CN107478113A - A kind of UHV transmission line stake well one-shot forming blasting method - Google Patents

A kind of UHV transmission line stake well one-shot forming blasting method Download PDF

Info

Publication number
CN107478113A
CN107478113A CN201710604535.3A CN201710604535A CN107478113A CN 107478113 A CN107478113 A CN 107478113A CN 201710604535 A CN201710604535 A CN 201710604535A CN 107478113 A CN107478113 A CN 107478113A
Authority
CN
China
Prior art keywords
hole
stake well
transmission line
blasting
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710604535.3A
Other languages
Chinese (zh)
Other versions
CN107478113B (en
Inventor
余俊
章金洲
鲁飞
张国强
贾金龙
丁志龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Shun Engineering Co Ltd
East China Power Transmission and Transformation Engineering Co Ltd
Original Assignee
Hunan Shun Engineering Co Ltd
East China Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Shun Engineering Co Ltd, East China Power Transmission and Transformation Engineering Co Ltd filed Critical Hunan Shun Engineering Co Ltd
Priority to CN201710604535.3A priority Critical patent/CN107478113B/en
Publication of CN107478113A publication Critical patent/CN107478113A/en
Application granted granted Critical
Publication of CN107478113B publication Critical patent/CN107478113B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention is directed to the excavation project of UHV transmission line stake well (depth is not more than 10m), propose a kind of wide-angle double focusing energy presplit blasting, a kind of UHV transmission line stake well one-shot forming blasting method that high-precision digital detonator is layered hole-by-hole initiation, water pressure blasting is combined, it is characterised in that:All Drillings of design blasthole of stake well are completed, and are once lighted a fire after powder charge, Sub-region and hierarchical delayed ignition, whole stake well onepull shaping.Compared with prior art, realize once drilling, the stake well explosion of onepull shaping, UHV transmission line stake well is excavated artificial underground work amount and time substantially reduces, greatly reduce explosion number, explosion of once lighting a fire is become by traditional multiple circulation explosion, reduces the security risk of work progress.

Description

A kind of UHV transmission line stake well one-shot forming blasting method
Technical field
The invention belongs to stake well blasting technique field, and in particular to a kind of UHV transmission line stake well one-shot forming explosion Method.
Background technology
Frequently with digging formula stake well is drawn, rock location need to be opened project of transmitting and converting electricity foundation excavation using blasting method at present Dig.Light section (is less than 10m2) in deep (being less than 10m) stake well Blasting Excavation, proportion is larger in high-voltage line stake well construction. Vertical shaft deep hole Slicing blasting method (discussion and application of vertical shaft deep hole Slicing blasting method, the Zhang Yi that the adopted equality of Central South University proposes Flat, Chen Shouru, Wang Maoling, mining technique, 2002.06), on the excavation scar of vertical shaft or similar vertical shaft, set with borehole drilling Standby disposable (actual tunnelling footage is less than 30m) or the by several times vertical long hole of (excavate quick-fried depth and be more than 30m) Drilling major diameter, in making Heart hole, via hole, periphery hole reach same level depth, and the snubber of minor diameter is beaten using medium-length hole cutting method cloth hole Eye.Deep drilling finishes, and is just filled to certain altitude with river sand, and packed height is that actual hole depth subtracts next explosion hole depth.It is quick-fried Quarrel clearly is carried out after broken ventilation (conditions permit can use machinery and the clear quarrel of artificial joint).Pneumatic pick and airduct can be used clear after having cleared up Go out the macropore aperture that bottom plate leaves, then the sandstone in macropore is blown into sky to required height with high-pressure air hose.Then keyhole is carried out Perforating, after the completion of perforating start subsequent cycle explosion, until whole deep hole depth of round complete.It is high (such as when all stage 30m) after the completion of development blasting, then carry out the drilling of next deep hole depth of round.Patent of invention CN201510255636.5, preboring Mesopore shaft excavation blasting method description is comprised the following steps using the drill bursting construction of explosive forming twice:A, in blast area Domain is drilled, and after backfilling mesopore with sand, onepull keyhole, onepull are drilled out according to the requirement of central emptying aperture burn cut formula Via hole and onepull periphery hole;B, explosive is loaded;D, detonating charge;E, secondary blasting via hole and secondary blasting week are drilled out It is lateral opening;F, explosive is loaded;G, detonating charge;H, it is aerated to underground, pernicious gas is completely exhausted out;F, repeat step a is extremely Step h, layering carries out explosion, until designed elevation.
Because stake well section is small, an only scope of freedom, the clamping action of explosion is big, and drilling depth is restricted, conventional at present Blasting method excavate, usual onepull drilling depth is 0.3 times~0.5 times of cross section diameter.It is more to there is blast working circulation, bores Number of perforations is more, and blast hole utilization factor is low, and explosive consumption is big, and the shaping of stake well is undesirable, backbreaks, owes to dig the problems such as phenomenon is serious. Construction quality is have impact on, constrains construction speed, adds construction cost, and current Small-sectional Pile-walls Blasting Excavation is faced Technical barrier.And the big depth basis blasting digging method under specified conditions, courtyard deep hole blasting method, large diameter, deep borehole are spherical Pack retrusive caved stopes, it is Blasting Excavation order from the bottom to top, does not meet practice of construction requirement.Vertical shaft deep hole point Layer blasting procedure, is once drilled using centre bore, via hole, periphery hole, and keyhole repeatedly drills, and vertical shaft is layered the side of more separate explosions Method, the destruction of the vertical long hole of major diameter is easily caused in this method implementation process, operation difficulty is big, construction period and routine Blasting method does not more significantly improve.Preboring mesopore shaft excavation blasting method is repeatedly to drill, and circulates blasting method, the party Method only centre bore once drills in place, and remaining Kong Jun according to a conventional method construct by Drilling, and backfill mesopore with sand adds work simultaneously Measure, without significantly improving, construction cost increases construction speed, it is impossible to meets that UHV transmission line stake well excavates needs.
The content of the invention
The technical problem to be solved in the present invention is:For the excavation of UHV transmission line stake well (depth is not more than 10m) Engineering, the borehole blasting construction circulation of solution stake well Blasting Excavation is more, and drilling number is more, and blast hole utilization factor is low, and explosive consumption is big, construction The problems such as risk is high.
In order to solve the above technical problems, the present invention proposes a kind of wide-angle double focusing energy presplit blasting, high-precision digital thunder A kind of UHV transmission line stake well one-shot forming blasting method that pipe layering hole-by-hole initiation, water pressure blasting are combined, Compared with background technology, once drilling, the stake well explosion of onepull shaping are realized.
The present invention is achieved through the following technical solutions:
A kind of UHV transmission line stake well one-shot forming blasting method, it is characterised in that:All design blastholes one of stake well Secondary Drilling is completed, and is once lighted a fire after powder charge, Sub-region and hierarchical delayed ignition, whole stake well onepull shaping.
Specifically, described all design Drillings of blasthole of stake well concretely comprise the following steps and first utilize machinery in stake well construction region Equipment cuts out surface soil layer and builds out complete pledge excavation plane, then with the disposable Drilling major diameter of borehole drilling equipment Heart hole, keyhole, via hole and periphery hole reach same level depth;The form of the powder charge is that periphery hole is double using wide-angle Cumulative presplit blasting charge structure, keyhole and via hole use layered charge form, and centre bore only carries out powder charge in bottom hole and filled out Plug;After ignition and detonation, periphery hole presplit blasting first, onepull forms the borehole wall of whole stake well, then keyhole, via hole, Hole-specifically, successively detonate, be finally reached the onepull molding effect of a well.
Preferably, the vertical property of drilling is ensured when the borehole drilling equipment disposably drills, error is not more than 5 ‰.
Preferably, the borehole drilling equipment is down-the-hole drill.
Preferably, it is characterised in that:The keyhole and via hole use layered charge form, layer and layer powder charge at intervals of 0.8-1 times of stake well diameter, hard material interval is used between keyhole powder charge, between via hole powder charge using hard material with Water spacer charge structure.
Preferably, it is characterised in that:Hole-by-hole initiation is layered using high-precision digital detonator.
Preferably, it is characterised in that:After powder charge and detonator filling, when setting gradually the accurate extension of each region detonator Between;In blasting process, periphery hole presplit blasting first, the borehole wall of whole stake well is once formed;After 200-300ms delays, first Layer powder charge is by keyhole, the order hole-by-hole initiation successively of via hole, interval time 30-50ms between hole;Detonation, layer are successively completed again Between interval time 200-300ms, during bottom explosion, centre bore powder charge is detonated at first, is followed successively by keyhole, via hole, Kong Jian Interval time is consistent with upper strata.
Advantages of the present invention is with good effect:
1st, invention realizes the once drilling of UHV transmission line stake well, onepull shaping;
2nd, the present invention, which makes UHV transmission line stake well excavate artificial underground work amount, substantially reduces, and greatly reduces explosion Number (becomes explosion of once lighting a fire) by traditional multiple circulation explosion, reduces the security risk of work progress;
3rd, the present invention realize preferable demolition effect, reduce UHV transmission line stake well excavation drill, manually, The costs such as time, effectively increase efficiency of construction.
Brief description of the drawings
Fig. 1 is UHV transmission line stake well one-shot forming blasting method overall plan;
Fig. 2 is blasthole layout diagram;
Fig. 3 is blast hole projectile filling schematic diagram;
Fig. 4 is firing order schematic diagram.
Embodiment
Below in conjunction with drawings and examples, the present invention is described in further detail.
Mainly for the Blasting Excavation of UHV transmission line stake well, solves traditional project of transmitting and converting electricity basis Blasting Excavation side Method exist blast working circulation it is more, drilling number it is more, blast hole utilization factor is low, and explosive consumption is big, stake well shaping it is undesirable, construction wind Many practical problems of the high restriction extra-high voltage grid engineering construction development in danger, realize once drilling, the stake of onepull shaping Well Blasting Excavation needs.Stake well one-shot forming blasting method avoids the underground work mode of artificial circulation drilling, effectively reduces Artificial below ground activity duration, explosion number become onepull by circulating more separate explosions, effectively reduce whole explosion and apply The security risk of work.Meanwhile the present invention repeatedly circulates construction party relative to traditional stake well drilling, powder charge, explosion, scarfing cinder process Method, efficiency of construction are higher.The present invention is used for UHV transmission line stake well of the depth no more than 10m and once drilled in place, Once lighted a fire after powder charge, Sub-region and hierarchical delay blasting, mechanically or manually scarfing cinder operation, blast working process are carried out after the completion of explosion Efficiency significantly improves.
The invention mainly relates to the stake well Blasting Excavation in above-mentioned environment, including bore mode, charge constitution, detonation side Formula, filling mode, overall composition as shown in figure 1,
(1) bore mode
Compared with common rock drill, down-the-hole drill is with drilling is deep, bore diameter is big, drilling efficiency is high, accommodation The features such as wide, it is current general large-scale rock drilling equipment.It must be closed in drilling construction according to geology, landform and technical conditions The track of reason design drilling.But influenceed by nature, technology and human factor, under current technical conditions, down-the-hole drill exists Often occur different degrees of deflection in rock drilling work progress, especially in, borehole drilling construction in it is more apparent.Rock drilling deviation proportion Generation to stake well can onepull shaping there is large effect.In construction, to reduce rock drilling deviation proportion respectively from rig Job platform transformation (building pledge excavation plane using plant equipment, it is levelling to carry out concreting for place if necessary), down-the-hole The driller parameters such as rig the pressure of the drill drilling speed control etc. carries out operation.(also it may be selected according to construction orographic condition using hidden hole drilling Geology drilling row bore operation), it is ensured that the vertical property of drilling, error cannot be greater than 5 ‰.
(2) periphery forming hole
Using wide-angle double focusing energy Pre-splitting Blasting Technique.The forming technique of Explosive cartridge with double cumulative energy grooves and ensure that energy-gathering jetting can The centering technology of Action of blade is played along pre- broken face, makes Explosion stress wave effect, the expansion of gases at high pressure, energy-gathering jetting Action of blade form moment in crack in rock mass and can organically combine, interact, bring out the best in each other, so as to complete presplitting Explosion and the combination of CUMULATIVE BLASTING mechanism, realize the full-scale application of cumulative Pre-splitting Blasting Technique.Wide-angle double focusing energy Pre-splitting Blasting Technique is to be molded needs according to the onepull of UHV transmission line stake well, and double focusing energy Pre-splitting Blasting Technique is changed Enter, the angle of double focusing energy is mainly adjusted according to the sectional dimension of stake well, ensure the one-shot forming effect of the stake well borehole wall, at the same it is also big Harm of the explosion to stake well borehole wall rock mass is reduced greatly, strengthens the stability of rock of borehole.
(3) detonation mode selects
High-precision digital detonator is layered hole by hole initiation technique.It has the ability of high-precision millisecond extension simultaneous initiation, energy Enough engine requests realized and meet high accuracy delay buffer blasting.Extension scope can arbitrarily be set in the range of 1-15000ms, Minimum delays setting at intervals of 1ms.Working condition can on-line checking, extension data can retaking of a year or grade checking.Pass through parallel network networking Application environment, can be achieved conveniently, safely with large-scale design of blasting net.Due to the energy with online programming and detection Power, easily at any time change networking Ignition plan, can preferably meet UHV transmission line stake well one-shot forming explosion layering by The actual requirement of hole detonation.
(4) selection of charge structure
Via hole uses water pressure blasting technology.Using water transmission shock wave to the Incoercibility of water, Explosion energy is set to pass through Water transport almost free of losses into country rock, meanwhile, water " water caused by under explosion gas expansion Wedge " effect, is advantageous to catalase, and the water in borehole can play atomized dust settling effect, substantially reduce dirt of the dust to environment Dye.It ensure that a well onepull molding effect, improve powder charge capacity usage ratio, while serve reduction hazardous effects of explosion Effect.
Slag powder charge slotting, high-precision digital detonator water spacer powder charge point are thrown using the presplit blasting of double focusing energy, big emptying aperture bottom The stake well one-shot forming blasting method of layer hole-by-hole initiation using hidden hole drilling or geology when it is implemented, creep into row bore operation (root According to construction orographic condition selection, construction surface leveling is carried out), centre bore, keyhole, via hole and the periphery of Drilling major diameter Hole reaches same level depth, ensures the vertical property of drilling, and error cannot be greater than 5 ‰;After drilling, cleaning blasthole blowout is residual Slag;As shown in figure 3, during powder charge, periphery hole uses wide-angle double focusing energy presplit blasting charge structure, and keyhole and via hole use Layered charge form, layer and layer powder charge are at intervals of 0.8-1 times of stake well diameter, using between hard material between keyhole powder charge Every using hard material and water spacer charge structure between via hole powder charge, centre bore is only in bottom hole progress powder charge filling;It is all Use high-precision digital blasting cap initiation;After powder charge and detonator filling, when setting gradually the accurate extension of each region detonator Between.
In blasting process, as shown in figure 4, periphery hole presplit blasting first, the borehole wall of whole stake well is once formed;200- After 300ms delays, first layer powder charge is by keyhole, the order hole-by-hole initiation successively of via hole, interval time 30-50ms between hole; Detonation is successively completed again, and time interval between layers 200-300ms, during bottom explosion, centre bore powder charge is detonated at first, is followed successively by and is drawn Slotted eye, via hole, interval time is consistent with upper strata between hole.
Using the inventive method, compared to existing stake well blasting construction method, the spy that depth is not more than 10m is mainly realized The once drilling of ultra-high-tension power transmission line stake well, a powder charge, the onepull of once detonation shaping purpose, avoid circulation explosion The shortcomings that operation, reduce manual operation amount, reduce the security risk of work progress, while reduce UHV transmission line stake The departmental cost of well construction, effectively increases efficiency of construction.
Embodiment:
Diameter 2.5m, deep 9m UHV transmission line stake well.
Blasting parameter design is as follows:
(1) blasthole diameter.Centre bore, keyhole, the blasthole diameter of via hole and periphery hole take 90mm, centre bore conduct The scope of freedom and compensation space.
(2) blast hole depth.Centre bore, keyhole, via hole and periphery hole hole depth 9.5m.
(3) hole arrangement parameters.Periphery hole pitch-row 0.87m, 9 holes are laid altogether;Via hole pitch-row 0.63,6 are laid altogether Hole;Keyhole lays 3 altogether, centre bore 1.Blasthole is laid as shown in Figure 2.
(4) charge structure.Periphery hole uses wide-angle double focusing energy presplit blasting charge structure, and keyhole and via hole use Layered charge form, layer and layer powder charge are at intervals of 0.8-1 times of stake well diameter, using between hard material between keyhole powder charge Every using hard material and water spacer charge structure between via hole powder charge, centre bore is only in bottom hole progress powder charge filling.Blasthole Powder charge is as shown in Figure 3.
(5) firing order.Periphery hole presplit blasting first, once form the borehole wall of whole stake well;After 200ms delays, the One layer of powder charge is by keyhole, the order hole-by-hole initiation successively of via hole, interval time 50ms between hole;Detonation, layer are successively completed again Between interval time 300ms, during bottom explosion, centre bore powder charge is detonated at first, is followed successively by keyhole, via hole, is spaced between hole Time is consistent with upper strata.Firing order is as shown in Figure 4.
Technique effect:Using the presplit blasting of wide-angle double focusing energy, high-precision digital detonator layering hole-by-hole initiation, medium-length hole water The stake well onepull forming technique that is combined of pressure explosion, can in rock matter harder, stratification owe educate, the more complete geology bar of rock Under part, onepull cutting depth 9m stake wells, borehole wall integrality is preferable, and the control of blasting vibration occurrence situation is preferable.The present invention is quick-fried Broken construction period is 2 working days, and scarfing cinder and borehole wall supporting operation are carried out after the completion of explosion, without secondary blasting, is integrally applied 10 days work cycles.Conventional method, the size stake well need to carry out the explosion, scarfing cinder, supporting operation of 5-6 circulation, need to carried out 6 times Drillhole blasting operation above, construction period 20-25 days.
Above content described in this specification is only illustration made for the present invention.Technology belonging to the present invention The technical staff in field can make various modifications or supplement to described specific embodiment or using similar mode Substitute, content without departing from description of the invention or surmount scope defined in the claims, this all should be belonged to The protection domain of invention.

