CN110329713A - One kind being used for building construction project residue conveying device - Google Patents

One kind being used for building construction project residue conveying device Download PDF

Info

Publication number
CN110329713A
CN110329713A CN201910518358.6A CN201910518358A CN110329713A CN 110329713 A CN110329713 A CN 110329713A CN 201910518358 A CN201910518358 A CN 201910518358A CN 110329713 A CN110329713 A CN 110329713A
Authority
CN
China
Prior art keywords
communicating pipe
fixedly connected
supporting block
bottom end
conveying device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910518358.6A
Other languages
Chinese (zh)
Inventor
凌利锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Anchi Construction Co Ltd
Original Assignee
Zhejiang Anchi Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Anchi Construction Co Ltd filed Critical Zhejiang Anchi Construction Co Ltd
Priority to CN201910518358.6A priority Critical patent/CN110329713A/en
Publication of CN110329713A publication Critical patent/CN110329713A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G11/00Chutes
    • B65G11/02Chutes of straight form
    • B65G11/026Chutes of straight form for bulk
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G11/00Chutes
    • B65G11/20Auxiliary devices, e.g. for deflecting, controlling speed of, or agitating articles or solids
    • B65G11/206Auxiliary devices, e.g. for deflecting, controlling speed of, or agitating articles or solids for bulk
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/04Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means
    • F16F15/046Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means using combinations of springs of different kinds

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chutes (AREA)

Abstract

The present invention relates to architectural engineering facilities and equipment technical fields, it is especially a kind of to be used for building construction project residue conveying device, including supporting block, supporting block side is provided with open slot, supporting block top was fixedly connected with for the first communicating pipe, first communicating pipe was connected to the open slot in supporting block, first communicating pipe top be fixedly connected with positioning ring, first communicating pipe top outer be fixedly connected with fixed ring, first communicating pipe top be placed with for the second communicating pipe, annular positioning groove is provided at second communicating pipe bottom end relative positioning ring, in positioning ring insertion locating slot in first communicating pipe, the bottom end of fixed ring is placed with concave fixed frame, concave fixed frame top is in contact with fixed ring bottom end, concave fixed frame is fixedly connected by bolt with wall, buffer gear is installed in supporting block, supporting block bottom end is fixedly connected with elastomeric support column.The configuration of the present invention is simple is able to achieve engineering residue and quickly carries, is worthy to be popularized.

Description

One kind being used for building construction project residue conveying device
Technical field
The present invention relates to architectural engineering facilities and equipment technical field, more particularly to one kind are defeated for building construction project residue Send device.
Background technique
With the development of science and technology, the quickening of urbanization paces, City Building quantity increases, and land intensification degree is more next It is higher, and all the more precious situation is showed, new building also the more is built the more high to achieve the purpose that save using soil, each at present It is substantially worker with construction progress in building, it is useless with the solids such as concrete residue, surflaes, brickbat head, mortar are cleaned After object, it is divided into and cleans several times, a pile is concentrated after cleaning, is then carried downwards in mode in bulk, inclined even directly to outdoor , individual building sites do it is good residue dress silk bag is carried downstairs backward, all in all both having taken a lot of work, there have to be laborious, and cleaning and The pollution such as fugitive dust and dust is inevitably produced in handling process, since work up in bulk is had bad luck, overall construction speed is slow, And a large amount of human cost can be consumed to carrying downstairs, there is deficiencies, are not able to satisfy the demand of social high speed development, existing Also there is tube-in-tube structure to be conveyed in technology, but the structure of sleeve is more complicated, the lifting between practical operation sleeve is also very Inconvenience, and residue is fallen from above can have biggish impact, generates seismaesthesia.
Summary of the invention
The purpose of the present invention is to solve apparatus structures existing in the prior art to send out miscellaneous, and residue is fallen from above the bottom of to Face is also easy to produce impact seismaesthesia, so that the disadvantage that the mechanism for accepting residue is easy to damage, and the one kind proposed is used for building construction project Residue conveying device.
To achieve the goals above, present invention employs following technical solutions:
One kind is designed to be provided with out for building construction project residue conveying device, including supporting block, the supporting block side Mouth slot, the supporting block top were fixedly connected with for the first communicating pipe, are connected to the open slot in supporting block first communicating pipe, First communicating pipe, top was fixedly connected with positioning ring, and the first communicating pipe top outer is fixedly connected with fixed ring, institute State first communicating pipe top be placed with for the second communicating pipe, be provided with circular orientation at second communicating pipe bottom end relative positioning ring Slot, the positioning ring in first communicating pipe are inserted into locating slot, and the bottom end of the fixed ring is placed with concave fixed frame, described Concave fixed frame top is in contact with fixed ring bottom end, and the concave fixed frame is fixedly connected by bolt with wall, the branch Buffer gear is installed, the supporting block bottom end is fixedly connected with elastomeric support column in bracer.
Preferably, the buffer gear includes skewback, and the skewback is located in supporting block, and skewback was located at for the first communicating pipe With the lower section of supporting block junction, inclined-plane in the skewback is towards the side for being provided with open slot in supporting block, the skewback bottom End is provided with putting hole, is placed with first sleeve in the putting hole, and the first sleeve is far from being socketed with the on the outside of skewback one end Two sleeves, the second sleeve are fixedly connected far from first sleeve one end with supporting block, are placed with spring in the second sleeve, One end of the spring is fixedly connected with first sleeve, is fixedly connected on the inside of the other end of the spring and the bottom end of supporting block.
Preferably, the fixed ring top is fixedly connected there are two arc locating piece, two arc locating pieces about First communicating pipe axisymmetrical, arc locating piece side is provided with threaded hole, and the threaded hole runs through arc locating piece, second Communicating pipe and positioning ring, the threaded hole internal screw thread are connected with fastening bolt, and one end of the fastening bolt is positioned across arc Block extends to the inner sidewall of the second communicating pipe.
Preferably, first communicating pipe top is fixedly connected with guide pad, second communicating pipe side be oppositely oriented Guide groove is provided at block, the guide pad is adapted with guide groove.
Preferably, the first communicating pipe bottom inside is fixedly connected with the first buffer stopper, first buffer stopper it is oblique Facing towards the direction with skewback on the contrary, the second communicating pipe bottom inside is fixedly connected with the second buffer stopper, described second is slow The inclined-plane direction for rushing block is opposite with the inclined-plane of the first buffer stopper direction.
Preferably, the apex structure of second communicating pipe is identical as the structure of the first communicating pipe.
Preferably, rubber pad is bonded on the inside of the supporting block bottom end.
Proposed by the present invention a kind of for building construction project residue conveying device, beneficial effect is:
1, the present invention is by setting buffer board and buffer gear, can slow down residue impact caused by fall into supporting block The inclined-plane of buffer board is designed towards in opposite direction, reaches better buffering effect by sense;
2, the present invention can load and unload residue by setting elastomeric support column convenient for handler at open slot, and can Reduce impact of the residue to ground,
3, the present invention is quickly connected the first communicating pipe and second by setting guide pad, guide groove and arc locating piece Siphunculus connection.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram for building construction project residue conveying device proposed by the present invention;
Fig. 2 is proposed by the present invention a kind of for building construction project residue conveying device side partial sectional view;
Fig. 3 is proposed by the present invention a kind of for building construction project residue conveying device top view;
Fig. 4 is Fig. 1 partial enlarged view at A;
Fig. 5 is Fig. 2 partial enlarged view at B.
In figure: supporting block 1, the first communicating pipe 2, the second communicating pipe 3, arc locating piece 4, concave fixed frame 5, guide pad 6, Guide groove 7, fastening bolt 8, fixed ring 9, threaded hole 10, positioning ring 11, elastomeric support column 12, the first buffer stopper 13, open slot 14, skewback 15, first sleeve 16, putting hole 17, spring 18, second sleeve 19, annular positioning groove 20, the second buffer stopper 21, rubber Rubber mat 22.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-5, a kind of to be used for building construction project residue conveying device, including supporting block 1,1 side of supporting block are opened There is open slot 14,1 top of supporting block is fixedly connected with the first communicating pipe 2, the first communicating pipe 2 and the open slot 14 in supporting block 1 Connection, the first communicating pipe, 2 top was fixedly connected with positioning ring 11, and the first communicating pipe, 2 top outer was fixedly connected with fixed ring 9, First communicating pipe, 2 top was placed with for the second communicating pipe 3, and the second communicating pipe, 3 top also can connect another according to actual needs Communicating pipe, the first communicating pipe 2 and the second communicating pipe 3 are made of rubber material.
Annular positioning groove 20, the positioning ring 11 in the first communicating pipe 2 are provided at second communicating pipe 3 bottom end relative positioning ring 11 It is inserted into locating slot 20, the bottom end of fixed ring 9 is placed with concave fixed frame 5,5 top of concave fixed frame and 9 bottom end phase of fixed ring Contact, concave fixed frame 5 are fixedly connected by bolt with wall, and buffer gear is equipped in supporting block 1, and 1 bottom end of supporting block is solid Surely it is connected with elastomeric support column 12.
Buffer gear includes skewback 15, and skewback 15 is located in supporting block 1, and skewback 15 is located at the first communicating pipe 2 and support The lower section of 1 junction of block, towards the side for being provided with open slot 14 in supporting block 1,15 bottom end of skewback is provided with for inclined-plane in skewback 15 Putting hole 17, is placed with first sleeve 16 in putting hole 17, and first sleeve 16 is far from being socketed with second set on the outside of 15 one end of skewback Cylinder 19, second sleeve 19 is fixedly connected far from 16 one end of first sleeve with supporting block 1, and spring 18 is placed in second sleeve 19, One end of spring 18 is fixedly connected with first sleeve 16, is fixedly connected on the inside of the other end of spring 18 and the bottom end of supporting block 1, When residue is dropped on the inclined-plane of skewback 15, kinetic energy entrained by residue is converted into the elastic potential energy of spring, can be by loading-unloading vehicle Tail portion is placed on 1 lower section of supporting block, is then dug out residue out of supporting block 1 using tool.
9 top of fixed ring is fixedly connected there are two arc locating piece 4, and two arc locating pieces 4 are about 2 axis of the first communicating pipe Line is symmetrical, and 4 side of arc locating piece is provided with threaded hole 10, and threaded hole 10 is through arc locating piece 4, the second communicating pipe 3 and positioning Ring 11,10 internal screw thread of threaded hole are connected with fastening bolt 8, and one end of fastening bolt 8 passes through arc locating piece 4 and extends to the second company The inner sidewall of siphunculus 3.
First communicating pipe, 2 top was fixedly connected with guide pad 6, and 3 side was oppositely oriented at block 6 and was provided with guiding the second communicating pipe Slot 7, guide pad 6 are adapted with guide groove 7, and the first communicating pipe, 2 bottom inside was fixedly connected with the first buffer stopper 13, the first buffering The inclined-plane of block 13 is towards the direction with skewback 15 on the contrary, 3 bottom inside of the second communicating pipe is fixedly connected with the second buffer stopper 21, and the The inclined-plane direction of two buffer stoppers 21 is opposite with the inclined-plane of the first buffer stopper 13 direction.
The apex structure of second communicating pipe 3 is identical as the structure of the first communicating pipe 2, is bonded with rubber on the inside of 1 bottom end of supporting block Rubber mat 22.
Supporting block 1 is placed on wall outer side, according to building when high-building construction clears up construction residue by working principle The height of layer selects the quantity of communicating pipe, when installation, so that the inclined-plane of the buffer stopper in adjacent communicating pipe is towards phase Instead, by concave fixed frame 5, communicating pipe is fixed with respect to wall, the length of communicating pipe story height with is identical, so just In disassembly and installation communicating pipe.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. one kind is used for building construction project residue conveying device, including supporting block (1), which is characterized in that the supporting block (1) Side is provided with open slot (14), and supporting block (1) top is fixedly connected with the first communicating pipe (2), first communicating pipe (2) It is connected to the open slot (14) in supporting block (1), the first communicating pipe (2) top is fixedly connected with positioning ring (11), described First communicating pipe (2) top outer is fixedly connected with fixed ring (9), and the first communicating pipe (2) top is placed with the second connection It manages (3), is provided with annular positioning groove (20) at the second communicating pipe (3) bottom end relative positioning ring (11), first communicating pipe (2) in positioning ring (11) insertion locating slot (20) in, the bottom end of the fixed ring (9) is placed with concave fixed frame (5), described Concave fixed frame (5) top is in contact with fixed ring (9) bottom end, and the concave fixed frame (5) connects by the way that bolt and wall are fixed It connects, buffer gear is installed in the supporting block (1), supporting block (1) bottom end is fixedly connected with elastomeric support column (12).
2. according to claim 1 a kind of for building construction project residue conveying device, which is characterized in that the buffering Mechanism includes skewback (15), and the skewback (15) is located in supporting block (1), and skewback (15) is located at the first communicating pipe (2) and branch The lower section of bracer (1) junction, inclined-plane in the skewback (15) towards the side for being provided with open slot (14) in supporting block (1), Skewback (15) bottom end is provided with putting hole (17), is placed with first sleeve (16), the first set in the putting hole (17) Cylinder (16) on the outside of skewback (15) one end far from being socketed with second sleeve (19), and the second sleeve (19) is far from first sleeve (16) One end is fixedly connected with supporting block (1), is placed with spring (18) in the second sleeve (19), one end of the spring (18) with First sleeve (16) is fixedly connected, and is fixedly connected on the inside of the other end of the spring (18) and the bottom end of supporting block (1).
3. according to claim 1 a kind of for building construction project residue conveying device, which is characterized in that the fixation Ring (9) top is fixedly connected there are two arc locating piece (4), and two arc locating pieces (4) are about the first communicating pipe (2) axis Line is symmetrical, and arc locating piece (4) side is provided with threaded hole (10), and the threaded hole (10) is through arc locating piece (4), the Two communicating pipes (3) and positioning ring (11), threaded hole (10) internal screw thread are connected with fastening bolt (8), the fastening bolt (8) One end pass through arc locating piece (4) and extend to the inner sidewalls of the second communicating pipe (3).
4. according to claim 1 a kind of for building construction project residue conveying device, which is characterized in that described first Communicating pipe (2) top is fixedly connected with guide pad (6), and the second communicating pipe (3) side, which is oppositely oriented at block (6), is provided with guiding Slot (7), the guide pad (6) are adapted with guide groove (7).
5. according to claim 2 a kind of for building construction project residue conveying device, which is characterized in that described first Communicating pipe (2) bottom inside is fixedly connected with the first buffer stopper (13), the inclined-plane direction and skewback of first buffer stopper (13) (15) on the contrary, second communicating pipe (3) bottom inside is fixedly connected with the second buffer stopper (21), described second buffers direction The inclined-plane direction of block (21) is opposite with the inclined-plane of the first buffer stopper (13) direction.
6. according to claim 1 a kind of for building construction project residue conveying device, which is characterized in that described second The apex structure of communicating pipe (3) is identical as the structure of the first communicating pipe (2).
7. according to claim 1 a kind of for building construction project residue conveying device, which is characterized in that the support Rubber pad (22) are bonded on the inside of block (1) bottom end.
CN201910518358.6A 2019-06-15 2019-06-15 One kind being used for building construction project residue conveying device Pending CN110329713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910518358.6A CN110329713A (en) 2019-06-15 2019-06-15 One kind being used for building construction project residue conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910518358.6A CN110329713A (en) 2019-06-15 2019-06-15 One kind being used for building construction project residue conveying device

Publications (1)

Publication Number Publication Date
CN110329713A true CN110329713A (en) 2019-10-15

Family

ID=68141027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910518358.6A Pending CN110329713A (en) 2019-06-15 2019-06-15 One kind being used for building construction project residue conveying device

Country Status (1)

Country Link
CN (1) CN110329713A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1122133A (en) * 1979-07-20 1982-04-20 Charles P. Tabler Air cushion chute
AU2007295879A1 (en) * 2006-09-15 2008-03-20 John Clement Preston Refuse chute
CN205207930U (en) * 2015-12-10 2016-05-04 宝丰钢业集团有限公司 Internal rolling stainless steel composite pipe
CN108341207A (en) * 2018-03-22 2018-07-31 新乡市振英机械设备有限公司 A kind of feature of environmental protection building waste conveying device
CN208105764U (en) * 2018-01-31 2018-11-16 河南铁恒新材料科技有限公司 A kind of tall building life garbage reclamation channel
CN208329503U (en) * 2018-06-19 2019-01-04 郭东良 A kind of construction garbage chute

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1122133A (en) * 1979-07-20 1982-04-20 Charles P. Tabler Air cushion chute
AU2007295879A1 (en) * 2006-09-15 2008-03-20 John Clement Preston Refuse chute
CN205207930U (en) * 2015-12-10 2016-05-04 宝丰钢业集团有限公司 Internal rolling stainless steel composite pipe
CN208105764U (en) * 2018-01-31 2018-11-16 河南铁恒新材料科技有限公司 A kind of tall building life garbage reclamation channel
CN108341207A (en) * 2018-03-22 2018-07-31 新乡市振英机械设备有限公司 A kind of feature of environmental protection building waste conveying device
CN208329503U (en) * 2018-06-19 2019-01-04 郭东良 A kind of construction garbage chute

Similar Documents

Publication Publication Date Title
CN208734049U (en) A kind of hanging basket fixing device
CN205908031U (en) A rail mounted lifting device for high -rise building curtain wall construction
CN107090847B (en) Concrete precast tubular pile for overhead transmission line
CN202186764U (en) Adjustable inverted telescopic dust-proof device
CN110329713A (en) One kind being used for building construction project residue conveying device
CN207793859U (en) A kind of drag-line bridge pad
CN113339031A (en) Roadway support process system under extremely soft stratum condition and construction method
CN211524184U (en) Supporting device for building construction
CN208516221U (en) High-rise building waste vertical transit system
CN205400759U (en) Special U shaped steel support of city subway construction
CN207632043U (en) Extension type coal conduit
CN209261080U (en) A kind of assembly type iron skill railing
CN219754491U (en) Mining handheld jumbolter dust removal equipment
CN206645330U (en) A kind of dual depositing dust formula environment-friendly type water hopper dredger
CN208088670U (en) A kind of tile assembly
CN206071598U (en) Self-propelled for tunnel excavation supporting bores quick-fried chassis
CN206722414U (en) The grouting of steel column post bottom is with leading sizing device
CN215282688U (en) Proportioning machine sand silo
CN2346751Y (en) Electrohydraulic swinging three-way funnel
CN217580281U (en) Blast construction is with reverse construction method subway station supporting construction
CN221857794U (en) Supporting mechanism for pipeline installation
CN211725142U (en) High slope excavation face blasting dust environmental protection controlling means
CN218324944U (en) Intelligent tunnel maintenance dust fall platform truck
CN217340536U (en) Dust removal pulse jetting pipe for receiving pit
CN205557540U (en) Side slope retaining structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015