CN110378551A - A kind of vcehicular tunnel facility military service method of evaluating performance based on big data - Google Patents

A kind of vcehicular tunnel facility military service method of evaluating performance based on big data Download PDF

Info

Publication number
CN110378551A
CN110378551A CN201910485336.4A CN201910485336A CN110378551A CN 110378551 A CN110378551 A CN 110378551A CN 201910485336 A CN201910485336 A CN 201910485336A CN 110378551 A CN110378551 A CN 110378551A
Authority
CN
China
Prior art keywords
evaluation
tunnel
military service
index
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910485336.4A
Other languages
Chinese (zh)
Inventor
许崇帮
张劲泉
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute Of Highway Science Ministry Of Transport
Research Institute of Highway Ministry of Transport
Original Assignee
Institute Of Highway Science Ministry Of Transport
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute Of Highway Science Ministry Of Transport filed Critical Institute Of Highway Science Ministry Of Transport
Priority to CN201910485336.4A priority Critical patent/CN110378551A/en
Publication of CN110378551A publication Critical patent/CN110378551A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

A kind of vcehicular tunnel military service method of evaluating performance based on big data, influence and restriction according to Highway Tunnel Construction each construction period to tunnel operation safety construct vcehicular tunnel facility military service Evaluating Models, evaluation index;It proposes a kind of vcehicular tunnel facility military service method of evaluating performance of hierarchical structure+Fuzzy Calculation according to evaluation model, the weight of each evaluation index has been determined;Related data sample database is established according to subject evaluation index value to be evaluated, relevant calculation parameter is determined by sample data, metrics evaluation values at different levels are obtained by Fuzzy Calculation, to realize the evaluation to vcehicular tunnel facility military service performance.The evaluation method can obtain reliable evaluation result according to the analysis to big figureofmerit sample data, realize the theoretical prediction to vcehicular tunnel facility military service performance.

Description

A kind of vcehicular tunnel facility military service method of evaluating performance based on big data
Technical field
The invention belongs to Highway Tunnel Construction and city underground field of engineering technology.Rank is respectively built according to Highway Tunnel Construction Influence and restriction of the section to tunnel operation safety, construct vcehicular tunnel facility military service Evaluating Models, evaluation index;According to A kind of vcehicular tunnel facility military service method of evaluating performance of hierarchical structure+Fuzzy Calculation is proposed according to evaluation model, has been determined respectively The weight of evaluation index;Related data sample database is established according to subject evaluation index value to be evaluated, correlometer is determined by sample data Parameter is calculated, metrics evaluation values at different levels are obtained by Fuzzy Calculation, to realize the evaluation to vcehicular tunnel facility military service performance.It should Evaluation method can obtain reliable evaluation result according to the analysis to big figureofmerit sample data, realize and take to vcehicular tunnel facility Use as a servant the theoretical prediction of performance.
Background technique
Currently, special testing result of the vcehicular tunnel facility military service performance evaluation mostly foundation to entity Tunnel Engineering, usually Cause that the project implementation is costly, the period is long.With the fast development of big data technology, can be realized using big data technology to sample The high accuracy analysis of data, meanwhile, the acquisition to Massive Sample data can also be realized, by a large amount of Tunnel Engineering military service performances Sample data acquisition can realize the prediction point to special detection Highway Tunnel Construction military service performance is not done by building evaluation model Analysis.It has been recognised by the inventors that by the way that big data technology in such a way that tunnel facility military service Evaluating Models combine, is solved highway The forecasting problem of tunnel basis facility military service performance, saves unnecessary engineering detecting.Therefore, the present inventor completes this hair It is bright.
Summary of the invention
Influence and restriction according to Highway Tunnel Construction each construction period to tunnel operation safety, construct vcehicular tunnel Facility military service Evaluating Models, evaluation index;A kind of highway tunnel of hierarchical structure+Fuzzy Calculation is proposed according to evaluation model Facility military service method of evaluating performance in road has determined the weight of each evaluation index;It is established according to subject evaluation index value to be evaluated related Data sample library determines relevant calculation parameter by sample data, metrics evaluation values at different levels is obtained by Fuzzy Calculation, to realize Evaluation to vcehicular tunnel facility military service performance.The evaluation method can obtain reliable according to the analysis to big figureofmerit sample data Evaluation result, realize theoretical prediction to vcehicular tunnel facility military service performance.
Technical solution of the present invention is as follows:
Vcehicular tunnel facility military service method of evaluating performance based on big data, which is characterized in that construct and cover engineering and survey It examines, the two-stage model of fuzzy synthetic evaluation of engineering design and engineering construction three classes evaluation index.
The engineering investigation, engineering design and engineering construction are level-one evaluation index.
The engineering investigation class evaluation index include: formation lithology, geological structure, unfavorable geology, special rock, underground water and 6 evaluation indexes of climate characteristic.
The Engineering Design evaluation index includes: length of tunnel, lane quantity and two lining concrete and pavement structure class 4 evaluation indexes of type.
The engineering construction class evaluation index includes: construction quality, disaster accident and sand type, 3 evaluation indexes.
The formation lithology, geological structure, unfavorable geology, special rock, underground water and climate characteristic, length of tunnel, lane Quantity and two lining concrete and Pavement Structure, construction quality, disaster accident and sand type, 13 evaluation indexes are second level Evaluation index.
Evaluation indexes at different levels determine the weight of evaluation indexes at different levels according to comparison two-by-two.
The weight of the engineering investigation, engineering design and engineering construction three is respectively as follows: 0.438 0.239 0.323
The engineering investigation class formation lithology, geological structure, unfavorable geology, special rock, underground water and climate characteristic 6 comment The weight of valence index is respectively 0.17 0.13 0.17 0.17 0.23 0.13:.
The Engineering Design length of tunnel, lane quantity and two lining 4 evaluation indexes of concrete and Pavement Structure Weight be respectively 0.3 0.2 0.3 0.2.
The engineering construction class construction quality, disaster accident and sand type, the weight of 3 evaluation indexes are respectively 0.365 0.365 0.27。
According to Tunnel Engineering evaluation index value to be evaluated, two-level appraisement index value database is established;It is supported according to vcehicular tunnel Technical specification is protected, each tunnel evaluation index sample is divided into five grades according to tunnel technology of facilities status assessment standard, Each engineering technology situation membership function depends on sample statistics situation.
The evaluation index database include: formation lithology database, geological structure database, unfavorable geology database, Special rock database, underground water database and weather property data base, length of tunnel database, lane quantity database and two linings Concrete database and Pavement Structure database, construction quality database, disaster accident database and sand categorical data Library.
Each engineering technology situation membership function depends on sample statistics situation, and degrees of membership at different levels are sample numbers at different levels The ratio of amount and database.
To the score value of imparting respectively 1 of each grade, 2,3,4,5, Fuzzy Calculation is carried out to score value and degree of membership, can get evaluation The Fuzzy comprehensive evalution of index.
The Fuzzy Calculation of the score value and degree of membership can be stated are as follows:
In formula:Fuzzy comprehensive evalution
The degree of membership that engineering technology situation grade is 1/2/3/4/5
I: all kinds of level-one evaluation indexes are indicated
J: all kinds of two-level appraisement indexs are indicated
It is comprehensive that obscuring for each level-one evaluation index of acquisition can be calculated by two-level index Fuzzy comprehensive evalution and each index weights Close evaluation of estimate.
The Fuzzy comprehensive evalution with each two-level appraisement index is row, that is, is constituted each under the type index subjet The matrix of the single factor test Fuzzy comprehensive evalution of evaluation index:
In formula: i K, J, S, j 1/2/3/4/5/6.
The weight of two-level index under each first class index collection, can obtain weight vectors:
In formula: i K, J, S, j 1/2/3/4/5/6.
The matrix of the single factor test Fuzzy comprehensive evalution by two-level appraisement index each in every first class index and each index Between weight vectors, obtain the Fuzzy comprehensive evalution of each level-one evaluation index:
In formula: QiFirst class index concentrates the Fuzzy comprehensive evalution of each evaluation index.
By the first class index Fuzzy comprehensive evalution and each index weights obtained, it can calculate and obtain tunnel facility military service performance Fuzzy comprehensive evalution.
It is described to concentrate the Fuzzy comprehensive evalution of each evaluation index for row with first class index, form the Dan Yin of first class index collection The matrix of plain Fuzzy comprehensive evalution:
PG=(QK QJ QS)T
The weight by level-one evaluation index, obtains weight vectors:
ωG=(ωK ωJ ωS)
The single factor evaluation matrix and weight vectors according to first class index collection, using following model of fuzzy synthetic evaluation Obtain the Fuzzy comprehensive evalution of facility military service performance in tunnel to be evaluated:
Q=ωGPG
In formula: ωGThe weight vectors of-index of classification collection;
PGThe matrix of-index of classification collection single factor test Fuzzy comprehensive evalution;
Q-tunnel facility military service performance Fuzzy comprehensive evalution.
According to the Fuzzy comprehensive evalution range of tunnel facility military service performance, establishes and determine tunnel facility military service performance etc. Grade.
The Fuzzy comprehensive evalution of the tunnel facility military service performance and tunnel facility military service performance rate relationship such as table institute Column.
Tunnel facility military service performance evaluation grade quantitatively divides
Military service performance rate Military service performance condition Fuzzy comprehensive evalution Q
1 class It is intact 1.5 >=Q > 1.0
2 classes Well 2.5 >=Q > 1.5
3 classes It is qualified 3.5 >=Q > 2.5
4 classes Difference 4.5 >=Q > 3.5
5 classes It is very poor Q > 4.5
Detailed description of the invention
Fig. 1 is vcehicular tunnel facility military service train diagram adjusting and evaluation model.
Appended drawing reference list following engineering investigation, engineering design, engineering construction be level-one evaluation index;
Engineering investigation is divided into: formation lithology, geological structure, unfavorable geology, Special Rock, underground water and climate characteristic 6 Two-level index;
Engineering design is divided into: length of tunnel, lane quantity, two lining 4 two-level index of concrete and Pavement Structure;
Engineering construction is divided into: 3 construction quality, disaster accident and sand type two-level index.
Specific embodiment
With reference to the accompanying drawing (Fig. 1) the present invention will be described.
Level according to figure 1 and index system determine the index set of each level respectively.
The first class index collection is as follows
Gi={ G1,G2,G3}
In formula: G1- engineering investigation;G2- engineering design;G3- engineering construction.
The two-level index collection
Engineering investigation: G1={K1, K2, K3, K4, K5, K6}
Engineering design: G2={ J1, J2, J3, J4}
Engineering construction: G3={ S1, S2, S3}
In formula: K1- formation lithology;K2- geological structure;K3- unfavorable geology;K4- Special Rock;K5- underground water; K6- climate characteristic.J1- length of tunnel;J2- lane quantity;J3- bis- lining concrete;J4- Pavement Structure.S1- construction Quality;S2- disaster accident;S3- sand type.
The determination of the tunnel military service Performance Evaluating Indexes weight
(1) two-level index collection weight
1. engineering investigation
Engineering investigation amounts to 6 indexs, is formation lithology (K respectively1), geological structure (K2), unfavorable geology (K3), it is special Rock (K4), underground water (K5) and climate characteristic (K6), the scale weight ratio of 6 indexs are as follows:
2. engineering design
Four evaluation indexes of engineering design are respectively as follows: length of tunnel (J1), lane quantity (J2) and two lining concrete (J3) With Pavement Structure (J4).The scale weight of 4 evaluation indexes is
3. 3 indexs of engineering construction
Engineering construction class evaluation index includes construction quality (S1), disaster accident (S2), sand type (S3) three indexs, 3 The scale weight of a index is
(2) determination of each index weights of detection project layer
Vcehicular tunnel facility military service performance evaluation includes three index of classification, respectively engineering investigation (K), engineering design (J) and engineering construction (S).The scale weight of 3 index of classification is
K ωJ ωS)=(0.438 0.239 0.323)
The model of fuzzy synthetic evaluation of the vcehicular tunnel facility service state
(1) process evaluated
1) evaluation indice is established
First class index collection, two-level index collection are established according to Fig. 1 vcehicular tunnel facility military service train diagram adjusting;According to be evaluated Tunnel Engineering two-level appraisement index value chooses the sample data established and meet evaluation index value.
2) disease class set is established
Each tunnel evaluation index is divided into five grades according to tunnel technology of facilities status assessment standard:
V={ v1, v2, v3, v4, v5}
In formula: v1、v2、v3、v4、v5Respectively indicating Tunnel Engineering technology status grade is 1 class, 2 classes, 3 classes, 4 classes, 5 classes;And Score value 1,2,3,4,5 is assigned respectively.
3) membership function is established
According to big data statistical analysis technique, in tunnel military service performance evaluation two-level index concentrate each evaluation index relative to The membership function of all kinds of engineering technology situations is derived from the sample data of acquisition, and all kinds of to be subordinate to number form formula as follows:
In formula: n=1 class, 2 classes, 3 classes, 4 classes, 5 classes are five engineering technology situation grades;
CijFor each evaluation index of bottom index set;
N is the sample size for meeting evaluation index value;
MnThe sample size for being n for Tunnel Engineering technology status grade.
4) fuzzy overall evaluation of each index of two-level index collection
1. according to sample database to the statistical analysis of evaluation index, obtain two-level appraisement index its for each engineering technology The Membership Vestor of situation grade:
In formula: i K, J, S, j 1/2/3/4/5/6.
2. Membership Vestor uniformization.According to the assignment situation of each engineering technology situation grade, then each evaluation index is fuzzy Comprehensive evaluation value is calculated as follows:
3. being row with the Fuzzy comprehensive evalution of each two-level appraisement index, that is, constitutes and respectively commented under the first class index project The matrix of the single factor test Fuzzy comprehensive evalution of valence index:
In formula: i K, J, S, j 1/2/3/4/5/6.
4. determining the weight of two-level index under each first class index collection, weight vectors are obtained:
In formula: i K, J, S, j 1/2/3/4/5/6.
5. matrix and each index by the single factor test Fuzzy comprehensive evalution of two-level appraisement index each in each first class index Between weight vectors, obtain the Fuzzy comprehensive evalution of each level-one evaluation index with following model of fuzzy synthetic evaluation:
In formula: QiFirst class index concentrates the Fuzzy comprehensive evalution of each evaluation index.
5) fuzzy overall evaluation of tunnel facility military service performance
1. concentrating the Fuzzy comprehensive evalution of each evaluation index for row with first class index, the Dan Yin of the type index set is formed The matrix of plain Fuzzy comprehensive evalution:
PG=(QK QJ QS)T
2. determining that first class index concentrates the weight of each evaluation index, weight vectors are obtained:
ωG=(ωK ωJ ωS)
3. can be obtained with following model of fuzzy synthetic evaluation according to the single factor evaluation matrix and weight vectors of first class index collection To the Fuzzy comprehensive evalution of facility military service performance in tunnel to be evaluated:
Q=ωGPG
In formula: ωGThe weight vectors of-first class index collection;
PGThe matrix of-first class index collection single factor test Fuzzy comprehensive evalution;
Q-vcehicular tunnel facility military service Fuzzy Synthetic Evaluation for Performance value.
6) judgement of vcehicular tunnel facility military service performance synthesis opinion rating
The evaluation of vcehicular tunnel facility military service performance synthesis, the grade classification of base data values is according to highway tunnel maintenance Tunnel Engineering condition state is classified in technical specification and is developed, therefore, obtained vcehicular tunnel infrastructure is on active service The evaluation of performance according to it to provide to carry out quantification division, opinion rating such as table 1.
1 tunnel facility military service performance evaluation grade of table quantitatively divides
Military service performance rate Military service performance condition Fuzzy comprehensive evalution Q
1 class It is intact 1.5 >=Q > 1.0
2 classes Well 2.5 >=Q > 1.5
3 classes It is qualified 3.5 >=Q > 2.5
4 classes Difference 4.5 >=Q > 3.5
5 classes It is very poor Q > 4.5
It is hereby stated that described above facilitate those skilled in the art understand that the invention, but not limit the present invention The protection scope of creation.Any equivalent replacement described above, modification are improved without disengaging the invention substantive content And/or delete numerous conform to the principle of simplicity and the implementation that carries out, each fall within the protection scope of the invention.

Claims (6)

1. a kind of vcehicular tunnel military service method of evaluating performance based on big data, which is characterized in that construct cover engineering investigation, The two-stage model of fuzzy synthetic evaluation of engineering design and engineering construction three classes evaluation index.
2. a kind of vcehicular tunnel military service method of evaluating performance based on big data according to claim 1, which is characterized in that institute Stating engineering investigation, engineering design and engineering construction is level-one evaluation index;The formation lithology, geological structure, unfavorable geology, spy Different rock, underground water and climate characteristic, length of tunnel, lane quantity and two lining concrete and Pavement Structure, construction quality, calamity Evil accident and sand type, 13 evaluation indexes are two-level appraisement index.
3. a kind of vcehicular tunnel military service method of evaluating performance based on big data according to claim 2, which is characterized in that each Grade evaluation index determines the weight of evaluation indexes at different levels according to comparison two-by-two.
4. a kind of vcehicular tunnel military service method of evaluating performance based on big data according to claim 2, which is characterized in that according to According to Tunnel Engineering evaluation index value to be evaluated, two-level appraisement index value database is established;According to highway tunnel maintenance technical specification, Each tunnel evaluation index sample is divided into five grades, each engineering technology shape according to tunnel technology of facilities status assessment standard Condition membership function depends on sample statistics situation;Each engineering technology situation membership function depends on sample statistics shape Condition, degrees of membership at different levels are the ratio of sample sizes at different levels and database.
5. a kind of vcehicular tunnel military service method of evaluating performance based on big data according to claim 4, which is characterized in that by Two-level index Fuzzy comprehensive evalution and each index weights can calculate the Fuzzy comprehensive evalution for obtaining each level-one evaluation index;By The first class index Fuzzy comprehensive evalution and each index weights of acquisition, can calculate the fuzzy synthesis for obtaining tunnel facility military service performance Evaluation of estimate.
6. a kind of vcehicular tunnel military service method of evaluating performance based on big data according to claim 5, which is characterized in that root According to the Fuzzy comprehensive evalution range of tunnel facility military service performance, establishes and determine tunnel facility military service performance rate.
CN201910485336.4A 2019-06-05 2019-06-05 A kind of vcehicular tunnel facility military service method of evaluating performance based on big data Pending CN110378551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910485336.4A CN110378551A (en) 2019-06-05 2019-06-05 A kind of vcehicular tunnel facility military service method of evaluating performance based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910485336.4A CN110378551A (en) 2019-06-05 2019-06-05 A kind of vcehicular tunnel facility military service method of evaluating performance based on big data

Publications (1)

Publication Number Publication Date
CN110378551A true CN110378551A (en) 2019-10-25

Family

ID=68249769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910485336.4A Pending CN110378551A (en) 2019-06-05 2019-06-05 A kind of vcehicular tunnel facility military service method of evaluating performance based on big data

Country Status (1)

Country Link
CN (1) CN110378551A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101980A (en) * 2019-10-30 2020-05-05 交通运输部公路科学研究所 Equivalent evaluation method for bearing capacity of tunnel lining structure
CN111639837A (en) * 2020-04-30 2020-09-08 同济大学 Road network service performance evaluation method and device, storage medium and terminal
CN112418645A (en) * 2020-11-18 2021-02-26 云南航天工程物探检测股份有限公司 Tunnel engineering full life cycle safety evaluation method
CN114066183A (en) * 2021-11-02 2022-02-18 山东康威大数据科技有限公司 Tunnel monitoring system based on big data analysis
CN115545561A (en) * 2022-11-09 2022-12-30 交通运输部公路科学研究所 Safe and reliable service risk assessment method for highway tunnel facility
CN117217562A (en) * 2023-11-09 2023-12-12 交通运输部公路科学研究所 Structural safety evaluation method and system after tunnel water flooding-drainage
CN117875796A (en) * 2024-03-12 2024-04-12 交通运输部公路科学研究所 Highway tunnel maintenance level evaluation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104063612A (en) * 2014-07-02 2014-09-24 武汉理工大学 Tunnel engineering risk situation fuzzy evaluation method and system
CN106919784A (en) * 2017-01-19 2017-07-04 上海隧道工程有限公司 A kind of shield tunnel military service method of evaluating performance based on variable weight
CN106920040A (en) * 2017-03-01 2017-07-04 西南交通大学 Freeway tunnel street accidents risks appraisal procedure based on Fuzzy Level Analytic Approach

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104063612A (en) * 2014-07-02 2014-09-24 武汉理工大学 Tunnel engineering risk situation fuzzy evaluation method and system
CN106919784A (en) * 2017-01-19 2017-07-04 上海隧道工程有限公司 A kind of shield tunnel military service method of evaluating performance based on variable weight
CN106920040A (en) * 2017-03-01 2017-07-04 西南交通大学 Freeway tunnel street accidents risks appraisal procedure based on Fuzzy Level Analytic Approach

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔辉,施式亮: "《安全评价》", 31 March 2019, 中国矿业大学出版社 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101980A (en) * 2019-10-30 2020-05-05 交通运输部公路科学研究所 Equivalent evaluation method for bearing capacity of tunnel lining structure
CN111639837A (en) * 2020-04-30 2020-09-08 同济大学 Road network service performance evaluation method and device, storage medium and terminal
CN111639837B (en) * 2020-04-30 2023-02-10 同济大学 Road network service performance evaluation method and device, storage medium and terminal
CN112418645A (en) * 2020-11-18 2021-02-26 云南航天工程物探检测股份有限公司 Tunnel engineering full life cycle safety evaluation method
CN112418645B (en) * 2020-11-18 2024-02-02 云南航天工程物探检测股份有限公司 Tunnel engineering full life cycle safety evaluation method
CN114066183A (en) * 2021-11-02 2022-02-18 山东康威大数据科技有限公司 Tunnel monitoring system based on big data analysis
CN115545561A (en) * 2022-11-09 2022-12-30 交通运输部公路科学研究所 Safe and reliable service risk assessment method for highway tunnel facility
CN117217562A (en) * 2023-11-09 2023-12-12 交通运输部公路科学研究所 Structural safety evaluation method and system after tunnel water flooding-drainage
CN117217562B (en) * 2023-11-09 2024-01-23 交通运输部公路科学研究所 Structural safety evaluation method and system after tunnel water flooding-drainage
CN117875796A (en) * 2024-03-12 2024-04-12 交通运输部公路科学研究所 Highway tunnel maintenance level evaluation method
CN117875796B (en) * 2024-03-12 2024-05-07 交通运输部公路科学研究所 Highway tunnel maintenance level evaluation method

Similar Documents

Publication Publication Date Title
CN110378551A (en) A kind of vcehicular tunnel facility military service method of evaluating performance based on big data
Li et al. Unascertained measure model of water and mud inrush risk evaluation in karst tunnels and its engineering application
CN110929939B (en) Landslide hazard susceptibility spatial prediction method based on clustering-information coupling model
CN113570226A (en) Method for evaluating occurrence probability grade of tunnel water inrush disaster in fault fracture zone
CN104616093A (en) Earthquake disaster rescue command and dispatch system and method
CN111339486A (en) Deep foundation pit blasting vibration velocity risk level big data evaluation method
CN108332696B (en) Landslide monitoring method selection method
CN111898315A (en) Landslide susceptibility assessment method based on fractal-machine learning hybrid model
CN104715159A (en) Multi-hierarchy analysis method for risk assessment of linear engineering geological hazards
CN113222347B (en) Method for evaluating gray system of safety risk of open-air blasting
CN106845559A (en) Take the ground mulching verification method and system of POI data special heterogeneity into account
CN111445156A (en) Bias tunnel construction safety evaluation method based on variable weight fuzzy comprehensive evaluation
Xia et al. Slope stability analysis based on group decision theory and fuzzy comprehensive evaluation
CN112487695A (en) Multi-target intelligent comprehensive line selection method for railway in complex environment
CN105046080A (en) Rock mass quality evaluation method
CN107491846A (en) Method for carrying out approximate technical and economic evaluation on coal resources by adopting analogy method
Chen et al. Building vulnerability assessment in seismic areas using ensemble learning: A Nepal case study
CN114897378A (en) Geological disaster refined meteorological risk early warning area evaluation method and device
Zhang et al. Spatio-temporal evolution characteristics of typical debris flow sources after an earthquake
CN102663527A (en) Water resource ecological sensitivity analysis method for urban and rural planning
Yu et al. Research on site classification method based on BP neural network
CN115310748A (en) Soft soil settlement risk fuzzy evaluation method based on combined empowerment
Ding et al. Evaluation of Landslide Susceptibility in Mountainous Areas of Changji City at the Northern Foot of Tianshan Mountain based on Coupled Model of Weight of Evidence and Shanon’s Entropy
Zhang et al. Mine geological disaster risk assessment and management based on multisensor information fusion
CN102663507A (en) Geoecological sensitivity analysis method for town and country planning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191025

WD01 Invention patent application deemed withdrawn after publication