CN110350513A - A kind of safety stabilization control system strategy of on-line definite value check method - Google Patents

A kind of safety stabilization control system strategy of on-line definite value check method Download PDF

Info

Publication number
CN110350513A
CN110350513A CN201910473108.5A CN201910473108A CN110350513A CN 110350513 A CN110350513 A CN 110350513A CN 201910473108 A CN201910473108 A CN 201910473108A CN 110350513 A CN110350513 A CN 110350513A
Authority
CN
China
Prior art keywords
strategy
line
control system
stabilization control
definite value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910473108.5A
Other languages
Chinese (zh)
Other versions
CN110350513B (en
Inventor
李铁
唐俊刺
姜枫
苏安龙
高凯
孙明一
张艳军
贾松江
李正文
王印
王亮
高鸿飞
时伯年
孙刚
曾辉
韩子娇
武力
伦涛
张宇时
胡浩
许小鹏
曲直
冯占稳
崔岱
张建
孙文涛
朱伟峰
蔡壮
胡锦景
李学斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd, State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN201910473108.5A priority Critical patent/CN110350513B/en
Publication of CN110350513A publication Critical patent/CN110350513A/en
Application granted granted Critical
Publication of CN110350513B publication Critical patent/CN110350513B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of safety stabilization control system strategy of on-line definite value check method, off-line strategy are that operations staff formulates under the method for operation considered, but when certain extreme methods of operation occurs in actual electric network, will lead to offline stability control strategy failure;Off-line strategy is, if certain multiple successive failures occurs in power grid, to will lead to Policy Table's mismatch, there are unstability risks for power grid based on formulating under certain specific failures;Off-line strategy is not best definite value for some methods of operation, will lead to cut in actual operation, economic performance is poor;Off-line strategy formulates work complexity, is analyzing, is summarizing, needing worker experienced in classification process, it is made to face huge challenge.The present invention is repeatedly to be checked from different aspect to strategy of on-line definite value, improves the reliability that stabilized control system uses strategy of on-line definite value, provides technical guarantee for power network safety operation.

Description

A kind of safety stabilization control system strategy of on-line definite value check method
Technical field
The invention belongs to power system automatic fields, relate more specifically to a kind of safety stabilization control system strategy of on-line Definite value check method.
Background technique
Safety stabilization control system is the second defence line for ensureing power network safety operation, in certain method of operation knit stitch Control strategy is formulated to some forecast failures, therefore effectively reliable security and stability control strategy is then safety stabilization control system Core and power network safety operation guarantee.
Security and stability control strategy includes the method for operation, four seed type information of failure mode, trend mode and control measure, And the Policy Table for forming clear logic in a particular format, being easy to understand, facilitate application developer to program.It is wide both at home and abroad at present The Off-line control strategy that the control strategy of general application mostly uses offline mode to formulate, mode computing staff or parallel computer according to Research power grid is likely to occur the forecast failure type under the method for operation and carries out fault scanning, and the power grid that must send as an envoy to keeps safety and stability Measure, is analyzed calculated result later, is summarized, is sorted out and is organized into Policy Table, and safety is written in Policy Table by programming personnel Stabilizing control system.When certain failure occurs for power grid, if the Off-line control strategy of stabilizing control system and grid operation mode, When failure mode and trend mode match, otherwise stabilized control system movement excision unit or load are failure to actuate.
Off-line strategy is primarily present following problems:
(1) off-line strategy is that operations staff formulates under the method for operation considered, but occurs in actual electric network certain When the extreme method of operation, offline stability control strategy failure will lead to;
(2) off-line strategy, if certain multiple successive failures occurs in power grid, is incited somebody to action based on formulating under certain specific failures Lead to Policy Table's mismatch, there are unstability risks for power grid;
(3) off-line strategy is not best definite value for some methods of operation, will lead to cut in actual operation, warp Performance of helping is poor;
(4) off-line strategy formulates work complexity, is analyzing, is summarizing, needing worker experienced in classification process, is making it Face huge challenge.
The drawbacks of based on the above off-line strategy, there is an urgent need to a kind of safety on line Stable Control Strategies of real-time matching, full Sufficient grid operation mode, twin failure reduce control cost and mitigate the requirement of worker's burden, and are reliably issued to live steady Control system, as the strategy in subsequent time period.
Summary of the invention
Goal of the invention:
This demand, this hair are checked using needing to carry out tactful validity when strategy of on-line definite value for live stabilized control system Bright to propose a kind of safety stabilization control system strategy of on-line definite value check method, the purpose is to solve following problems:
(1) off-line strategy is that operations staff formulates under the method for operation considered, but occurs in actual electric network certain When the extreme method of operation, offline stability control strategy failure will lead to;
(2) off-line strategy, if certain multiple successive failures occurs in power grid, is incited somebody to action based on formulating under certain specific failures Lead to Policy Table's mismatch, there are unstability risks for power grid;
(3) off-line strategy is not best definite value for some methods of operation, will lead to cut in actual operation, warp Performance of helping is poor;
(4) off-line strategy formulates work complexity, is analyzing, is summarizing, needing worker experienced in classification process, is making it Face huge challenge.
The method of the present invention guarantees that stabilized control system receives by repeatedly checking stabilized control system strategy of on-line definite value from different aspect Strategy of on-line definite value it is accurate and effective.
Technical solution:
The present invention specifically uses following technical scheme:
A kind of safety stabilization control system strategy of on-line definite value check method, described method includes following steps:
(1), dispatching terminal strategy of on-line definite value is triggered, and generates strategy of on-line fixed value list needed for safety stabilization control system;
(2), the strategy of on-line fixed value list that dispatching terminal calculation and check generates, and decide whether under safety stabilization control system The power grid analog quantity information that strategy of on-line definite value table and dispatching terminal after hair check are collected, for by safety stabilization control system pair Dispatching terminal determines the information check issued;
(3), dispatching terminal receives the strategy of on-line fixed value list after being checked by safety stabilization control system and checks safety and stability Whether the strategy of on-line fixed value list sent in control system and the fixed value list that buffer area saves are consistent, generate new strategy of on-line definite value It is single;
(4), the strategy of on-line fixed value list sent on newly-generated strategy of on-line fixed value list and safety stabilization control system is checked Within the allowable range whether error, and decide whether to be updated to the strategy of on-line definite value after checking.
(1) the following two kinds mode in step by safety stabilization control system triggers dispatching terminal strategy of on-line definite value: thing Therefore triggering or period triggering, after triggering, the strategy of on-line definite value nucleus correcting system of dispatching terminal is triggered in accident or the period triggers institute's shape At the new method of operation under for forecast failure or fault set calculate corresponding On-line Control strategy definite value, and it is steady to generate safety Determine strategy of on-line fixed value list needed for control system.
(2) in step:
(2.1), the strategy of on-line fixed value list generated in dispatching terminal calculation and check (1) step and the lattice that fixed value list is sent in steady control Whether formula, unit exactly match, if so, entering step (2.2);If it is not, return step (1);
(2.2), dispatching terminal strategy of on-line definite value nucleus correcting system, which calculates, generates under strategy of on-line definite value and the current method of operation The absolute error of off-line strategy definite value whether within the allowable range, if so, entering step (2.3);If it is not, return step (1);
(2.3), dispatching terminal issues the strategy of on-line definite value table after checking to safety stabilization control system and dispatching terminal is collected Power grid analog quantity;
(2.4), dispatching terminal checks dispatching terminal for safety stabilization control system to photos and sending messages under safety stabilization control system Lower power generating network analog quantity and safety stabilization control system acquisition power grid analog quantity relative error whether within the allowable range, if It is to enter step (3);If it is not, return step (1);
(3) in step:
(3.1), dispatching terminal receives the strategy of on-line fixed value list after safety stabilization control system is checked;
(3.2), dispatching terminal is checked the strategy of on-line fixed value list sent on safety stabilization control system and is determined with what buffer area saved Whether value is single consistent, if so, entering step (3.3);If it is not, return step (1);
(3.3), forecast failure or event of the strategy of on-line definite value nucleus correcting system of dispatching terminal again according to the current method of operation Barrier collection calculates strategy of on-line control strategy, generates new fixed value list.
(4) in step:
(4.1), strategy of on-line fixed value list and safety stabilization control system newly-generated in (3.3) step are checked in dispatching terminal On the strategy of on-line fixed value list error sent whether within the allowable range, if so, entering step (4.3);If it is not, return step (1);
(4.2), dispatching terminal is sent to safety stabilization control system updates policy instructions.
Following two steps are executed before entering (2) step by (1) step:
(1), judge whether the communication channel between dispatching terminal and safety stabilization control system is normal, if so, entering step (2);If it is not, return step (1);
(2), the validity that quantity of state is sent on dispatching terminal check safety stabilization control system, judges security and stability control Whether system is normal, if so, entering step (2);If it is not, return step (1).
(4.2) return step (one) after step.
(2) in step, quantity of state is sent on the safety stabilization control system that dispatching terminal is checked includes system exception, online Policy Status and strategy starting.
Accident triggering is that element exits accident;Period triggering is measured by index of the time, i.e., adjacent online twice fixed It is 10s -180s that value, which calculates time interval,.
When the strategy of on-line definite value check method is applied to power transmission network stability contorting, in step (2.4), in dispatching terminal The power grid analog quantity parameter issued is opposite with the analog quantity parameter of same place synchronization that safety stabilization control system acquires When error is checked, the safety and stability feature of power grid under different faults should be grasped, selection can embody power grid security under the failure Some analog quantitys of invariant feature check parameter, the relatively weak some electric simulation amounts for embodying stabilization of power grids feature as main As secondary check parameter;Main relative error of parameter setting value of checking is less than 2%, secondary check relative error of parameter setting value Less than 10%.
A kind of safety stabilization control system strategy of on-line definite value nucleus correcting system, the system include dispatching terminal strategy of on-line definite value Trigger module, strategy of on-line fixed value list check module, new strategy of on-line fixed value list generation module and error and check module;
Strategy of on-line definite value trigger module triggers dispatching terminal strategy of on-line definite value, and generates needed for safety stabilization control system Strategy of on-line fixed value list;
Strategy of on-line fixed value list is checked module and is checked to the strategy of on-line fixed value list that strategy of on-line definite value trigger module generates, And decide whether to issue the power grid simulation that strategy of on-line definite value table and dispatching terminal after checking are collected to safety stabilization control system Information is measured, and determines by safety stabilization control system the information check issued to dispatching terminal;
New strategy of on-line fixed value list generation module receives the security and stability control in strategy of on-line fixed value list check module Strategy of on-line fixed value list after system checking, and check send online fixed value list and buffer area to save in steady control fixed value list whether one It causes, generates new strategy of on-line fixed value list;
Error check module check sent on the newly-generated strategy of on-line fixed value list and safety stabilization control system Within the allowable range whether line strategy fixed value list error, and decide whether to be updated to the strategy of on-line definite value after checking.
Advantageous effect:
To guarantee that stabilized control system can accurately and reliably receive the strategy of on-line that dispatching terminal issues, not only need to realize dispatching terminal With the communication of stabilized control system, it is also necessary to repeatedly be checked from different aspect to strategy of on-line definite value, otherwise stabilized control system uses Off-line strategy definite value.The present processes respectively check strategy of on-line definite value in dispatching terminal and stabilized control system end, guarantee The strategy of on-line fixed value list and the strategy of on-line fixed value list that receives of stabilized control system termination that communication channel, dispatching terminal generate be it is accurate, Effectively, dispatching terminal is sent on the strategy of on-line fixed value list after finally checking stabilized control system, and calculates generation again with dispatching terminal Fixed value list carry out consistency check.During check, if some condition is unsatisfactory for, stabilized control system will use off-line strategy Definite value;Only when full terms meet, stabilized control system just uses strategy of on-line definite value.
To sum up, the present invention is repeatedly to be checked from different aspect to strategy of on-line definite value, improves stabilized control system use The reliability of strategy of on-line definite value provides technical guarantee for power network safety operation.
Detailed description of the invention
Fig. 1 is strategy of on-line fixed value calculation, generation and the nucleus correcting system schematic diagram of dispatching terminal and stabilized control system composition;
Fig. 2 is stabilized control system strategy of on-line fixed value checking process.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
The check of the method for the present invention stabilized control system strategy of on-line definite value on site updates, respectively in dispatching terminal and steady control system Strategy of on-line definite value is checked at system end, guarantees strategy of on-line fixed value list and stabilized control system that communication channel, dispatching terminal generate Terminate the strategy of on-line fixed value list that receives be it is accurate and effective, on the strategy of on-line fixed value list after finally checking stabilized control system Dispatching terminal is sent, and calculates the fixed value list progress consistency check of generation again with dispatching terminal.During check, if some Part is unsatisfactory for, and stabilized control system will use off-line strategy definite value;Only when full terms meet, stabilized control system just uses online plan Slightly definite value.
Fig. 1 is strategy of on-line fixed value calculation, generation and the nucleus correcting system schematic diagram of dispatching terminal and stabilized control system composition, by adjusting Degree end calculates the control strategy of forecast failure under the method for operation according to online EMS and WAMS data, by a series of check Afterwards, stabilized control system strategy definite value is updated to the strategy of on-line definite value of dispatching down distributing.Communication protocol is to realize open, rule in the present invention The principles such as model, standard, it is preferred to use 103 specifications as national standard.
The present invention sends the control plan of ± 800kV extra-high voltage direct-current (rated power is 10,000 MW) locking outside with certain regional power grid Slightly embodiment is illustrated, and according to off-line strategy, when extra-high voltage direct-current locking, which needs to take and cut Machine control measure cut machine power=direct current locking power (Pd)-and retain power (Pb=2000MW).
As shown in Fig. 2, the specific design procedure of each link of the method for the present invention is as follows:
(1) stabilized control system uses off-line strategy definite value;
The extra-high voltage direct-current puts into operation in embodiment, and when occurring to be latched failure, sending end regional power grid cuts the choosing of machine control measure With off-line strategy, the reservation power in control strategy is 2000MW.
(2) when grid operation mode changes (element exits or trend great variety) or adjacent definite value online twice Time interval is calculated greater than after 10s, the strategy of on-line fixed value calculation system of dispatching terminal is under the new method of operation for anticipation event Barrier or fault set calculate corresponding On-line Control strategy definite value, and generate fixed value list needed for stabilized control system;
In embodiment, when the regional power grid is because certain reason (do not permit by climate change or low-carbon emission or other direct currents Perhaps modulation etc.), the method for operation of the regional power grid is changed, the strategy of on-line fixed value calculation system of dispatching terminal is in this method of operation It is latched the new control strategy of calculation of fault for the extra-high voltage direct-current down, it is 2500MW that power is retained in new control strategy, and The fixed value list format that stability control device can identify is generated, the strategy of on-line fixed value list of generation see the table below.
Serial number Definite value title Setting range Setting valve Unit
1 Retain power 0~10000 2500 MW
(3) do you judge whether the communication channel between dispatching terminal and stabilized control system normal? if so, entering step (4);If it is not, Return step (1);
In embodiment, stabilized control system sends a heartbeat message control word (being set as 1) to control centre every 1s, if adjusting Degree center cannot receive heartbeat message control word (i.e. in 4s) continuous 4 times, then illustrate communication channel exception;If control centre can be held It is continuous to receive heartbeat message control word, then illustrate that communication channel is normal.
(4) dispatching terminal check stabilized control system on send quantity of state (such as system exception, strategy of on-line state, strategy starting Deng) validity, judge whether stabilized control system normal? if so, entering step (5);If it is not, return step (1);
In embodiment, stabilized control system send device exception control word on dispatching terminal, if device exception control word is 1, says Bright stabilized control system is abnormal;If device exception control word is 0, illustrate that stabilized control system is normal.
(5) format of fixed value list, unit are sent on the strategy of on-line fixed value list that dispatching terminal calculation and check generates and steady control is No exact matching? if so, entering step (6);If it is not, return step (1);
In embodiment, stabilized control system send offline fixed value list as shown in the table on dispatching terminal, and dispatching terminal checks determining for generation Whether value list and the definite value single-unit above sent are consistent, and whether in setting range, fixed value list definite value title and quantity are setting valve It is no consistent?
Serial number Definite value title Setting range Setting valve Unit
1 Retain power 0~10000 MW
(6) dispatching terminal strategy of on-line fixed value calculation system-computed generate line strategy definite value and the current method of operation under from Within the allowable range whether the absolute error of line strategy definite value? if so, entering step (7);If it is not, return step (1);
In embodiment, retain power error and be set as 800MW, if retaining power and offline definite value in strategy of on-line fixed value list Is absolute error in list less than 800? if so, entering step (7);If it is not, return step (1);
(7) dispatching terminal issues the power grid simulation that the strategy of on-line definite value table after checking and dispatching terminal are collected to stabilized control system Amount;
In embodiment, dispatching terminal issues strategy of on-line fixed value list and power grid analog quantity to stabilized control system, and power grid analog quantity is shown in Following table.
Serial number Title Numerical value Unit
1 Inverter side frequency 49.98 Hz
2 1 output power of pole 5005 MW
3 2 output power of pole 5000 MW
4 Inversion side bus voltage 501 kV
5 Wind power plant collects 1 output power of station 345 MW
6 Wind power plant collects 2 output powers of station 280 MW
7 Wind power plant collects 3 output powers of station 360 MW
8 Send out circuit output power in power station 1 450 MW
9 Send out circuit output power in power station 2 400 MW
10 Send out circuit output power in power station 3 380 MW
11 Thermal power plant 1 sends out circuit output power 620 MW
12 Thermal power plant 2 sends out circuit output power 590 MW
13 Thermal power plant 3 sends out circuit output power 610 MW
(8) after stabilized control system receives the information that dispatching terminal issues, power generating network analog quantity and steady control under dispatching terminal is checked and is filled Whether within the allowable range set the power grid analog quantity relative error of acquisition? if so, entering step (9);If it is not, return step (1);
It is frequency stabilization problem caused by direct current locking is main, therefore can the frequency of power grid, direct current is defeated in embodiment Power and inversion side bus voltage is sent to check parameter as main, wind power plant, power station and thermal power plant's power output are used as secondary check Parameter, the main relative error of parameter of checking is within 2%, and the secondary check relative error of parameter is within 10%.
(9) stabilized control system by the strategy of on-line fixed value list after check again on send dispatching terminal;
In embodiment, stabilized control system will send dispatching terminal on the strategy of on-line fixed value list after check again;
(10) in embodiment, dispatching terminal check send online fixed value list and buffer area to save in steady control fixed value list whether one Cause? if so, entering step (11);If it is not, return step (1)
(11) forecast failure or failure of the strategy of on-line fixed value calculation system of dispatching terminal again according to the current method of operation Collection calculates corresponding strategy of on-line control strategy, generates new fixed value list;
In embodiment, dispatching terminal strategy of on-line fixed value calculation system is latched again according to the current method of operation for direct current Calculation of fault retains power, and generates new fixed value list again, see the table below
Serial number Definite value title Setting range Setting valve Unit
1 Retain power 0~10000 2502 MW
(12) in embodiment, the online plan sent on newly-generated strategy of on-line fixed value list and stabilized control system is checked in dispatching terminal Does slightly whether within the allowable range fixed value list relative error (set relative error less than 0.1%)? if so, entering step (13);If It is no, return step (1);
(13) in embodiment, dispatching terminal sends thinner policy instructions control word 1 to stabilized control system;
(14) stability control device definite value is updated to the strategy of on-line definite value after checking;
(15) return step (2) wait next strategy of on-line to calculate in embodiment.
In the present embodiment, system is in off-line strategy definite value mode, and grid operation mode changes, and dispatching terminal is counted automatically It calculates and generates new strategy of on-line definite value, and test to corresponding strategy of on-line definite value.If new strategy of on-line control strategy is fixed Value has passed through inspection, then tactful definite value is updated to strategy of on-line definite value in stabilized control system, otherwise, using off-line strategy definite value.
Correspondingly, it the present invention also provides a kind of safety stabilization control system strategy of on-line definite value nucleus correcting system, is able to carry out The method of above-described embodiment realizes that same effect, the system include that dispatching terminal strategy of on-line definite value trigger module, strategy of on-line are fixed Single module, new strategy of on-line fixed value list generation module and the error of checking of value checks module;
Strategy of on-line definite value trigger module triggers dispatching terminal strategy of on-line definite value, and generates needed for safety stabilization control system Strategy of on-line fixed value list;
Strategy of on-line fixed value list is checked module and is checked to the strategy of on-line fixed value list that strategy of on-line definite value trigger module generates, And decide whether to issue the power grid simulation that strategy of on-line definite value table and dispatching terminal after checking are collected to safety stabilization control system Information is measured, and determines by safety stabilization control system the information check issued to dispatching terminal;
New strategy of on-line fixed value list generation module receives the security and stability control in strategy of on-line fixed value list check module Strategy of on-line fixed value list after system checking, and check send online fixed value list and buffer area to save in steady control fixed value list whether one It causes, generates new strategy of on-line fixed value list;
Error check module check sent on the newly-generated strategy of on-line fixed value list and safety stabilization control system Within the allowable range whether line strategy fixed value list error, and decide whether to be updated to the strategy of on-line definite value after checking.
Above embodiments are received to live stabilized control system to illustrate that the method for the present invention is checked by strategy of on-line definite value Strategy of on-line definite value combine the current method of operation carry out validity check, improve stabilized control system using strategy of on-line definite value can By property and accuracy.

Claims (11)

1. a kind of safety stabilization control system strategy of on-line definite value check method, it is characterised in that: the method includes walking as follows It is rapid:
(1), dispatching terminal strategy of on-line definite value is triggered, and generates strategy of on-line fixed value list needed for safety stabilization control system;
(2), the strategy of on-line fixed value list that dispatching terminal calculation and check generates, and decide whether to issue school to safety stabilization control system The power grid analog quantity information that strategy of on-line definite value table and dispatching terminal after core are collected, is used for by safety stabilization control system to scheduling End determines the information check issued;
(3), dispatching terminal receives the strategy of on-line fixed value list after being checked by safety stabilization control system and checks security and stability control Whether the strategy of on-line fixed value list sent in system and the fixed value list that buffer area saves are consistent, generate new strategy of on-line fixed value list;
(4), the strategy of on-line fixed value list error sent on newly-generated strategy of on-line fixed value list and safety stabilization control system is checked Whether within the allowable range, and decide whether to be updated to the strategy of on-line definite value after checking.
2. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 1, it is characterised in that: (1) the following two kinds mode in step by safety stabilization control system triggers dispatching terminal strategy of on-line definite value: accident triggering or Period triggering, after triggering, the strategy of on-line definite value nucleus correcting system of dispatching terminal is formed by new in accident triggering or period triggering Corresponding On-line Control strategy definite value is calculated for forecast failure or fault set under the method for operation, and generates security and stability control system Strategy of on-line fixed value list needed for uniting.
3. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 2, it is characterised in that: (2) in step:
(2.1), the strategy of on-line fixed value list generated in dispatching terminal calculation and check (1) step and the format that fixed value list is sent in steady control, Whether unit exactly matches, if so, entering step (2.2);If it is not, return step (1);
(2.2), dispatching terminal strategy of on-line definite value nucleus correcting system, which calculates, generates under strategy of on-line definite value and the current method of operation offline The absolute error of tactful definite value whether within the allowable range, if so, entering step (2.3);If it is not, return step (1);
(2.3), dispatching terminal issues the electricity that the strategy of on-line definite value table after checking and dispatching terminal are collected to safety stabilization control system Net analog quantity;
(2.4), dispatching terminal is checked dispatching terminal for safety stabilization control system and is issued to photos and sending messages under safety stabilization control system Power grid analog quantity and safety stabilization control system acquisition power grid analog quantity relative error whether within the allowable range, if so, into Enter step (3);If it is not, return step (1).
4. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 3, it is characterised in that: (3) in step:
(3.1), dispatching terminal receives the strategy of on-line fixed value list after safety stabilization control system is checked;
(3.2), the fixed value list that dispatching terminal checks the strategy of on-line fixed value list sent on safety stabilization control system and buffer area saves It is whether consistent, if so, entering step (3.3);If it is not, return step (1);
(3.3), forecast failure or fault set of the strategy of on-line definite value nucleus correcting system of dispatching terminal again according to the current method of operation Strategy of on-line control strategy is calculated, new fixed value list is generated.
5. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 4, it is characterised in that: (4) in step:
(4.1), it checks in dispatching terminal and is sent on strategy of on-line fixed value list and safety stabilization control system newly-generated in (3.3) step Strategy of on-line fixed value list error whether within the allowable range, if so, entering step (4.3);If it is not, return step (1);
(4.2), dispatching terminal is sent to safety stabilization control system updates policy instructions.
6. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 5, it is characterised in that: Following two steps are executed before entering (2) step by (1) step:
(1), judge whether the communication channel between dispatching terminal and safety stabilization control system is normal, if so, entering step (2);If it is not, return step (1);
(2), the validity that quantity of state is sent on dispatching terminal check safety stabilization control system, judges safety stabilization control system It is whether normal, if so, entering step (2);If it is not, return step (1).
7. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 6, it is characterised in that: (4.2) return step (one) after step.
8. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 7, it is characterised in that: (2) in step, dispatching terminal check safety stabilization control system on send quantity of state include system exception, strategy of on-line state, And strategy starting.
9. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 2, it is characterised in that: Accident triggering is that element exits accident;Period triggering is measured by index of the time, i.e., adjacent online fixed value calculation twice when Between between be divided into 10s -180s.
10. a kind of safety stabilization control system strategy of on-line definite value check method according to claim 3, feature exist In: when the strategy of on-line definite value check method is applied to power transmission network stability contorting, in step (2.4), issued in dispatching terminal Power grid analog quantity parameter and safety stabilization control system acquisition same place synchronization analog quantity parameter relative error When being checked, the safety and stability feature of power grid under different faults should be grasped, selection can embody electricity net safety stable under the failure Some analog quantitys of feature check parameter, the relatively weak some electric simulation amount conducts for embodying stabilization of power grids feature as main Secondary check parameter;Less than 2%, secondary check relative error of parameter setting value is less than main relative error of parameter setting value of checking 10%.
11. a kind of safety stabilization control system strategy of on-line definite value nucleus correcting system according to claim 1, feature exist In: the system includes dispatching terminal strategy of on-line definite value trigger module, strategy of on-line fixed value list checks module, new strategy of on-line is determined It is worth single generation module and error checks module;
Strategy of on-line definite value trigger module triggers dispatching terminal strategy of on-line definite value, and generates online needed for safety stabilization control system Tactful fixed value list;
Strategy of on-line fixed value list is checked module and is checked to the strategy of on-line fixed value list that strategy of on-line definite value trigger module generates, and certainly The fixed power grid analog quantity letter that the strategy of on-line definite value table after checking and dispatching terminal collection whether are issued to safety stabilization control system Breath, and the information check issued is determined by safety stabilization control system to dispatching terminal;
New strategy of on-line fixed value list generation module receives the safety stabilization control system in strategy of on-line fixed value list check module Strategy of on-line fixed value list after check, and whether the fixed value list for sending online fixed value list to save with buffer area in the steady control of check is consistent, Generate new strategy of on-line fixed value list;
Error checks module and checks the online plan sent on the newly-generated strategy of on-line fixed value list and safety stabilization control system It whether within the allowable range to omit fixed value list error, and decides whether to be updated to the strategy of on-line definite value after checking.
CN201910473108.5A 2019-05-31 2019-05-31 Online strategy fixed value checking method for safety and stability control system Active CN110350513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910473108.5A CN110350513B (en) 2019-05-31 2019-05-31 Online strategy fixed value checking method for safety and stability control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910473108.5A CN110350513B (en) 2019-05-31 2019-05-31 Online strategy fixed value checking method for safety and stability control system

Publications (2)

Publication Number Publication Date
CN110350513A true CN110350513A (en) 2019-10-18
CN110350513B CN110350513B (en) 2023-05-16

Family

ID=68174152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910473108.5A Active CN110350513B (en) 2019-05-31 2019-05-31 Online strategy fixed value checking method for safety and stability control system

Country Status (1)

Country Link
CN (1) CN110350513B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112510656A (en) * 2020-10-30 2021-03-16 国网江苏省电力有限公司 Method and system for issuing fixed value of protection strategy of power system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638040A (en) * 2012-04-16 2012-08-15 中国南方电网有限责任公司 Online setting method of safety and stability emergency control fixed value of electric power system
CN102664463A (en) * 2012-05-16 2012-09-12 北京四方继保自动化股份有限公司 Realization method for online control strategies of security control device with self-adaption running modes
CN102664464A (en) * 2012-05-16 2012-09-12 北京四方继保自动化股份有限公司 On-line control strategy switching method for security control device by using strategy effective conditions
CN103384068A (en) * 2013-03-25 2013-11-06 南京南瑞集团公司 Online strategy optimization calculating method for electric system transient state safety and stability emergency control
CN103618307A (en) * 2013-11-08 2014-03-05 天津大学 Emergency control method for improving safe stability of power system
WO2016201840A1 (en) * 2015-06-19 2016-12-22 国电南瑞科技股份有限公司 Security and stability adaptive emergency control system and method for power system
CN107342588A (en) * 2017-07-18 2017-11-10 国电南瑞科技股份有限公司 The adaptive emergency control method of mains frequency of meter and transmission cross-section limit
CN108390371A (en) * 2018-02-11 2018-08-10 中国电力科学研究院有限公司 Network system protects control strategy modeling method in on-line analysis
CN108847660A (en) * 2018-06-06 2018-11-20 国电南瑞科技股份有限公司 The prevention and control Study on Decision-making Method for Optimization checked online based on Safety system off-line strategy
CN109066970A (en) * 2018-07-18 2018-12-21 国家电网公司华中分部 A kind of transmission cross-section dynamic monitoring and controlling method based on expert system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638040A (en) * 2012-04-16 2012-08-15 中国南方电网有限责任公司 Online setting method of safety and stability emergency control fixed value of electric power system
CN102664463A (en) * 2012-05-16 2012-09-12 北京四方继保自动化股份有限公司 Realization method for online control strategies of security control device with self-adaption running modes
CN102664464A (en) * 2012-05-16 2012-09-12 北京四方继保自动化股份有限公司 On-line control strategy switching method for security control device by using strategy effective conditions
CN103384068A (en) * 2013-03-25 2013-11-06 南京南瑞集团公司 Online strategy optimization calculating method for electric system transient state safety and stability emergency control
CN103618307A (en) * 2013-11-08 2014-03-05 天津大学 Emergency control method for improving safe stability of power system
WO2016201840A1 (en) * 2015-06-19 2016-12-22 国电南瑞科技股份有限公司 Security and stability adaptive emergency control system and method for power system
CN107342588A (en) * 2017-07-18 2017-11-10 国电南瑞科技股份有限公司 The adaptive emergency control method of mains frequency of meter and transmission cross-section limit
CN108390371A (en) * 2018-02-11 2018-08-10 中国电力科学研究院有限公司 Network system protects control strategy modeling method in on-line analysis
CN108847660A (en) * 2018-06-06 2018-11-20 国电南瑞科技股份有限公司 The prevention and control Study on Decision-making Method for Optimization checked online based on Safety system off-line strategy
CN109066970A (en) * 2018-07-18 2018-12-21 国家电网公司华中分部 A kind of transmission cross-section dynamic monitoring and controlling method based on expert system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
LILI ZHAO ET AL: "Review and prospect of hidden failure: protection system and security and stability control system", 《JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY》 *
ZHU LIN SONG ET AL: "Petrochemical plant power grid stability control system study", 《2012 PETROLEUM AND CHEMICAL INDUSTRY CONFERENCE EUROPE CONFERENCE PROCEEDINGS (PCIC EUROPE)》 *
刘孝刚等: "智能变电站二次安措策略自动生成和在线校核技术", 《电力系统保护与控制》 *
李锋等: "基于智能分析的电网运行方式和安控策略智能编制方法和应用", 《电气应用》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112510656A (en) * 2020-10-30 2021-03-16 国网江苏省电力有限公司 Method and system for issuing fixed value of protection strategy of power system
CN112510656B (en) * 2020-10-30 2022-09-06 国网江苏省电力有限公司 Method and system for issuing fixed value of protection strategy of power system

Also Published As

Publication number Publication date
CN110350513B (en) 2023-05-16

Similar Documents

Publication Publication Date Title
Bernabeu et al. Methodology for a security/dependability adaptive protection scheme based on data mining
CN109995145A (en) A kind of low-voltage network failure active analysis method based on intelligent distribution transformer terminals
CN106021596B (en) A kind of analysis method of electric network fault rush of current topological diagram
CN103746368B (en) Method of optimizing static safe and stable operation limit of electric power system
CN108847660A (en) The prevention and control Study on Decision-making Method for Optimization checked online based on Safety system off-line strategy
CN105719062B (en) A kind of power grid risk considering double probability of malfunction characteristic and weak link appraisal procedure
CN106099906A (en) A kind of power system safety and stability online integrated campaign method
CN107516903B (en) Accurate load control method considering economy and safety and stability of multiple time scales
CN106451384A (en) Power grid self-healing decision support system based on scheduling emergency plan
CN110265998A (en) A kind of method and device that stabilized control system strategy definite value is checked
CN113806420A (en) Power grid data monitoring method and device
CN112214901A (en) Distribution network scheduling instruction ticket security checking method and system based on traversal tree
CN110350513A (en) A kind of safety stabilization control system strategy of on-line definite value check method
CN107181321A (en) It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric
CN109613372A (en) A kind of electric network failure diagnosis method based on polynary electric network database
CN102664416B (en) Prevention and control method of power safety accident risk caused by load shedding
CN115940409A (en) Full-period fault diagnosis method and device for safety control system function test command
CN108879597A (en) A kind of selection method of the power distribution network ground connection of the access containing distributed generation resource
Varghese et al. The CAISO experience of implementing automated remedial action schemes in energy management systems
Zhichun et al. Active fault analysis of distribution transformer service area based on intelligent transformer terminal unit
CN112418459A (en) Power grid maintenance operation mode risk checking experience management method and system
CN112152878A (en) Monitoring and management method, system, terminal and storage medium for digital channel of transformer substation
She A novel searching method of fault chains for power system cascading outages based on quantitative analysis of dynamic interaction between system and components
Guo et al. A review on simulation models of cascading failures in power systems
Qi et al. A risk assessment method of intelligent substation relay protection device based on severity index

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant