CN110332866A - Single free-face combines blasthole kerf blasting method - Google Patents

Single free-face combines blasthole kerf blasting method Download PDF

Info

Publication number
CN110332866A
CN110332866A CN201910614780.1A CN201910614780A CN110332866A CN 110332866 A CN110332866 A CN 110332866A CN 201910614780 A CN201910614780 A CN 201910614780A CN 110332866 A CN110332866 A CN 110332866A
Authority
CN
China
Prior art keywords
blasthole
blasting
combination
explosive
kerf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910614780.1A
Other languages
Chinese (zh)
Inventor
邱贤阳
史秀志
苟永刚
喻智
饶帝军
霍晓峰
陈辉
王远来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201910614780.1A priority Critical patent/CN110332866A/en
Publication of CN110332866A publication Critical patent/CN110332866A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a kind of Single free-faces to combine blasthole kerf blasting method, the combination blasthole of multi-turn different distance including one explosion centre bore of arrangement and around explosion centre bore arrangement, decking and individually control detonation in blasthole, bottom-up stage delayed blasting is segmented according to explosive inside all blastholes, between two sections of explosive blastings delay in the blasthole of center, using center blasthole as starting point, all combination blastholes complete the delaying blasting of same section of explosive in the way of from inside to outside.The present invention use blasthole between and blasthole in combine delayed ignition, common explosive funnel can be formed, guarantee kerf blasting effect, detonation gas pressure action time in combination blasthole can be extended again, more energy are acted on into subsequent rock passage and throwing, single deck blast dose can also be greatly reduced, so that tradition be avoided to vibrate big disadvantage with section Cut Blasting.

Description

Single free-face combines blasthole kerf blasting method
Technical field
The invention belongs to mine blasting technologies, and in particular to a kind of Single free-face combination blasthole kerf blasting method.
Background technique
The explosion item on only one scope of freedom is often faced in underground mine exploitation kerf blasting and upraise blasting engineering Part.It is influenced by drilling machine construction precision, different degrees of deflection inevitably occurs in blasthole in deep hole Cut Blasting, to reduce big gun Influence of the hole deflection to Cut Blasting effect provides Cut Blasting efficiency under Single free-face, a kind of common Cut Blasting method Be by several blastholes form combination blasthole Same millisecond blasting, using combination blasthole between Explosive stress wave and detonation gas between it is mutual Effect forms common explosive funnel, however, due to only having a scope of freedom, and explosion single hop dose is big, the Cut Blasting mode Often cause strong vibrating effect, periphery rock mass and facilities and equipment are adversely affected.How Single free-face under slotting is reduced Blasting vibration effect becomes a big technical problem.
Summary of the invention
Technical problem solved by the present invention is the defect big for blasting vibration under Single free-face, providing one kind can drop The Single free-face of low blasting vibration combines blasthole kerf blasting method.
The present invention adopts the following technical scheme that realization:
Single free-face combines blasthole kerf blasting method, includes the following steps:
Step 1: arranging an intermediate hole at kerf blasting region midpoint, arranged outward centered on the intermediate hole Several circles combine blasthole;
Step 2: explosive, the separately installed detonation of every section of explosive inside same blasthole are loaded in segmentation inside all blastholes Detonator;
Step 3: it is segmented bottom-up stage delayed blasting according to explosive inside all blastholes, two in the blasthole of center Between section explosive blasting delay, using center blasthole as starting point, all combination blastholes complete same section in the way of from inside to outside The delaying blasting of explosive.
Further, all combination blastholes are from inside to outside during delaying blasting in the step 3, the institute of same circle There is combination blasthole successively delaying blasting.
Further, the explosion extension time is set as 5-12ms between the combination blasthole of same circle.
Further, the explosion extension time is set as 25-30ms between the combination blasthole of adjacent turn.
Further, the upper-lower section adjacent explosive blasting extension time is set as 200-300ms inside all blastholes.
In Single free-face combination blasthole kerf blasting method of the invention, all blastholes are depth not less than 20m Deep hole.
Further, the combination blasthole setting 4-8 is enclosed, and every circle is equidistantly evenly arranged 4-8 combination blasthole.
Further, the number of segment explosive that identical quantity is loaded inside all blastholes is 2-5 sections, different explosive sections in blasthole Between use river sand interval.
Further, the detonating capsule uses minimum delay for the digital electric detonator of 1ms, to avoid short delaying blasting There is string section.
In Single free-face combination blasthole kerf blasting method of the invention, when with delaying between a circle combination blasthole hole of group Between the shorter than new scope of freedom of adjacent turn combination shot hole blasting form the time, enable and form common explosion leakage with the combination blasthole of group Bucket.Also, it can effectively extend the effect of detonation gas pressure with the accurate short delaying blasting used between a circle combination blasthole hole of group Time makes the initial crack around blasthole obtain sufficiently extending and penetrating through under the effect of detonation gas pressure, and more energy are made For the passage of subsequent rock and throwing, be conducive to catalase.It is quick-fried with the short delay used between a circle combination blasthole hole of group The broken time of delaying is greater than 5ms, moreover it is possible to effectively realize explosion drop vibration.
Compared with prior art, the present invention what is obtained has the beneficial effect that:
1. the present invention can not only form common explosion with the accurate short delaying blasting used between a circle combination blasthole hole of group Funnel obtains the kerve effect similar with section kerf blasting with tradition, also can increase detonation gas pressure action time, will be more Energy act on the passage of subsequent rock and throwing so that explosion and crushing lumpiness is more uniform.
2. the present invention replaces conventional combination blasthole Same millisecond blasting by using accurate short delaying blasting, significantly reduce quick-fried Hong compressive load peak value, can be greatly reduced the blasting vibration peak of explosion near region rock, while can reduce by detonation pressure load Vibration effect of explosion is greatly reduced in the high-frequency vibration component evoked, realization.
In conclusion the Single free-face combination blasthole kerf blasting method that the present invention uses, on the one hand short interval delay is quick-fried The formation for breaking common explosive funnel between having no effect on combination blasthole, on the other hand to combine in blasthole by short delaying blasting Single deck blast dose is greatly reduced in different blasthole delayed ignitions, reduces blasting vibration, overcomes kerf blasting under Single free-face and shakes Move big defect.
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
Detailed description of the invention
Fig. 1 is the combination steel for shot schematic diagram in embodiment.
Fig. 2 is the blasthole internal charge schematic diagram in embodiment.
Fig. 3 is the combination blasthole firing order schematic diagram in embodiment.
Specific embodiment
Embodiment
Referring to Fig. 1-3, it is illustrated as the specific embodiment party using Single free-face combination blasthole kerf blasting method of the invention Formula.
Specifically as shown in Figure 1, the present embodiment arranges six circles combination blasthole in kerf blasting region.Combine the arrangement of blasthole Steps are as follows: a center blasthole 1-1 being arranged first in the middle part of kerf blasting region, a circle is arranged centered on the center blasthole The blasthole of four square orientation arrangements, above five blastholes form first lap and combine blasthole 1;Blasthole 1 is combined in first lap The blasthole of four square orientation arrangements is enclosed in the setting one centered on the blasthole 1-1 of center outside, forms the second circle combination blasthole 2;Then the combination blasthole that gradually three circle of setting is arranged in octagon orientation centered on the blasthole 1-1 of center outward, difference shape At the third circle combination circle of blasthole the 3, the 4th combination blasthole 4 and the 5th circle combination blasthole 5;Finally in outermost with center blasthole 1-1 Centered on arrangement four blastholes control kerf blasting boundaries the 6th circle combination blasthole 6.
In practical applications, 4-8 circle, every circle can be set according to the kerf blasting region area of onepull in combination blasthole Equidistantly it is evenly arranged 4-8 combination blasthole.
All blasthole diameters are 165mm in the present embodiment, and depth is more than 20m, wherein the outer ring four of first lap combination blasthole 1 A blasthole is 1.2m, the second circle combination blasthole 2, the third circle combination circle combination big gun of blasthole the 3, the 4th with a distance from the blasthole 1-1 of center Hole the 4, the 5th circle combination blasthole 5 and the 6th circle combination blasthole 6 it is all be respectively with a distance from the blasthole 1-1 of center 1.8m, 2.8m、4.0m、5.2m、6.6m。
Filling explosive is carried out to all blastholes after steel for shot.Specific step is as follows: using and divides inside all blastholes Section filling explosive, as shown in Fig. 2, the burst region only has an explosion scope of freedom 12 of bottom one, blasthole pass through drilling machine from this The explosion scope of freedom 12 drill, all blastholes be not less than on 20m to deep hole, three sections of filling explosives 7 of blasthole inner part, powder charge Height 2.0m, burden 1.5m are spaced between explosive using river sand 9, and it is highly 2.5m that top filling 10, which equally uses river sand, with It prevents that punching occurs in blasting process.A hair electric detonator 8 detonation is filled by payment to a porter 11 inside every section of explosive, electric detonator is Minimum delay time is the digital electric detonator of 1ms, realizes that every section of explosive individually detonates.Explosive section can be according to the depth of blasthole It is calculated, it is general to select 2-5 sections.
Detonation finally is controlled according to whole firing order from inside to outside, from bottom to top to the blasthole that powder charge is completed.Specifically Blasting process is as follows: being segmented bottom-up stage delayed blasting according to explosive inside blasthole, two sections of explosives in the blasthole of center Between explosion delay, using center blasthole as starting point, all combination blastholes complete same section of explosive in the way of from inside to outside Delaying blasting, and all combination blastholes of same circle successively delaying blasting.In the present embodiment, between every circle combination blasthole The short delaying blasting of 5ms is used between blasthole, the time of delaying between the group of adjacent turn combination blasthole is 50ms, and the upper section of each blasthole is fried Medicine is than the delay 300ms detonation of lower section explosive.Kerf blasting hole detonation extension time and single hop dose in the present embodiment see the table below:
In practical blasting process, according to the number of the boring hole of arrangement, the explosion extension time exists between the combination blasthole of same circle It is chosen between 5-12ms, explosion delays the time in 25-30ms selection, blasthole inside upper-lower section phase between the combination blasthole of adjacent turn The adjacent explosive blasting extension time is chosen in 200-300ms.
Shown using the live demolition effect that the present embodiment carries out quick-fried using Single free-face combination blasthole kerve of the invention Broken method, kerf blasting effect is high, and blast fragmentation size is uniform, quick-fried with traditional boulder yield compared with section kerf blasting reduction by 40% Broken vibration peak reduces by 50% or more.
It should be clear that described above is only the embodiment of the present invention, it is not intended to limit the invention, it is all Within technical solution of the present invention and principle, changes, equivalent replacement, improvement etc., belong to protection of the present invention Within the scope of.

Claims (9)

1. Single free-face combines blasthole kerf blasting method, it is characterised in that include the following steps:
Step 1: arranging an intermediate hole at kerf blasting region midpoint, arranged outward centered on the intermediate hole several Circle combination blasthole;
Step 2: explosive, the separately installed detonating capsule of every section of explosive inside same blasthole are loaded in segmentation inside all blastholes;
Step 3: being segmented bottom-up stage delayed blasting according to explosive inside all blastholes, two sections in the blasthole of center are fried Between medicine explosion delay, using center blasthole as starting point, all combination blastholes complete same section of explosive in the way of from inside to outside Delaying blasting.
2. Single free-face according to claim 1 combines blasthole kerf blasting method, all combination big guns in the step 3 Hole is from inside to outside during delaying blasting, all combination blastholes of same circle successively delaying blasting.
3. Single free-face according to claim 2 combines blasthole kerf blasting method, quick-fried between the combination blasthole of same circle The broken time of delaying is set as 5-12ms.
4. Single free-face according to claim 3 combines blasthole kerf blasting method, quick-fried between the combination blasthole of adjacent turn The broken time of delaying is set as 25-30ms.
5. Single free-face according to claim 4 combines blasthole kerf blasting method, upper-lower section is adjacent inside all blastholes The explosive blasting extension time is set as 200-300ms.
6. Single free-face according to any one of claims 1-5 combines blasthole kerf blasting method, all blastholes are Depth is not less than the deep hole of 20m.
7. Single free-face according to claim 6 combines blasthole kerf blasting method, the combination blasthole setting 4-8 is enclosed, Every circle is equidistantly evenly arranged 4-8 combination blasthole.
8. Single free-face according to claim 7 combines blasthole kerf blasting method, identical number is loaded inside all blastholes The number of segment explosive of amount is 2-5 sections, uses river sand interval between different explosive sections in blasthole.
9. Single free-face according to claim 8 combines blasthole kerf blasting method, the detonating capsule is prolonged using minimum When for 1ms digital electric detonator.
CN201910614780.1A 2019-07-09 2019-07-09 Single free-face combines blasthole kerf blasting method Pending CN110332866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910614780.1A CN110332866A (en) 2019-07-09 2019-07-09 Single free-face combines blasthole kerf blasting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910614780.1A CN110332866A (en) 2019-07-09 2019-07-09 Single free-face combines blasthole kerf blasting method

Publications (1)

Publication Number Publication Date
CN110332866A true CN110332866A (en) 2019-10-15

Family

ID=68143446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910614780.1A Pending CN110332866A (en) 2019-07-09 2019-07-09 Single free-face combines blasthole kerf blasting method

Country Status (1)

Country Link
CN (1) CN110332866A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113720226A (en) * 2021-08-31 2021-11-30 玉溪大红山矿业有限公司 Small-section upward blind raise one-shot blasting well-forming blast hole arrangement structure and method
CN114086960A (en) * 2022-01-21 2022-02-25 矿冶科技集团有限公司 Forming method of cutting groove
CN114199090A (en) * 2021-12-09 2022-03-18 安徽铜冠(庐江)矿业有限公司 Deep hole groove-drawing top-breaking gangue return-free charging structure and operation method thereof
CN115355785A (en) * 2022-09-15 2022-11-18 中南大学 Sectional blasting well completion method considering blast hole deflection

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101762218A (en) * 2009-10-30 2010-06-30 湖州新开元碎石有限公司 Hole-by-hole blasting method
CN102549373A (en) * 2009-09-29 2012-07-04 澳瑞凯炸药技术有限公司 A method of underground rock blasting
CN104596372A (en) * 2014-12-31 2015-05-06 中国铁道科学研究院铁道建筑研究所 Tunneling method for improving explosion driving rate and lowering explosion vibration
CN107478113A (en) * 2017-07-24 2017-12-15 华东送变电工程公司 A kind of UHV transmission line stake well one-shot forming blasting method
CN108007285A (en) * 2017-12-05 2018-05-08 中国矿业大学(北京) A kind of stone head deep hole sublevel is segmented efficient Cut Blasting method
CN108592716A (en) * 2018-03-29 2018-09-28 安徽马钢张庄矿业有限责任公司 A kind of method of underground stope fining blasting excavation
CN208313155U (en) * 2018-05-16 2019-01-01 厦门爆破工程公司 A kind of Tunnel Blasting system reducing ground blasting vibration
CN109827480A (en) * 2019-04-11 2019-05-31 安徽铜冠(庐江)矿业有限公司 A kind of novel pencil hole kerf blasting high-stage Cheng Jingfa
CN110145981A (en) * 2019-05-27 2019-08-20 铜陵有色金属集团铜冠矿山建设股份有限公司 A kind of explosion well completion method for shallow vertical shaft

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102549373A (en) * 2009-09-29 2012-07-04 澳瑞凯炸药技术有限公司 A method of underground rock blasting
CN101762218A (en) * 2009-10-30 2010-06-30 湖州新开元碎石有限公司 Hole-by-hole blasting method
CN104596372A (en) * 2014-12-31 2015-05-06 中国铁道科学研究院铁道建筑研究所 Tunneling method for improving explosion driving rate and lowering explosion vibration
CN107478113A (en) * 2017-07-24 2017-12-15 华东送变电工程公司 A kind of UHV transmission line stake well one-shot forming blasting method
CN108007285A (en) * 2017-12-05 2018-05-08 中国矿业大学(北京) A kind of stone head deep hole sublevel is segmented efficient Cut Blasting method
CN108592716A (en) * 2018-03-29 2018-09-28 安徽马钢张庄矿业有限责任公司 A kind of method of underground stope fining blasting excavation
CN208313155U (en) * 2018-05-16 2019-01-01 厦门爆破工程公司 A kind of Tunnel Blasting system reducing ground blasting vibration
CN109827480A (en) * 2019-04-11 2019-05-31 安徽铜冠(庐江)矿业有限公司 A kind of novel pencil hole kerf blasting high-stage Cheng Jingfa
CN110145981A (en) * 2019-05-27 2019-08-20 铜陵有色金属集团铜冠矿山建设股份有限公司 A kind of explosion well completion method for shallow vertical shaft

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113720226A (en) * 2021-08-31 2021-11-30 玉溪大红山矿业有限公司 Small-section upward blind raise one-shot blasting well-forming blast hole arrangement structure and method
CN113720226B (en) * 2021-08-31 2023-07-28 玉溪大红山矿业有限公司 Small-section upward blind patio primary blasting well-forming blasthole arrangement structure and method
CN114199090A (en) * 2021-12-09 2022-03-18 安徽铜冠(庐江)矿业有限公司 Deep hole groove-drawing top-breaking gangue return-free charging structure and operation method thereof
CN114086960A (en) * 2022-01-21 2022-02-25 矿冶科技集团有限公司 Forming method of cutting groove
CN114086960B (en) * 2022-01-21 2022-04-19 矿冶科技集团有限公司 Forming method of cutting groove
CN115355785A (en) * 2022-09-15 2022-11-18 中南大学 Sectional blasting well completion method considering blast hole deflection
CN115355785B (en) * 2022-09-15 2024-04-19 中南大学 Sectional blasting well forming method considering blast hole deflection

Similar Documents

Publication Publication Date Title
CN110332866A (en) Single free-face combines blasthole kerf blasting method
US10364387B2 (en) Subterranean formation shock fracturing charge delivery system
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
US7707939B2 (en) Method of blasting
CN109115061B (en) Detonation control method for reducing blasting vibration
CN106091848B (en) It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion
CN101799261B (en) Hole distributing and blasting method of foundation pit excavation
CN106767212B (en) A kind of two-region undercut blast hole arrangement and its explosion well completion method of application
CN102401616A (en) Blasting excavation method of vertical shaft
CN101441055A (en) Presplit blasting method
CN109724484A (en) A kind of the undercut blast hole arragement construction and well completion method of blind courtyard simultaneous shaft sin king
CN101419040A (en) Deep hole blasting method in large aperture composite undermine
CN108489348B (en) A kind of deep hole and the knockdown hard rock air bench blasting method of short-bore
CN110671981B (en) Smooth blasting method for vertical shaft tunneling in high stress environment
KR20110023968A (en) Controlled blasting method for protecting cut slope, cbps
CN110657722A (en) Hole-by-hole initiation method for complex environment foundation pit excavation
US20090211746A1 (en) High-energy gas fracture apparatus for through-tubing operation
CN103389015A (en) Subsection millisecond differential blasting method in blasthole
CN102735122B (en) A kind of opencut perforated blasting method
CN112179225A (en) One-time well-completion blasting method
CN109373843A (en) A kind of no courtyard deep hole kerf blasting method
CN102519322A (en) Blasting method based on joint control of hole inside energy accumulation blasting and smooth blasting
CN110332865A (en) Deep high stress stope upper centripetal deep hole combined blasting method
CN201007199Y (en) Bundling perforator
CN108592726A (en) A kind of presplit blasting Parameters design for excavation of foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191015

WD01 Invention patent application deemed withdrawn after publication