CN110331809A - A kind of stability sunk panel and its installation method being easily installed - Google Patents

A kind of stability sunk panel and its installation method being easily installed Download PDF

Info

Publication number
CN110331809A
CN110331809A CN201910564418.8A CN201910564418A CN110331809A CN 110331809 A CN110331809 A CN 110331809A CN 201910564418 A CN201910564418 A CN 201910564418A CN 110331809 A CN110331809 A CN 110331809A
Authority
CN
China
Prior art keywords
articulamentum
fixed link
fulcra
installation
sunk panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910564418.8A
Other languages
Chinese (zh)
Other versions
CN110331809B (en
Inventor
庄金标
庄福兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuang Jinbiao
Original Assignee
Fujian Huian County Luoyang Qingda Stone Carving Art Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Huian County Luoyang Qingda Stone Carving Art Co Ltd filed Critical Fujian Huian County Luoyang Qingda Stone Carving Art Co Ltd
Priority to CN201910564418.8A priority Critical patent/CN110331809B/en
Publication of CN110331809A publication Critical patent/CN110331809A/en
Application granted granted Critical
Publication of CN110331809B publication Critical patent/CN110331809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/18Special structures in or on roofs, e.g. dormer windows
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V7/00Reflectors for light sources

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention discloses a kind of stability sunk panel and its installation method being easily installed, including sunk panel ontology, affiliated sunk panel ontology includes the first articulamentum being from top to bottom arranged successively, second articulamentum, third articulamentum and bracketing bottom, the bottom end edges and corners of the bracketing bottom are equipped with first connecting rod, several horizontal fulcra are respectively connected between each two neighboring first connecting rod, it respectively arranges and is equipped with perpendicular fulcra between the horizontal fulcra, first articulamentum, the surface edges and corners of second articulamentum and third articulamentum are equipped with several locating rods, the locating rod top is equipped with locating slot, fixed link is equipped with above the locating rod, the fixed link bottom surface is equipped with several positioning protrusion, installation method the following steps are included: impetus calculating, the installation of fixed link, the installation of each articulamentum, the installation of bracketing bottom, japanning;It is easy for removal and installation, it is supported so that not having to sets of brackets on top of the columns, structure is equally stable, and using this installation method, convenient for construction, installation difficulty is reduced.

Description

A kind of stability sunk panel and its installation method being easily installed
Technical field
The present invention relates to sunk panel technical field of structures, more particularly, to be a kind of stability sunk panel being easily installed and its Installation method.
Background technique
Sunk panel is unique decorative parts of indoor canopy in Chinese traditional architecture.It generally is made into the well shape swelled upwards, is had Rectangular, polygon or round concave surface is around decorated with various colored sunk panel lines, engraving and colored drawing.The treasured being mostly used in palace, temple Most important position above seat, Buddhist altar;Since entire sunk panel structural style is larger, heavier mass, when installation, needing disposably will be whole A sunk panel structure slings installation, causes installation difficulty larger, constructs cumbersome, and the sunk panel after installing due to every layer all and room Reserved welding for steel structure on top, so that it is more troublesome when disassembly, and existing sunk panel is intended to support by sets of brackets on top of the columns structure, Not only structure is complicated, but also higher cost.
Summary of the invention
The purpose of the present invention is to overcome the above shortcomings and to provide a kind of stability sunk panel being easily installed and its installation sides Method.
To achieve the above object, the technical solution of the invention is as follows: a kind of stability sunk panel being easily installed, including algae Well ontology, affiliated sunk panel ontology include the first articulamentum being from top to bottom arranged successively, the second articulamentum, third articulamentum and support Backing layer, first articulamentum, the second articulamentum, third articulamentum and bracketing bottom pass through mortise and tenon and successively detachably connect It connects, the bottom end edges and corners of the bracketing bottom are equipped with first connecting rod, connect between each two neighboring first connecting rod Several horizontal fulcra are connected to, respectively arranges and is equipped with perpendicular fulcra between the horizontal fulcra, the perpendicular fulcra are longitudinally fixed to pass through each horizontal branch Bone, and top is connect with roof within doors, the surface edges and corners of first articulamentum, the second articulamentum and third articulamentum are all provided with There are several locating rods, the locating rod top is equipped with locating slot, is equipped with fixed link, the fixed link bottom above the locating rod Face is equipped with several positioning protrusion compatible with locating slot, and the fixed link top is connect with roof within doors, and the other end passes through Second connecting rod is connect with roof within doors, and second connecting rod and fixed link form stable three-legged structure.
Preferably, first articulamentum, the second articulamentum, be equipped with several lighting devices inside third articulamentum, The lighting device includes connecting column, lampshade and reflection sphere, and the lampshade passes through connecting column and the first articulamentum, the second articulamentum Or third articulamentum is fixedly connected, the reflection sphere is set to the underface of lampshade, for reflecting the light projected in lampshade.
Preferably, first articulamentum, the second articulamentum, third connection each adjacent two locating rod in layer surface edges and corners it Between be equipped with third connecting rod, form stable bracket between each layer third connecting rod.
Preferably, the connecting column two sides are equipped with limit plate, and the limit plate is detachably connected with connecting column.
Preferably, the reflection sphere is made of glass material.
Preferably, the limit plate triangular shape.
A kind of installation method for the stability sunk panel being easily installed, comprising the following steps:
The calculating of impetus: step 1 reserves steel construction on roof cement structures, calculates each reserved steel construction institute The impetus of connection, and mark.
The installation of fixed link: step 2 first by the second connecting rod and reserved welding for steel structure, confirms fixed link in reserved steel Position in structure and the second connecting rod, and in fixed link mark auger shell wire hole, by screw by fixed link and reserved steel knot Structure connection, then the connecting portion of reserved steel and fixed link is welded, the connecting portion of bar and the second connecting rod is finally welded and fixed again.
Step 3, the installation of each articulamentum: the first articulamentum is sling upwards, until the positioning protrusion of fixed link is caught in In locating slot in the locating rod of one articulamentum, then by locating rod and fixed link by screw connection, then successively by the second company It connects layer and third articulamentum is connect with fixed link in the same way.
Step 4, the installation of bracketing bottom: slinging bracketing is bottom-up, until perpendicular fulcra are contacted with reserved steel construction, The coupling part of perpendicular fulcra and reserved steel construction is welded.
Japanning: step 5 after installing entire sunk panel structure, according to actual requirement, coats different face to total The paint of color.
By using above-mentioned technical solution, the beneficial effects of the present invention are: by by the first articulamentum, the second articulamentum And third articulamentum is detachably connected to realize with fixed link by the clamping between locating slot and positioning protrusion, then by solid The reserved steel structure connection of fixed pole and roof, so that the first articulamentum, the second articulamentum and third articulamentum do not have to directly and room Reserved steel construction is pushed up directly to weld, it is easy for removal and installation, while welded by perpendicular fulcra and roof and the second connecting rod with Fixed link forms stable three-legged structure, supports so that not having to sets of brackets on top of the columns, structure is equally stable, by the installation method of offer, makes Construction is simple is obtained, installation difficulty reduces.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of sunk panel of the present invention;
Fig. 2 is the schematic diagram of internal structure of sunk panel of the present invention;
Fig. 3 is the connection schematic diagram of fixed link of the present invention and locating rod;
Fig. 4 is illuminator structure connection schematic diagram of the present invention;
Fig. 5 is the installation method flow chart of sunk panel of the present invention;
Main appended drawing reference explanation: 1 first articulamentum, 2 second articulamentums, 3 third articulamentums, 4 bracketing bottoms, 5 first Connecting rod, 6 horizontal fulcra, 7 perpendicular fulcra, 8 locating rods, 9 locating slots, 10 fixed links, 11 positioning protrusion, 12 second connecting rods, 13 shine Bright device, 131 connecting columns, 132 lampshades, 133 reflection spheres, 14 third connecting rods, 15 limit plates.
Specific embodiment
The present invention is further illustrated below in conjunction with the drawings and specific embodiments.
As shown in Figure 1-Figure 3, a kind of stability sunk panel being easily installed, including sunk panel ontology, affiliated sunk panel ontology include The first articulamentum 1, the second articulamentum 2, third articulamentum 3 and the bracketing bottom 4 being from top to bottom arranged successively, first connection The 1, second articulamentum 2 of layer, third articulamentum 3 and bracketing bottom 4 are successively detachably connected by mortise and tenon, the bracketing bottom 4 Bottom end edges and corners be equipped with first connecting rod 5, be respectively connected with several horizontal branch between 5 bars of each two neighboring first connection Bone 6 respectively arranges and is equipped with perpendicular fulcra 7 between the horizontal fulcra 6, and the perpendicular fulcra 7 are longitudinally fixed to pass through each horizontal fulcra 6, and top It is connect with roof within doors, the surface edges and corners of first articulamentum 1, the second articulamentum 2 and third articulamentum 3 are equipped with several A locating rod 8,8 top of locating rod are equipped with locating slot 9, are equipped with fixed link 10, the fixed link 10 above the locating rod 8 Bottom surface is equipped with several positioning protrusion 11 compatible with locating slot 9, and 10 top of fixed link is connect with roof within doors, another End is connect by the second connecting rod 12 with roof within doors, and second connecting rod 12 forms stable triangle knot with fixed link 10 Structure;By the way that the first articulamentum 1, the second articulamentum 2 and third articulamentum 3 are passed through between locating slot 9 and positioning protrusion 11 Clamping is detachably connected to realize with fixed link 10, then passes through the reserved steel structure connection of fixed link 10 and roof, so that first Articulamentum 1, the second articulamentum 2 and third articulamentum 3 are directly welded without directly reserving steel construction with roof, easy to disassemble and peace Dress, while stable three-legged structure is formed with fixed link 10 with roof welding and the second connecting rod 12 by perpendicular fulcra 7, so that It is supported without sets of brackets on top of the columns, structure is equally stable.
As shown in Fig. 2, being equipped with several illuminations inside first articulamentum 1, the second articulamentum 2, third articulamentum 3 Device 13, the lighting device 13 include connecting column 131, lampshade 132 and reflection sphere 133, and the lampshade 132 passes through connecting column 131 are fixedly connected with the first articulamentum 1, the second articulamentum 2 or third articulamentum 3, and the reflection sphere 133 is set to lampshade 132 Underface, for reflecting the light projected in lampshade;So that the inside of entire sunk panel is more bright under the irradiation of light.
As shown in Figure 1, first articulamentum 1, the second articulamentum 2,3 surface edges and corners of third articulamentum each adjacent two are fixed It is equipped with third connecting rod 14 between the bar 8 of position, stable bracket is formed between each layer third connecting rod 14, improves positioning Stability between bar 8.
As shown in figure 4,131 two sides of connecting column are equipped with limit plate 15, the limit plate 15 and connecting column 131 are detachable Connection;Limitation connecting column 131 is offset to both sides.
The reflection sphere 133 is made of glass material, and cost is relatively low.
As shown in figure 4,15 triangular shape of limit plate so that limit plate 15 connect with connecting column 131 it is more stable.
As shown in figure 5, a kind of installation method for the stability sunk panel being easily installed, comprising the following steps:
The calculating of impetus: step 1 reserves steel construction on roof cement structures, calculates each reserved steel construction institute The impetus of connection, and mark.
The installation of fixed link 10: step 2 first by the second connecting rod 12 and reserved welding for steel structure, confirms fixed link pre- The position on steel construction and the second connecting rod 12 is stayed, and in 10 mark auger shell wire hole of fixed link, by screw by fixed link 10 With reserved steel structure connection, then the connecting portion of reserved steel Yu fixed link 10 is welded, bar 10 and second is finally welded and fixed again and connects The connecting portion of extension bar 12.
Step 3, the installation of each articulamentum: the first articulamentum 1 is sling upwards, until the convex card lifting of fixed link 10 Enter in the locating slot 9 in the locating rod 8 of the first articulamentum 1, then by locating rod 8 and fixed link 10 by screw connection, then according to It is secondary to connect the second articulamentum 2 and third articulamentum 3 with fixed link 10 in the same way.
Step 4, the installation of bracketing bottom 4: bracketing bottom 4 is sling upwards, until perpendicular fulcra 7 connect with reserved steel construction The coupling part of perpendicular fulcra 7 and reserved steel construction is welded in touching.
Japanning: step 5 after installing entire sunk panel structure, according to actual requirement, coats different face to total The paint of color.
By above-mentioned layer-by-layer installation method, convenient for entire sunk panel is stably installed at house roof, construction is simple, drop Low installation difficulty.
Above-described, only presently preferred embodiments of the present invention cannot limit the scope of implementation of the present invention, it is all according to Equivalent change made by scope of the present invention patent and decoration, should still belong in the range of the present invention covers.

Claims (7)

1. a kind of stability sunk panel being easily installed, including sunk panel ontology, it is characterised in that: affiliated sunk panel ontology include by up to Under the first articulamentum, the second articulamentum, third articulamentum and the bracketing bottom that are arranged successively, first articulamentum, second connect It connects layer, third articulamentum and bracketing bottom and passes through mortise and tenon and be successively detachably connected, the bottom end edges and corners of the bracketing bottom are equal Equipped with first connecting rod, several horizontal fulcra are respectively connected between each two neighboring first connecting rod, respectively arrange the horizontal branch It is equipped with perpendicular fulcra between bone, the perpendicular fulcra are longitudinally fixed to pass through each horizontal fulcra, and top is connect with roof within doors, and described the The surface edges and corners of one articulamentum, the second articulamentum and third articulamentum are equipped with several locating rods, the locating rod top Equipped with locating slot, fixed link is equipped with above the locating rod, it is compatible with locating slot that the fixed link bottom surface is equipped with several Positioning protrusion, the fixed link top are connect with roof within doors, and the other end is connect by the second connecting rod with roof within doors, described Second connecting rod and fixed link form stable three-legged structure.
2. a kind of stability sunk panel being easily installed according to claim 1, it is characterised in that: first articulamentum, It is equipped with several lighting devices inside second articulamentum, third articulamentum, the lighting device includes connecting column, lampshade and anti- Ball is penetrated, the lampshade is fixedly connected by connecting column with the first articulamentum, the second articulamentum or third articulamentum, the reflection sphere Set on the underface of lampshade, for the light projected in lampshade to be reflected.
3. a kind of stability sunk panel being easily installed according to claim 1, it is characterised in that: first articulamentum, Third connecting rod is equipped between second articulamentum, third connection each adjacent two locating rod in layer surface edges and corners, each layer described the Stable bracket is formed between three connecting rods.
4. a kind of stability sunk panel being easily installed according to claim 2, it is characterised in that: the connecting column two sides are set There is limit plate, the limit plate is detachably connected with connecting column.
5. a kind of stability sunk panel being easily installed according to claim 2, it is characterised in that: the reflection sphere is by glass Material is made.
6. a kind of stability sunk panel being easily installed according to claim 4, it is characterised in that: the limit plate is in triangle Shape.
7. a kind of installation method for the stability sunk panel being easily installed, which comprises the following steps:
The calculating of impetus: step 1 reserves steel construction on roof cement structures, calculates each reserved steel construction and connected Impetus, and mark.
The installation of fixed link: step 2 first by the second connecting rod and reserved welding for steel structure, confirms fixed link in reserved steel construction Fixed link and reserved steel construction are connected by screw with the position in the second connecting rod and in fixed link mark auger shell wire hole It connects, then welds the connecting portion of reserved steel and fixed link, the connecting portion of bar and the second connecting rod is finally welded and fixed again.
Step 3, the installation of each articulamentum: the first articulamentum is sling upwards, the first articulamentum is sling upwards, until fixation The positioning protrusion of bar is caught in the locating slot in the locating rod of the first articulamentum, then locating rod and fixed link are connected by screw It connects, then successively connect the second articulamentum and third articulamentum with fixed link in the same way.
Step 4, the installation of bracketing bottom: slinging bracketing is bottom-up, until perpendicular fulcra are contacted with reserved steel construction, will erect It welds the coupling part of fulcra and reserved steel construction.
Japanning: step 5 after installing entire sunk panel structure, according to actual requirement, coats different colours to total Paint.
CN201910564418.8A 2019-06-27 2019-06-27 Stability caisson ceiling convenient to install and installation method thereof Active CN110331809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910564418.8A CN110331809B (en) 2019-06-27 2019-06-27 Stability caisson ceiling convenient to install and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910564418.8A CN110331809B (en) 2019-06-27 2019-06-27 Stability caisson ceiling convenient to install and installation method thereof

Publications (2)

Publication Number Publication Date
CN110331809A true CN110331809A (en) 2019-10-15
CN110331809B CN110331809B (en) 2024-04-26

Family

ID=68144016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910564418.8A Active CN110331809B (en) 2019-06-27 2019-06-27 Stability caisson ceiling convenient to install and installation method thereof

Country Status (1)

Country Link
CN (1) CN110331809B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2439848A1 (en) * 1978-10-25 1980-05-23 Valette Nicole Prefabricated building construction - has precast wall panels fixed by vertical tie bars in joint grooves and which also fix cleats for roof frames
US4435926A (en) * 1982-09-01 1984-03-13 Struben Francis L Ridge roof
AU4006085A (en) * 1984-03-16 1985-09-19 Aquatan Pty. Ltd. Reservoir cover
WO2001021899A1 (en) * 1999-09-17 2001-03-29 Fourie, Louis Building kit
KR20050033957A (en) * 2003-10-07 2005-04-14 김종헌 Bracket constructing structure of steel-structure
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN102296771A (en) * 2011-06-17 2011-12-28 绍兴文理学院 Soft package wall decoration profile and production method thereof
CN106049766A (en) * 2016-05-30 2016-10-26 中国建筑第八工程局有限公司 Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN206769157U (en) * 2017-03-30 2017-12-19 河北方庭新型建材科技有限公司 A kind of prefabricated villa roof structure
CN208363391U (en) * 2018-06-08 2019-01-11 天长市皖东通风设备有限公司 A kind of efficient ridge lighting and ventilation device
CN109505374A (en) * 2018-12-24 2019-03-22 庄金标 A kind of sunk panel structure and its construction method that stability is high
CN210976264U (en) * 2019-06-27 2020-07-10 福建惠安县洛阳庆达石雕艺术有限公司 Stability algae well convenient to installation

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2439848A1 (en) * 1978-10-25 1980-05-23 Valette Nicole Prefabricated building construction - has precast wall panels fixed by vertical tie bars in joint grooves and which also fix cleats for roof frames
US4435926A (en) * 1982-09-01 1984-03-13 Struben Francis L Ridge roof
AU4006085A (en) * 1984-03-16 1985-09-19 Aquatan Pty. Ltd. Reservoir cover
WO2001021899A1 (en) * 1999-09-17 2001-03-29 Fourie, Louis Building kit
KR20050033957A (en) * 2003-10-07 2005-04-14 김종헌 Bracket constructing structure of steel-structure
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN102296771A (en) * 2011-06-17 2011-12-28 绍兴文理学院 Soft package wall decoration profile and production method thereof
CN106049766A (en) * 2016-05-30 2016-10-26 中国建筑第八工程局有限公司 Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN206769157U (en) * 2017-03-30 2017-12-19 河北方庭新型建材科技有限公司 A kind of prefabricated villa roof structure
CN208363391U (en) * 2018-06-08 2019-01-11 天长市皖东通风设备有限公司 A kind of efficient ridge lighting and ventilation device
CN109505374A (en) * 2018-12-24 2019-03-22 庄金标 A kind of sunk panel structure and its construction method that stability is high
CN210976264U (en) * 2019-06-27 2020-07-10 福建惠安县洛阳庆达石雕艺术有限公司 Stability algae well convenient to installation

Also Published As

Publication number Publication date
CN110331809B (en) 2024-04-26

Similar Documents

Publication Publication Date Title
CN205475963U (en) Compound furred ceiling layer structure and second grade furred ceiling layer of using thereof
CN106193413A (en) One hides day rail system and a construction method
CN110331809A (en) A kind of stability sunk panel and its installation method being easily installed
CN107514088A (en) Integrated modular flat-top and its construction method
CN210976264U (en) Stability algae well convenient to installation
CN2839823Y (en) Producing clamp for colourful water pipe lamp
CN1873151B (en) Tie bar installation in use for suspended ceiling of building
CN205873599U (en) Connect formula elevator well soon
CN206112668U (en) Lawn lamp location structure
CN207974326U (en) Toilet furred ceiling component
CN100578070C (en) Combined type seamless soft light large-scale decorating lighting lamp
CN210459716U (en) Novel section bar type second grade furred ceiling
CN208650430U (en) A kind of arc angling aluminium sheet light transmission decoration square column
CN208687560U (en) A kind of Landscape Lamp being adjusted by rotation
CN214905429U (en) Show cupboard on dry-hang stone material interior wall
CN201228403Y (en) Hoisting ceiling structure
CN205875491U (en) Roof in sunshine room
CN110258895A (en) Silk ball moulding furred ceiling and its construction method
CN219450447U (en) Installation and construction auxiliary device for river bridge landscape lighting
CN217897085U (en) Assembly type kitchen wall surface hanging assembly
CN207092419U (en) A kind of adjustable railing post
CN207486524U (en) A kind of lamp decoration device of ribbon formula moulding
CN203742039U (en) Novel component type curtain wall system
CN219138236U (en) Apple sand stainless steel facing stand
CN108104357A (en) Toilet furred ceiling component and its assembly method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220620

Address after: 362000 No. 1, Dongjing, Xiadong village, Luocheng Town, Hui'an County, Quanzhou City, Fujian Province

Applicant after: Zhuang Jinbiao

Address before: 362000 Yu tou Cun, Luoyang Town, Quanzhou City, Fujian Province

Applicant before: Fujian Huian County Luoyang Qingda Stone Carving Art Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant