CN110300299A - Show facility switching machine method for testing pressure, device, equipment and storage medium - Google Patents
Show facility switching machine method for testing pressure, device, equipment and storage medium Download PDFInfo
- Publication number
- CN110300299A CN110300299A CN201910568486.1A CN201910568486A CN110300299A CN 110300299 A CN110300299 A CN 110300299A CN 201910568486 A CN201910568486 A CN 201910568486A CN 110300299 A CN110300299 A CN 110300299A
- Authority
- CN
- China
- Prior art keywords
- display
- equipment
- display equipment
- test
- picture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N17/00—Diagnosis, testing or measuring for television systems or their details
- H04N17/004—Diagnosis, testing or measuring for television systems or their details for digital television systems
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Multimedia (AREA)
- Signal Processing (AREA)
- Controls And Circuits For Display Device (AREA)
Abstract
The invention discloses a kind of display facility switching machine method for testing pressure, device, equipment and storage mediums.This method comprises: detecting and determining to show the state of equipment, the state includes off-position and standby mode, and the opening and closing of the display equipment are controlled according to the state;Display picture after acquiring the display opening of device; by the display picture and preset normal pictures comparative analysis; equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state normally includes that booting is normally shown normally with the image after booting;If the display equipment is normal, further judge whether the display equipment completes primary complete test loop, wherein the complete test loop refers to input test signal to showing equipment, to showing that equipment is normally-open, the extremely display equipment normal switching-off;Otherwise, test stops.The present invention is able to achieve the automatic test to display facility switching machine pressure test, and testing efficiency is high.
Description
Technical field
The present invention relates to field of display devices more particularly to a kind of display facility switching machine method for testing pressure, device, set
Standby and storage medium.
Background technique
With the continuous development of display equipment, show that the function of equipment becomes increasingly complex, user is soft or hard to display equipment
The requirement of part system stability is higher and higher, therefore, to ensure complete machine stability, can all carry out before display equipment factory a series of
Reliability, stability test, including alternating-current switch machine test, remote control switch test, software pressure test so that by hand
The test that work is completed becomes increasingly complex, and reduces the validity of test job, proposes the requirement of automation to software test for this,
To improve the efficiency of software test.
Such as in the detection to intelligent TV set, normal switch machine function is a basic function in test.In order to
Reach the requirement of user, it is often necessary to limit check is carried out, such as switching on and shutting down pressure test 100-200 times, but at present to for aobvious
Show that equipment carries out the test of alternating-current switch machine or the on-off using test fixture control display equipment Alternating Current Power Supply.Remote control switch
When test, telecontrol code control display equipment is issued generally by computer control Infrared Remote-Control Sending device, but opening
Shut down test process when, can not constantly monitor whether display equipment has been switched on, situations such as whether picture normally equal after booting, in this way
Test operation waste very much test human resources and effect be not apparent.
As it can be seen that the existing technology needs to be improved and developed.
Summary of the invention
The technical problem to be solved by the present invention is to the purpose of the present invention is to provide a kind of display facility switching machine pressure
Test method, device, equipment and storage medium, it is intended to it is more serious to solve waste of human resource in test in the prior art, and surveys
Try inefficient problem, especially by external input test picture to equipment is shown, compare display equipment show picture with just
Normal picture, and then the test request of display equipment is completed, it is simple to operate, improve testing efficiency.
Specific technical solution is as follows:
In a first aspect, providing a kind of display facility switching machine method for testing pressure, comprising:
S1, detection and the state for determining to show equipment, the state includes off-position and standby mode, according to the state control
Make the opening and closing of the display equipment;
Display picture after S2, the acquisition display opening of device, by the display picture and preset normal pictures to score
Analysis, equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state normally includes out
Machine is normally shown normally with the image after booting;
If S3, the display equipment are normal, further judge whether the display equipment completes primary complete test loop,
In, the complete test loop refers to the input test signal to the display equipment, until the display equipment is normally-open, extremely
The display equipment normal switching-off;Otherwise, test stops.
Further, it if the display equipment is the off-position, is controlled by setting exchange power-on time described aobvious
Show that the unlatching of equipment, and setting AC dump time control the closing of the display equipment;
If the display equipment is the standby mode, the unlatching of the display equipment is controlled by setting stand-by time, and
The setting available machine time controls the closing of the display equipment.
Further, the unlatching that the display equipment is controlled by setting exchange power-on time, and setting exchange
Power-off time controls the closing of the display equipment, comprising:
Control the connection/disconnection for the power supply connecting with the display equipment;
Infrared code value is sent to the display equipment, the display equipment is according to the infrared code value unlatching/closing.
Further, the unlatching that the display equipment is controlled by setting stand-by time, and setting available machine time
Control the closing of the display equipment, comprising:
Infrared code value is sent to the display equipment, the display equipment is according to the infrared code value unlatching/closing.
Further, the S2 step includes:
Set the normal pictures, wherein the normal pictures include normal boot-strap picture and normal display picture;Described in acquisition
Show the start-up picture and display picture of equipment;
Show described in normal boot-strap picture described in comparative analysis and the start-up picture and comparative analysis picture and it is described normally
Show picture.
Further, before the S2 step further include:
Test signal is sent to the display equipment, wherein the test signal includes institute in the display equipment test process
There is display picture.
Further, the S3 step further include:
If the abnormal display of the display equipment, it is packaged and sends specified fault message corresponding with the abnormal display;
Test threshold is set, after the primary complete test loop of every completion, determines whether completion and the test threshold phase
Deng testing time.
Second aspect, the present invention provide a kind of device for showing the pressure test of facility switching machine, comprising:
Signal transmitting module, formulation image frame needed for being used to provide the described display equipment test;
Energy supply control module, for controlling the opening and closing of the display equipment;
Image capture module, for acquire it is described display opening of device after display picture;
Comparative analysis module, display picture and preset normal display picture for collecting described image acquisition unit
It compares and analyzes.
The third aspect, the embodiment of the present invention also provide a kind of equipment for showing the pressure test of facility switching machine, comprising: processing
Device, memory and display screen;
Processing routine can be controlled by the switching on and shutting down pressure test that the processor executes by being stored on the memory;
Being connected by communication bus between the processor and memory;
The processor realizes following steps when executing the switching on and shutting down pressure test control processing routine:
It detects and determines to show that the state of equipment, the state include off-position and standby mode, controlled according to the state
The opening and closing of the display equipment;
Display picture after acquiring the display opening of device, by the display picture and preset normal pictures comparative analysis,
Equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state normally includes booting
Image after normal and booting is shown normally;
If the display equipment is normal, further judge whether the display equipment completes primary complete test loop, wherein institute
It states complete test loop and refers to the input test signal to the display equipment, until the display equipment is normally-open, extremely described
Show equipment normal switching-off;Otherwise, test stops.
Fourth aspect, the embodiment of the present invention also provide a kind of computer readable storage medium, the computer-readable storage
Media storage has one or more program, and one or more of programs can be executed by one or more processor, with
Realize the step in display facility switching machine method for testing pressure as described above.
Compared with prior art, the embodiment of the present invention has the advantage that
Method provided by embodiment according to the present invention, i.e., by believing the external test including picture of intelligent display device
Number, it is being powered directly to display equipment by physical power source or will show that equipment after standby mode unlatching, compares test letter
Picture after number input display equipment show and normal pictures, is determined to show whether equipment is out of order, if failure, is stopped surveying
Examination, and be packaged and send corresponding fault message;If not failure, continue and tested according to pre-determined number, until final
It completes, realizes the automatic test to display facility switching machine pressure test, testing efficiency is high.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The some embodiments recorded in invention, for those of ordinary skill in the art, without creative efforts,
It is also possible to obtain other drawings based on these drawings.
Fig. 1 is the implementation process schematic diagram of herein described display facility switching machine method for testing pressure.
Fig. 2 provides the functional block diagram of display facility switching machine pressure test equipment preferred embodiment for the application.
Fig. 3 is the structural principle diagram of display facility switching machine pressure test device preferred embodiment provided by the present application
Meaning.
Fig. 4 is that the structure of display facility switching machine method for testing pressure provided by the present application in a particular embodiment realizes frame
Figure.
Fig. 5 is the implementation process of display facility switching machine method for testing pressure provided by the present application in a particular embodiment
Figure.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only this
Invention a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art exist
Every other embodiment obtained under the premise of creative work is not made, shall fall within the protection scope of the present invention.
The present invention provides a kind of display facility switching machine method for testing pressure, refering to fig. 1, Fig. 1 show the invention shows
The implementation flow chart of facility switching machine method for testing pressure preferred embodiment, method specifically comprise the following steps:
S10, detection and the state for determining to show equipment, the state includes off-position and standby mode, according to the state
Control the opening and closing of the display equipment.
In the present embodiment, the display equipment is specially intelligent display device, such as smart television, smart projector, intelligence
Energy laser television etc..
In the specific implementation, there may be completely in two kinds of situations of off-position and standby mode for display equipment, wherein
If the display equipment is the off-position, the display equipment is controlled by the exchange power-on time of setting display equipment
It opens, the setting AC dump time controls the closing of the display equipment, specifically includes: that control is connect with the display equipment
Power supply connection/disconnection;Infrared code value is sent to the display equipment, the display equipment is opened according to the infrared code value
It opens/closes, two steps are implemented in combination with the opening and closing operation to the display equipment;Assuming that existing carry out intelligent TV set
100 ~ 200 switching on and shutting down pressure tests, the then switch control for first passing through setting are powered to intelligent TV set, such as by will be after
Electric appliance one end is connect by serial ports with computer, and the other end connects the wiring board powered to intelligent TV set in this case can
Write the program code for controlling the relay " actuations ", "off" by computer, so the normally opened contact of utilization relay or
Person's normally-closed contact removes the control foot for being connected to wiring board, controls the on-off of controllable patch board socket alternating current, to realize to intelligence
Connection control and the disconnection of energy TV set power control.Then send infrared code value to showing equipment, for example, by with the intelligence
The energy matched remote control machine of television set is executed and is operated to the open and close of the display equipment.
In a particular embodiment, the normally opened contact of relay and normally-closed contact can carry out setting duration according to the actual situation,
Such as setting normally opened contact continues 2s etc. after the execution of above procedure code, sets normally-closed contact after executing above procedure code
Continue 5s etc..
In other embodiments of the invention, if the display equipment is in standby, pass through setting stand-by time
The unlatching of the display equipment is controlled, and the setting available machine time controls the closing of the display equipment;Specifically, passing through transmission
Infrared code value is to the display equipment, and the display equipment is according to the infrared code value unlatching/closing;Such as by with intelligent electricity
Remote control machine depending on machine adaptation is turned on or off control to intelligent TV set under standby mode.
Display facility switching machine method for testing pressure of the invention opens display equipment by control method
Or control is closed, it can be realized the automation in switching on and shutting down pressure test sequence, reduce the investment of human resources, improve test
Efficiency.
Display picture after S20, the acquisition display opening of device, by the display picture and preset normal pictures pair
Than analysis, equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state is normally wrapped
Booting is included normally to show normally with the image after booting.
When it is implemented, to display equipment be powered open after, not necessarily have the display of picture, at this point, then need from
The test signal of external input setting carries out switching on and shutting down pressure test to display equipment by test signal, wherein the test
Signal includes all display pictures in the display equipment test process, for example, animation when intelligent TV set is switched on and certain
The program pictures etc. of one channel.In order to embody the validity of test, switching on and shutting down method for testing pressure of the invention by
Corresponding test program is write on computer to be realized, specifically, setting the positive reason of intelligent TV set in test program
The picture shown under condition, i.e. normal pictures, because in actual test including the broadcasting picture after display device starting-up picture and booting
Face, therefore, it is necessary to the normal boot-strap picture of corresponding display equipment and normal display picture are set in test program code;Together
When, the start-up picture of display equipment and the program of display picture are acquired by setting, specifically, by process control physical equipment,
Such as video camera etc., acquisition display equipment start-up picture and be particularly shown picture, then by the start-up picture collected with
The normal boot-strap picture does analysis comparison, and the display picture collected and the normal display picture are done analysis comparison.
To the invention shows during the real-time operation of facility switching machine method for testing pressure, display equipment is carried out
Show the acquisition of picture after start-up picture and booting, and has carried out analysis with the normal pictures of setting after acquisition and compared, because
To have randomness in collection process, during carrying out loop test, display equipment can be tested more comprehensively,
Guarantee the accuracy of test, reduces error that may be present in test process.
If S30, the display equipment are normal, further judge whether the display equipment is completed primary complete test and followed
Ring, wherein the complete test loop refers to the input test signal to the display equipment, until the display equipment is just normally opened
It opens, to the display equipment normal switching-off;Otherwise, test stops.
When it is implemented, in order to more comprehensively, thoroughly complete the test operation of display equipment, the present invention can be set centainly
Testing time, that is, set the upper limit or lower threshold of testing time, be denoted as test threshold, and it is every complete it is primary described
After complete test loop, determine whether to complete the testing time equal with the test threshold, if reaching setting test threshold,
Then continue step S10 ~ S20 to be tested, otherwise, terminates test.It is carried out for above-mentioned 100 ~ 200 times to intelligent TV set
Explanation, it is known that the upper limit of test threshold is 200, and lower limit 100 specifically can be during actual test, for survey each time
Test result is adjusted, such as: if preceding 80 test results are that can be shown that the normal work of intelligent TV set, can adjust test threshold
Value is 100;If can not also show the normal work of intelligent TV set completely in 150 test results, test threshold is adjusted
Value is 200.In actual test operating process, if certain primary test shows the abnormal display of the display equipment, i.e., it will adopt
Collection obtain display equipment picture and normal display picture comparison it is inconsistent in the case where, such as occur not being switched on, boot LOGO not
Phenomena such as display, starting-up image flower screen, green screen etc., then test operation is terminated, and is packaged and sends and the abnormal display pair
The specified fault message answered, such as type information, problem image information etc., by the fault message by server for example, by
The form of mail be sent to related maintenance personnel perhaps in responsible person maintenance personnel or responsible person according to obtained information to survey
The problems in examination process is analyzed, and is conducive to solve the problems in test process in time, is promoted the efficiency of test.
Refering to Fig. 4 and Fig. 5, it is illustrated as the practice of display facility switching machine method for testing pressure of the invention in TV
Device block diagram and flow chart when realization, wherein the image of default settings is provided by the signal generator of TV connection, for TV's
Switching on and shutting down pressure test;TV is connect with the end PC by serial communication;By passing through the USB power switch device connecting and red with the end PC
The switching on and shutting down operation of outer emitter control TV;By the picture of camera acquisition TV during the test;At the end PC to for example
The fundamental systems states such as serial ports connection, Configuration of baud rate are configured, and are write such as the setting of test switching on and shutting down number, tested
The time interval setting of each process, shooting TV test process image time, picture compare, are packaged TV when finding failure in journey
Serial Port Information, failure picture send the software scripts of mail etc., meanwhile, TV, which is also set with, at the end PC tests normal picture letter
Breath;Then specific test process are as follows: firstly, sending special test picture by signal generator, and PC is sent by serial ports and controlled
Order controls power switch device or/and infrared launcher to control the power-on operation of TV, and sends corresponding control life
Control camera is enabled to acquire the display picture after TV is opened, and display picture transmission is gone back into the end PC after acquisition, the end PC will adopt
The display picture of collection and preset normal pictures carry out analysis comparison, if analysis comparing result is normal, are sent by the end PC
Control command controls the power-off operation of TV by power switch device or/and infrared launcher, completes at this time primary complete
Test loop determines whether to reach preset times by testing time compared with preset times, it is no then, continue next time
Complete test loop, the test until completing all numbers stop test, and pass through after test result information compression is packaged
Serial ports is sent to the end PC;If the analysis result in certain primary test loop is abnormal, stop testing, and corresponding failure is surveyed
The end PC is sent to by serial ports after examination information package compression.
In the actual operation process, the practical execution step during each complete test loop can be carried out certain
Time delay, such as execute by infrared launcher boot action after wait 5s(by power supply device control TV open
When machine, different waiting time, such as 2s etc. can be set), execute shooting start-up picture order after wait 30s, execute shooting
5s is waited after TV booting after picture, after the analysis comparison order for executing picture 2s is waited, executes through infrared launcher pass
Wait 8s(when controlling TV shutdown by power supply device after motor-driven work, different waiting time, such as 5s etc. can be set) etc.
Deng can more preferably be apparent from the reality of each process in test process by the waiting time being arranged in each practical implementation
Border situation, convenient for the subsequent specific performance for determining display equipment according to test result.
Display facility switching machine method for testing pressure of the invention, by believing the external test including picture of display equipment
Number, it is being powered directly to display equipment by physical power source or will show that equipment after standby mode unlatching, compares test letter
Picture after number input display equipment show and normal pictures, is determined to show whether equipment is out of order, if failure, is stopped surveying
Examination, and be packaged and send corresponding fault message;If continuing and being tested according to pre-determined number, realized without failure
The intelligence and automation of test, can effectively promote testing efficiency.
As shown in Fig. 2, showing facility switching machine method for testing pressure based on the above embodiment, the present invention is also corresponding to provide one
The equipment of kind display facility switching machine pressure test, the equipment include processor 1, memory 2 and display screen 3, and processor 1 is logical
It crosses communication bus 5 to connect with memory 2, the display screen 3 is connect by communication bus 5 with processor 1.Fig. 2 illustrates only survey
The members of equipment are tried, it should be understood that being not required for implementing all components shown, the implementation that can be substituted is more
Or less component.
The memory 2 can be the internal storage unit of the test equipment in some embodiments, such as test is set
The memory block of standby prepackage.The memory 2 is also possible to the External memory equipment of the test equipment in further embodiments,
Such as the plug-in type USB flash disk being equipped in the test equipment, intelligent memory card (Smart Media Card, SMC), secure digital
(Secure Digital, SD) card, flash card (Flash Card) etc..Further, the memory 2 can also both include
The internal storage unit of the test equipment also includes External memory equipment.The memory 2 is installed on the survey for storing
Try the application software and Various types of data of equipment, such as the program code etc. of test equipment starting.The memory 2 can be with
For temporarily storing the data that has exported or will export.In one embodiment, switching on and shutting down pressure is stored on memory 2
Power testing and control processing method program 4, the switching on and shutting down pressure test control processing method program 4 can performed by processor 1, from
And it realizes the grateful pressure test of opening of test equipment in the application and controls processing method.
The processor 1 can be in some embodiments a central processing unit (Central Processing Unit,
CPU), microprocessor, mobile phone baseband processor or other data processing chips, for running the journey stored in the memory 2
Sequence code or processing data, such as execute switching on and shutting down pressure test control processing method as described above etc..
In one embodiment, processing method program is controlled when processor 1 executes switching on and shutting down pressure test in the memory 2
It is performed the steps of when 4
It detects and determines to show that the state of equipment, the state include off-position and standby mode, controlled according to the state
The opening and closing of the display equipment;
Display picture after acquiring the display opening of device, by the display picture and preset normal pictures comparative analysis,
Equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state normally includes booting
Image after normal and booting is shown normally;
If the display equipment is normal, further judge whether the display equipment completes primary complete test loop, wherein institute
It states complete test loop and refers to the input test signal to the display equipment, until the display equipment is normally-open, extremely described
Show equipment normal switching-off;Otherwise, test stops.
Display facility switching machine method for testing pressure based on the above embodiment, the present invention correspondingly provide a kind of show and set
The device of standby switching on and shutting down pressure test, refering to Fig. 3, described device includes signal transmitting module 100, energy supply control module 200, figure
As acquisition module 300 and comparative analysis module 400, wherein signal transmitting module 100 is used to provide the described display equipment 500 and surveys
Formulation image frame needed for examination;Energy supply control module 200 is used to control the opening and closing of the display equipment 500;Image
Acquisition module 300 is used to acquire the display picture after the display equipment 300 is opened, and the display picture that will be collected
It is transmitted to comparative analysis module 400, wherein the display picture includes start-up picture and actual play picture;Comparative analysis mould
Block 400 is for comparing the display picture that described image acquisition unit 300 collects with preset normal display picture
Analysis shows whether equipment 500 breaks down according to comparative analysis result judgement.
It should be noted that above-mentioned apparatus provided in an embodiment of the present invention, same due to being based on embodiment of the present invention method
One design, bring technical effect is identical as embodiment of the present invention method, and particular content can be found in embodiment of the present invention method
In narration, details are not described herein again.
The embodiment of the present invention also provides a kind of computer readable storage medium, and the computer-readable recording medium storage has
One or more program, one or more of programs can be executed by one or more processor, to realize institute as above
The step in display facility switching machine method for testing pressure stated.
In conclusion a kind of display facility switching machine method for testing pressure provided by the invention, device, equipment and storage are situated between
Matter, this method comprises: detecting and determining to show the state of equipment, the state includes off-position and standby mode, according to institute
The state of stating controls the opening and closing of the display equipment;Display picture after acquiring the display opening of device, will be described aobvious
Show picture and preset normal pictures comparative analysis, shown according to the result judgement of the comparative analysis equipment whether state
Normally, wherein the state normally includes that booting is normally shown normally with the image after booting;If the display equipment is normal,
Further judge whether the display equipment completes primary complete test loop, wherein the complete test loop refers to input institute
Test signal is stated to the display equipment, to the display equipment is normally-open, the extremely display equipment normal switching-off;Otherwise,
Test stops.The present invention by the external test signal including picture of intelligent display device, by physical power source directly to
Show that equipment is powered or will show equipment after standby mode unlatching, the picture after comparing test signal input display equipment is shown
Show and whether normal pictures, judgement display equipment are out of order, if failure, stop testing, and be packaged and send corresponding failure
Information;If not failure, continues and tested according to pre-determined number, realize the intelligence and automation of test, it can be effective
Promote testing efficiency.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to of the invention its
Its embodiment.The present invention is directed to cover any variations, uses, or adaptations of the invention, these modifications, purposes or
Person's adaptive change follows general principle of the invention and including the undocumented common knowledge in the art of the disclosure
Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following
Claim is pointed out.
It should be understood that the present invention is not limited to the precise structure already described above and shown in the accompanying drawings, and
And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is limited only by the attached claims.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of display facility switching machine method for testing pressure characterized by comprising
S1, detection and the state for determining to show equipment, the state includes off-position and standby mode, according to the state control
Make the opening and closing of the display equipment;
Display picture after S2, the acquisition display opening of device, by the display picture and preset normal pictures to score
Analysis, equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state normally includes out
Machine is normally shown normally with the image after booting;
If S3, the display equipment are normal, further judge whether the display equipment completes primary complete test loop,
In, the complete test loop refers to the input test signal to the display equipment, until the display equipment is normally-open, extremely
The display equipment normal switching-off;Otherwise, test stops.
2. display facility switching machine method for testing pressure according to claim 1, which is characterized in that if the display equipment
For the off-position, the unlatching of the display equipment is controlled by setting exchange power-on time, and when setting AC dump
Between control it is described display equipment closing;
If the display equipment is the standby mode, the unlatching of the display equipment is controlled by setting stand-by time, and
The setting available machine time controls the closing of the display equipment.
3. display facility switching machine method for testing pressure according to claim 2, which is characterized in that described to be handed over by setting
Stream power-on time controls the unlatching of the display equipment, and the setting AC dump time controls the closing of the display equipment,
Include:
Control the connection/disconnection for the power supply connecting with the display equipment;
Infrared code value is sent to the display equipment, the display equipment is according to the infrared code value unlatching/closing.
4. display facility switching machine method for testing pressure according to claim 2, which is characterized in that it is described by setting to
The machine time controls the unlatching of the display equipment, and the setting available machine time controls the closing of the display equipment, comprising:
Infrared code value is sent to the display equipment, the display equipment is according to the infrared code value unlatching/closing.
5. display facility switching machine method for testing pressure according to claim 1, which is characterized in that the S2 step packet
It includes:
Set the normal pictures, wherein the normal pictures include normal boot-strap picture and normal display picture;Described in acquisition
Show the start-up picture and display picture of equipment;
Show described in normal boot-strap picture described in comparative analysis and the start-up picture and comparative analysis picture and it is described normally
Show picture.
6. display facility switching machine method for testing pressure according to claim 5, which is characterized in that before the S2 step
Further include:
Test signal is sent to the display equipment, wherein the test signal includes institute in the display equipment test process
There is display picture.
7. display facility switching machine method for testing pressure according to claim 1, which is characterized in that the S3 step is also wrapped
It includes:
If the abnormal display of the display equipment, it is packaged and sends specified fault message corresponding with the abnormal display;
Test threshold is set, after the primary complete test loop of every completion, determines whether completion and the test threshold phase
Deng testing time.
8. a kind of device for showing the pressure test of facility switching machine characterized by comprising
Signal transmitting module, formulation image frame needed for being used to provide the described display equipment test;
Energy supply control module, for controlling the opening and closing of the display equipment;
Image capture module, for acquire it is described display opening of device after display picture;
Comparative analysis module, display picture and preset normal display picture for collecting described image acquisition unit
It compares and analyzes.
9. a kind of equipment for showing the pressure test of facility switching machine characterized by comprising processor, memory and display screen;
Processing routine can be controlled by the switching on and shutting down pressure test that the processor executes by being stored on the memory;
Being connected by communication bus between the processor and memory;
The processor realizes following steps when executing the switching on and shutting down pressure test control processing routine:
It detects and determines to show that the state of equipment, the state include off-position and standby mode, controlled according to the state
The opening and closing of the display equipment;
Display picture after acquiring the display opening of device, by the display picture and preset normal pictures comparative analysis,
Equipment is shown according to the result judgement of the comparative analysis, and whether state is normal, wherein the state normally includes booting
Image after normal and booting is shown normally;
If the display equipment is normal, further judge whether the display equipment completes primary complete test loop, wherein institute
It states complete test loop and refers to the input test signal to the display equipment, until the display equipment is normally-open, extremely described
Show equipment normal switching-off;Otherwise, test stops.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage have one or
Multiple programs, one or more of programs can be executed by one or more processor, to realize that claim 1-7 such as appoints
Step in display facility switching machine method for testing pressure described in meaning one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910568486.1A CN110300299A (en) | 2019-06-27 | 2019-06-27 | Show facility switching machine method for testing pressure, device, equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910568486.1A CN110300299A (en) | 2019-06-27 | 2019-06-27 | Show facility switching machine method for testing pressure, device, equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110300299A true CN110300299A (en) | 2019-10-01 |
Family
ID=68029158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910568486.1A Pending CN110300299A (en) | 2019-06-27 | 2019-06-27 | Show facility switching machine method for testing pressure, device, equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110300299A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110572642A (en) * | 2019-10-25 | 2019-12-13 | 深圳创维-Rgb电子有限公司 | Automatic test method of display device, display device and storage medium |
CN110636286A (en) * | 2019-10-25 | 2019-12-31 | 深圳创维-Rgb电子有限公司 | Remote testing method of display equipment, terminal and storage medium |
CN110838274A (en) * | 2019-11-25 | 2020-02-25 | 伯恩光学(惠州)有限公司 | Detection system and detection method for eDP interface display panel |
CN110907723A (en) * | 2019-11-12 | 2020-03-24 | 深圳创维-Rgb电子有限公司 | Switch impact testing device and system |
CN111338328A (en) * | 2020-05-19 | 2020-06-26 | 北京易诚高科科技发展有限公司 | Method for testing working state of intelligent household link product |
CN112004080A (en) * | 2020-08-28 | 2020-11-27 | 安徽江淮汽车集团股份有限公司 | Fault detection method, device, storage medium and device of automobile display device |
CN112073717A (en) * | 2020-09-17 | 2020-12-11 | 四川长虹电器股份有限公司 | Laser photoelectric visual moving picture detector |
CN112339683A (en) * | 2020-10-13 | 2021-02-09 | 广州汽车集团股份有限公司 | Method, system and storage medium for vehicle power distribution |
CN112653888A (en) * | 2020-12-16 | 2021-04-13 | 康佳集团股份有限公司 | Automatic startup and shutdown test system and test method thereof |
CN113784116A (en) * | 2021-09-10 | 2021-12-10 | 南京巨鲨显示科技有限公司 | System and method for realizing automatic signal interface test |
CN113900875A (en) * | 2021-11-23 | 2022-01-07 | 深圳市康冠商用科技有限公司 | Startup test method and device, computer equipment and storage medium |
CN114025152A (en) * | 2021-10-22 | 2022-02-08 | 四川长虹电器股份有限公司 | Startup and shutdown pressure testing method for abnormal power failure in startup process of smart television |
CN114816961A (en) * | 2022-05-16 | 2022-07-29 | 宝德计算机系统股份有限公司 | Server pressure testing method and device and computer storage medium |
-
2019
- 2019-06-27 CN CN201910568486.1A patent/CN110300299A/en active Pending
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110572642B (en) * | 2019-10-25 | 2021-09-24 | 深圳创维-Rgb电子有限公司 | Automatic test method of display device, display device and storage medium |
CN110636286A (en) * | 2019-10-25 | 2019-12-31 | 深圳创维-Rgb电子有限公司 | Remote testing method of display equipment, terminal and storage medium |
CN110572642A (en) * | 2019-10-25 | 2019-12-13 | 深圳创维-Rgb电子有限公司 | Automatic test method of display device, display device and storage medium |
CN110907723A (en) * | 2019-11-12 | 2020-03-24 | 深圳创维-Rgb电子有限公司 | Switch impact testing device and system |
CN110838274A (en) * | 2019-11-25 | 2020-02-25 | 伯恩光学(惠州)有限公司 | Detection system and detection method for eDP interface display panel |
CN111338328A (en) * | 2020-05-19 | 2020-06-26 | 北京易诚高科科技发展有限公司 | Method for testing working state of intelligent household link product |
CN112004080A (en) * | 2020-08-28 | 2020-11-27 | 安徽江淮汽车集团股份有限公司 | Fault detection method, device, storage medium and device of automobile display device |
CN112073717A (en) * | 2020-09-17 | 2020-12-11 | 四川长虹电器股份有限公司 | Laser photoelectric visual moving picture detector |
CN112339683A (en) * | 2020-10-13 | 2021-02-09 | 广州汽车集团股份有限公司 | Method, system and storage medium for vehicle power distribution |
CN112653888A (en) * | 2020-12-16 | 2021-04-13 | 康佳集团股份有限公司 | Automatic startup and shutdown test system and test method thereof |
CN113784116A (en) * | 2021-09-10 | 2021-12-10 | 南京巨鲨显示科技有限公司 | System and method for realizing automatic signal interface test |
CN113784116B (en) * | 2021-09-10 | 2023-08-15 | 南京巨鲨显示科技有限公司 | System for realizing automatic signal interface test |
CN114025152A (en) * | 2021-10-22 | 2022-02-08 | 四川长虹电器股份有限公司 | Startup and shutdown pressure testing method for abnormal power failure in startup process of smart television |
CN114025152B (en) * | 2021-10-22 | 2023-09-29 | 四川长虹电器股份有限公司 | Method for testing on-off pressure of abnormal power failure in starting process of intelligent television |
CN113900875A (en) * | 2021-11-23 | 2022-01-07 | 深圳市康冠商用科技有限公司 | Startup test method and device, computer equipment and storage medium |
CN114816961A (en) * | 2022-05-16 | 2022-07-29 | 宝德计算机系统股份有限公司 | Server pressure testing method and device and computer storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110300299A (en) | Show facility switching machine method for testing pressure, device, equipment and storage medium | |
RU2644817C2 (en) | Intelligent socket switch control method and device | |
CN102256156B (en) | Method and system for controlling power-on and power-off test of television | |
CN103345414B (en) | Self-aided terminal controls the method for hardware device, equipment manager and processor | |
CN103051490A (en) | Method for carrying out startup and shutdown testing on blade server | |
CN105357266A (en) | Universal SOCKET communication and process management platform applied to multiple scenes and method | |
CN104062956A (en) | Real-time detecting and integrated monitoring and controlling system for equipment in multi-media classrooms | |
CN103530265B (en) | Realize the device and method of the CF card safe hot plug of electronics | |
CN103347194A (en) | Method, apparatus and system for starting-up and shut-down testing | |
CN106101834A (en) | Intelligent television and control method thereof | |
CN109308241A (en) | Monitor application program launching flow and method, device, terminal device and storage medium | |
CN110098965A (en) | A kind of server management system and method | |
CN108762886B (en) | Fault detection recovery method and system for virtual machine | |
CN109683964A (en) | Bios software debugging control program, system and server | |
CN112333057A (en) | Intelligent household equipment distribution network testing method and device, execution machine and storage medium | |
CN110109371A (en) | Intelligent household equipment management system and equipment management method | |
CN111294652A (en) | Intelligent television fault online diagnosis method and device and controller | |
CN105871922A (en) | Television fault locating method, business server and television | |
CN105704484B (en) | Analog subscriber operates the test device and method of TV | |
CN112839097B (en) | Remote control method, equipment and system | |
CN208076952U (en) | Wisdom electronic box suitable for projection equipment power management | |
CN101272480A (en) | Method and circuit for restarting DVR video monitoring system in case of system halt | |
CN106445046A (en) | Computer equipment and method for switching on and switching off computer equipment | |
CN103648029B (en) | The energising guard method of intelligent television and system | |
CN106250106A (en) | The startup method and device of projector equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191001 |
|
RJ01 | Rejection of invention patent application after publication |