CN106250106A - The startup method and device of projector equipment - Google Patents

The startup method and device of projector equipment Download PDF

Info

Publication number
CN106250106A
CN106250106A CN201610562900.4A CN201610562900A CN106250106A CN 106250106 A CN106250106 A CN 106250106A CN 201610562900 A CN201610562900 A CN 201610562900A CN 106250106 A CN106250106 A CN 106250106A
Authority
CN
China
Prior art keywords
projector equipment
ray machine
master control
module
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610562900.4A
Other languages
Chinese (zh)
Inventor
宗树伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hisense Broadband Multimedia Technology Co Ltd
Original Assignee
Hisense Broadband Multimedia Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hisense Broadband Multimedia Technology Co Ltd filed Critical Hisense Broadband Multimedia Technology Co Ltd
Priority to CN201610562900.4A priority Critical patent/CN106250106A/en
Publication of CN106250106A publication Critical patent/CN106250106A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/4401Bootstrapping
    • G06F9/4403Processor initialisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/445Program loading or initiating
    • G06F9/44505Configuring for program initiating, e.g. using registry, configuration files

Abstract

The present invention provides the startup method and device of a kind of projector equipment.The startup method of projector equipment of the present invention, including: obtain projector equipment open command;According to described projector equipment open command, the module of the master control system of described projector equipment is initialized, and power on to the ray machine of projector equipment, so that described ray machine starts, complete the start-up course of described projector equipment.Present invention reduces the duration needed for the start-up course of projector equipment, better user experience.

Description

The startup method and device of projector equipment
Technical field
The present invention relates to projector equipment technical field, particularly relate to the startup method and device of a kind of projector equipment.
Background technology
Along with developing rapidly of science and technology, the use of projector equipment is more and more extensive, such as in general meeting bulletin occasion In, use projector equipment to show report content, so that participant can clearly watch data.
In prior art, when projector equipment is started shooting, owing to the ray machine of projector equipment needs the start of long period to preheat, because of This generally requires the long period and image could occurs, the Consumer's Experience that cause the user is bad.Fig. 1 is existing projector equipment Start process schematic diagram.Concrete, as it is shown in figure 1, first projector equipment carries out the system module of Master control chip after powering on The initial work of some necessity, such as, successively configuration debugging port, arrange backlight color, initialize chip, interrupt enable, Recover the electronics formula of erasing and can make carbon copies read only memory (Electrically-Erasable Programmable Read-Only Memory, is called for short EEPROM) data, configurable clock generator, About You's server etc., need afterwards ray machine is initialized, point Bright screen curtain, and then start logo can be shown, the initialized process of ray machine needs the long period, and it is right to realize in initialization procedure The optics of ray machine preheats, and after having initialized, light chance provides one and initializes complement mark, shows that ray machine is permissible Communicate with other module of projector equipment.Now, projector equipment can configure ray machine function, after having configured, and ray machine point Bright, the whole initialization procedure of ray machine terminates.In the initialization procedure of ray machine, Master control chip is constantly in waiting state, light After the initialization of machine completes, Master control chip carries out the initialization of other follow-up modules, when the initialization of whole projector equipment After completing, the Master control chip of projector equipment wants the information of projection to ray machine transmission.
In prior art, owing to the execution of each system function module order the most respectively of projector equipment initialized Journey, particularly bare engine module, required initialization time is longer, therefore so that the available machine time of whole projector equipment is relatively slow, After user's start, after needing waiting for a long time, find that ray machine just starts to light, projection picture occurs, causes and power at ray machine Before lighting screen, user cannot accurately know whether and successfully start shooting, and thus results in poor Consumer's Experience.
Summary of the invention
The present invention provides the startup method and device of a kind of projector equipment, to overcome whole projector equipment in prior art Available machine time is longer, the problem that ray machine starts poor user experience in evening.
First aspect, the present invention provides a kind of startup method of projector equipment, including:
Obtain projector equipment open command;
According to described projector equipment open command, the module of the master control system of described projector equipment is initialized, And power on to the ray machine of projector equipment, so that described ray machine starts, complete the start-up course of described projector equipment.
Alternatively, as a kind of enforceable mode, described master control system module is initialized, and set to projection Standby ray machine powers on, including:
According to described projector equipment open command, configuration debugging port;
If described debugging port has configured, then power on to described ray machine, and carry out in described master control system except configuration Other initialization operations outside debugging port.
Alternatively, as a kind of enforceable mode, the module of the master control system of described projector equipment is carried out initially Change, and after the ray machine of projector equipment powers on, described method also include:
When the power-on time of described ray machine reaches default duration, detect whether described ray machine completes to start.
Alternatively, as a kind of enforceable mode, whether the described ray machine of described detection has started includes:
If detecting, the level starting instruction pin of the described ray machine being pre-configured with changes, it is determined that described ray machine Complete to start;
Otherwise, it determines described ray machine is not fully complete startup.
Alternatively, as a kind of enforceable mode, port is debugged in described configuration, including:
The universal input of described projector equipment/output GPIO port is set to output port.
Second aspect, the present invention provides the starter of a kind of projector equipment, including:
Acquisition module, is used for obtaining projector equipment open command;
Processing module, for according to described projector equipment open command, the mould to the master control system of described projector equipment Block initializes, and powers on to the ray machine of projector equipment, so that described ray machine starts, completes the startup of described projector equipment Journey.
Alternatively, as a kind of enforceable mode, described processing module, specifically for:
According to described projector equipment open command, configuration debugging port;
If described debugging port has configured, then power on to described ray machine, and carry out in described master control system except configuration Other initialization operations outside debugging port.
Alternatively, as a kind of enforceable mode, also include:
Detection module, for when the power-on time of described ray machine reaches default duration, detects described ray machine the completeest Become to start.
Alternatively, as a kind of enforceable mode, described detection module, specifically for:
If detecting, the level starting instruction pin of the described ray machine being pre-configured with changes, it is determined that described ray machine Complete to start;
Otherwise, it determines described ray machine is not fully complete startup.
Alternatively, as a kind of enforceable mode, described processing module, also particularly useful for:
The universal input of described projector equipment/output GPIO port is set to output port.
The startup method and device of projector equipment of the present invention, obtains projector equipment open command;Open according to projector equipment Instruction, initializes the module of the master control system of projector equipment, and powers on to the ray machine of projector equipment, so that ray machine opens Dynamic, complete the start-up course of projector equipment, in said process, the module at the master control system to projector equipment initializes Time, just powering on to the ray machine of projector equipment, the module initialization on the one hand making ray machine initialize with master control system is held parallel OK, the available machine time of projector equipment is shortened, on the other hand, owing to the module of the master control system at projector equipment is carried out initially Just power on to the ray machine of projector equipment during change, make screen light, user's projector equipment can be pointed out to have started to, from vision On give the sensation that subscriber equipment quickly starts, improve Consumer's Experience.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is this Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to Other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is the start process schematic diagram of existing projector equipment;
Fig. 2 is the schematic flow sheet of startup method one embodiment of projector equipment of the present invention;
Fig. 3 is the start process schematic diagram of projector equipment in the inventive method embodiment;
Fig. 4 is the structural representation of starter one embodiment of projector equipment of the present invention;
Fig. 5 is the structural representation of projector equipment one embodiment of the present invention.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
The start process of existing projector equipment is as it is shown in figure 1, first projector equipment carries out Master control chip after powering on The initialization of system module, configures debugging port successively, arranges backlight color, initialization chip, interruption enable, recovery EEPROM Data, configurable clock generator, About You's server etc., then before display start logo, initialize ray machine, and ray machine Initialized process needs the long period, realizes preheating the optics of ray machine, initialized in initialization procedure Cheng Hou, light chance provides one and initializes complement mark (i.e. starting complement mark in figure), shows that ray machine can be with projector equipment Other module communicate.Now, projector equipment can configure ray machine function, as shown in fig. 1, is configured by interactive instruction Ray machine function, after having configured, ray machine is lighted, and the whole initialization procedure of ray machine terminates.In the initialization procedure of ray machine, master control Coremaking sheet is constantly in waiting state, and after the initialization of ray machine completes, Master control chip carries out the initial of other follow-up modules Change, such as audio-frequency module, video module, menu etc., as carried out audio frequency audio frequency initialization, video initialization, data monitoring, arrange Source, arranges program window etc., and after the initialization of whole projector equipment completes, the Master control chip of projector equipment transmits to ray machine Want the information of projection.
In sum, inherently needing the initialization procedure of long period due to ray machine, the initialization of Master control chip is more Add complexity, both add up the consumed time considerably beyond user expect, cause bad Consumer's Experience.
Owing to ray machine is independently of one piece of single circuit chip of the Master control chip of projector equipment, initialize the most relatively Long, and after ray machine powers on, can be luminous, and then preferable interactive interface, such as prompting user can presented to user Initialize.Therefore, in the embodiment of the present invention, the initialization procedure of ray machine is parallel with the partially-initialized operation of Master control chip Perform, it is to avoid user waits for a long time.
Fig. 2 is the schematic flow sheet of startup method one embodiment of projector equipment of the present invention.As in figure 2 it is shown, the present embodiment The startup method of projector equipment, including:
Step 201, acquisition projector equipment open command;
Step 202, according to projector equipment open command, the module of the master control system of projector equipment is initialized, And power on to the ray machine of projector equipment, so that ray machine starts, complete the start-up course of projector equipment.
Concrete, owing to the part of devices of ray machine is frame for movement, before projector equipment dormancy or shutdown, it is necessary to first close Ray machine, in order to avoid causing the damage of unrepairable to ray machine.Therefore, the open and close of ray machine need to be by Master control chip control.
User, when using projector equipment, first starts projector equipment, when starting projector equipment, can be used by reception The projector equipment open command of family operation, then according to this projector equipment open command, first, the master control coremaking to projector equipment The module of the master control system of sheet initializes, and powers on to ray machine simultaneously, is i.e. controlled ray machine by Master control chip and powers on, makes light Machine starts and carries out initialization procedure, has initialized at ray machine and has carried out ray machine functional configuration, the most alternatively, main control afterwards Chip carries out the initialization of other follow-up modules, such as audio-frequency module, video module, menu etc., as carried out audio frequency initialization, depending on Frequency initializes, and data monitoring arranges source, arranges program window etc., to complete to throw the start-up course of whole projector equipment.
The above-mentioned module to the master control system of the Master control chip of projector equipment initializes, as following in included Step: configuration debugging port, backlight color is set, initializes chip, interrupt enabling, recover EEPROM data, configurable clock generator, individual People's web page server etc..
In actual applications, such as can control ray machine and power on, to complete at the beginning of ray machine after completing configuration debugging port Beginning process, in the initialization procedure of ray machine, is configured backlight color simultaneously, initializes chip, interruption enable, recovery EEPROM data, configurable clock generator, About You's server etc. operate.
The startup method of the projector equipment that the present embodiment provides, obtains projector equipment open command;Open according to projector equipment Open instruction, the module of the master control system of projector equipment is initialized, and power on to the ray machine of projector equipment, so that ray machine Starting, complete the start-up course of projector equipment, in said process, the module at the master control system to projector equipment is carried out initially During change, just power on to the ray machine of projector equipment, on the one hand make ray machine initialize parallel with the module initialization of master control system Perform, shorten the available machine time of projector equipment, on the other hand, at the beginning of carrying out due to the module of the master control system at projector equipment Just power on to the ray machine of projector equipment during beginningization, make screen light, user's projector equipment can be pointed out to have started to, from regarding Give the sensation that subscriber equipment quickly starts in feel, improve Consumer's Experience.
Fig. 3 is the start process schematic diagram of projector equipment in the inventive method embodiment.On the basis of above-described embodiment, In the present embodiment, as it is shown on figure 3, step 202 specifically can be accomplished in that
According to projector equipment open command, configuration debugging port;
If detecting, the configuration of debugging port completes, then power on to ray machine, and carries out in master control system except configuration debugging Other initialization operations outside port.
Concrete, in projector equipment start-up course, the module of the master control system of projector equipment is initialized, and to The ray machine of projector equipment powers on, and specifically can realize as follows:
First configuration debugging port, has configured debugging port at master control system, will described projector equipment general defeated Enter/export GPIO port and be set to output port, and after the level of this port is set to high level, it is possible to control to light Machine powers on.
After powering on to ray machine, carry out during ray machine is initialized in master control system except configuration debugging port in addition to Other initialization operations, as arrange backlight color, initialize chip, interrupt enable, recover EEPROM data, configurable clock generator, About You's servers etc., i.e. the initialization of ray machine can be carried out with other initialization operations in master control system simultaneously, therefore The available machine time of projector equipment can be shortened.
It should be noted that in other embodiments of the invention, it is also possible to initial in other modules of master control system After change, powering on to ray machine, this is not limiting as by the present invention.
Wherein, in actual applications, configuration debugging port, including:
The universal input of described projector equipment/output GPIO port is set to output port.
In above-mentioned detailed description of the invention, according to projector equipment open command, configuration debugging port;If the configuration of debugging port Complete, then power on to ray machine, and carry out in master control system except configuration debugging port in addition to other initialization operations, it is achieved that Ray machine initialization procedure is carried out with other initialization operations in master control system simultaneously, shortens projector equipment start duration.
On the basis of above-described embodiment, in the present embodiment, after step 202, described method also includes:
When the power-on time of ray machine reaches default duration, whether detection ray machine completes to start.
Optionally, as a kind of enforceable mode, whether detection ray machine has started, can be real in the following way Existing:
If detecting, the level starting instruction pin of the ray machine being pre-configured with changes, it is determined that ray machine completes to open Dynamic;
Otherwise, it determines ray machine is not fully complete startup.
Concrete, as described in above-described embodiment, Master control chip powers on, and after necessary initialization, i.e. powers on to ray machine. As it is shown on figure 3, the part of module of master control system and ray machine initialize parallel, such as optical mechanical system initialization time is about 800ms, increase part sets aside some time 100ms, and optical mechanical system initializes and total time is about 900ms.Master control system is from ray machine Establish beginning timing by cable, when the power-on time of ray machine reaches default duration, such as (set aside some time 100ms) after 1s, then judge that ray machine is No completing initializes, and then carries out follow-up ray machine functional configuration, display start logo.
Wherein, in actual applications, starting instruction pin is the pin that Master control chip is connected with ray machine, is used for indicating light Whether machine completes to start.
Owing to the system program of ray machine and the master control system of Master control chip are the programs of different manufacturer's encapsulation, therefore After the system program of ray machine completes to initialize, have the mark conversion of a low and high level, such as connect Master control chip Starting instruction pin and become high level from low level, now, Master control chip is the (number that early stage is tested after default duration According to), can actively go to read the level value starting instruction pin, if it find that change, just explanation ray machine completes to initialize, if Find no change, illustrate that ray machine initializes and do not terminate or initialize unsuccessfully, now, if be not fully complete can in ray machine initialization As existing start-up course continues waiting for ray machine initialize terminate, as it is shown on figure 3, and can master control system other at the beginning of The work of beginningization shifts to an earlier date some items, and some initial work after start logo shows is carried out in advance, such as, audio-frequency module, The initialization operation such as video module, menu, can avoid waiting for, and shortens the starting duration of projector equipment.
If after detecting that ray machine completes to start, master control system carries out other follow-up initialization operations, master control system After completing to initialize, the channel of projection can be play when shutting down last time, or, if projection for the first time, then can play to dispatch from the factory and set The main menu put.
The embodiment of the present invention, to initializing used time longer ray machine, have employed parallel processing mechanism, time-consuming accurately calculating On the premise of, the order of adjustment member initialization operation, compared with existing projector equipment start duration, decrease ray machine and start Duration.
Fig. 4 is the structural representation of starter one embodiment of projector equipment of the present invention.The projector equipment of the present embodiment Starter can be arranged in projector equipment.As shown in Figure 4, the starter of the projector equipment of the present embodiment, including:
Acquisition module 401 and processing module 402;
Wherein, acquisition module 401, it is used for obtaining projector equipment open command;
Processing module 402, for according to described projector equipment open command, to the master control system of described projector equipment Module initializes, and powers on to the ray machine of projector equipment, so that described ray machine starts, completes the startup of described projector equipment Process.
Concrete, owing to the part of devices of ray machine is frame for movement, before projector equipment dormancy or shutdown, it is necessary to first close Ray machine, in order to avoid causing the damage of unrepairable to ray machine.Therefore, the open and close of ray machine need to be by Master control chip control.
User, when using projector equipment, first starts projector equipment, when starting projector equipment, and can be by obtaining mould Block 401 receives the projector equipment open command of user operation, and then processing module 402 is according to this projector equipment open command, first First, the module of the master control system of the Master control chip of projector equipment is initialized, power on to ray machine, i.e. by master control simultaneously Chip controls ray machine processed powers on, and makes ray machine start and carries out initialization procedure, has initialized at ray machine and has carried out ray machine merit afterwards Can configure, the most alternatively, Master control chip carries out the initialization of other follow-up modules, such as audio-frequency module, video module, dish Single etc., as carried out audio frequency initialization, video initialization, data monitoring, source is set, program window etc. is set, whole to complete to throw The start-up course of projector equipment.
The above-mentioned module to the master control system of the Master control chip of projector equipment initializes, as following in included Step: configuration debugging port, backlight color is set, initializes chip, interrupt enabling, recover EEPROM data, configurable clock generator, individual People's web page server etc..
In actual applications, such as can control ray machine and power on, to complete at the beginning of ray machine after completing configuration debugging port Beginning process, in the initialization procedure of ray machine, is configured backlight color simultaneously, initializes chip, interruption enable, recovery EEPROM data, configurable clock generator, About You's server etc. operate.
Alternatively, as a kind of enforceable mode, described processing module 402, specifically for:
According to described projector equipment open command, configuration debugging port;
If after described debugging port has configured, then powering on to described ray machine, and carry out in described master control system except joining Put other initialization operations outside debugging port.
Alternatively, as a kind of enforceable mode, the device of the present embodiment can also include:
Detection module, for when the power-on time of described ray machine reaches default duration, detects described ray machine the completeest Become to start.
Alternatively, as a kind of enforceable mode, described detection module, specifically for:
If detecting, the level starting instruction pin of the described ray machine being pre-configured with changes, it is determined that described ray machine Complete to start;
Otherwise, it determines described ray machine is not fully complete startup.
Alternatively, as a kind of enforceable mode, described processing module 402, also particularly useful for:
The universal input of described projector equipment/output GPIO port is set to output port.
The device of the present embodiment, may be used for performing the technical scheme of embodiment of the method as shown in Figure 2, and it realizes principle class Seemingly, here is omitted.
The device of the present embodiment, acquisition module, it is used for obtaining projector equipment open command;Processing module, for according to throwing Shadow opening of device instructs, and initializes the module of the master control system of projector equipment, and powers on to the ray machine of projector equipment, So that ray machine starts, complete the start-up course of projector equipment, in said process, in the debugging of the master control system to projector equipment After port module has initialized, just power on to the ray machine of projector equipment so that ray machine initializes the module with master control system Initialize executed in parallel, shorten the available machine time of projector equipment.
Fig. 5 is the structural representation of projector equipment one embodiment of the present invention.As it is shown in figure 5, the projector equipment of the present embodiment, May include that memorizer 501, processor 502, communication interface 503 and ray machine 504;Wherein, memorizer 501, it is used for storing journey Sequence;Specifically, program can include that program code, described program code include computer-managed instruction.Memorizer 501 may bag (random access memory is called for short RAM) containing random access memory, it is also possible to also include nonvolatile memory (non-volatile memory), for example, at least one disk memory.
Processor 502, for performing the program of memorizer 501 storage, for performing what method embodiment of the present invention was provided Technical scheme, it is similar with technique effect that it realizes principle, refers to the embodiment of the method shown in Fig. 2, and here is omitted.
Communication interface 503, is used for obtaining projector equipment open command;
In said apparatus, processing module, the function of detection module can be realized by processor 302.
Above-mentioned parts are communicated by one or more bus.It will be understood by those skilled in the art that shown in Fig. 5 The structure of equipment is not intended that limitation of the invention, and it both can be busbar network, it is also possible to be hub-and-spoke configuration, it is also possible to Illustrate more or less of parts including ratio, or combine some parts, or different parts are arranged.
It should be noted that for projector equipment embodiment, owing to it essentially corresponds to embodiment of the method, so phase The part seeing embodiment of the method in place of pass illustrates.
One of ordinary skill in the art will appreciate that: all or part of step realizing said method embodiment can be passed through The hardware that programmed instruction is relevant completes, and aforesaid program can be stored in a computer read/write memory medium, this program Upon execution, perform to include the step of said method embodiment;And aforesaid storage medium includes: ROM, RAM, magnetic disc or light The various medium that can store program code such as dish.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;To the greatest extent The present invention has been described in detail by pipe with reference to foregoing embodiments, it will be understood by those within the art that: it depends on So the technical scheme described in foregoing embodiments can be modified, or the most some or all of technical characteristic is entered Row equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. the startup method of a projector equipment, it is characterised in that including:
Obtain projector equipment open command;
According to described projector equipment open command, the module of the master control system of described projector equipment is initialized, and to The ray machine of projector equipment powers on, so that described ray machine starts, completes the start-up course of described projector equipment.
Method the most according to claim 1, it is characterised in that described master control system module is initialized, and to The ray machine of projector equipment powers on, including:
According to described projector equipment open command, configuration debugging port;
If described debugging port has configured, then power on to described ray machine, and carry out in described master control system except configuration debugging Other initialization operations outside port.
Method the most according to claim 1 and 2, it is characterised in that the module to the master control system of described projector equipment Initialize, and after the ray machine of projector equipment powers on, described method also include:
When the power-on time of described ray machine reaches default duration, detect whether described ray machine completes to start.
Method the most according to claim 3, it is characterised in that whether the described ray machine of described detection has started includes:
If detecting, the level starting instruction pin of the described ray machine being pre-configured with changes, it is determined that described ray machine completes Start;
Otherwise, it determines described ray machine is not fully complete startup.
Method the most according to claim 2, it is characterised in that described configuration debugging port, including:
The universal input of described projector equipment/output GPIO port is set to output port.
6. the starter of a projector equipment, it is characterised in that including:
Acquisition module, is used for obtaining projector equipment open command;
Processing module, for according to described projector equipment open command, enters the module of the master control system of described projector equipment Row initializes, and powers on to the ray machine of projector equipment, so that described ray machine starts, completes the start-up course of described projector equipment.
Device the most according to claim 6, it is characterised in that described processing module, specifically for:
According to described projector equipment open command, configuration debugging port;
If described debugging port has configured, then power on to described ray machine, and carry out in described master control system except configuration debugging Other initialization operations outside port.
8. according to the device described in claim 6 or 7, it is characterised in that also include:
Detection module, for when the power-on time of described ray machine reaches default duration, detects whether described ray machine completes to open Dynamic.
Device the most according to claim 8, it is characterised in that described detection module, specifically for:
If detecting, the level starting instruction pin of the described ray machine being pre-configured with changes, it is determined that described ray machine completes Start;
Otherwise, it determines described ray machine is not fully complete startup.
Device the most according to claim 7, it is characterised in that described processing module, also particularly useful for:
The universal input of described projector equipment/output GPIO port is set to output port.
CN201610562900.4A 2016-07-15 2016-07-15 The startup method and device of projector equipment Pending CN106250106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610562900.4A CN106250106A (en) 2016-07-15 2016-07-15 The startup method and device of projector equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610562900.4A CN106250106A (en) 2016-07-15 2016-07-15 The startup method and device of projector equipment

Publications (1)

Publication Number Publication Date
CN106250106A true CN106250106A (en) 2016-12-21

Family

ID=57613887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610562900.4A Pending CN106250106A (en) 2016-07-15 2016-07-15 The startup method and device of projector equipment

Country Status (1)

Country Link
CN (1) CN106250106A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019056723A1 (en) * 2017-09-25 2019-03-28 广景视睿科技(深圳)有限公司 Automatic focusing method and apparatus of projector, and electronic device
CN110677357A (en) * 2018-07-03 2020-01-10 北京东土科技股份有限公司 Method and device for rapidly forwarding port data of switching equipment
CN113422990A (en) * 2021-05-12 2021-09-21 深圳岱仕科技有限公司 Projection equipment working state control method and device, controller and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101398597A (en) * 2007-09-25 2009-04-01 中强光电股份有限公司 Projector and startup method thereof
US8336056B1 (en) * 2009-12-22 2012-12-18 Gadir Omar M A Multi-threaded system for data management
CN105120112A (en) * 2015-09-25 2015-12-02 维沃移动通信有限公司 Camera starting method for mobile terminal and mobile terminal
CN105721942A (en) * 2016-01-26 2016-06-29 青岛海信移动通信技术股份有限公司 Starting method for intelligent television and intelligent television

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101398597A (en) * 2007-09-25 2009-04-01 中强光电股份有限公司 Projector and startup method thereof
US8336056B1 (en) * 2009-12-22 2012-12-18 Gadir Omar M A Multi-threaded system for data management
CN105120112A (en) * 2015-09-25 2015-12-02 维沃移动通信有限公司 Camera starting method for mobile terminal and mobile terminal
CN105721942A (en) * 2016-01-26 2016-06-29 青岛海信移动通信技术股份有限公司 Starting method for intelligent television and intelligent television

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019056723A1 (en) * 2017-09-25 2019-03-28 广景视睿科技(深圳)有限公司 Automatic focusing method and apparatus of projector, and electronic device
CN110677357A (en) * 2018-07-03 2020-01-10 北京东土科技股份有限公司 Method and device for rapidly forwarding port data of switching equipment
CN110677357B (en) * 2018-07-03 2021-07-13 北京东土科技股份有限公司 Method and device for rapidly forwarding port data of switching equipment
CN113422990A (en) * 2021-05-12 2021-09-21 深圳岱仕科技有限公司 Projection equipment working state control method and device, controller and storage medium

Similar Documents

Publication Publication Date Title
CN103941436B (en) Display module testing and displaying system and application method thereof
CN102256156B (en) Method and system for controlling power-on and power-off test of television
CN102609356B (en) Terminal product driver loading stability testing method
CN109522165B (en) Display module testing platform
CN103347194A (en) Method, apparatus and system for starting-up and shut-down testing
EP3122023A1 (en) Smart wristband testing method and testing system thereof
CN106250106A (en) The startup method and device of projector equipment
CN104615396A (en) Android-based resolution ratio automatic adjustment method and system
CN105548753A (en) Automatic testing method and system of standby and boot function of electric equipment
CN106101834A (en) Intelligent television and control method thereof
US20150271435A1 (en) Method and device for displaying boot screen
TWI520578B (en) Testing method and testing apparatus for tv system
CN105700210A (en) LCD (liquid crystal display) panel and manufacturing method therefor
CN111399922B (en) Dual-system display device and system
CN104881357A (en) System And Method For Scan-testing Of Idle Functional Units In Operating Systems
CN113077834A (en) Storage device testing method and device, television and storage medium
CN106469070A (en) The method of panel parameter self-regeneration
CN107391180A (en) Point screen method, apparatus and computer-readable recording medium
CN104602124A (en) Multi-screen driving method and system of LCD TV and driving main board module
CN105117254B (en) Wireless communication module and operation method and device thereof
CN110083484B (en) FPGA reloading method, device, storage medium and system
CN105607925A (en) Processor on-chip FLASH program burning method and burning system
CN107093408B (en) The control method and device of backlight lightening when smart machine is switched on
CN108347521A (en) A kind of data back up method and device
US20110225327A1 (en) Systems and methods for controlling an electronic device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221