- CN110329964A CN110329964A CN201910619794.2A CN201910619794A CN110329964A CN 110329964 A CN110329964 A CN 110329964A CN 201910619794 A CN201910619794 A CN 201910619794A CN 110329964 A CN110329964 A CN 110329964A
- Authority
- CN
- China
- Prior art keywords
- long slab
- connecting base
- lifting
- welded
- assembling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
- B66F11/042—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F13/00—Common constructional features or accessories
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F17/00—Safety devices, e.g. for limiting or indicating lifting force
- B66F17/006—Safety devices, e.g. for limiting or indicating lifting force for working platforms
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C1/00—Ladders in general
- E06C1/02—Ladders in general with rigid longitudinal member or members
- E06C1/38—Special constructions of ladders, e.g. ladders with more or less than two longitudinal members, ladders with movable rungs or other treads, longitudinally-foldable ladders
- E06C1/383—Foldable ladders in which the longitudinal members are brought together on folding
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C7/00—Component parts, supporting parts, or accessories
- E06C7/08—Special construction of longitudinal members, or rungs or other treads
- E06C7/081—Rungs or other treads comprising anti-slip features
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Emergency Lowering Means (AREA)
- Tents Or Canopies (AREA)
Abstract
The present invention provides a kind of intelligentized multifunction power maintenance device, including lower connecting base, first slide opening, movable pulley, set casing, PLC, switch, extend steel plate, rotating handle, support plate, first lifting long slab, second lifting long slab, reinforce assembling bar, upper connecting base, second slide opening, solenoid valve, hydraulic cylinder, fuel tank, oil pipe, oil pump, threeway head, connect insert rack, fender bracket, web plate, first fixed ring, second fixed ring, L-type inserted link, climb carriage structure, protect Extension support structure, framed plate structure and lifting screw are blocked in protective jacket female connector structure and protection.The invention has the benefit that passing through the setting of climbing carriage structure, it is convenient to be reached on upper connecting base by pole for climbing, and then it easily carries out using pushing apparatus or material that can be transported on upper connecting base by the roller of rotation when the apparatus or material for repairing electric power are close to the roller.
Description
Technical field
The invention belongs to electric power maintenance technical field more particularly to a kind of intelligentized multifunction power maintenance devices.
Background technique
In recent years, China's power technology rapidly develops, and transmission line of electricity is rapidly added, these electric power facilities need periodically to carry out
Maintenance, this just needs to use electric power maintenance tool, and electric power maintenance ladder is the tool being commonly used in electric power maintenance, work progress
One of, the irony ladder that existing maintenance ladder is generally voluntarily welded, when overhauling the electric power facility of eminence, it usually needs maintenance people
Member ascends a height operation, and operator generallys use safety belt suspension and either carries out climbing of ascending a height, existing skill using easy ladder
Art is that technical solution used by the power circuit maintenance device that China Patent Publication No. is CN201710462918.1 is: including
Car body, rotation lifting assembly, operation bracket, camera and maintenance assembly;It is total that control rotation lifting is equipped in the driver's cabin of car body
At, operation bracket and safeguard assembly movement console;Rotation lifting assembly is fixed on the trunk of car body;Rotation lifting
Assembly includes the pedestal being fixed on trunk, and the turntable that fixation can rotate in the horizontal plane on pedestal, it is electric that turntable passes through first
Machine drives rotation, and support is fixed at the top of turntable, and support is lifted one end of bar by the first articulated shaft articulated connection first,
First articulated shaft is connect by the first retarder with the output end of the second motor;The other end of first lifting bar is hinged by second
One end of axis articulated connection the second lifting bar, the second articulated shaft are connect by the second retarder with the output end of third motor, the
The other end of two lifting bars is fixedly connected with operation bracket, has the dehumidifying section realization pair cooperated in maintenance assembly by camera
The dehumidifying of overhead insulation is safeguarded, grid power leakage caused by insulator or cable bad is prevented;It can be automatic by crusher members
Break process is carried out to the damaged insulator not being available, prevents artificial damaged fragment from splashing the injury to human body;Pass through
Installing component realizes the crawl to insulator, convenient for cooperating the advantages of manually being installed.
But there is also be inconvenient to climb when the folding device and tool is transported to this for existing electric power maintenance device
On device, not have the function of being protected and intercepted article and fall, protection effect poor and do not have and play sun-shading rainproof
Problem.
Therefore, a kind of intelligentized multifunction power maintenance device is invented to be very necessary.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of intelligentized multifunction power maintenance devices, to solve
Be inconvenient to climb and tool is transported on the device, do not have and protect when existing electric power maintenance device folding device
And intercept that function that article falls, protection effect is poor and does not have the problem of playing sun-shading rainproof.A kind of intelligentized more function
Energy electric power maintenance device, including lower connecting base, the first slide opening, movable pulley, set casing, PLC, switch extend steel plate, rotate hand
Handle, support plate, the first lifting long slab, the second lifting long slab are reinforced and assemble bar, upper connecting base, the second slide opening, and solenoid valve is hydraulic
Cylinder, fuel tank, oil pipe, oil pump, threeway head, connection insert rack, fender bracket, web plate, the first fixed ring, the second fixed ring, L-type inserted link,
Carriage structure is climbed, protects Extension support structure, framed plate structure and lifting screw are blocked in protective jacket female connector structure and protection, described
The first slide opening be provided with the lefts of front and rear sides inside lower connecting base respectively;The movable pulley is welded on lower connecting base following table
The surrounding in face;The set casing bolt is mounted on the intermediate position of lower connecting base lower surface;The PLC bolt is mounted on solid
Determine the left side of shell front surface;The switch is embedded in the front of PLC;The extension steel plate is welded on lower connecting base outer wall
Surrounding, and lifting screw is connected with extending steel plate internal whorl;The rotating handle and support plate is respectively welded at lifting
The upper and lower surface of screw rod;The mutual axis in position connects among the first lifting long slab and the second lifting long slab, and the first lifting length
Axis connects in right side and the first slide opening inside lower connecting base respectively for plate and the second lifting long slab lower part, while the first lifting long slab
Axis connects the right side inside upper connecting base and the inside of the second slide opening respectively with the top of the second lifting long slab;The reinforcing group
Dress bar is respectively welded between the first lifting long slab and the first lifting long slab, between the second lifting long slab and the second lifting long slab;
Second slide opening is provided with the front and back two of upper connecting base inside left respectively;The solenoid valve is threaded in fuel tank
Internal right side;Axis connects on the inner wall of the first lifting long slab and the second lifting long slab the hydraulic cylinder respectively;The oil
Case bolt is mounted on the intermediate position inside set casing;The oil pipe is socketed between solenoid valve and oil pump respectively, threeway head
Between hydraulic cylinder;The bolt of cylinder is mounted on the right side inside set casing, and connect on the right side of oil pump with threeway head thread;
The connection insert rack bolt is mounted on the right end of lower connecting base;The fender bracket is respectively welded at upper connecting base upper surface
Front and back two and right side;The web plate hinge is mounted on the left of the fender bracket at upper connecting base rear portion;First fixed ring
It is welded on the left of the fender bracket of upper connecting base front;Second fixed ring is welded on the front surface of web plate;The L-type is inserted
Bar is plugged on respectively in the first fixed ring and the second fixed ring;The climbing carriage structure is mounted on a left side for lower connecting base
Side;The protection Extension support structure is mounted on the outside of upper connecting base;The protective jacket female connector structure is mounted on first liter
It drops on long slab and the second lifting long slab;The top that framed plate structure is mounted on fender bracket is blocked in the protection;The climbing is defeated
Sending frame structure includes mounting plate, adjusts strip, and inclined seat erects long slab, reinforces assembling head, Anti-slip cover, pole for climbing, bearing and rolling
Cylinder, the mounting plate are welded on the left end of lower connecting base;Described adjusting strip one end is bolted with mounting plate, the other end
It is bolted with inclined seat;The setting long slab is respectively welded at the front and back two of inclined seat left surface;The reinforcing group
Dress head is welded on the upper end for erectting long slab;The Anti-slip cover is socketed in the lower end for erectting long slab;The pole for climbing is welded on
It erects long slab and erects between long slab;The bearing is embedded in the inside for erectting long slab, and is arranged in pole for climbing and pole for climbing
Between;The roller is plugged in bearing.
Preferably, the protection Extension support structure includes fastening seat, support edge, assembling frame, protective net, reinforcing cord,
It reinforces bell and spigot joint and fishbolt, the fastening seat and support edge is welded to each other, and be respectively welded at upper connecting base outer wall four
The top in week;Described reinforcing cord one end is welded on the upper right quarter of assembling frame;The reinforcing bell and spigot joint is respectively welded at guarantor
On the outside of the upper end of retaining frame and web plate;The fishbolt is threaded in the upper end for reinforcing bell and spigot joint.
Preferably, the protective jacket female connector structure includes protective jacket, is socketed chamber, and the first erection bolt assembles slotting ring, even
Logical annular distance and the second erection bolt, the socket chamber is provided with the inside of protective jacket, and is socketed in the first lifting long slab respectively
With the outside of the second lifting long slab;First erection bolt is threaded in the surrounding of protective jacket front and rear surfaces respectively;Institute
The assembling slotting ring stated is glued to the top of socket cavity wall;The connection annular distance is provided with the inside of assembling slotting ring;Described
Second erection bolt is threaded in the front and back two at left and right sides of assembling slotting ring respectively.
Preferably, it includes socket pipe that framed plate structure is blocked in the protection, adjusts bolt, and stretch steel pole, organizes rim, assembling
Column and barrier bed, described socket pipe one end are welded on the upper end of fender bracket, and the other end is socketed in the lower part of flexible steel pole;It is described
Adjusting bolt thread be connected to the junction of socket pipe and flexible steel pole;The flexible steel pole upper end and assembling column welding;
The assembling column is respectively welded at group rim and organizes the left and right sides and intermediate position between rim.
Preferably, it there are two setting long slab settings, and erects long slab and erects the pole for climbing outer wall between long slab
On be provided with a word anti-skid chequer.
Preferably, the bearing and roller are respectively arranged with multiple, and the diameter of cylinder is bigger than the diameter of pole for climbing
One centimetre to three centimetres.
Preferably, the inclined seat is set as U-shaped, at left and right sides of the described adjusting strip respectively with inclined seat and installation
Plate connection.
Preferably, the assembling frame uses U-shaped aluminium alloy pipe support, and the protective net on inner wall uses nylon wire, institute
The assembling frame and protective net stated are separately positioned on the surrounding of upper connecting base outer wall, and the protective net system solution is in assembling frame
On inner wall.
Preferably, it is connect on the inside of the fastening seat with the left-hand axis of assembling frame outer wall.
Preferably, the reinforcing cord uses wirerope, through-hole is offered inside the reinforcing bell and spigot joint, and internal slotting
It is connected to reinforcing cord.
Preferably, the protective jacket is provided with multiple, and internal socket chamber is socketed in the first lifting long slab and second
The outside of long slab is gone up and down, the protective jacket uses bellows-sheathed.
Preferably, first erection bolt is provided with eight, and pass through protective jacket respectively with the first lifting long slab and
Second lifting long slab is threadedly coupled.
Preferably, the connection annular distance uses rubber ring, and internal whorl is connected with the second erection bolt.
Preferably, the barrier bed is provided with three layers, the barrier bed be respectively adopted aluminium foil layer, PVC waterproof layer and
The top of upper connecting base is arranged in rubber layer, the barrier bed.
Preferably, the group rim is provided with two, and is connected with each other by assembling column, the group rim upper surface
It is bolted with barrier bed.
Preferably, the socket pipe and flexible steel pole are adapted, and are tightened the adjusting bolt and fixed.
Compared with prior art, the invention has the benefit that
1. in the present invention, there are two the setting long slab settings, and erects long slab and erect the pole for climbing outer wall between long slab
On be provided with a word anti-skid chequer, first lifting long slab and second lifting long slab folding shrinking after, easily pass through pole for climbing
Reach upper connecting base on, and then easily carry out using.
2. in the present invention, it is more straight than pole for climbing that the bearing and roller are respectively arranged with multiple, described diameter of cylinder
Diameter is one centimetre to three centimetres big, when the apparatus or material for repairing electric power are close to the roller, pushes apparatus or material that can pass through
The roller of rotation is transported on upper connecting base, and enforcement of going forward side by side is used.
3. in the present invention, the inclined seat is set as U-shaped, at left and right sides of the adjusting strip respectively with inclined seat and
Mounting plate connection, can make therewith in this way erect long slab tilt to different angles carry out using.
4. in the present invention, the assembling frame uses U-shaped aluminium alloy pipe support, and the protective net on inner wall uses nylon
Net, the assembling frame and protective net are separately positioned on the surrounding of upper connecting base outer wall, and the protective net system solution is assembling
On the inner wall of frame, and then protection can be played by protective net and intercepts the function that article is fallen, and avoids and is easy to appear
The problem of falling object from high altitude, and increase protection effect.
5. in the present invention, the left-hand axis on the inside of the fastening seat with assembling frame outer wall is connect, convenient for make assembling frame into
Line tilt activity, and be convenient for storing or use.
6. in the present invention, the reinforcing cord uses wirerope, through-hole is offered inside the reinforcing bell and spigot joint, and interior
Portion is plugged with reinforcing cord, when in use, loosens or be straightened the reinforcing cord, and assembled frame frame can be assisted to carry out storage and to assembled frame
The work that frame is lifted, and then increase the tightness of the protection Extension support structure.
7. in the present invention, the protective jacket be provided with it is multiple, and internal socket chamber be socketed in the first lifting long slab and
The outside of second lifting long slab, the protective jacket uses bellows-sheathed, in use, the protective jacket of different number can be made to the
One lifting long slab and the second lifting long slab are protected.
8. in the present invention, first erection bolt is provided with eight, and passes through protective jacket and grow respectively with the first lifting
Plate and second lifting long slab be threadedly coupled, the work for reasonably cooperating the protective jacket to be dismounted, and be convenient for disassembly and more
Change use.
9. in the present invention, the connection annular distance uses rubber ring, and internal whorl is connected with the second erection bolt, installation
When, the connection annular distance of different location can be made to be inserted on the protective jacket of different location therewith, and then reasonably make different number
Protective jacket assembling go forward side by side enforcement use.
10. in the present invention, the barrier bed is provided with three layers, and aluminium foil layer, PVC waterproof is respectively adopted in the barrier bed
The top of upper connecting base is arranged in layer and rubber layer, the barrier bed, can play to the staff on upper connecting base anti-
The function with rain-proof is shone, staff is carried out blocking protection therewith, and increase protection effect.
11. in the present invention, the group rim is provided with two, and is connected with each other by assembling column, the group rim
Upper surface is bolted with barrier bed, and barrier bed is easily made to be installed or be dismantled, while being also convenient for replacing and be used.
12. in the present invention, the socket pipe and flexible steel pole are adapted, and are tightened the adjusting bolt and fixed, loosen
Or when tightening the adjusting bolt, socket pipe and flexible steel pole can be cooperated to be dismounted, and then be suitable for different environment and make
With.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of climbing carriage structure of the invention.
Fig. 3 is the structural schematic diagram of protection Extension support structure of the invention.
Fig. 4 is the structural schematic diagram of protective jacket female connector structure of the invention.
Fig. 5 is the structural schematic diagram that framed plate structure is blocked in protection of the invention.
Fig. 6 is the structural schematic diagram of appliance wiring of the invention.
In figure:
1, lower connecting base;2, the first slide opening;3, movable pulley;4, set casing;5,PLC;6, it switchs;7, extend steel plate;8, hand is rotated
Handle;9, support plate;10, the first lifting long slab;11, the second lifting long slab;12, assembling bar is reinforced;13, upper connecting base;14, second
Slide opening;15, solenoid valve;16, hydraulic cylinder;17, fuel tank;18, oil pipe;19, oil pump;20, threeway head;21, insert rack is connected;22, it protects
Retaining frame;23, web plate;24, the first fixed ring;25, the second fixed ring;26, L-type inserted link;27, carriage structure is climbed;271, pacify
Loading board;272, strip is adjusted;273, inclined seat;274, long slab is erect;275, assembling head is reinforced;276, Anti-slip cover;277, it climbs
Bar;278, bearing;279, roller;28, Extension support structure is protected;281, seat is fastened;282, support edge;283, frame is assembled;
284, protective net;285, reinforcing cord;286, bell and spigot joint is reinforced;287, fishbolt;29, protective jacket female connector structure;291, it protects
Set;292, it is socketed chamber;293, the first erection bolt;294, slotting ring is assembled;295, it is connected to annular distance;296, the second erection bolt;30,
Framed plate structure is blocked in protection;301, socket pipe;302, bolt is adjusted;303, stretch steel pole;304, rim is organized;305, column is assembled;
306, barrier bed;31, lifting screw.
Specific embodiment
The present invention is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 2, a kind of intelligentized multifunction power maintenance device, including lower connecting base 1, the first slide opening
2, movable pulley 3, set casing 4, PLC5, switch 6, extension steel plate 7, rotating handle 8, support plate 9, the first lifting long slab 10, second
Long slab 11 is gone up and down, assembling bar 12, upper connecting base 13, the second slide opening 14, solenoid valve 15, hydraulic cylinder 16, fuel tank 17, oil pipe are reinforced
18, oil pump 19, threeway head 20, connect insert rack 21, fender bracket 22, web plate 23, the first fixed ring 24, the second fixed ring 25, L-type insert
Bar 26 climbs carriage structure 27, protects Extension support structure 28,30 He of framed plate structure is blocked in protective jacket female connector structure 29 and protection
Lifting screw 31, first slide opening 2 are provided with the left of 1 inside front and rear sides of lower connecting base respectively;The movable pulley 3
It is welded on the surrounding of 1 lower surface of lower connecting base;4 bolt of set casing is mounted on the intermediate position of 1 lower surface of lower connecting base;
The PLC5 bolt is mounted on the left side of 4 front surface of set casing;The switch 6 is embedded in the front of PLC5;Described prolongs
The surrounding that steel plate 7 is welded on 1 outer wall of lower connecting base is stretched, and is connected with lifting screw 31 extending 7 internal whorl of steel plate;Described
Rotating handle 8 and support plate 9 are respectively welded at the upper and lower surface of lifting screw 31;Described first goes up and down long slab 10 and second liter
The drop 11 mutual axis in intermediate position of long slab connects, and axis connects in lower connection respectively for the first lifting long slab 10 and the second lifting 11 lower part of long slab
In right side and the first slide opening 2 inside seat 1, while axis connects respectively on the top of the first lifting long slab 10 and the second lifting long slab 11
The inside on right side and the second slide opening 14 inside upper connecting base 13;It is long that the reinforcing assembling bar 12 is respectively welded at the first lifting
Between plate 10 and the first lifting long slab 10, between the second lifting long slab 11 and the second lifting long slab 11;Second slide opening 14
It is provided with the front and back two of 13 inside left of upper connecting base respectively;The solenoid valve 15 is threaded in the right side inside fuel tank 17
Side;Axis connects on the inner wall of the first lifting long slab 10 and the second lifting long slab 11 hydraulic cylinder 16 respectively;The fuel tank
17 bolts are mounted on the intermediate position inside set casing 4;The oil pipe 18 is socketed in respectively between solenoid valve 15 and oil pump 19,
Between threeway head 20 and hydraulic cylinder 16;19 bolt of oil pump is mounted on the right side inside set casing 4, and 19 right side of oil pump with
Threeway head 20 is threadedly coupled;21 bolt of connection insert rack is mounted on the right end of lower connecting base 1;The fender bracket 22 is distinguished
It is welded on the front and back two and right side of 13 upper surface of upper connecting base;23 hinge of web plate is mounted on 13 rear portion of upper connecting base
22 left side of fender bracket;First fixed ring 24 is welded on 22 left side of fender bracket of 13 front of upper connecting base;Described second
Fixed ring 25 is welded on the front surface of web plate 23;It is fixed that the L-type inserted link 26 is plugged on the first fixed ring 24 and second respectively
In ring 25;The climbing carriage structure 27 is mounted on the left side of lower connecting base 1;The protection Extension support structure 28 is installed
In the outside of upper connecting base 13;The protective jacket female connector structure 29 is mounted on the first lifting long slab 10 and the second lifting long slab 11
On;The top that framed plate structure 30 is mounted on fender bracket 22 is blocked in the protection;The climbing carriage structure 27 includes peace
Loading board 271 adjusts strip 272, and inclined seat 273 erects long slab 274, reinforces and assembles head 275, Anti-slip cover 276, pole for climbing 277,
Bearing 278 and roller 279, the mounting plate 271 are welded on the left end of lower connecting base 1;Described 272 one end of adjusting strip with
Mounting plate 271 is bolted, and the other end is bolted with inclined seat 273;The setting long slab 274 is respectively welded at inclined seat
The front and back of 273 left surfaces two;The reinforcing assembling head 275 is welded on the upper end for erectting long slab 274;The Anti-slip cover
276 are socketed in the lower end for erectting long slab 274;The pole for climbing 277, which is welded on, to be erect long slab 274 and erects between long slab 274;
The bearing 278 is embedded in the inside for erectting long slab 274, and is arranged between pole for climbing 277 and pole for climbing 277;Described
Roller 279 is plugged in bearing 278.
As shown in Fig. 3, in above-described embodiment, specifically, the protection Extension support structure 28 includes fastening seat 281,
Support edge 282 assembles frame 283, protective net 284, and reinforcing cord 285 reinforces bell and spigot joint 286 and fishbolt 287, and described is tight
Gu seat 281 and support edge 282 are welded to each other, and are respectively welded at the top of 13 outer wall surrounding of upper connecting base;The reinforcing cord
285 one end are welded on the upper right quarter of assembling frame 283;The reinforcing bell and spigot joint 286 is respectively welded at fender bracket 22 and web plate
On the outside of 23 upper end;The fishbolt 287 is threaded in the upper end for reinforcing bell and spigot joint 286.
As shown in Fig. 4, in above-described embodiment, specifically, the protective jacket female connector structure 29 includes protective jacket 291,
It is socketed chamber 292, the first erection bolt 293 assembles slotting ring 294, is connected to annular distance 295 and the second erection bolt 296, the socket
Chamber 292 is provided with the inside of protective jacket 291, and is socketed in the outside of the first lifting long slab 10 and the second lifting long slab 11 respectively;
First erection bolt 293 is threaded in the surrounding of 291 front and rear surfaces of protective jacket respectively;The assembling slotting ring 294
It is glued to the top of socket 292 inner wall of chamber;The connection annular distance 295 is provided with the inside of assembling slotting ring 294;Described second
Erection bolt 296 is threaded in the front and back two of 294 left and right sides of assembling slotting ring respectively.
As shown in Fig. 5, in above-described embodiment, specifically, it includes socket pipe that framed plate structure 30 is blocked in the protection
301, bolt 302 is adjusted, stretch steel pole 303, organizes rim 304, assembles column 305 and barrier bed 306, the socket pipe 301 1
End is welded on the upper end of fender bracket 22, and the other end is socketed in the lower part of flexible steel pole 303;302 screw thread of adjusting bolt connects
It connects in the junction of socket pipe 301 and flexible steel pole 303;303 upper end of flexible steel pole and assembling column 305 is welded;It is described
Assembling column 305 be respectively welded at group rim 304 and organize the left and right sides and intermediate position between rim 304.
In above-described embodiment, specifically, there are two the settings of setting long slab 274, and erect long slab 274 and erect length
It is provided with a word anti-skid chequer on 277 outer wall of pole for climbing between plate 274, in the first lifting long slab 10 and the second lifting 11 folding of long slab
Overlapping contracting after, easily by pole for climbing 277 reach upper connecting base 13 on, and then easily carry out using.
In above-described embodiment, specifically, the bearing 278 and roller 279 is respectively arranged with multiple, described rollers
279 diameters are one centimetre to three centimetres bigger than the diameter of pole for climbing 277, maintenance electric power apparatus or material close to the roller 279
When, push apparatus or material that can be transported on upper connecting base 13 by the roller 279 of rotation, enforcement of going forward side by side is used.
In above-described embodiment, specifically, the inclined seat 273 is set as U-shaped, the adjusting strip 272 or so two
Side is connect with inclined seat 273 and mounting plate 271 respectively, can make therewith in this way erect long slab 274 tilt to different angles into
It exercises and uses.
In above-described embodiment, specifically, the assembling frame 283 uses U-shaped aluminium alloy pipe support, and the protection on inner wall
Net 284 uses nylon wire, and the assembling frame 283 and protective net 284 are separately positioned on the surrounding of 13 outer wall of upper connecting base, institute
The 284 system's solution of protective net stated can play protection and interceptor by protective net 284 on the inner wall of assembling frame 283
The function that product are fallen, and the problem of being easy to appear falling object from high altitude is avoided, and increase protection effect.
In above-described embodiment, specifically, the left-hand axis of 281 inside of fastening seat and assembling 283 outer wall of frame connects, just
In make assemble frame 283 carry out tilting action, and be convenient for store or use.
In above-described embodiment, specifically, the reinforcing cord 285 uses wirerope, inside the reinforcing bell and spigot joint 286
Through-hole is offered, and inside is plugged with reinforcing cord 285, when in use, loosens or be straightened the reinforcing cord 285, can assist assembling
The work that frame 283 carries out storage and lifted to assembling frame 283, and then increase the tight of the protection Extension support structure 28
Solidity.
In above-described embodiment, it is socketed in specifically, the protective jacket 291 is provided with multiple and internal socket chambers 292
The outside of first lifting long slab 10 and the second lifting long slab 11, the protective jacket 291 uses bellows-sheathed, in use, can
Protect the protective jacket 291 of different number to the first lifting long slab 10 and the second lifting long slab 11.
In above-described embodiment, specifically, first erection bolt 293 is provided with eight, and passes through protective jacket 291 and divide
It is not threadedly coupled with the first lifting long slab 10 and the second lifting long slab 11, the work for reasonably cooperating the protective jacket 291 to be dismounted
Make, and is convenient for dismantling and replacing use.
In above-described embodiment, specifically, the connection annular distance 295 uses rubber ring, and internal whorl is connected with second
Erection bolt 296 when installation, can make the connection annular distance 295 of different location be inserted into the protective jacket 291 of different location therewith
On, and then so that the protective jacket 291 of different number is assembled enforcement of going forward side by side and use.
In above-described embodiment, specifically, the barrier bed 306 is provided with three layers, the barrier bed 306 is respectively adopted
The top of upper connecting base 13 is arranged in aluminium foil layer, PVC waterproof layer and rubber layer, the barrier bed 306, can be to upper connecting base
Staff on 13 plays sun-proof and rain-proof function, carries out blocking protection therewith to staff, and increase protection effect.
In above-described embodiment, specifically, there are two the settings of group rim 304, and pass through assembling 305 phase of column interconnection
It connects, 304 upper surface of group rim is bolted with barrier bed 306, and barrier bed 306 is easily made to be installed or be torn open
It unloads, while being also convenient for replacing and use.
In above-described embodiment, specifically, the socket pipe 301 and flexible steel pole 303 is adapted, and the adjusting spiral shell is tightened
Bolt 302 is fixed, and when loosening or tightening the adjusting bolt 302, socket pipe 301 and flexible steel pole 303 can be cooperated to be dismounted,
And then it is suitable for different environment and use.
In above-described embodiment, specifically, the PLC5 uses model FX2N-48 type PLC.
In above-described embodiment, specifically, the solenoid valve 15 uses model ZCT type solenoid valve.
In above-described embodiment, specifically, the oil pump 19 uses model 2XZF-2 type oil pump.
In above-described embodiment, specifically, the switch 6 is electrically connected the input terminal of PLC5,15 electricity of solenoid valve
Property connection PLC5 output end, the oil pump 19 is electrically connected the output end of PLC5.
Working principle
The working principle of the invention: before use, rotation rotating handle 8, and decline lifting screw 31 and support plate 9, Ji Kezhi
Prop up lower connecting base 1, when installation, make 291 sets of protective jacket of different number in the first lifting long slab 10 and the second lifting long slab 11
Outer wall on, and the assembling slotting ring 294 of different location is made to be inserted into the lower section of protective jacket 291 of different location, then tightened respectively
First erection bolt 293 and the second erection bolt 296 are fixed, and can go up and down long slab to the first lifting long slab 10, second in this way
11 and hydraulic cylinder 16 protected, in use, staff climb erect long slab 274 between pole for climbing 277 reach on connect
On seat 13, while making biggish tool or article close to roller 279, and pushed, can be moved by the roller 279 of rotation
It moves on upper connecting base 13, after completion, closes web plate 23 and L-type inserted link 26 is made to be inserted into the first fixed ring 24 and second and fix
In ring 25, after protection is good, started by PLC5 control oil pump 19, it can be by fuel tank 17 and oil pipe 18 to 16 note of hydraulic cylinder
Oil, and extend, while the second lifting long slab 11 and the first lifting long slab 10 rise with it, and upper connecting base 13 can be driven to arrive in this way
Up at specified height, after arrival, stops oil pump 19 and close solenoid valve 15, can top out in this way, finally loosen folder
Tight bolt 287 simultaneously makes to assemble frame 283 and the inclination of protective net 284 and be supported by support edge 282, finally tightens fishbolt
287, it can be protected in this way, and staff repairs power equipment or route is fallen in maintenance process convenient for making
Sundries can carry out intercepting by protective net 284 and protection and use, while use process, shadow of the staff by sunlight
It when ringing, pulls flexible steel pole 303 and reaches suitable height with socket pipe 301, finally tighten adjusting bolt 302 and fix, this
Sample can carry out sunshade by the barrier bed 306 on group rim 304 and assembling column 305 and protect.
Using technical solutions according to the invention or those skilled in the art under the inspiration of technical solution of the present invention,
Similar technical solution is designed, and reaches above-mentioned technical effect, is to fall into protection scope of the present invention.
Claims (10)
1. a kind of intelligentized multifunction power maintenance device, which is characterized in that the intelligentized multifunction power maintenance device,
Including lower connecting base (1), the first slide opening (2), movable pulley (3), set casing (4), PLC(5), it switchs (6), extends steel plate (7), rotation
It changes hands handle (8), support plate (9), the first lifting long slab (10), assembling bar (12), upper connecting base are reinforced in the second lifting long slab (11)
(13), the second slide opening (14), solenoid valve (15), hydraulic cylinder (16), fuel tank (17), oil pipe (18), oil pump (19), threeway head
(20), insert rack (21) are connected, fender bracket (22), web plate (23), the first fixed ring (24), the second fixed ring (25), L-type inserted link
(26), carriage structure (27) are climbed, protected Extension support structure (28), grillage knot is blocked in protective jacket female connector structure (29) and protection
Structure (30) and lifting screw (31), first slide opening (2) are provided with a left side for the internal front and rear sides of lower connecting base (1) respectively
Side;The movable pulley (3) is welded on the surrounding of lower connecting base (1) lower surface;Described set casing (4) bolt is mounted on lower company
The intermediate position of joint chair (1) lower surface;The PLC(5) bolt is mounted on the left side of set casing (4) front surface;Described opens
Close (6) be embedded in PLC(5) front;The extension steel plate (7) is welded on the surrounding of lower connecting base (1) outer wall, and is extending
Steel plate (7) internal whorl is connected with lifting screw (31);The rotating handle (8) and support plate (9) is respectively welded at lifting
The upper and lower surface of screw rod (31);First lifting long slab (10) and the intermediate mutual axis in position of the second lifting long slab (11) connects,
And first axis connects the right side and first inside the lower connecting base (1) respectively lifting long slab (10) and second lifting long slab (11) lower part
In slide opening (2), while axis connects in upper connecting base (13) respectively on the top of the first lifting long slab (10) and the second lifting long slab (11)
The inside on internal right side and the second slide opening (14);Reinforcing assembling bar (12) is respectively welded at the first lifting long slab (10)
And first lifting long slab (10) between, second lifting long slab (11) and second goes up and down long slab (11) between;Second slide opening
(14) it is provided with the front and back two of upper connecting base (13) inside left respectively;The solenoid valve (15) is threaded in fuel tank
(17) internal right side;Axis connects and goes up and down long slab (11) in the first lifting long slab (10) and second respectively for the hydraulic cylinder (16)
On inner wall;Described fuel tank (17) bolt is mounted on the internal intermediate position of set casing (4);The oil pipe (18) is socketed respectively
Between solenoid valve (15) and oil pump (19), between threeway head (20) and hydraulic cylinder (16);Oil pump (19) the bolt installation
It is threadedly coupled on the internal right side of set casing (4), and on the right side of oil pump (19) with threeway head (20);Described connection insert rack (21) spiral shell
Bolt is mounted on the right end of lower connecting base (1);The fender bracket (22) is respectively welded at the front and back of upper connecting base (13) upper surface
Two and right side;Described web plate (23) hinge is mounted on the left of the fender bracket (22) at upper connecting base (13) rear portion;Described
One fixed ring (24) is welded on the left of the fender bracket (22) of upper connecting base (13) front;Second fixed ring (25) is welded on
The front surface of web plate (23);The L-type inserted link (26) is plugged on respectively in the first fixed ring (24) and the second fixed ring (25);
The climbing carriage structure (27) is mounted on the left side of lower connecting base (1);Protection Extension support structure (28) installation
In the outside of upper connecting base (13);The protective jacket female connector structure (29) is mounted on the first lifting long slab (10) and the second lifting
On long slab (11);The top that framed plate structure (30) is mounted on fender bracket (22) is blocked in the protection;The climbing carriage
Structure (27) includes mounting plate (271), is adjusted strip (272), inclined seat (273), is erect long slab (274), and assembling head is reinforced
(275), Anti-slip cover (276), pole for climbing (277), bearing (278) and roller (279), the mounting plate (271) are welded on down
The left end of attachment base (1);Described adjusting strip (272) one end is bolted with mounting plate (271), the other end and inclined seat
(273) it is bolted;The setting long slab (274) is respectively welded at the front and back two of inclined seat (273) left surface;Described
It reinforces assembling head (275) and is welded on the upper end for erectting long slab (274);The Anti-slip cover (276), which is socketed in, erects long slab (274)
Lower end;The pole for climbing (277), which is welded on, to be erect long slab (274) and erects between long slab (274);The bearing
(278) it is embedded in the inside for erectting long slab (274), and is arranged between pole for climbing (277) and pole for climbing (277);The rolling
Cylinder (279) is plugged in bearing (278).
2. intelligentized multifunction power maintenance device as described in claim 1, which is characterized in that the protection Extension support
Structure (28) includes fastening seat (281), and support edge (282) assemble frame (283), protective net (284), and reinforcing cord (285) adds
Gu bell and spigot joint (286) and fishbolt (287), the fastening seat (281) and support edge (282) are welded to each other, and are welded respectively
It connects on the top of upper connecting base (13) outer wall surrounding;Described reinforcing cord (285) one end is welded on the upper right of assembling frame (283)
Portion;The reinforcing bell and spigot joint (286) is respectively welded on the outside of the upper end of fender bracket (22) and web plate (23);The clamping spiral shell
Bolt (287) is threaded in the upper end for reinforcing bell and spigot joint (286).
3. intelligentized multifunction power maintenance device as described in claim 1, which is characterized in that the protective jacket female connector
Structure (29) includes protective jacket (291), is socketed chamber (292), the first erection bolt (293), is assembled slotting ring (294), and annular distance is connected to
(295) and the second erection bolt (296), the socket chamber (292) is provided with the inside of protective jacket (291), and is socketed respectively
In the outside of the first lifting long slab (10) and the second lifting long slab (11);Screw thread connects first erection bolt (293) respectively
Connect the surrounding in protective jacket (291) front and rear surfaces;The assembling slotting ring (294) is glued to the top of socket chamber (292) inner wall;
The connection annular distance (295) is provided with the inside of assembling slotting ring (294);Second erection bolt (296) the difference screw thread
It is connected to the front and back two at left and right sides of assembling slotting ring (294).
4. intelligentized multifunction power maintenance device as described in claim 1, which is characterized in that the protection shutter
Frame structure (30) includes socket pipe (301), is adjusted bolt (302), is stretched steel pole (303), is organized rim (304), is assembled column (305)
With barrier bed (306), the socket pipe (301) one end is welded on the upper end of fender bracket (22), and the other end is socketed in flexible steel
The lower part of bar (303);The adjusting bolt (302) is threaded in the connection of socket pipe (301) and flexible steel pole (303)
Place;Flexible steel pole (303) upper end and assembling column (305) welding;The assembling column (305) is respectively welded at a group rim
(304) left and right sides between group rim (304) and intermediate position.
5. intelligentized multifunction power maintenance device as described in claim 1, which is characterized in that the setting long slab
(274) there are two setting, and long slab (274) is erect and are erect and are provided with one on pole for climbing (277) outer wall between long slab (274)
Word anti-skid chequer.
6. intelligentized multifunction power maintenance device as described in claim 1, which is characterized in that the bearing (278)
It is one centimetre to three bigger than the diameter of pole for climbing (277) that multiple, described rollers (279) diameter is respectively arranged with roller (279)
Centimetre.
7. intelligentized multifunction power maintenance device as claimed in claim 2, which is characterized in that the assembling frame
(283) use U-shaped aluminium alloy pipe support, and the protective net (284) on inner wall use nylon wire, the assembling frame (283) and
Protective net (284) is separately positioned on the surrounding of upper connecting base (13) outer wall, and the protective net (284) system's solution is in assembling frame
(283) on inner wall.
8. intelligentized multifunction power maintenance device as claimed in claim 2, which is characterized in that the reinforcing cord
(285) wirerope is used, offers through-hole inside the reinforcing bell and spigot joint (286), and inside is plugged with reinforcing cord (285).
9. intelligentized multifunction power maintenance device as claimed in claim 3, which is characterized in that the protective jacket
(291) it is provided with multiple and internal socket chambers (292) and is socketed in the first lifting long slab (10) and second and go up and down long slab (11)
Outside, the protective jacket (291) use bellows-sheathed.
10. intelligentized multifunction power maintenance device as claimed in claim 4, which is characterized in that the barrier bed
(306) three layers are provided with, aluminium foil layer, PVC waterproof layer and rubber layer is respectively adopted in the barrier bed (306), and described blocks
Top of layer (306) setting in upper connecting base (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910619794.2A CN110329964B (en) | 2019-07-10 | 2019-07-10 | Intelligent multifunctional electric power maintenance device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910619794.2A CN110329964B (en) | 2019-07-10 | 2019-07-10 | Intelligent multifunctional electric power maintenance device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110329964A true CN110329964A (en) | 2019-10-15 |
CN110329964B CN110329964B (en) | 2021-08-24 |
Family
ID=68146154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910619794.2A Active CN110329964B (en) | 2019-07-10 | 2019-07-10 | Intelligent multifunctional electric power maintenance device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110329964B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110775911A (en) * | 2019-11-20 | 2020-02-11 | 金陵科技学院 | Maintenance platform with protection function for large mechanical equipment |
CN110820557A (en) * | 2019-12-12 | 2020-02-21 | 中国铁建大桥工程局集团有限公司 | Steel truss arch bridge maintenance car |
CN111313300A (en) * | 2020-04-26 | 2020-06-19 | 华核电气股份有限公司 | Automatically controlled cabinet of modularization equipment car |
CN111927296A (en) * | 2020-08-20 | 2020-11-13 | 谢秋云 | Cat ladder for building engineering with flexible function |
CN113120821A (en) * | 2021-03-04 | 2021-07-16 | 张继初 | Construction comprehensive equipment for electric power engineering |
CN114075920A (en) * | 2021-10-09 | 2022-02-22 | 北京首钢富通电梯有限责任公司 | Folding ladder for outdoor power supply maintenance in rainy days |
CN115402980A (en) * | 2022-05-17 | 2022-11-29 | 国网山西省电力公司超高压变电分公司 | Auxiliary tool for power transformation maintenance |
CN116924290A (en) * | 2023-09-14 | 2023-10-24 | 泰州锦和温室设备有限公司 | High-altitude operation safety protection device |
CN117220201A (en) * | 2023-11-08 | 2023-12-12 | 黑龙江省建筑安装集团有限公司 | Auxiliary installation equipment for building electromechanical construction cable |
US11945702B1 (en) * | 2022-10-17 | 2024-04-02 | Oshkosh Corporation | Scissor lift with middle pin offset and kicker |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020029930A1 (en) * | 2000-07-31 | 2002-03-14 | Bassett Frederick N. | Low level scaffold with ballscrew drive |
EP0971827B1 (en) * | 1997-01-30 | 2004-07-28 | JLG Industries, Inc. | Hybrid power system for a vehicle |
CN202063689U (en) * | 2011-05-09 | 2011-12-07 | 范柏华 | Electric automobile with scissors type lifting platform |
CN202297005U (en) * | 2011-10-31 | 2012-07-04 | 东莞市伟创东洋自动化设备有限公司 | Nut-screw rod type jacking mechanism |
CN207209899U (en) * | 2017-04-03 | 2018-04-10 | 惠州市锦恒工业模具设计合伙企业(普通合伙) | A kind of aerial work platform of sun-shading rain-proof |
CN207390946U (en) * | 2017-09-14 | 2018-05-22 | 浙江海鸿工业产品设计有限公司 | It is a kind of to lift stable communication maintenance platform |
CN108383031A (en) * | 2018-05-06 | 2018-08-10 | 刘新娟 | A kind of movable altitude lifting platform for electric power first-aid |
CN208265731U (en) * | 2018-06-08 | 2018-12-21 | 河南省黄河防爆起重机有限公司 | A kind of explosive-proof hydraulic hoistable platform |
CN208440247U (en) * | 2018-06-12 | 2019-01-29 | 许晓燕 | A kind of bridge construction lifting platform |
CN208603668U (en) * | 2018-08-22 | 2019-03-15 | 国学伟 | A kind of safety cage for construction |
CN109532903A (en) * | 2019-01-07 | 2019-03-29 | 沈阳辽电新能源技术开发有限公司 | Across the track wire-binding device of vehicular |
-
2019
- 2019-07-10 CN CN201910619794.2A patent/CN110329964B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0971827B1 (en) * | 1997-01-30 | 2004-07-28 | JLG Industries, Inc. | Hybrid power system for a vehicle |
US20020029930A1 (en) * | 2000-07-31 | 2002-03-14 | Bassett Frederick N. | Low level scaffold with ballscrew drive |
CN202063689U (en) * | 2011-05-09 | 2011-12-07 | 范柏华 | Electric automobile with scissors type lifting platform |
CN202297005U (en) * | 2011-10-31 | 2012-07-04 | 东莞市伟创东洋自动化设备有限公司 | Nut-screw rod type jacking mechanism |
CN207209899U (en) * | 2017-04-03 | 2018-04-10 | 惠州市锦恒工业模具设计合伙企业(普通合伙) | A kind of aerial work platform of sun-shading rain-proof |
CN207390946U (en) * | 2017-09-14 | 2018-05-22 | 浙江海鸿工业产品设计有限公司 | It is a kind of to lift stable communication maintenance platform |
CN108383031A (en) * | 2018-05-06 | 2018-08-10 | 刘新娟 | A kind of movable altitude lifting platform for electric power first-aid |
CN208265731U (en) * | 2018-06-08 | 2018-12-21 | 河南省黄河防爆起重机有限公司 | A kind of explosive-proof hydraulic hoistable platform |
CN208440247U (en) * | 2018-06-12 | 2019-01-29 | 许晓燕 | A kind of bridge construction lifting platform |
CN208603668U (en) * | 2018-08-22 | 2019-03-15 | 国学伟 | A kind of safety cage for construction |
CN109532903A (en) * | 2019-01-07 | 2019-03-29 | 沈阳辽电新能源技术开发有限公司 | Across the track wire-binding device of vehicular |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110775911A (en) * | 2019-11-20 | 2020-02-11 | 金陵科技学院 | Maintenance platform with protection function for large mechanical equipment |
CN110820557A (en) * | 2019-12-12 | 2020-02-21 | 中国铁建大桥工程局集团有限公司 | Steel truss arch bridge maintenance car |
CN111313300A (en) * | 2020-04-26 | 2020-06-19 | 华核电气股份有限公司 | Automatically controlled cabinet of modularization equipment car |
CN111313300B (en) * | 2020-04-26 | 2021-06-01 | 华核电气股份有限公司 | Automatically controlled cabinet of modularization equipment car |
CN111927296A (en) * | 2020-08-20 | 2020-11-13 | 谢秋云 | Cat ladder for building engineering with flexible function |
CN113120821A (en) * | 2021-03-04 | 2021-07-16 | 张继初 | Construction comprehensive equipment for electric power engineering |
CN114075920A (en) * | 2021-10-09 | 2022-02-22 | 北京首钢富通电梯有限责任公司 | Folding ladder for outdoor power supply maintenance in rainy days |
CN114075920B (en) * | 2021-10-09 | 2023-10-03 | 北京首融汇科技发展有限公司 | Folding ladder for outdoor power supply maintenance in rainy days |
CN115402980A (en) * | 2022-05-17 | 2022-11-29 | 国网山西省电力公司超高压变电分公司 | Auxiliary tool for power transformation maintenance |
US11945702B1 (en) * | 2022-10-17 | 2024-04-02 | Oshkosh Corporation | Scissor lift with middle pin offset and kicker |
US20240124285A1 (en) * | 2022-10-17 | 2024-04-18 | Oshkosh Corporation | Scissor lift with middle pin offset and kicker |
CN116924290A (en) * | 2023-09-14 | 2023-10-24 | 泰州锦和温室设备有限公司 | High-altitude operation safety protection device |
CN116924290B (en) * | 2023-09-14 | 2024-02-09 | 泰州锦和温室设备有限公司 | High-altitude operation safety protection device |
CN117220201A (en) * | 2023-11-08 | 2023-12-12 | 黑龙江省建筑安装集团有限公司 | Auxiliary installation equipment for building electromechanical construction cable |
CN117220201B (en) * | 2023-11-08 | 2024-01-30 | 黑龙江省建筑安装集团有限公司 | Auxiliary installation equipment for building electromechanical construction cable |
Also Published As
Publication number | Publication date |
---|---|
CN110329964B (en) | 2021-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110329964A (en) | A kind of intelligentized multifunction power maintenance device | |
US10041479B2 (en) | Hinged tower segments and transport method | |
CN108657200B (en) | A kind of multi-functional subway repair car of electric power | |
CN111345168A (en) | Mobile manipulator assembly and operation method thereof | |
EP3204576B1 (en) | Method for assembling hinged tower segments | |
CN105064671B (en) | A kind of electric power overhaul climbs device | |
CN208548692U (en) | A kind of improved cable ditch | |
CN106836936B (en) | A kind of electric power tower of mountable 4G antenna | |
CN211341658U (en) | Portable secondary construction telescopic stool | |
CN106246094A (en) | A kind of novel mounting attachment and using method thereof | |
KR20220000428U (en) | Cable lifting and winding device | |
CN214658600U (en) | Tool platform for overhauling bus duct well | |
JP3887278B2 (en) | Retractable prop with electrical equipment attached to the tip | |
CN110863643A (en) | Hanging flower basket for building engineering that protecting effect is good | |
CN219158361U (en) | High-stability assembly type building construction operation platform | |
CN207453858U (en) | Maintaining platform ladder | |
CN109449783A (en) | A kind of power equipment case being easily installed | |
CN108545677A (en) | A kind of dismantled and assembled safety guard of building lift | |
CN107648985B (en) | A kind of high-power transformer dehydrating breather maintenance device | |
CN220223346U (en) | Climbing frame integrated tower crane safety channel | |
CN217400806U (en) | Electric power overhauls specialized tool car | |
CN220440357U (en) | Cable support for electric power tunnel | |
CN218715739U (en) | But reuse's assembled protector | |
CN210316792U (en) | Hanging pulley | |
CN208666988U (en) | A kind of New type water pipe assistant fitter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210804 Address after: 014010 Kaixuan Haoting 4-2504, No. 80, Gangtie street, Kunqu District, Baotou City, Inner Mongolia Autonomous Region Applicant after: Inner Mongolia Kunming Environmental Protection Technology Co.,Ltd. Address before: 250000 Ji'nan City, Shandong Province, No. ten, No. 23266 Applicant before: SHANDONG LABOR VOCATIONAL AND TECHNICAL College (SHANDONG LABOR TECHNICIAN College) |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |