en) | A kind of power system security stabilization control device is when being worth tactful exploitativeness appraisal procedure | |
CN115577996B (en) | Risk assessment method, system, equipment and medium for power grid power failure plan |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191025 |