CN110344527A - A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology - Google Patents
A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology Download PDFInfo
- Publication number
- CN110344527A CN110344527A CN201910637801.1A CN201910637801A CN110344527A CN 110344527 A CN110344527 A CN 110344527A CN 201910637801 A CN201910637801 A CN 201910637801A CN 110344527 A CN110344527 A CN 110344527A
- Authority
- CN
- China
- Prior art keywords
- diamond dust
- construction
- layer
- structure floor
- expansion bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010276 construction Methods 0.000 title claims abstract description 92
- 239000000428 dust Substances 0.000 title claims abstract description 85
- 229910003460 diamond Inorganic materials 0.000 title claims abstract description 81
- 239000010432 diamond Substances 0.000 title claims abstract description 81
- 238000005299 abrasion Methods 0.000 title claims abstract description 29
- 238000004873 anchoring Methods 0.000 title claims abstract description 22
- 238000005516 engineering process Methods 0.000 title claims abstract description 16
- 239000010410 layer Substances 0.000 claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 239000002356 single layer Substances 0.000 claims abstract description 30
- 230000002457 bidirectional effect Effects 0.000 claims abstract description 27
- 238000000034 method Methods 0.000 claims abstract description 20
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 12
- 238000004140 cleaning Methods 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000002360 preparation method Methods 0.000 claims abstract description 7
- 239000004567 concrete Substances 0.000 claims description 22
- 239000000463 material Substances 0.000 claims description 18
- 238000003892 spreading Methods 0.000 claims description 18
- 238000005498 polishing Methods 0.000 claims description 14
- 239000004744 fabric Substances 0.000 claims description 9
- 238000009408 flooring Methods 0.000 claims description 7
- 238000013461 design Methods 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 claims description 5
- 239000000843 powder Substances 0.000 claims description 5
- 230000005540 biological transmission Effects 0.000 claims description 3
- 239000003795 chemical substances by application Substances 0.000 claims description 3
- 238000007796 conventional method Methods 0.000 claims description 3
- 230000018044 dehydration Effects 0.000 claims description 3
- 238000006297 dehydration reaction Methods 0.000 claims description 3
- 230000008020 evaporation Effects 0.000 claims description 3
- 238000001704 evaporation Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000002893 slag Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 239000000758 substrate Substances 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 3
- 238000012549 training Methods 0.000 claims description 3
- 239000002699 waste material Substances 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims description 2
- 239000002594 sorbent Substances 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 229910001651 emery Inorganic materials 0.000 description 4
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 4
- 239000010931 gold Substances 0.000 description 4
- 229910052737 gold Inorganic materials 0.000 description 4
- 239000004576 sand Substances 0.000 description 3
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 210000001519 tissue Anatomy 0.000 description 2
- 238000005336 cracking Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Foundations (AREA)
Abstract
The present invention discloses that a kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology, including is made of structural beams, structure floor, double-layer double-direction steel mesh, diamond dust wearing layer, single-layer bidirectional steel mesh, coarse faying face, hook type expansion bolt;The secondary diamond dust abrasion-resistant ground construction technology that pours of the anchoring type mainly includes the working procedures such as preparation of construction, base chisels, the installation of hook type expansion bolt, base is cleaned, reinforcing bar is bound, cleaning sundries, diamond dust wearing layer concreting;Using the beneficial effects of the present invention are: anchor connection uses the hook type expansion bolt of M8 × 120mm, single-layer bidirectional steel mesh is bound using crotch outstanding, it may insure anchorage depth, spacing and single-layer bidirectional steel mesh terrain clearance and spacing, it is ensured that construction quality and avoid construction safety hidden danger.
Description
Technical field:
The invention belongs to architectural engineering ground structure and its construction technology more particularly to a kind of anchoring type is secondary pours Buddha's warrior attendant
Sand abrasion-resistant ground and its construction technology.
Background technique:
As today's society is increasing the use of vehicle and means of transport, warehouse, workshop, parking lot, computer room, vehicle
The ground such as library, freight house formula market use means of transport due to high-frequency for a long time, and the ground of the part is caused to be easy to cause damage.
Diamond dust abrasion-resistant ground becomes the main choosing of above-mentioned building ground due to the advantages that durability is good, wearability is strong, low dirt
It selects.
For diamond dust abrasion-resistant ground technique due to needing to construct when concrete reaches initial set, one-pass molding construction is gold
The traditional method of emery abrasion-resistant ground;But due to today's society ruler soil cun gold, no matter workshop, parking lot or warehouse are all accused
Not single-layer type building, is built using multiple field;Therefore, floor construction is allowed not led to nest occur by diamond dust ground construction
The problems such as work, shut-down, influences, and becomes the emphasis of current diamond dust Construction Study, the secondary pouring technique of diamond dust is gradually adopted
With.
The secondary pouring technique of diamond dust also gradually becomes more floors in the development of diamond dust abrasion-resistant ground construction technology
The common selection of diamond dust ground construction.But the secondary pouring construction in current diamond dust ground is mainly using pre- in structure sheaf construction
It stays " Z " steel bar as reserved dowel, but this construction method hinders lower layer of worker construction, construction is also be easy to cause to pacify
It is complete or because worker's reinforcing bar that bends not can guarantee subsequent construction quality, lead to the common quality defect for mattess cracking occur.
Insufficient in view of the above technology, the present invention discloses that a kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction skill
Art, by using hook type expansion bolt as flooring anchor connection muscle, it is ensured that work progress safety;And by technology
Improvement optimization and technological innovation, effectively improve the secondary construction quality and efficiency poured of diamond dust abrasion-resistant ground.
Summary of the invention:
To realize the above-mentioned technical purpose, the technical solution adopted by the present invention is that: a kind of anchoring type is secondary, and to pour diamond dust resistance to
Grind ground, including by structural beams, structure floor, double-layer double-direction steel mesh, diamond dust wearing layer, single-layer bidirectional steel mesh, coarse
Faying face, hook type expansion bolt composition;The structural beams combined with the structure floor to be formed diamond dust abrasion-resistant ground by
Power and power transmission support construction;It is laid in the structure floor and is disposed with double-layer double-direction steel mesh;The diamond dust wearing layer is knot
The secondary pea gravel concreten structure sheaf poured on structure floor;It is laid in the diamond dust wearing layer and is disposed with single-layer bidirectional reinforcing bar
Net;The contact surface of the structure floor and diamond dust wearing layer is set as coarse faying face;The structure floor and diamond dust are resistance to
It is provided with hook type expansion bolt between mill layer, which is set as hook solid, is used for anchor connection institute
Single-layer bidirectional steel mesh is stated, so that structure floor and diamond dust wearing layer more form monoblock type floor ground structure.
Preferably, the hook type expansion bolt uses the hook type expansion bolt of M8 × 120mm, the hook type is swollen
The lower end of swollen bolt anchors into structure floor depth and is no less than 60mm, is evenly arranged by the interval of 450 × 450mm of@.
Preferably, the hook type expansion bolt anchor into structure floor depth be 70mm, exposed 50mm, by@450 ×
The interval of 450mm is evenly arranged.
Preferably, the height of concave convex difference design of the coarse faying face can be 3-5mm.
Preferably, the height of concave convex difference of the coarse faying face is 4mm.
A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground construction technology, mainly chisels including preparation of construction, base, is curved
The working procedures such as the installation of hook-type expansion bolt, base's cleaning, reinforcing bar binding, cleaning sundries, diamond dust wearing layer concreting;
It is specific as follows:
(1) preparation of construction: construction machinery is configured by construction requirement and site condition, does sth. in advance insertion construction machinery peace before construction
Fill debugging efforts;It organizes site operation personnel to learn construction quality, acceptance specification and job instruction, carries out professional technique training
Instruction;Tissue carries out the technology to site operation personnel, contract, safety and tells somebody what one's real intentions are.
(2) base chisels construction: the construction and maintenance of the structure floor carry out according to a conventional method, to guarantee that diamond dust is resistance to
Mill ground pea gravel concreten is firmly bonded with structure floor, before diamond dust abrasion-resistant ground pea gravel concreten of constructing, first to structure
Floor substrate concrete carries out dabbing, and structure floor plate face is made into the coarse faying face that height of concave convex difference is 3-5mm;Using machine
Tool dabbing machine is chiselled.
(3) hook type expansion bolt is installed: 1) being told somebody what one's real intentions are in advance with teams and groups according to drawing requirement, setting starting point hook type expands
Bolt simultaneously carries out unwrapping wire positioning;2) it constructs by design requirement spacing 450mm × 450mm, installation uses M8 × 120mm crotch
Formula expansion bolt, anchoring into structure floor depth is 70mm, exposed 50mm.
(4) base is cleaned: flooring can have a large amount of concrete slags after structure floor dabbing and after the construction of hook type expansion bolt
And dust, worker should be arranged to be rinsed the region after the completion of construction, it is ensured that by the residue chiselled and powder before reinforcement construction
Dirt is cleaned out substantially, it is ensured that subsequent construction quality.
(5) reinforcing bar is bound: the single-layer bidirectional steel mesh uses 6@150mm reinforced mesh of single-layer bidirectional Φ, liftoff aerial
40-50mm height placement;Single-layer bidirectional steel mesh and all hook type expansion bolts top are connected and fixed using tied silk, forbidden
Jump is tied up.
(6) clear up sundries: according to arrangement and method for construction, confide a technological secret and job specfication requirement, reinforcing bar binding construction after the completion of it is right
Structure floor flooring sundries is cleared up, and cleaning completes that subsequent pouring construction can be carried out after examination passes through.
(7) diamond dust wearing layer concreting:
The wear-resisting layer concrete of diamond dust uses C35 pea gravel concreten, configures 6 150mm reinforced mesh of single-layer bidirectional Φ.Gold
Emery wearing layer ground starts to carry out secondary pouring construction after main structure is basically completed, with a thickness of 60mm, in microlith coagulation
Diamond dust aggregate 5kg/ ㎡, placing and troweling light are spilt in native initial set when reaching respective strengths standard;The 50- before pea gravel concreten initial set
60% it is dry when, spreading aggregate makes every effort to that spreading is uniform, and spreading carries out in two times, and guarantees dosage;Specific practice is as follows:
1) laitance is removed, first time cloth: dispenses the gold of specified volume 2/3 when 50-60% is dry before pea gravel concreten initial set
Emery is compacted rub hair with the hands with disk sander, diamond dust is made to penetrate into concrete surface layer;
2) thin portion is levelling, second of cloth: first time cloth complete and complete thin portion it is levelling after again by residue 1/3 Buddha's warrior attendant
Sand is dispensed according to sample, cooperates disk sander and metal trowel entirety powder light;
3) mechanical trowel operation: view concrete hardening situation carries out at least vane type sanding machine polishing operation three times;
4) surface detail polishing operation: final to be completed the process using mechanical trowel or manual trowel surface;
5) it conserves: applying curing agent on the diamond dust wearing layer ground for thrown light and conserved, carried out depending on weather condition
Maintenance, curing time are no less than 7 days.
When spreading diamond dust aggregate Specific construction, it should also be noted that following main points: dispense before according to can construction area area
And ground progress situation calculates and dispenses material utilization amount, every square metre of spreading 5kg avoids dosage insufficient or waste;It dispenses for the first time
2/3 wear-resistant material of specified volume is spread in uniform in the concrete surface in pre-hardening stage by hand, and dehydration is local faster, such as close
Template, column, doorway, wall, pit etc. should be dispensed first;When material absorbs concrete surface moisture and darkens, into
Row installs the mechanical polishing operation of disk additional for the first time, disk processing less than place polishing operation by hand because moisture can be secreted
Out, so this process is not required to plus water-wet profit;And then middle ware every other hour, can then carry out the spreading of surplus material, in this way
Can make material fully absorb surface not and evaporation moisture;When material absorbs moisture and darkens, carries out second and install circle additional
The mechanical polishing operation of disk, secretes moisture completely out.
Be using the beneficial effect that the present invention obtains: connection by post-installed fastenings uses the hook type expansion bolt of M8 × 120mm, spiral shell
Bolt anchors into floor 70mm, and exposed 50mm, 450 × 450mm arrangement bind single-layer bidirectional steel mesh using crotch outstanding, can be with
Ensure anchorage depth, spacing and single-layer bidirectional steel mesh terrain clearance and spacing, it is ensured that construction quality and avoid construction safety
Hidden danger.
Detailed description of the invention:
Fig. 1, which is that a kind of anchoring type is secondary, pours diamond dust abrasion-resistant ground structural schematic diagram.
Wherein: 1 is structural beams, and 2 be structure floor, and 21 be double-layer double-direction steel mesh, and 3 be diamond dust wearing layer, and 31 be single
Layer two-way steel mesh, 4 be coarse faying face, and 5 be hook type expansion bolt.
Specific embodiment:
For present invention be described in more detail technical solution, now in conjunction with embodiment, the present invention is further elaborated.
Refering to fig. 1, a kind of anchoring type is secondary pours diamond dust abrasion-resistant ground, including by structure, 1, structure floor 2, bilayer
Two-way steel mesh 21, diamond dust wearing layer 3, single-layer bidirectional steel mesh 31, coarse faying face 4, hook type expansion bolt 5 form;
The structural beams 1 combine the stress and power transmission support construction to form diamond dust abrasion-resistant ground with the structure floor 2;The structure
It is laid in floor 2 and is disposed with double-layer double-direction steel mesh 21;The diamond dust wearing layer 3 be structure floor 2 on it is secondary pour it is thin
Stone concrete structure sheaf;It is laid in the diamond dust wearing layer 3 and is disposed with single-layer bidirectional steel mesh 31;The structure floor 2 with
The contact surface of diamond dust wearing layer 3 is set as coarse faying face 4;It is provided between the structure floor 2 and diamond dust wearing layer 3
Hook type expansion bolt 5,5 upper end of hook type expansion bolt are set as hook solid, for single-layer bidirectional steel described in anchor connection
Muscle net 31, so that structure floor 2 and diamond dust wearing layer 3 more form monoblock type floor ground structure.
In specific implementation, the hook type expansion bolt 3 uses the hook type expansion bolt component of M8 × 120mm, described
It is 70mm that hook type expansion bolt 3, which anchors into 2 depth of structure floor, and exposed 50mm is evenly arranged by the interval of 450 × 450mm of@.
In specific implementation, the height of concave convex difference of the coarse faying face 4 is 4mm.
A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground construction technology, mainly chisels including preparation of construction, base, is curved
The construction works such as the installation of hook-type expansion bolt 5, base's cleaning, reinforcing bar binding, cleaning sundries, 3 concreting of diamond dust wearing layer
Sequence;It is specific as follows:
(1) preparation of construction: construction machinery is configured by construction requirement and site condition, does sth. in advance insertion construction machinery peace before construction
Fill debugging efforts;It organizes site operation personnel to learn construction quality, acceptance specification and job instruction, carries out professional technique training
Instruction;Tissue carries out the technology to site operation personnel, contract, safety and tells somebody what one's real intentions are.
(2) base chisels construction: the construction and maintenance of the structure floor 2 carry out according to a conventional method, to guarantee diamond dust
Abrasion-resistant ground pea gravel concreten is firmly bonded with structure floor 2, before diamond dust abrasion-resistant ground pea gravel concreten of constructing, first to knot
2 substrate concrete of structure floor carries out dabbing, and 2 plate face of structure floor is made into the coarse faying face that height of concave convex difference is 3-5mm;It adopts
It is chiselled with mechanical dabbing machine.
(3) hook type expansion bolt 5 is installed: 1) being told somebody what one's real intentions are in advance with teams and groups according to drawing requirement, setting starting point hook type is swollen
Swollen bolt 5 simultaneously carries out unwrapping wire positioning;2) it constructs by design requirement spacing 450mm × 450mm, installation uses M8 × 120mm
Hook type expansion bolt component, anchoring into 2 depth of structure floor is 70mm, exposed 50mm.
(4) base is cleaned: flooring can have a large amount of concretes after 2 dabbing of structure floor and after the construction of hook type expansion bolt 5
Slag and dust should arrange worker to be rinsed the region after the completion of construction, it is ensured that before reinforcement construction by the residue chiselled and
Dust is cleaned out substantially, it is ensured that subsequent construction quality.
(5) reinforcing bar is bound: the single-layer bidirectional steel mesh 31 uses 6@150mm reinforced mesh of single-layer bidirectional Φ, liftoff frame
Empty 40-50mm height placement;Single-layer bidirectional steel mesh 31 is connected admittedly with all 5 tops of hook type expansion bolt using tied silk
It is fixed, forbid to jump and tie up.
(6) clear up sundries: according to arrangement and method for construction, confide a technological secret and job specfication requirement, reinforcing bar binding construction after the completion of it is right
2 flooring sundries of structure floor is cleared up, and cleaning completes that subsequent pouring construction can be carried out after examination passes through.
(7) 3 concreting of diamond dust wearing layer:
3 concrete of diamond dust wearing layer uses C35 pea gravel concreten, configures 6@150mm reinforced mesh of single-layer bidirectional Φ.Gold
3 ground of emery wearing layer starts to carry out secondary pouring construction after main structure is basically completed, with a thickness of 60mm, in microlith coagulation
Diamond dust aggregate 5kg/ ㎡, placing and troweling light are spilt in native initial set when reaching respective strengths standard;The 50- before pea gravel concreten initial set
60% it is dry when, spreading aggregate makes every effort to that spreading is uniform, and spreading carries out in two times, and guarantees dosage;Specific practice is as follows:
1) laitance is removed, first time cloth: dispenses the gold of specified volume 2/3 when 50-60% is dry before pea gravel concreten initial set
Emery is compacted rub hair with the hands with disk sander, diamond dust is made to penetrate into pea gravel concreten surface layer;
2) thin portion is levelling, second of cloth: first time cloth complete and complete thin portion it is levelling after again by residue 1/3 Buddha's warrior attendant
Sand is dispensed according to sample, cooperates disk sander and metal trowel entirety powder light;
3) mechanical trowel operation: view concrete hardening situation carries out at least vane type sanding machine polishing operation three times;
4) surface detail polishing operation: final to be completed the process using mechanical trowel or manual trowel surface;
5) it conserves: applying curing agent on 3 ground of diamond dust wearing layer for thrown light and conserved, carried out depending on weather condition
Maintenance, curing time are no less than 7 days.
Dispense diamond dust aggregate Specific construction when, it should also be noted that following main points: dispense before according to can construction area area
And ground progress situation calculates and dispenses material utilization amount, every square metre of spreading 5kg avoids dosage insufficient or waste;It dispenses for the first time
2/3 wear-resistant material of specified volume is spread in uniform in the concrete surface in pre-hardening stage by hand, and dehydration is local faster, such as close
Template, column, doorway, wall, pit etc. should be dispensed first;When material absorbs concrete surface moisture and darkens, into
Row installs the mechanical polishing operation of disk additional for the first time, disk processing less than place polishing operation by hand because moisture can be secreted
Out, so this process is not required to plus water-wet profit;And then middle ware every other hour, can then carry out the spreading of surplus material, in this way
Can make material fully absorb surface not and evaporation moisture;When material absorbs moisture and darkens, carries out second and install circle additional
The mechanical polishing operation of disk, secretes moisture completely out.
Be using the beneficial effect that the present invention obtains: anchoring type connection uses the hook type expansion bolt 5 of M8 × 120mm,
Hook type expansion bolt 5 anchors into floor 70mm, and exposed 50mm, 450 × 450mm of@arrangement are double using crotch outstanding binding single layer
To steel mesh 31, it can be ensured that anchorage depth, spacing and single-layer bidirectional steel mesh terrain clearance and spacing, it is ensured that construction matter
Measure and avoid construction safety hidden danger.
Claims (7)
1. a kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground, it is characterised in that: including by structural beams, structure floor, bilayer
Two-way steel mesh, diamond dust wearing layer, single-layer bidirectional steel mesh, coarse faying face, hook type expansion bolt composition;The structure
Beam combines the stress and power transmission support construction to form diamond dust abrasion-resistant ground with the structure floor;It is laid in the structure floor
It is disposed with double-layer double-direction steel mesh;The diamond dust wearing layer is the secondary pea gravel concreten structure sheaf poured on structure floor;
It is laid in the diamond dust wearing layer and is disposed with single-layer bidirectional steel mesh;The contact surface of the structure floor and diamond dust wearing layer
It is set as coarse faying face;Hook type expansion bolt is provided between the structure floor and diamond dust wearing layer, the hook type
Expansion bolt upper end is set as hook solid, for single-layer bidirectional steel mesh described in anchor connection, so that structure floor and diamond dust
Wearing layer more forms monoblock type floor ground structure.
2. a kind of anchoring type according to claim 1 is secondary to pour diamond dust abrasion-resistant ground, it is characterised in that: the crotch
Formula expansion bolt uses the hook type expansion bolt component of M8 × 120mm, and the lower end of the hook type expansion bolt anchors into structure
Floor depth is no less than 60mm, is evenly arranged by the interval of 450 × 450mm of@.
3. a kind of anchoring type according to claim 1 is secondary to pour diamond dust abrasion-resistant ground, it is characterised in that: the crotch
It is 70mm that formula expansion bolt, which anchors into structure floor depth, and exposed 50mm is evenly arranged by the interval of 450 × 450mm of@.
4. a kind of anchoring type according to claim 1 is secondary to pour diamond dust abrasion-resistant ground, it is characterised in that: described coarse
The height of concave convex difference design of faying face can be 3-5mm.
5. a kind of anchoring type according to claim 1 is secondary to pour diamond dust abrasion-resistant ground, it is characterised in that: described coarse
The height of concave convex difference of faying face is 4mm.
6. a kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground construction technology, it is characterised in that: mainly include preparation of construction, base
Layer chisels, the installation of hook type expansion bolt, base's cleaning, reinforcing bar binding, clears up sundries, diamond dust wearing layer concreting is applied
Work process;It is specific as follows:
(1) preparation of construction: construction machinery is configured by construction requirement and site condition, the installation of insertion construction machinery is adjusted ahead of time before construction
Trial work is made;It organizes site operation personnel to learn construction quality, acceptance specification and job instruction, carries out professional technique training;Group
The technology to site operation personnel that carries out, contract, safety is knitted to tell somebody what one's real intentions are;
(2) base chisels construction: the construction and maintenance of the structure floor carry out according to a conventional method, to guarantee diamond dust wear-resistingly
Face pea gravel concreten is firmly bonded with structure floor, before diamond dust abrasion-resistant ground pea gravel concreten of constructing, first to structure floor
Substrate concrete carries out dabbing, and structure floor plate face is made into the coarse faying face that height of concave convex difference is 3-5mm;It is dug using machinery
Hair machine is chiselled;
(3) hook type expansion bolt is installed: 1) being told somebody what one's real intentions are in advance with teams and groups according to drawing requirement, starting point hook type expansion bolt is arranged
And carry out unwrapping wire positioning;2) it constructs by design requirement spacing 450mm × 450mm, installation is expanded using the hook type of M8 × 120
Bolt, anchoring into structure floor depth is 70mm, exposed 50mm;
(4) base is cleaned: flooring can have a large amount of concrete slags and powder after structure floor dabbing and after the construction of hook type expansion bolt
Dirt should arrange worker to be rinsed the region after the completion of construction, it is ensured that by the residue chiselled and dust base before reinforcement construction
Originally it cleans out, it is ensured that subsequent construction quality;
(5) reinforcing bar is bound: the single-layer bidirectional steel mesh uses 6@150mm reinforced mesh of single-layer bidirectional Φ, liftoff aerial 40-
50mm height placement;Single-layer bidirectional steel mesh and all hook type expansion bolts top are connected and fixed using tied silk, forbid to jump
It ties up;
(6) clear up sundries: according to arrangement and method for construction, confide a technological secret and job specfication requirement, reinforcing bar binding construction after the completion of to structure
Floor flooring sundries is cleared up, and cleaning completes that subsequent pouring construction can be carried out after examination passes through;
(7) diamond dust wearing layer concreting:
The wear-resisting layer concrete of diamond dust uses C35 pea gravel concreten, configures 6 150mm reinforced mesh of single-layer bidirectional Φ;Diamond dust
Wearing layer ground starts to carry out secondary pouring construction after main structure is basically completed, with a thickness of 60mm, at the beginning of pea gravel concreten
It coagulates and spills diamond dust aggregate 5kg/ ㎡, placing and troweling light when reaching respective strengths standard;50-60% is dry before pea gravel concreten initial set
When, spreading aggregate makes every effort to that spreading is uniform, and spreading carries out in two times, and guarantees dosage;Specific practice is as follows:
1) laitance is removed, first time cloth: dispenses the diamond dust of specified volume 2/3 when 50-60% is dry before pea gravel concreten initial set,
It is compacted rub hair with the hands with disk sander, diamond dust is made to penetrate into concrete surface layer;
2) thin portion is levelling, second of cloth: first time cloth complete and complete thin portion it is levelling after again by residue 1/3 diamond dust according to
Sample dispenses, and cooperates disk sander and metal trowel entirety powder light;
3) mechanical trowel operation: view concrete hardening situation carries out at least vane type sanding machine polishing operation three times;
4) surface detail polishing operation: final to be completed the process using mechanical trowel or manual trowel surface;
5) it conserves: applying curing agent on the diamond dust wearing layer ground for thrown light and conserved, conserved depending on weather condition,
Curing time is no less than 7 days.
7. a kind of anchoring type according to claim 6 is secondary to pour diamond dust abrasion-resistant ground construction technology, it is characterised in that:
When spreading diamond dust aggregate Specific construction, it should also be noted that following main points: dispense before according to can construction area area and ground into
It spends situation and calculates spreading material utilization amount, every square metre of spreading 5kg avoids dosage insufficient or waste;Specified volume is dispensed for the first time
2/3 wear-resistant material be spread in uniform in the concrete surface in pre-hardening stage by hand, dehydration is local faster, such as close to template, vertical
Column, doorway, wall, pit etc. should be dispensed first;When material absorbs concrete surface moisture and darkens, carry out for the first time
Install the mechanical polishing operation of disk additional, disk processing less than place polishing operation by hand because moisture can be secreted out, this
Process is not required to plus water-wet profit;And then middle ware every other hour, can then carry out the spreading of surplus material, material can be made to fill in this way
Divide sorbent surface not and the moisture of evaporation;When material absorbs moisture and darkens, second of mechanical mill for installing disk additional is carried out
Light operation secretes moisture completely out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910637801.1A CN110344527A (en) | 2019-07-15 | 2019-07-15 | A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910637801.1A CN110344527A (en) | 2019-07-15 | 2019-07-15 | A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110344527A true CN110344527A (en) | 2019-10-18 |
Family
ID=68176347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910637801.1A Withdrawn CN110344527A (en) | 2019-07-15 | 2019-07-15 | A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110344527A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111305509A (en) * | 2020-03-31 | 2020-06-19 | 唐山仁良地坪工程有限公司 | Manufacturing method of super-wear-resistant fireproof industrial terrace |
CN115126139A (en) * | 2022-07-08 | 2022-09-30 | 宁海国基模材有限公司 | Operation method for secondary floor pouring |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104712085A (en) * | 2015-03-24 | 2015-06-17 | 中交一航局第四工程有限公司 | Large-area wear-resistant concrete ground construction method |
CN105350559A (en) * | 2015-11-27 | 2016-02-24 | 中国一冶集团有限公司 | Construction method suitable for emery structural ground of large factory building |
CN210482706U (en) * | 2019-07-15 | 2020-05-08 | 广东电白建设集团有限公司 | Anchoring type secondary pouring carborundum wear-resistant ground and construction technology thereof |
-
2019
- 2019-07-15 CN CN201910637801.1A patent/CN110344527A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104712085A (en) * | 2015-03-24 | 2015-06-17 | 中交一航局第四工程有限公司 | Large-area wear-resistant concrete ground construction method |
CN105350559A (en) * | 2015-11-27 | 2016-02-24 | 中国一冶集团有限公司 | Construction method suitable for emery structural ground of large factory building |
CN210482706U (en) * | 2019-07-15 | 2020-05-08 | 广东电白建设集团有限公司 | Anchoring type secondary pouring carborundum wear-resistant ground and construction technology thereof |
Non-Patent Citations (2)
Title |
---|
孙振平等: "水泥基耐磨地坪材料在地坪修复加固工程中的应用", 第五届全国商品砂浆学术交流会论文集, pages 380 - 385 * |
张剑: "浅谈大面积金刚砂楼面施工及质量控制", 广东土木与建筑, no. 11, pages 23 - 25 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111305509A (en) * | 2020-03-31 | 2020-06-19 | 唐山仁良地坪工程有限公司 | Manufacturing method of super-wear-resistant fireproof industrial terrace |
CN115126139A (en) * | 2022-07-08 | 2022-09-30 | 宁海国基模材有限公司 | Operation method for secondary floor pouring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106868959B (en) | A kind of method that high ferro non-fragment orbit circuit is quickly repaired | |
CN101476382B (en) | Construction method of angle steel angle bead dividing joint of large-area concrete floor | |
CN105587102B (en) | A kind of wet construction method to the wet type high abrasion terrace that paves | |
CN107143111A (en) | A kind of construction method of abrasion-proof terrace | |
CN106836815A (en) | Large area diamond dust floor structure plate and surface layer one-off construction method | |
CN106401144A (en) | Construction technology for addition type wear resisting concrete ground | |
CN105421254B (en) | In-situ repairing method of upper pinner of rail transit bridge support and pinner formwork | |
CN104929365B (en) | Refuse of refuse burning generating plant discharging platform combined type surface construction technology | |
CN105804769A (en) | Method for reinforcing tunnel lining through corrugated steel plate | |
CN110344527A (en) | A kind of anchoring type is secondary to pour diamond dust abrasion-resistant ground and its construction technology | |
CN102776897A (en) | Wash apron anti-settling anti-cracking construction method and structure | |
JP2018150792A (en) | Concrete finishing method | |
US11732492B2 (en) | UHPC material for reinforcing existing stone masonry wall and reinforcing method thereof | |
JPH11302061A (en) | Concrete for placing joint and method for placing joint using the concrete for placing joint | |
CN107152147A (en) | A kind of concrete abrasion-resistant terrace construction technique | |
CN106150032A (en) | A kind of construction method of the type high-wear-resistant alloy terrace that paves | |
Abellán-García et al. | Application of ultra-high-performance concrete as bridge pavement overlays: Literature review and case studies | |
CA2107225C (en) | Process for producing improved concrete pavement having water permeability | |
CN110528524A (en) | Volume of concrete foundation unit cellular-type construction method | |
CN210482706U (en) | Anchoring type secondary pouring carborundum wear-resistant ground and construction technology thereof | |
CN110468729A (en) | A kind of frame bridge construction method | |
JPH08157249A (en) | Concrete for sprayed concrete structure | |
Specification | Standard | |
JP2018150786A (en) | Concrete finishing method | |
CN107151988A (en) | Trough girder bridge deck structure and its reinforcement means that a kind of ultra-high performance concrete is reinforced |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191018 |