CN110374676A - Freeway tunnel Central Drainage construction method - Google Patents

Freeway tunnel Central Drainage construction method Download PDF

Info

Publication number
CN110374676A
CN110374676A CN201910662880.1A CN201910662880A CN110374676A CN 110374676 A CN110374676 A CN 110374676A CN 201910662880 A CN201910662880 A CN 201910662880A CN 110374676 A CN110374676 A CN 110374676A
Authority
CN
China
Prior art keywords
central drainage
groove
cover board
construction method
drainage groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910662880.1A
Other languages
Chinese (zh)
Inventor
智凯毅
魏金山
刘俐
刘俊宏
樊陈科
刘财源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201910662880.1A priority Critical patent/CN110374676A/en
Publication of CN110374676A publication Critical patent/CN110374676A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to freeway tunnel drainage constructions, specially freeway tunnel Central Drainage construction method.Existing freeway tunnel Central Drainage construction method is solved, the problem easy to damage of the concrete drain tile in Central Drainage groove.The construction method is realized by following steps: 1) Central Drainage groove is constructed in inverted arch Concrete Filled, Central Drainage groove is made of the narrow groove of lower part, the wide groove on top and horizontal support surface excessive between the two;2) transverse drain in tunnel and road surface transverse direction aqueduct extend and are connected to the narrow groove of Central Drainage groove lower part;3) cover board is set on Central Drainage groove upper berth, cover board two sides are respectively supported in the horizontal support surface on Central Drainage groove two sidewalls;4) on the cover board in square wide groove fill concrete to inverted arch Concrete Filled face.Water flow is introduced the narrow groove of Central Drainage groove lower part and is expelled directly out tunnel by transverse drain and road surface transverse direction aqueduct.

Description

Freeway tunnel Central Drainage construction method
Technical field
The present invention relates to freeway tunnel drainage constructions, specially freeway tunnel Central Drainage construction method.
Background technique
In freeway tunnel construction, the quality for influencing vcehicular tunnel construction quality has several factors, and wherein water is most One of important factor, tunnel water handling are an important links of tunnel construction quality, while being also that operating procedure is numerous One of miscellaneous, biggish link of difficulty of construction, is always valued by the people.In guarded drainage construction, Central Drainage construction is especially heavy It wants.
Existing freeway tunnel Central Drainage construction, it is trapezoidal center that section is first constructed on inverted arch Concrete Filled Drainage groove, arrangement top is evenly equipped with the concrete drain tile of water seepage hole in Central Drainage groove, the transverse drain in tunnel and Road surface transverse direction aqueduct extends and is connected to Central Drainage groove, and rubble is backfilled in Central Drainage groove to inverted arch Concrete Filled Face (road surface will be constructed above in rubble in future).Water flow is introduced Central Drainage groove by transverse drain and road surface transverse direction aqueduct And is entered in concrete drain tile by the water seepage hole on rubble and concrete drain tile and tunnel (Central Drainage groove edge is discharged Tunnel direction extends, outside both ends to tunnel).The laggard walking along the street surface construction of tunnel holing through.In the construction process, oversize vehicle is more, Vehicle is pressed on rubble, in addition tunnel dark, and vehicle pass-through is easy to make the concrete drain tile in central drainage groove At damage, to cannot ensure that tunnel drainage is unobstructed, causes road surface the harm such as to crack or deform, influence later period operation peace Entirely.
Summary of the invention
The present invention solves existing freeway tunnel Central Drainage construction method, the concrete draining in Central Drainage groove Pipe problem easy to damage during constructing tunnel provides a kind of improved freeway tunnel Central Drainage construction method, with Overcome the problems, such as of the existing technology.
The present invention is achieved by the following technical scheme: freeway tunnel Central Drainage construction method, is by as follows Step is realized: 1) Central Drainage groove is constructed in inverted arch Concrete Filled, Central Drainage groove is by the narrow groove of lower part, top Wide groove and excessive between the two horizontal support surface constitute;2) transverse drain in tunnel and road surface transverse direction aqueduct extend And it is connected to the narrow groove of Central Drainage groove lower part;3) cover board is set on Central Drainage groove upper berth, cover board two sides support respectively In the horizontal support surface on Central Drainage groove two sidewalls;4) fill concrete is mixed to inverted arch in the wide groove of side on the cover board Solidifying soil fill surface.Water flow is introduced the narrow groove of Central Drainage groove lower part and direct by transverse drain and road surface transverse direction aqueduct Tunnel is discharged.
Present invention omits concrete drain tile in the prior art, the shape of Central Drainage groove is changed, and in Cover board is laid on the drainage groove of centre, it is current to can satisfy oversize vehicle to fill surface for fill concrete at the top of cover board, it is ensured that center Gutter globality is good, reaches that waterproof is reliable, draining is unobstructed, it is ensured that safety for tunnel engineering is high-quality and efficient.It is of the present invention to apply The operation of work method is easy, does not need special construction mechanical equipment, without putting into specific fund purchase special construction equipment.
Detailed description of the invention
Fig. 1 is the schematic diagram of construction method of the present invention;
Fig. 2 is the schematic cross section of centre drain slot template.
In figure: the narrow groove of 1-, 2- wide groove, 3- horizontal support surface, the transverse drain in the tunnel 4-, the road surface 5- are horizontal To aqueduct, 6- cover board, 7- inverted arch Concrete Filled face.
Specific embodiment
Freeway tunnel Central Drainage construction method, is realized by following steps: 1) structure in inverted arch Concrete Filled Central Drainage groove is built, Central Drainage groove is by the narrow groove 1 of lower part, the wide groove 2 on top and level excessive between the two Supporting surface 3 is constituted;2) transverse drain 4 in tunnel and road surface transverse direction aqueduct 5 extend and are connected to Central Drainage groove lower part Narrow groove 1;3) cover board 6 is set on Central Drainage groove upper berth, 6 two sides of cover board are respectively supported on Central Drainage groove two sidewalls Horizontal support surface 3 on;4) in the wide groove 2 above cover board 6 fill concrete to inverted arch Concrete Filled face.
When it is implemented, building Central Drainage groove is that (tunnel inverted arch is the steel by bottom in reinforcing bar inverted arch in step 1) Muscle inverted arch and constituted by pouring the inverted arch Concrete Filled formed after the concrete setting on reinforcing bar inverted arch) pour before, in steel Centre drain slot template is fixed on muscle inverted arch, then casting concrete takes template after concrete setting on reinforcing bar inverted arch Out, to form Central Drainage groove in inverted arch Concrete Filled.The narrow groove 1 of Central Drainage groove lower part, top width Groove 2 is rectangle.Cover board 6 uses reinforced concrete prefabricated board.Narrow groove 1 the width 40cm, depth of Central Drainage groove lower part 40cm, 2 width 60cm of wide groove, the depth 35cm on Central Drainage groove top;Cover board 6 grows 50 cm, width 60cm, thickness 10cm.
Specific construction process:
1) surveying setting-out
Go out tunnel center line with whole station device measuring, tunnel inverted arch has been constructed one section of one section of measuring, to guarantee that Central Drainage groove is applied Make promptly and accurately, and the tunnel position of center line gone out to measuring is told somebody what one's real intentions are.
2) centre drain slot template is installed
The eliminating impurities that reinforcing bar inverted arch surface construction is left are clean, carry out centre drain slot template paragraph by paragraph according to center line Formwork, formwork length is actually determined according to scene each time, while meeting the advanced centre drain slot template of reinforcing bar inverted arch Formwork, centre drain slot template is placed in reinforcing bar inverted arch upper surface and adds diagonal brace firm supporting to the side form of template, in order to avoid pour Template shifts when building concrete, and Central Drainage groove size is caused not meet design requirement.It can be into after template installation is qualified on inspection Row further work.
3) concrete placings
Concrete mixing station used is poured by match ratio concentrated compactness, concrete tank is transported to construction site, is being set in casting process Meter requires position installation transverse drain 4 and road surface transverse direction aqueduct 5.
Concrete slump is observed in casting process at any time, to control concrete workability index, the drop height degree that freely inclines must not exceed 2m, It is subject to and isolation does not occur.Poker vibrator moving distance should ensure that concrete by jolt ramming, and each position is vibrated continuity Time should ensure that concrete obtains enough compactness, and curing time is no less than 7-14 days.
4) cover board production and installation
Cover board 6 is made in prefabrication practice, the size of the cover plate 50*60*10cm.Cover board reinforcing bar is made of φ 8 and 12 two kinds of φ, It is bound by design requirement.6 concrete label of cover board is consistent with inverted arch Concrete Filled.
Cover board, which pours, to be completed and is installed after meeting design strength, and installation is by progress paragraph by paragraph.
5) fill concrete at the top of cover board
Fill concrete is to inverted arch Concrete Filled face in the wide groove 2 above cover board 6, and concrete label is the same as inverted arch Concrete Filled Unanimously.

Claims (6)

1. a kind of freeway tunnel Central Drainage construction method, which is characterized in that realized by following steps: 1) mixed in inverted arch Central Drainage groove is constructed in solidifying soil filling, Central Drainage groove is by the narrow groove (1) of lower part, the wide groove (2) and two on top Excessive horizontal support surface (3) is constituted between person;2) transverse drain (4) in tunnel and road surface transverse direction aqueduct (5) extend simultaneously It is connected to the narrow groove (1) of Central Drainage groove lower part;3) it is set cover board (6) on Central Drainage groove upper berth, cover board (6) two sides point It is not supported in the horizontal support surface (3) on Central Drainage groove two sidewalls;4) it is returned in the wide groove (2) above cover board (6) Concrete is filled out to inverted arch Concrete Filled face.
2. freeway tunnel Central Drainage construction method according to claim 1, which is characterized in that in step 1), structure Building Central Drainage groove is centre drain slot template to be fixed on reinforcing bar inverted arch, then reinforcing bar is faced upward before reinforcing bar inverted arch pours Casting concrete on arch takes out template after concrete setting, to form centre drain in inverted arch Concrete Filled Slot.
3. freeway tunnel Central Drainage construction method according to claim 1 or 2, which is characterized in that Central Drainage The narrow groove (1) of lower trench, the wide groove (2) on top are rectangle.
4. freeway tunnel Central Drainage construction method according to claim 3, which is characterized in that cover board (6) uses Reinforced concrete prefabricated board.
5. freeway tunnel Central Drainage construction method according to claim 4, which is characterized in that Central Drainage groove Narrow groove (1) width 40cm, the depth 40cm of lower part, wide groove (2) width 60cm, the depth 35cm on Central Drainage groove top;Cover board (6) long 50 cm, width 60cm, thickness 10cm.
6. freeway tunnel Central Drainage construction method according to claim 1, which is characterized in that building Central Drainage Groove and laying cover board (6) are to carry out paragraph by paragraph.
CN201910662880.1A 2019-07-22 2019-07-22 Freeway tunnel Central Drainage construction method Pending CN110374676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910662880.1A CN110374676A (en) 2019-07-22 2019-07-22 Freeway tunnel Central Drainage construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910662880.1A CN110374676A (en) 2019-07-22 2019-07-22 Freeway tunnel Central Drainage construction method

Publications (1)

Publication Number Publication Date
CN110374676A true CN110374676A (en) 2019-10-25

Family

ID=68254947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910662880.1A Pending CN110374676A (en) 2019-07-22 2019-07-22 Freeway tunnel Central Drainage construction method

Country Status (1)

Country Link
CN (1) CN110374676A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501967A (en) * 2020-04-20 2020-08-07 招商局重庆交通科研设计院有限公司 Scheme for adding central trench to tunnel without interrupting traffic and rapid construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005105514A (en) * 2003-08-12 2005-04-21 Hokuetsu:Kk Side ditch block regulating position of lid slab
CN202483588U (en) * 2012-01-12 2012-10-10 中国市政工程西北设计研究院有限公司 Self water-proof drainage system of tunnel lining
CN104329118A (en) * 2014-11-05 2015-02-04 甘肃路桥第四公路工程有限责任公司 Inserted convex integral central drainage ditch device in road tunnel
CN204357485U (en) * 2014-12-11 2015-05-27 中铁十一局集团第五工程有限公司 The drainage system of anti-tunnel double-lining behind ponding crossfire
CN204457864U (en) * 2015-01-19 2015-07-08 中铁十八局集团有限公司 The narrow tunnel drainage structure of a kind of rich water
CN204572015U (en) * 2015-04-15 2015-08-19 西安科技大学 A kind of tunnel shunting combined type waterproof and water drainage system
CN106523028A (en) * 2017-01-05 2017-03-22 中铁工程设计咨询集团有限公司 Tunnel center drainage pipe and laying method thereof
CN207131449U (en) * 2017-08-31 2018-03-23 中铁二院工程集团有限责任公司 Region of FuShui tunnel inverted arch discharge structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005105514A (en) * 2003-08-12 2005-04-21 Hokuetsu:Kk Side ditch block regulating position of lid slab
CN202483588U (en) * 2012-01-12 2012-10-10 中国市政工程西北设计研究院有限公司 Self water-proof drainage system of tunnel lining
CN104329118A (en) * 2014-11-05 2015-02-04 甘肃路桥第四公路工程有限责任公司 Inserted convex integral central drainage ditch device in road tunnel
CN204357485U (en) * 2014-12-11 2015-05-27 中铁十一局集团第五工程有限公司 The drainage system of anti-tunnel double-lining behind ponding crossfire
CN204457864U (en) * 2015-01-19 2015-07-08 中铁十八局集团有限公司 The narrow tunnel drainage structure of a kind of rich water
CN204572015U (en) * 2015-04-15 2015-08-19 西安科技大学 A kind of tunnel shunting combined type waterproof and water drainage system
CN106523028A (en) * 2017-01-05 2017-03-22 中铁工程设计咨询集团有限公司 Tunnel center drainage pipe and laying method thereof
CN207131449U (en) * 2017-08-31 2018-03-23 中铁二院工程集团有限责任公司 Region of FuShui tunnel inverted arch discharge structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501967A (en) * 2020-04-20 2020-08-07 招商局重庆交通科研设计院有限公司 Scheme for adding central trench to tunnel without interrupting traffic and rapid construction method

Similar Documents

Publication Publication Date Title
CN104878766B (en) A kind of long side slope protection concrete continuous fast pouring drawing-die system and construction method
CN108316323A (en) Prefabricated lattice beam and construction method thereof
CN106437142A (en) Construction method and double-layer formwork structure for cast-in-situ slope roof
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN106759354A (en) A kind of stratified continuous pouring mode of ultra-long and ultra-thick volume of concrete foundation
CN108103871A (en) A kind of construction method of the roadbed foam concrete fill placement technique of neighbouring existing Subway Facilities
CN105201012A (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN106436732A (en) Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
CN108396761A (en) The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit
CN108316343A (en) Underground pipe gallery removable support template and its construction method
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN101603315B (en) Method for constructing seepage prevention system of secondary cofferdam for immersed tube tunnel
CN110374676A (en) Freeway tunnel Central Drainage construction method
CN206245730U (en) A kind of cast-in-place pitched roof double template structure
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN110273435A (en) A kind of construction of city open trench tunnel
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
CN214116461U (en) Embankment ballast
CN107034742B (en) Precast slab track structure applied to circular tunnel and construction method
CN105821891B (en) For the construction method of prestress anchoraging side slope armored concrete panel and the template molding structure of concrete slab
CN211172070U (en) Assembled type suspended wall retaining wall structure of reinforced concrete member
CN107299649A (en) A kind of post-cast strip advance water stop construction method for plentiful level of ground water
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025