Claims (7)

  1. A kind of 1. UHV transmission line stake well one-shot forming blasting method, it is characterised in that:All design blastholes of stake well are once Drilling is completed, and is once lighted a fire after powder charge, Sub-region and hierarchical delayed ignition, whole stake well onepull shaping.
  2. A kind of 2. UHV transmission line stake well one-shot forming blasting method as claimed in claim 1, it is characterised in that:It is described All design Drillings of blasthole of stake well concretely comprise the following steps first builds out complete rock in stake well construction region using plant equipment Stone excavates plane, then is reached with centre bore, keyhole, via hole and the periphery hole of the disposable Drilling major diameter of borehole drilling equipment Same level depth;
    The form of the powder charge is that periphery hole uses wide-angle double focusing energy presplit blasting charge structure, and keyhole and via hole use Layered charge form, centre bore only carry out powder charge filling in bottom hole;
    After ignition and detonation, periphery hole presplit blasting first, onepull forms the borehole wall of whole stake well, then keyhole, via hole, Hole-specifically, successively detonate, be finally reached the onepull shaping of a well.
  3. A kind of 3. UHV transmission line stake well one-shot forming blasting method as claimed in claim 2, it is characterised in that:It is described Borehole drilling equipment will ensure the vertical property of drilling when disposably drilling, error is not more than 5 ‰.
  4. A kind of 4. UHV transmission line stake well one-shot forming blasting method as claimed in claim 2, it is characterised in that:It is described Borehole drilling equipment is down-the-hole drill.
  5. A kind of 5. UHV transmission line stake well one-shot forming blasting method as claimed in claim 2, it is characterised in that:It is described Keyhole and via hole use layered charge form, and layer is with layer powder charge at intervals of 0.8~1 times of stake well diameter, keyhole powder charge Between use hard material interval, using hard material and water spacer charge structure between via hole powder charge.
  6. 6. such as any UHV transmission line stake well one-shot forming blasting method of claim 1 to 5, it is characterised in that:Using High-precision digital detonator is layered hole-by-hole initiation.
  7. A kind of 7. UHV transmission line stake well one-shot forming blasting method as claimed in claim 6, it is characterised in that:Powder charge After detonator filling, the accurate extension time of each region detonator is set gradually;
    In blasting process, periphery hole presplit blasting first, the borehole wall of whole stake well is once formed;After 200~300ms delays, the One layer of powder charge is by keyhole, the order hole-by-hole initiation successively of via hole, 30~50ms of interval time between hole;Successively complete again Quick-fried, 200~300ms of time interval between layers, during bottom explosion, centre bore powder charge is detonated at first, is followed successively by keyhole, auxiliary Hole, interval time is consistent with upper strata between hole.
CN201710604535.3A 2017-07-24 2017-07-24 A kind of UHV transmission line stake well one-pass molding blasting method Active CN107478113B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710604535.3A CN107478113B (en) 2017-07-24 2017-07-24 A kind of UHV transmission line stake well one-pass molding blasting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710604535.3A CN107478113B (en) 2017-07-24 2017-07-24 A kind of UHV transmission line stake well one-pass molding blasting method

Publications (2)

Publication Number Publication Date
CN107478113A true CN107478113A (en) 2017-12-15
CN107478113B CN107478113B (en) 2019-05-21

Family

ID=60595310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710604535.3A Active CN107478113B (en) 2017-07-24 2017-07-24 A kind of UHV transmission line stake well one-pass molding blasting method

Country Status (1)

Country Link
CN (1) CN107478113B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374661A (en) * 2018-02-06 2018-08-07 浙江省隧道工程公司 A kind of middle pilot shaft shaft formatting by one blasting method
CN110332866A (en) * 2019-07-09 2019-10-15 中南大学 Single free-face combines blasthole kerf blasting method
CN110595306A (en) * 2019-09-05 2019-12-20 中国科学技术大学 Construction method of efficient blasting pile foundation based on principle that external free surface forms tensile wave superposition boundary region
CN111457800A (en) * 2020-04-14 2020-07-28 郑州信息科技职业学院 Straight-eye barrel-shaped cutting hole arrangement structure and roadway straight-eye barrel-shaped cutting blasting method thereof
CN111705833A (en) * 2020-06-11 2020-09-25 武汉大学 Large-diameter offshore wind power rock-socketed single pile excavation method
CN111707151A (en) * 2020-06-11 2020-09-25 武汉大学 One-time blasting excavation forming method for offshore rock-socketed pile foundation
CN112432570A (en) * 2020-11-16 2021-03-02 中国矿业大学(北京) Controlled blasting construction method for vertical shaft wall beam nest
CN114199088A (en) * 2021-11-16 2022-03-18 北京中煤矿山工程有限公司 Carbon dioxide cracker brush-expanded shaft bottom coal bunker hole distribution structure and brush-expanded process
CN115342696A (en) * 2022-09-06 2022-11-15 南昌大学 Rock foundation excavation forming construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2327950C1 (en) * 2006-10-20 2008-06-27 Государственное образовательное учреждение высшего профессионального образования Читинский государственный университет (ЧитГУ) Method for pile loosening by blasiting in heap leaching of ores
CN102155892A (en) * 2011-01-10 2011-08-17 中国建筑第四工程局有限公司 Method for blasting pile well five-eye conical cut and structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2327950C1 (en) * 2006-10-20 2008-06-27 Государственное образовательное учреждение высшего профессионального образования Читинский государственный университет (ЧитГУ) Method for pile loosening by blasiting in heap leaching of ores
CN102155892A (en) * 2011-01-10 2011-08-17 中国建筑第四工程局有限公司 Method for blasting pile well five-eye conical cut and structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张龙斌等: "复杂地质条件下的小断面深孔桩基施工方法探讨", 《四川水力发电》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374661A (en) * 2018-02-06 2018-08-07 浙江省隧道工程公司 A kind of middle pilot shaft shaft formatting by one blasting method
CN110332866A (en) * 2019-07-09 2019-10-15 中南大学 Single free-face combines blasthole kerf blasting method
CN110595306A (en) * 2019-09-05 2019-12-20 中国科学技术大学 Construction method of efficient blasting pile foundation based on principle that external free surface forms tensile wave superposition boundary region
CN111457800A (en) * 2020-04-14 2020-07-28 郑州信息科技职业学院 Straight-eye barrel-shaped cutting hole arrangement structure and roadway straight-eye barrel-shaped cutting blasting method thereof
CN111705833A (en) * 2020-06-11 2020-09-25 武汉大学 Large-diameter offshore wind power rock-socketed single pile excavation method
CN111707151A (en) * 2020-06-11 2020-09-25 武汉大学 One-time blasting excavation forming method for offshore rock-socketed pile foundation
CN111705833B (en) * 2020-06-11 2022-01-04 武汉大学 Large-diameter offshore wind power rock-socketed single pile excavation method
CN112432570A (en) * 2020-11-16 2021-03-02 中国矿业大学(北京) Controlled blasting construction method for vertical shaft wall beam nest
CN114199088A (en) * 2021-11-16 2022-03-18 北京中煤矿山工程有限公司 Carbon dioxide cracker brush-expanded shaft bottom coal bunker hole distribution structure and brush-expanded process
CN114199088B (en) * 2021-11-16 2024-01-02 北京中煤矿山工程有限公司 Brushing and expanding shaft bottom coal bunker hole distribution structure of carbon dioxide fracturing device and brushing and expanding process
CN115342696A (en) * 2022-09-06 2022-11-15 南昌大学 Rock foundation excavation forming construction method
CN115342696B (en) * 2022-09-06 2023-09-29 南昌大学 Rock foundation excavation forming construction method

Also Published As

Publication number Publication date
CN107478113B (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN107478113B (en) A kind of UHV transmission line stake well one-pass molding blasting method
CN102230769B (en) Multi-row micro-differential roadbed deep hole blasting construction method
CN108286920A (en) A kind of implementation of Tunnel Blasting and excavation
CN110924953A (en) Tunnel hole body excavation construction process
CN101806066B (en) Method for molding vertical wall of deep foundation pit
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN104913696A (en) Side slope excavation smooth-surface blasting-method construction method
CN106677786B (en) A kind of ultra-deep big cross section vertical shaft shaft formatting by one blasting method based on electric detonator
CN106643361A (en) Construction method for excavating upper drift heading and lower drift heading in two side walls of ultra-large subsurface tunnel
CN108007285A (en) A kind of stone head deep hole sublevel is segmented efficient Cut Blasting method
CN107762399A (en) Explosion coordinates rotary drilling rig deep layer one-step pore-creating construction method
CN107024154A (en) High slope deep hole blasting construction method under a kind of complex environment
CN201706988U (en) Annular energy cumulating groove type flat bottom blasting explosive bag
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
CN104819670A (en) Pre-drilling mesopore shaft excavation blasting method
CN105423832A (en) Blast construction method of orientation window of thick-wall brick chimney
CN110260735A (en) A kind of diamond shape major diameter emptying aperture burn cut structure and lane construction technique
CN109238054A (en) A kind of oblique rock stratum high cut slope excavation construction method for supporting
CN102031782A (en) Layered inclined hole blast construction method for multilayer complex quicksand foundation
CN105443133A (en) Underground rock cumulative charge explosion device and method for non-excavation construction
CN102620614B (en) Cave depot is slagged tap the construction method of funnel
CN109405688A (en) Close on the blasting construction method in existing operation tunnel
CN101493305A (en) Damping blasting method for tunnel diggin
CN105065004A (en) Shallow-buried large-span rock tunnel portal section weak blasting excavation construction method
CN108061491A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.4-1.6m

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant