CN110331710A - Harbour large area super soft ground processing method - Google Patents

Harbour large area super soft ground processing method Download PDF

Info

Publication number
CN110331710A
CN110331710A CN201910549321.XA CN201910549321A CN110331710A CN 110331710 A CN110331710 A CN 110331710A CN 201910549321 A CN201910549321 A CN 201910549321A CN 110331710 A CN110331710 A CN 110331710A
Authority
CN
China
Prior art keywords
supervisor
central tube
soft ground
drainpipe
super soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910549321.XA
Other languages
Chinese (zh)
Other versions
CN110331710B (en
Inventor
曾峰
王随原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
Original Assignee
China Road and Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp filed Critical China Road and Bridge Corp
Priority to CN201910549321.XA priority Critical patent/CN110331710B/en
Publication of CN110331710A publication Critical patent/CN110331710A/en
Application granted granted Critical
Publication of CN110331710B publication Critical patent/CN110331710B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses harbour large area super soft ground processing methods, comprising: Step 1: being laid with sand bedding course above super soft ground;Step 2: setting multiple groups drainpipe vertically in super soft ground, every group of drainpipe includes multiple drainpipes of annular spread;Step 3: the center vertical in every group of drainpipe sets central tube, it is coaxially arranged with a shaft inside the central tube, the shaft is further fixed on eccentric wheel in the shaft by two bearing seat supports;Step 4: digging ring packing ditch every group of drainpipe periphery, sealing film is then laid with above sand bedding course and in sealing ditch;Step 5: the supervisor upper end, which is passed through connecting tube, is connected to vacuum pump, vacuumize process process is carried out, and the shaft is connect with a motor, so that shaft and eccentric wheel rotation;Step 6: removing sealing film, connecting tube and motor after vacuumize process process.A possibility that present invention can be improved drainage speed, reduce draining blockage.

Description

Harbour large area super soft ground processing method
Technical field
The present invention relates to foundation construction methods.It is more particularly related to a kind of harbour large area super soft ground Processing method.
Background technique
Super soft ground has the characteristics that high-moisture percentage, low-intensity, is generally handled at present using vacuum method.But It is that current vacuum method drainage speed is slow, and with the increase of construction time, drain bar is easier to block, and influences the row in later period Outlet capacity.Therefore, it is urgent to provide the super soft ground processing methods that one kind can overcome drawbacks described above to a certain degree.
Summary of the invention
It is an object of the present invention to provide a kind of harbour large area super soft ground processing methods, can be improved draining Speed reduces a possibility that draining blockage.
In order to realize these purposes and other advantages according to the present invention, the processing of harbour large area super soft ground is provided Method, comprising:
Step 1: being laid with sand bedding course above super soft ground;
Step 2: setting multiple groups drainpipe vertically in super soft ground, every group of drainpipe includes the multiple of annular spread Drainpipe, the drainpipe include supervisor and multiple wing plates, are formed with multiple first openings on the side wall of the supervisor, and described the One opening is in bar shaped, and along the axially extending of the supervisor, is formed with hollow chamber, the wing plate side inside the wing plate It is formed with the second opening being connected to the hollow chamber, the wing plate is fixed on first opening, and makes described the One opening and second open communication, the fish scale hole being connected to the hollow chamber, the fish is distributed in the wing plate surface The opening in squama hole is towards the supervisor upper end;
Step 3: the center vertical in every group of drainpipe sets central tube, the central tube lower end closed, the central tube It is internal to be arranged at intervals with two bearing blocks up and down, a shaft is coaxially arranged with inside the central tube, the shaft is by two axis Seat supports are held, are further fixed on eccentric wheel in the shaft;
Step 4: digging ring packing ditch every group of drainpipe periphery, then it is laid with above sand bedding course and in sealing ditch Seal film;
Step 5: the supervisor upper end, which is passed through connecting tube, is connected to vacuum pump, vacuumize process process is carried out, and will The shaft is connect with a motor, so that shaft and eccentric wheel rotation;
Step 6: sealing film, connecting tube and motor are removed, to drainpipe and center after vacuumize process process Grouting in cylinder.
Preferably, the harbour large area super soft ground processing method, the multiple first opening are symmetrical In supervisor's side wall, by close supervisor to far from supervisor, thickness is sequentially reduced the wing plate, and the wing plate is responsible for extremely by close Far from supervisor, width is sequentially reduced.
Preferably, the harbour large area super soft ground processing method, filled with geotechnique in the hollow chamber Fiber.
Preferably, the harbour large area super soft ground processing method, the supervisor and the central tube stretch out The sand bedding course digs annular groove around the central tube, and sealing film is laid in annular groove.
Preferably, the harbour large area super soft ground processing method, further includes:
Connecting rod is set, connecting rod one end is fixed with central tube, the other end and supervisor fix.
Preferably, the harbour large area super soft ground processing method, between the central tube and the supervisor Away from 10~15 times for the central tube diameter, the spacing of adjacent two supervisors is not more than 4~5 times of wing plate length.
The present invention is include at least the following beneficial effects:
Drainpipe annular is arranged the present invention, and central tube is arranged at center, drainpipe is controlled to a vacuum pump, suction is super Water in soft soil foundation is gentle, in aspiration procedure, drives central tube vibration with motor, promotes the peripherad row of water in ground Water pipe is mobile, improves drainability.The vibration of central tube is transferred at drainpipe, reduces the possibility of fish scale hole plug on drainpipe Property, assist in keeping drainability.After aspiration procedure, drainpipe and central tube are stayed in super soft ground, and auxiliary improves The intensity of ground.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of drainpipe of the present invention;
Fig. 3 is top view of the invention.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other elements or combinations thereof.
In a kind of technical solution, as shown in Figure 1, 2, 3, harbour large area super soft ground processing method, comprising:
Step 1: being laid with sand bedding course 1 above super soft ground;
Step 2: setting multiple groups drainpipe 4 vertically in super soft ground, every group of drainpipe 4 includes the more of annular spread A drainpipe 4, the drainpipe 4 include supervisor and multiple wing plates 401, are formed with multiple first on the side wall of the supervisor and open Mouthful, first opening is in bar shaped, and along the axially extending of the supervisor, is formed with hollow chamber inside the wing plate 401, 401 side of wing plate is formed with the second opening being connected to the hollow chamber, and the wing plate 401 is fixed on described first and opens At mouthful, and make first opening and second open communication, 401 surface of wing plate is distributed with and the hollow chamber The fish scale hole 402 of connection, the opening of the fish scale hole 402 is towards the supervisor upper end;
Step 3: the center vertical in every group of drainpipe 4 sets central tube 5,5 lower end closed of central tube, it is described in 5 inside of heart cylinder is arranged at intervals with two bearing blocks 502 up and down, and a shaft 501 is coaxially arranged with inside the central tube 5, described Shaft 501 is supported by two bearing blocks 502, is further fixed on eccentric wheel 503 in the shaft 501;
Step 4: ring packing ditch 2 is dug every group of 4 periphery of drainpipe, then above sand bedding course 1 and in sealing ditch 2 It is laid with sealing film 3;
Step 5: the supervisor upper end, which is passed through connecting tube, is connected to vacuum pump 6, vacuumize process process is carried out, and The shaft 501 is connect with a motor 504, so that shaft 501 and eccentric wheel 503 rotate;
Step 6: sealing film 3, connecting tube and motor 504 are removed, to 4 He of drainpipe after vacuumize process process Grouting in central tube 5.
In the above-mentioned technical solutions, it is lacked for the drain bar of existing vacuum method insertion super soft ground is susceptible to plugging It falls into, drainpipe 4 is circular layout, the central tube 5 that then setting can produce vibration at center utilizes in carrying out aspiration procedure The vibration of central tube 5 provides drainage speed, reduces a possibility that drainpipe 4 blocks.Sand is laid with above super soft ground first Then bed course 1 sets drainpipe 4 and central tube 5, drainpipe 4 is arranged around central tube 5, i.e., by entire harbour large area ultra-soft Soil base multiple groups drainpipe 4 is divided into junior unit;Then sealing ditch 2 is dug in every group of outer collarette of drainpipe 4, and with sealing film 3 Cover sand bedding course 1 and sealing ditch 2;Then setting vacuum pump 6, connecting tube and motor 504, are aspirated and are vibrated, and draining is completed Process;Finally remove connecting tube and motor 504, the slip casting into drainpipe 4 and central tube 5, for adding for subsequent super soft ground Gu.Drainpipe 4 includes supervisor and wing plate 401, and wing plate 401 is located at around supervisor in expansion shape, and 401 area of wing plate is big, and surface Fish scale hole 402 is distributed with, water is facilitated to enter, 402 opening upwards of fish scale hole are avoided when setting drainpipe 4, and mud blocks fish scale Hole 402.Rotatable shaft 501 is set inside central tube 5, and shaft 501 is driven by motor 504, also sets up bias in shaft 501 Wheel 503, when shaft 501 is driven by motor 504, eccentric wheel 503 also rotates, so that central tube 5 is whole to generate vibration.Central tube 5 Diameter, central tube 5 be rationally arranged at a distance from drainpipe 4, the vibration of central tube 5 is transferred at drainpipe 4, it is right Water pressure in super soft ground, promotes water to enter drainpipe 4, and the soil body near drainpipe 4 is vibrated, subtracts to a certain degree The blocking of few fish scale hole 402.As can be seen that the technical program can be improved and keep the drainability of vacuum method.
In another technical solution, the harbour large area super soft ground processing method, the multiple first is opened Mouth is symmetrically distributed in supervisor's side wall, and the wing plate 401 is by close to supervisor, to far from supervisor, thickness is sequentially reduced, the wing Plate 401 is by close to supervisor, to far from supervisor, width is sequentially reduced.Here, so that wing plate 401 is in spininess, aspect wing plate 401 is inserted Enter ground, symmetrically expansion is distributed in supervisor two sides to wing plate 401, and receiving is facilitated to vibrate bring water by central tube 5.
In another technical solution, the harbour large area super soft ground processing method, in the hollow chamber Filled with geofabrics.Here, geofabrics have water penetration, reduce mud and enter supervisor.
In another technical solution, the harbour large area super soft ground processing method, it is described supervisor and it is described Central tube 5 stretches out the sand bedding course 1, annular groove 101 is dug around the central tube 5, and be laid in annular groove 101 Seal film 3.Here, wing plate 401 is located in super soft ground, and it is recessed to dig annular in the portion that central tube 5 stretches out sand bedding course 1 Slot 101 is laid with sealing film 3 in annular groove 101, improves overall tightness.
In another technical solution, the harbour large area super soft ground processing method, further includes:
Connecting rod is set, and connecting rod one end and central tube 5 is fixed, and the other end and supervisor fix.Here, connecting rod can be with Between the centrally disposed cylinder 5 of mode that overlapped and supervisor, for the vibration of central tube 5 to be transferred to supervisor, promote wing plate 401 weeks The soil body vibration enclosed, reduces a possibility that fish scale hole 402 blocks.
In another technical solution, the harbour large area super soft ground processing method, the central tube 5 and institute The spacing for stating supervisor is 10~15 times of 5 diameter of central tube, and the spacing of adjacent two supervisors is no more than 401 length of wing plate 4~5 times.Here there is provided a kind of set-up modes of central tube 5 and supervisor, and central tube 5 is preferably transmitted vibration To supervisor.
Number of devices and treatment scale described herein are for simplifying explanation of the invention.To the big face in harbour of the present invention The application of product super soft ground processing method, modifications and variations will be readily apparent to persons skilled in the art.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (6)

1. harbour large area super soft ground processing method characterized by comprising
Step 1: being laid with sand bedding course above super soft ground;
Step 2: setting multiple groups drainpipe vertically in super soft ground, every group of drainpipe includes multiple drainings of annular spread Pipe, the drainpipe include supervisor and multiple wing plates, multiple first openings are formed on the side wall of the supervisor, described first opens Mouthful it is in bar shaped, and along the axially extending of the supervisor, is formed with hollow chamber inside the wing plate, the wing plate side is formed There is second be connected to the hollow chamber opening, the wing plate is fixed on first opening, and makes described first to open Mouth and second open communication, the fish scale hole being connected to the hollow chamber, the fish scale hole is distributed in the wing plate surface Opening towards the supervisor upper end;
Step 3: the center vertical in every group of drainpipe sets central tube, the central tube lower end closed, inside the central tube Two bearing blocks are arranged at intervals with up and down, a shaft are coaxially arranged with inside the central tube, the shaft is by two bearing blocks It supports, is further fixed on eccentric wheel in the shaft;
Step 4: digging ring packing ditch every group of drainpipe periphery, sealing then is laid with above sand bedding course and in sealing ditch Film;
Step 5: the supervisor upper end, which is passed through connecting tube, is connected to vacuum pump, vacuumize process process is carried out, and will be described Shaft is connect with a motor, so that shaft and eccentric wheel rotation;
Step 6: sealing film, connecting tube and motor are removed, into drainpipe and central tube after vacuumize process process Grouting.
2. large area super soft ground processing method in harbour as described in claim 1, which is characterized in that the multiple first opens Mouth is symmetrically distributed in supervisor's side wall, the wing plate by close to supervisor, to far from supervisor, thickness is sequentially reduced, the wing plate by Close to supervisor to far from supervisor, width is sequentially reduced.
3. large area super soft ground processing method in harbour as claimed in claim 2, which is characterized in that in the hollow chamber Filled with geofabrics.
4. large area super soft ground processing method in harbour as described in claim 1, which is characterized in that it is described supervisor and it is described Central tube stretches out the sand bedding course, and annular groove is dug around the central tube, and sealing film is laid in annular groove.
5. large area super soft ground processing method in harbour as claimed in claim 4, which is characterized in that further include:
Connecting rod is set, connecting rod one end is fixed with central tube, the other end and supervisor fix.
6. large area super soft ground processing method in harbour as claimed in claim 2, which is characterized in that the central tube and institute The spacing for stating supervisor is 10~15 times of the central tube diameter, and the spacing of adjacent two supervisors is not more than the 4~5 of wing plate length Times.
CN201910549321.XA 2019-06-24 2019-06-24 Port large-area ultra-soft soil foundation treatment method Active CN110331710B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910549321.XA CN110331710B (en) 2019-06-24 2019-06-24 Port large-area ultra-soft soil foundation treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910549321.XA CN110331710B (en) 2019-06-24 2019-06-24 Port large-area ultra-soft soil foundation treatment method

Publications (2)

Publication Number Publication Date
CN110331710A true CN110331710A (en) 2019-10-15
CN110331710B CN110331710B (en) 2021-03-09

Family

ID=68142677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910549321.XA Active CN110331710B (en) 2019-06-24 2019-06-24 Port large-area ultra-soft soil foundation treatment method

Country Status (1)

Country Link
CN (1) CN110331710B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863481A (en) * 2019-11-04 2020-03-06 三峡大学 Method for drainage, exhaust and consolidation treatment of weak subjacent layer

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004204573A (en) * 2002-12-26 2004-07-22 Shimizu Corp Method of preventing liquefaction of ground
CN102226337A (en) * 2011-04-22 2011-10-26 河海大学 Three-dimensional drain and construction method thereof
CN102465523A (en) * 2010-11-19 2012-05-23 葛辉 Dry and dense resonance method for reinforcing soft soil foundation of new hydraulic-fill sand
CN102518115A (en) * 2011-12-22 2012-06-27 中铁第四勘察设计院集团有限公司 Method for reinforcing soft soil foundation of large-area storage yard
CN102767174A (en) * 2012-07-17 2012-11-07 沈卫清 Dynamic and static water-discharging vibration method
WO2017159692A1 (en) * 2016-03-18 2017-09-21 正佳 近藤 Vacuum consolidation and dredging method, tower-like airtight preloading caisson, and dedicated work ship

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004204573A (en) * 2002-12-26 2004-07-22 Shimizu Corp Method of preventing liquefaction of ground
CN102465523A (en) * 2010-11-19 2012-05-23 葛辉 Dry and dense resonance method for reinforcing soft soil foundation of new hydraulic-fill sand
CN102226337A (en) * 2011-04-22 2011-10-26 河海大学 Three-dimensional drain and construction method thereof
CN102518115A (en) * 2011-12-22 2012-06-27 中铁第四勘察设计院集团有限公司 Method for reinforcing soft soil foundation of large-area storage yard
CN102767174A (en) * 2012-07-17 2012-11-07 沈卫清 Dynamic and static water-discharging vibration method
WO2017159692A1 (en) * 2016-03-18 2017-09-21 正佳 近藤 Vacuum consolidation and dredging method, tower-like airtight preloading caisson, and dedicated work ship

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863481A (en) * 2019-11-04 2020-03-06 三峡大学 Method for drainage, exhaust and consolidation treatment of weak subjacent layer

Also Published As

Publication number Publication date
CN110331710B (en) 2021-03-09

Similar Documents

Publication Publication Date Title
CN107700496B (en) The inverse suitable combining construction method of deep basal pit
CN110331710A (en) Harbour large area super soft ground processing method
CN107059849A (en) A kind of driven cast-in-place pile and its construction technology
CN109403341A (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method
CN108999178A (en) A kind of Soft Soil Subgrade Treatment Method of soil body hardening form compound foundation
CN106836201A (en) Immersed tube is into mould draining cast-in-situ steel reinforced concrete stake machine and soft soil foundation reinforcing method
CN206104541U (en) Administer soil pollution's dialysis apparatus
CN202023185U (en) Concrete tubular pile
CN108824113A (en) A kind of soft-soil foundation treatment method
CN104947636B (en) Stilling pool bottom plate reinforcing composition
CN107386269A (en) A kind of Two bors d's oeuveres I-shaped steel joint construction method for ultra-deep underground continuous wall
CN207143938U (en) A kind of novel vibrating hidden pipe pile shoe
CN110185046A (en) A kind of horizontal connecting leg construction method of novel ground source well-digging
CN107574792A (en) Contain high water head plugging structure and its construction method in a kind of dam foundation water delivery bottom
CN206941573U (en) Artificial digging pile
CN107237311B (en) The method of concretion of soft foundation processing structure
JP3696294B2 (en) Hollow foundation foundation method using air bag
CN106836211B (en) Prefabricated club-footed reducing pile for treating soft soil foundation and construction method thereof
JPS61134425A (en) Method of forming foundation pile
JPH04108910A (en) Method for processing pile head of sunk concrete pile
CN205576917U (en) Vibration sleeve pipe
CN106759162B (en) The construction method of sluice force reduction pool bottom ruggedized construction
JPS61158517A (en) Method of processing extra-banking concrete for cast-in-place pile
JP2949341B1 (en) Underwater girder construction method
JP2690361B2 (en) Pile construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant