CN110374674A - An a kind of lane is mostly used the discharge method of formula water in gob area - Google Patents

An a kind of lane is mostly used the discharge method of formula water in gob area Download PDF

Info

Publication number
CN110374674A
CN110374674A CN201910723702.5A CN201910723702A CN110374674A CN 110374674 A CN110374674 A CN 110374674A CN 201910723702 A CN201910723702 A CN 201910723702A CN 110374674 A CN110374674 A CN 110374674A
Authority
CN
China
Prior art keywords
lane
water
crossheading
discharge outlet
gob area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910723702.5A
Other languages
Chinese (zh)
Other versions
CN110374674B (en
Inventor
陈建华
赵晓慧
苏亮
秦永利
付强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Coal Mine Group Co Ltd
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201910723702.5A priority Critical patent/CN110374674B/en
Publication of CN110374674A publication Critical patent/CN110374674A/en
Application granted granted Critical
Publication of CN110374674B publication Critical patent/CN110374674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to coal mine drainage field, a specially a kind of lane is mostly used the discharge method of formula water in gob area, solves the problems in background technique, this method includes advance development crossheading lane;It constructs on tunnel several drillings, the distal end of drilling extends to Overburden gob area;After drilled via, diversion pipe is installed additional in the borehole;Water-proof sealing wall is built by laying at crossheading lane and centralized return air system the lane entrance to a lane that has a common boundary, the bottom that crossheading lane and water-proof sealing wall have a common boundary is provided with discharge outlet, protection grate is provided at discharge outlet, diversion pipe extends on the protection grate from discharge outlet from goaf, centralized return air system lane and water-proof sealing wall intersection dig sedimentation basin, and the discharge outlet extends to sedimentation basin;Ponding in sedimentation basin is concentrated by water pump to be discharged.The present invention does not stop to dig during can satisfy draining during draining, accelerates tunnelling, reduces the investment of artificial, equipment etc., and bring takes over nervous situation during reducing draining, while opening for drainage can also serve as tunnel crossheading and kill two birds with one stone.

Description

An a kind of lane is mostly used the discharge method of formula water in gob area
Technical field
The invention belongs to coal mine drainage field, a specially a kind of lane is mostly used the discharge method of formula water in gob area.
Background technique
In coal mine, 14-2#Layer western two panel centralized return air system, track, belt lane, above covering 8-10 meters or so is 11-2#Layer 8927 ~8937 face goafs, to prevent heterogeneous goaf from having carried out slip casting to goaf early period, goaf now adds up ponding 25.8 ten thousand Cubic meter, covers 14 under-2#The driving of belt, track, air return lane is concentrated to form hidden trouble in western two panel of layer.It is applied using conventional The drilling of work leting speeper discharges water by face, seriously affects developing linking, according to conventional leting speeper construction technology, tunnel is during driving Drilled using working face leting speeper of meeting head on to construct in advance, stop pick if having water after inspecting hole probing and discharge water, after ponding emptying again into Row driving, can not tunnel during discharging water and the period is long, slow effect.
Summary of the invention
It is an object of the invention to put water in gob area in order to solve the drilling of existing construction leting speeper by face and seriously affect The problem of developing linking, provides a kind of discharge method of multi-purpose formula water in gob area in a lane.
The present invention the technical solution to solve the technical problem is that: an a kind of lane is mostly used the discharge method of formula water in gob area, Characterized by comprising the following steps:
Centralized return air system lane is in tunneling process, when at driving to the crossheading lane position nearest apart from Overburden gob area minimum point, Start the advance development crossheading lane that turns;
When crossheading lane is tunneled at the minimum point proximal most position of Overburden gob area, in the several drillings of roadway construction, drilling Position and quantity according to the lowest point and water accumulating volume of Overburden gob area determine, the distal end of drilling extends to cover and adopt Dead zone;
After drilled via, diversion pipe is installed additional in the borehole;
After all drilling constructions finish, water-proof sealing wall, crossheading are built by laying at crossheading lane and centralized return air system the lane entrance to a lane that has a common boundary The bottom that lane and water-proof sealing wall have a common boundary is provided with discharge outlet, and protection grate, step are provided at the discharge outletIn water conservancy diversion Pipe extends on the protection grate from discharge outlet from goaf, and centralized return air system lane and water-proof sealing wall intersection dig sedimentation basin, institute It states discharge outlet and is connected to sedimentation basin;
Ponding in sedimentation basin is concentrated by suction pump to be discharged.
The beneficial effects of the present invention are: the discharge method that a lane is mostly used formula water in gob area through the invention can be real Now driving, which discharges water, neglects neither, and does not stop to dig during can satisfy draining during draining, accelerates tunnelling, reduces artificial, equipment Etc. investment, bring takes over nervous situation during reducing draining, while opening for drainage can also serve as tunnel crossheading at one stroke two , ponding hidden danger in front of place system tunnelling is effectively solved, is on the one hand realized and is covered ponding by effectively and concentrate discharge, it is another Aspect also achieves the preservation situation for finding out crossheading lane place working face in advance, for example coal seam is lower than minable thickness, then can shift to an earlier date Panel design is modified, has accomplished the integrated planning of optimization panel and arrangement;Opening for drainage is opened up using gate road advantage, was both realized Drift dewatering, and avoid tunnel footage unpayable;Construction waterproof fire dam and sedimentation basin during draining, by ponding effective drainage, together When do not influence system tunnelling;After ponding drains, removes the closed gate road that restores and normally tunnel.
Detailed description of the invention
Fig. 1 is the tunnel work that an a kind of lane of the present invention is mostly used under the discharge method exploitation of formula water in gob area Make face on-the-spot schematic.
In figure: 1- centralized return air system lane;The Overburden gob area 2-;3- crossheading lane;4- drilling;5- diversion pipe;6- water-proof sealing wall; 7- protects grate;8- sedimentation basin;9- overflow hole;10- peep hole.
Specific embodiment
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to skill of the invention Art scheme is described in detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than all real Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art without making creative work gained The every other embodiment arrived belongs to the range that the present invention is protected.
Referring to attached drawing, the discharge method for being now mostly used formula water in gob area to an a kind of lane provided by the invention is illustrated.
An a kind of lane is mostly used the discharge method of formula water in gob area, which comprises the following steps:
Centralized return air system lane 1 is in tunneling process, at driving to 3 position of crossheading lane nearest apart from 2 minimum point of Overburden gob area When, start the advance development crossheading lane 3 that turns;
When the driving of crossheading lane 3 is at 2 minimum point proximal most position of Overburden gob area, as shown in Figure 1, in roadway construction It is several drilling 4, drill 4 position and quantity according to the lowest point and water accumulating volume of Overburden gob area 2 determine, drilling 4 Distal end extend to Overburden gob area 2;
It drills after 4 through-holes, installs diversion pipe 5 additional in drilling 4;
After all 4 constructions of drilling finish, water-proof sealing wall 6 is built by laying in crossheading lane 3 and 1 boundary entrance to a lane of centralized return air system lane, The bottom that crossheading lane 3 and water-proof sealing wall 6 have a common boundary is provided with discharge outlet, and protection grate 7, step are provided at the discharge outletIn Diversion pipe 5 extended on the protection grate 7 from discharge outlet from goaf, centralized return air system lane 1 is dug with 6 intersection of water-proof sealing wall Sedimentation basin 8, the discharge outlet are connected to sedimentation basin 8;
Ponding in sedimentation basin 8 is concentrated by suction pump to be discharged.
Further, as a kind of specific embodiment party of the discharge method of the multi-purpose formula water in gob area in a lane of the present invention Formula is installed with overflow hole 9 and peep hole 10 on the water-proof sealing wall 6.When water accumulating volume is too big, and discharge outlet discharge capacity is too small or When grate 7 being protected to block, ponding overflow, ponding may cover water-proof sealing wall 6, and setting overflow hole 9 can effectively will be extra Ponding is discharged by an other pipeline, flows into sedimentation basin 8;By stay set 10 staff of peep hole can be from centralized return air system lane 1 observes the drainage situation after water-proof sealing wall 6, very convenient.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes.

Claims (2)

1. the discharge method that an a kind of lane is mostly used formula water in gob area, which comprises the following steps:
Centralized return air system lane (1) is in tunneling process, driving to the crossheading lane (3) nearest apart from Overburden gob area (2) minimum point When at position, start the advance development crossheading lane (3) that turns;
When crossheading lane (3) driving is at Overburden gob area (2) minimum point proximal most position, in the several drillings of roadway construction (4), the position of drilling (4) and quantity are determined according to the lowest point and water accumulating volume of Overburden gob area (2), are drilled (4) Distal end extend to Overburden gob area (2);
It drills after (4) through-hole, installs diversion pipe (5) additional in drilling (4);
After the construction of all drillings (4) finishes, anti-watertight is built by laying in crossheading lane (3) and centralized return air system lane (1) boundary entrance to a lane It closes wall (6), the bottom that crossheading lane (3) and water-proof sealing wall (6) have a common boundary is provided with discharge outlet, and protection is provided at the discharge outlet Grate (7), stepIn diversion pipe (5) extended on the protection grate (7) from discharge outlet from goaf, centralized return air system lane (1) with Water-proof sealing wall (6) intersection is dug sedimentation basin (8), and the discharge outlet is connected to sedimentation basin (8);
Ponding in sedimentation basin (8) is concentrated by suction pump to be discharged.
2. the discharge method that an a kind of lane according to claim 1 is mostly used formula water in gob area, which is characterized in that described anti- Overflow hole (9) and peep hole (10) are installed on watertight wall (6).
CN201910723702.5A 2019-08-07 2019-08-07 One-lane multipurpose drainage method for accumulated water in goaf Active CN110374674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910723702.5A CN110374674B (en) 2019-08-07 2019-08-07 One-lane multipurpose drainage method for accumulated water in goaf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910723702.5A CN110374674B (en) 2019-08-07 2019-08-07 One-lane multipurpose drainage method for accumulated water in goaf

Publications (2)

Publication Number Publication Date
CN110374674A true CN110374674A (en) 2019-10-25
CN110374674B CN110374674B (en) 2021-03-19

Family

ID=68258257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910723702.5A Active CN110374674B (en) 2019-08-07 2019-08-07 One-lane multipurpose drainage method for accumulated water in goaf

Country Status (1)

Country Link
CN (1) CN110374674B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202100279U (en) * 2011-03-16 2012-01-04 中煤科工集团西安研究院 Anti-blocking device of goaf water discharging drill hole
CN102505963A (en) * 2011-11-11 2012-06-20 山西晋城无烟煤矿业集团有限责任公司 Stope face roof water pre-drainage construction method
CN202560318U (en) * 2012-05-05 2012-11-28 山西晋城无烟煤矿业集团有限责任公司 Water guide structure of laneway seal wall
CN106640187A (en) * 2016-12-23 2017-05-10 济宁矿业集团有限公司霄云煤矿 Down coal face goaf water dredging structure and dredging method thereof
CN109578056A (en) * 2018-11-25 2019-04-05 大同煤矿集团有限责任公司 A kind of administering method about coal mine gob

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202100279U (en) * 2011-03-16 2012-01-04 中煤科工集团西安研究院 Anti-blocking device of goaf water discharging drill hole
CN102505963A (en) * 2011-11-11 2012-06-20 山西晋城无烟煤矿业集团有限责任公司 Stope face roof water pre-drainage construction method
CN202560318U (en) * 2012-05-05 2012-11-28 山西晋城无烟煤矿业集团有限责任公司 Water guide structure of laneway seal wall
CN106640187A (en) * 2016-12-23 2017-05-10 济宁矿业集团有限公司霄云煤矿 Down coal face goaf water dredging structure and dredging method thereof
CN109578056A (en) * 2018-11-25 2019-04-05 大同煤矿集团有限责任公司 A kind of administering method about coal mine gob

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周玉华: "济宁二号煤矿井下老空水害防治方法探讨", 《煤矿现代化》 *
李瑛: "回采工作面采空区积水治理的实践", 《能源与节能》 *

Also Published As

Publication number Publication date
CN110374674B (en) 2021-03-19

Similar Documents

Publication Publication Date Title
CN102979498B (en) A kind of multi-lateral horizontal well system for coal bed gas
CN102505963B (en) Stope face roof water pre-drainage construction method
CN101225742A (en) Construction method of shallow buried underground excavating tunnel super large section using PBA method
RU2730276C1 (en) Method of water protection/purification by repeated filling of formation destructed by coal mining, iron-containing waste water
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
PL237727B1 (en) Indexes of structural differentiation of upper zones of Ordovician limestone filling and method to determine it
CN104847375B (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel method for protecting support
CN110067597A (en) A kind of mine angle of depression negative pressure visits the method for putting old dead zone ponding
RU2407879C1 (en) Construction method of well of small diametre
CN112814737B (en) Collapse column advanced treatment method and system based on laminated multi-branch horizontal well
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
CN105909259B (en) Existing shield tunnel pipe curtain construction settlement control system and method are closely worn down
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN108590717B (en) The water-retaining method of chemical tendering carbonate rock promotion mining induced fissure selfreparing
CN108825247B (en) External inclination side wall horizontal bottom-making basin-shaped freezing water stop construction method for 8 pilot tunnel PBA construction method
CN110374674A (en) An a kind of lane is mostly used the discharge method of formula water in gob area
RU2382166C1 (en) Method of drilling-in
CN208619166U (en) Tunnel roof waterproof flow guiding structure
RU2295024C1 (en) Method for building wells with remote face
CN106246104B (en) A kind of two boiling water horizontal well construction methods
CN204899930U (en) Secretly dig leading dry out well in subway hole
CN1563664B (en) Well of coal-bed gas
CN105604605B (en) The complicated anti-broke-out diseases device of flood mine underground mine
RU2465405C2 (en) Drainage method of open pit edges by means of systems of combined drainage devices
CN113107589A (en) Method for pre-draining water in advance on ground of coal seam roof aquifer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 037003 xinpingwang mining area, Datong City, Shanxi Province

Applicant after: Jinneng holding Coal Group Co.,Ltd.

Address before: 037003 Wangxiao North Street, Xinping, Datong City, Shanxi Province

Applicant before: Datong Coal Mine Group Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant