CN110295526A - One kind being used for assembled road marshy plate and its installation method - Google Patents

One kind being used for assembled road marshy plate and its installation method Download PDF

Info

Publication number
CN110295526A
CN110295526A CN201910517217.2A CN201910517217A CN110295526A CN 110295526 A CN110295526 A CN 110295526A CN 201910517217 A CN201910517217 A CN 201910517217A CN 110295526 A CN110295526 A CN 110295526A
Authority
CN
China
Prior art keywords
air bag
road plate
plate
concrete
bag post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910517217.2A
Other languages
Chinese (zh)
Other versions
CN110295526B (en
Inventor
陈柏宇
杨飞
李红中
蔡汉东
陈幸
黄嘉敏
刘丰恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201910517217.2A priority Critical patent/CN110295526B/en
Publication of CN110295526A publication Critical patent/CN110295526A/en
Application granted granted Critical
Publication of CN110295526B publication Critical patent/CN110295526B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention relates to one kind to be used for assembled road marshy plate and its installation method.Assembled road plate includes concrete dirt road plate, conductive air bag post, hollow ionization column, microcontroller, air pump and power supply;Multiple air bag posts are set at the concrete dirt road board bottom portion interval, one end of air bag post is fixedly connected with concrete dirt road plate, and the other end is for stretching in marshland;The one end for ionizing column equipped with an ionization column is enclosed outside each air bag post and concrete dirt road plate is detachably connected, and the other end is for stretching in marshland;The cathode of air bag post and power supply is electrically connected, and the anode for ionizing column and power supply is electrically connected;Air pump is connect with air bag post, for inflating to air bag post;Microcontroller is electrically connected with the power supply, for controlling the unlatching or stopping of power supply;Microcontroller is also electrically connected with air pump, for controlling the unlatching or stopping of air pump.The present invention, which is realized, installs on marshland and uses assembled road plate.

Description

One kind being used for assembled road marshy plate and its installation method
Technical field
The present invention relates to technical field of civil engineering, more particularly, to one kind for assembled road marshy plate and Its installation method.
Background technique
Road trip is current main trip mode, and in recent years, in the continuous improvement, country is right for the economic level in China The investment of highway construction also constantly increases, and communications and transportation has played irreplaceable work to the effect of China's economy and society With.Highway also plays a highly important role as a part of transportation.
Currently, road surfacing, which mainly passes through large-scale mixer truck, pours pitch or concrete, there is construction slowly, period length Disadvantage is unfavorable for the requirement being quickly laid with.Road surface is substantially only built in smooth strong roadbed, and is encountered during repairing the roads Marshland, it is preferred then be build of detouring.Since silt depth marshy is quite big, hard road is such as built on marshland Face then uses concrete replacement mud, so needs to take a substantial amount of time cost.
Assembled architecture is gradually popularized, had part research discovery can by fabricated Technology application on road surface, I.e. by concrete pavement slab, then spliced at the construction field (site), greatly shorten construction and curing time, realizes green The demand of construction and energy-saving and emission-reduction.But current assembled road surface is only applicable to the road environment for having hard roadbed, such as exists It is laid on marsh or the higher clay ground of moisture content, will cause whole larger sedimentation, or even can be buried.
Summary of the invention
The present invention is to overcome the above-mentioned defect that cannot be laid with road surface directly on marshland in the prior art, provides a kind of use It will be prefabricated by the buoyancy realization of air bag post using Archimedes principle in assembled road marshy plate and its installation method Concrete road plate is mounted on marshland.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: one kind being used for assembled road marshy plate, Including concrete dirt road plate, conductive air bag post, hollow ionization column, microcontroller, air pump and power supply;Described Concrete dirt road board bottom portion interval multiple air bag posts are set, one end of air bag post is fixedly connected with concrete dirt road plate, The other end is for stretching in marshland;It is enclosed outside each air bag post equipped with an ionization column, one end of the ionization column It is detachably connected with concrete dirt road plate, the other end is for stretching in marshland;The cathode of the air bag post and power supply It is electrically connected, the anode of the ionization column and power supply is electrically connected;The air pump is connect with air bag post, for air bag post Inflation;The microcontroller is electrically connected with the power supply, for controlling the unlatching or stopping of power supply;The microcontroller It is also electrically connected with air pump, for controlling the unlatching or stopping of air pump.
It further, further include gyro sensor and range sensor;The gyro sensor is set to prefabricated mixed At the centroid of solidifying dirt road plate, the range sensor is set to the side wall of concrete dirt road plate;The gyro sensor It is communicated to connect with microcontroller with range sensor.
In the present invention, the material of air bag post is the electrically conductive rubber of high tenacity, and air bag post will due to averag density after inflation Meeting sharp fall, according to Archimedes's theorem, displaced weight, which is equal to buoyancy, also has theoretical proof even with silt soil The volume for being trapped into soil layer is bigger, and buoyancy is bigger, therefore can be by determining that aeration quantity can guarantee that air bag post itself does not sink, and energy Reply landing load more than needed;To avoid concrete dirt road plate that sedimentation occurs unevenly in inflation installation process, lead to road The phenomenon that plate tilts, reply air bag post is inflated simultaneously in gas replenishment process;In addition, for guarantee road surface in use because Passing vehicle loads change and the differential settlement for leading to road plate, concrete road intralamellar part are equipped with gyro sensor, obtain The plane information of road plate is simultaneously transferred to the corresponding microcontroller of every block of road plate, and microcontroller is measured by gyro sensor Road plate panel data compared with the panel data set, if road surface load increase, to lower than setting road plate plane one The air bag of side is inflated, to guarantee that road surface can carry out bearing capacity adjusting to the load of variation;Furthermore to avoid road surface load from subtracting The phenomenon that road plate that is small and occurring integrally floats, every piece of road edges of boards edge is equipped with range sensor, and real-time measurement road plate surface arrives Height marshy, if road plate is there is a phenomenon where floating, range sensor altitude information is transmitted to microcontroller, microcontroller It is compared with the original height set, control air bag post is deflated simultaneously, bearing capacity needed for reducing road plate.
It should be noted that assembled road provided by the invention plate can be applied not only to marshland, can also apply In muddy ground, moisture content higher clay;As long as can be with by assembled road provided by the invention with similar equal of marshland Plate is applied should also be as belonging to the scope of protection of the present invention on other kinds of road surface.
Further, after the air bag post inflation, the air bag post longitudinally extends along its axial direction.Air bag post Surface is corrugated foldable, and material can be rubber, and in the case where no inflation, air bag post can be folded, when After being inflated to air bag post, air bag post extends along its length, to guarantee that air bag post can be gradual in gas replenishment process It is inserted into marshland.
Further, one end that the air bag post is connect with concrete dirt road plate is equipped with overhanging end, and described is overhanging End is not connected to inside air bag post;When pouring concrete dirt road plate, the overhanging end stretches to concrete dirt road plate It is interior.In casting concrete, the overhanging end of air bag post is inserted into precast concrete in advance, to guarantee that air bag post is mixed with prefabricated Coagulate the stability of the connection of soil;The connection type of air bag post and concrete dirt road plate is not only limited to and above-described side Formula can also be fixed on by other means on concrete dirt road plate, as long as can guarantee the fixation that air bag post can consolidate On concrete dirt road plate.
Further, one end that the ionization column is connect with concrete dirt road plate is equipped with the first buckle, and described is pre- Concrete road plate bottom processed is equipped with the second buckle corresponding with the first buckle, and first buckle is clamped with the second buckle.? Around each air bag post and concrete dirt road plate junction be equipped with it is multiple second buckle, ionization column one end be equipped with Corresponding first buckle of second buckle snaps connection fixation with second by the first buckle when installation ionizes column;Pass through buckle Mode connect a preferred embodiment only of the invention, can also be connected and fixed by modes such as screw, steel nails.
Further, the length value of the ionization column is more than or equal to the length value after the longitudinal extension of air bag inflation.Ionization The length value of column is greater than the length value after air bag post inflation, just can guarantee during ionization in this way, below air bag post Soil particle is mobile toward ionization column direction, with guarantee air bag post during extending down, the not blocking of soil particle;Separately Outside, it is the effective progress for guaranteeing ionization process, maintains a certain distance, keep away between the outer wall of air bag post and the inner wall for ionizing column Exempt from the two contact, and causes ionization to fail, and there are enough spaces to soil particle for needs.Preferably, ionization column Side wall is equipped with through-hole, during ionization, supplies the water flow in soil.
Further, one end of the concrete dirt road plate is equipped with bulge-structure, and the other end is equipped with and bulge-structure Corresponding card slot, the bulge-structure protrude into the card slot of another concrete dirt road plate.Two blocks of concrete dirt road plates it Between be tentatively connected and fixed by bulge-structure and card slot first, structure as scheduled stretches in card slot;Then pass through flexible steel saw lumber Two blocks of concrete dirt road plates are further connected and fixed by material.
The present invention also provides a kind of installation methods for assembled road marshy plate, using above-described assembled Road plate, comprising the following steps:
S1. assembled road plate is assembled;Concrete dirt road plate is sling by crane, ionization column sleeve is mounted in each gas Outside capsule column, and column will be ionized and be clamped by the first buckle and second buckle in concrete dirt road board bottom portion, the outer wall of air bag post Certain distance is kept with the inner wall of ionization column, to guarantee being normally carried out for ionization;The anode for ionizing column and power supply is connected, air bag The connection of the cathode of column and power supply, microcontroller is electrically connected with the power supply, range sensor and gyro sensor and miniature control Device communication connection processed;
S2. concrete dirt road plate is hung to right above marshland to be laid, moves down it slowly, it will be electric It is inserted into marshland from column, until concrete dirt road plate is laid on marshland;
S3. startup power supply, while being powered to all air bag posts and ionization column, start to ionize, after energization, ionization Column is positively charged, and air bag post is negatively charged, and since soil particle is negatively charged in marshland, soil particle is mobile to ionization column direction, water Molecule is mobile to air bag post direction, at the same time, booster air pump, while all air bag posts are inflated, air bag post inflation Afterwards, it extends, makes in air bag post insertion marshland along marshland depth direction;Stop after the air pressure in air bag post reaches setting value It only inflates, and stops being powered to ionization column and air bag post;
S4. crane unclamps the support to concrete dirt road plate, and concrete dirt road plate is tiled by the buoyancy of air bag post On marshland, the assembly of one block of concrete dirt road plate is completed;
S5. step S1 to step S4 is repeated, the assembly of next block of concrete dirt road plate is carried out;To two pieces of concretes It, will be to be installed when concrete dirt road plate to be installed is laid on marshland by crane when dirt road plate is attached The bulge-structure of concrete dirt road plate is inserted into the card slot of another block of already installed concrete dirt road plate, is realized preliminary Connection;Then it is further fixed on the surface of two pieces of concrete dirt road plate junctions by flexible steel material, flexible steel The both ends of material are fixedly connected respectively at two blocks of concrete dirt road plates.
In installation method provided by the invention, main innovative point is through assembled road plate on marshland upper berth Road is realized in air bag quick insertion marshland using the air bag post and ionization column installed on the plate of assembled road, without by soil The obstruction of particle is transmitted using the information between gyro sensor, range sensor, air pump and microcontroller, control Concrete dirt road plate can keep certain buoyancy on marshland to support the load on road surface, avoid concrete dirt road plate Run-off the straight, floating or sinking;In addition, it is necessary to explanation, microcontroller belong to controller in the prior art, for It for those skilled in the art, is transmitted by the information between sensor and controller, controller is real according to the information received Now to the control of equipment, belong to the state of the art, controller in the prior art is only used in the present invention by the present invention Control circuit on, and be not belonging to innovative point of the invention.
Further, between the concrete dirt road plate on marshland and the road plate on normal road surface also by buckle with The mode of card slot is tentatively connected, and is then further fixed on the surface of the junction of the two by flexible steel material, soft One end of property steel material is fixed on the road plate on normal road surface, and the other end is fixed on the concrete dirt road plate on marshland road surface On.
Further, it the plane information of the gyro sensor real-time monitoring concrete road road plate and is transferred to micro- Type controller, microcontroller by road plate panel data that gyro sensor is measured and preset panel data into Row comparison, if road surface load is excessive, so that concrete dirt road plate run-off the straight, then microcontroller controls booster air pump and electricity Source is inflated the air bag post of the side lower than setting road plate plane;The range sensor real-time monitoring concrete The relative altitude value of dirt road plate surface and surrounding marsh ground surface, when concrete dirt road plate occurs to float or sinks When, microcontroller control air bag post is inflated or deflates.
Compared with prior art, beneficial effect is: it is provided by the invention it is a kind of for assembled road marshy plate and its Installation method, using the principle of ionization, quickly will be realized by the way that ionization column, air bag post is arranged in concrete dirt road board bottom portion Air bag post is inserted into marshland, using Archimedes principle, is installed on marshland by the buoyancy realization of air bag post prefabricated Concrete road plate is inflated or deflates to air bag in real time, pavement loading is avoided to become using microcontroller and sensor Change and concrete dirt road plate is caused to occur to float or tilt.The assembled road plate provided through the invention, can quickly exist It is installed and used on marshland, it is not necessary to modify marshland foundations.
Detailed description of the invention
Fig. 1 is the overall structure diagram of assembled road of the present invention plate.
Fig. 2 is the side view of assembled road of the present invention plate.
Fig. 3 is the connection relationship diagram between two blocks of assembled road plates of the invention.
Fig. 4 is circuit control flow chart in the present invention.
Specific embodiment
Attached drawing only for illustration, is not considered as limiting the invention;In order to better illustrate this embodiment, attached Scheme certain components to have omission, zoom in or out, does not represent the size of actual product;To those skilled in the art, The omitting of some known structures and their instructions in the attached drawings are understandable.Being given for example only property of positional relationship is described in attached drawing Illustrate, is not considered as limiting the invention.
Embodiment 1:
As shown in Figures 1 to 3, a kind of to be used for assembled road marshy plate including concrete dirt road plate 1, conductive Air bag post 2, hollow ionization column 3, microcontroller 4, air pump and power supply 5;It is arranged in 1 bottom interval of concrete dirt road plate One end of multiple air bag posts 2, air bag post 2 is fixedly connected with concrete dirt road plate 1, and the other end is for stretching in marshland; It is enclosed outside each air bag post 2 equipped with an ionization column 3, the one end for ionizing column 3 is detachably connected with concrete dirt road plate 1, The other end is for stretching in marshland;The cathode of air bag post 2 and power supply 5 is electrically connected, the anode electricity of ionization column 3 and power supply 5 Property connection;Air pump is connect with air bag post 2, for inflating to air bag post 2;Microcontroller 4 and power supply 5 are electrically connected, for controlling The unlatching or stopping of power supply 5 processed;Microcontroller 4 is also electrically connected with air pump, for controlling the unlatching or stopping of air pump.
Specifically, further including gyro sensor 6 and range sensor 7;Gyro sensor 6 is set to concrete dirt road At the centroid of plate 1, range sensor 7 is set to the side wall of concrete dirt road plate 1;Gyro sensor 6 and range sensor 7 are equal It is communicated to connect with microcontroller 4.
In the present invention, the material of air bag post 2 is the electrically conductive rubber of high tenacity, and air bag post 2 is due to averag density after inflation Will sharp fall, according to Archimedes's theorem, displaced weight is equal to buoyancy, even with silt soil, also reasonable demonstration The clear volume for being trapped into soil layer is bigger, and buoyancy is bigger, therefore can guarantee that air bag post 2 itself does not sink by determining aeration quantity, And landing load more than needed can be coped with;To avoid concrete dirt road plate 1 that sedimentation occurs unevenly in inflation installation process, lead The phenomenon that causing the inclination of road plate, reply air bag post 2 is inflated simultaneously in gas replenishment process;In addition, to guarantee road surface in use process In lead to the differential settlement of road plate because of passing vehicle loads change, concrete road intralamellar part is equipped with gyro sensor 6, it obtains the plane information of road plate and is transferred to the corresponding microcontroller 4 of every block of road plate, microcontroller 4 passes through gyroscope The road plate panel data that sensor 6 measures is compared with the panel data set, if road surface load increases, to lower than setting The air bag of road plate plane side is inflated, to guarantee that road surface can carry out bearing capacity adjusting to the load of variation;Furthermore to avoid The phenomenon that road plate that road surface load reduces and occurs integrally floats, every piece of road edges of boards edge is equipped with range sensor 7, real-time measurement Road plate surface is to height marshy, and if road plate is there is a phenomenon where floating, 7 altitude information of range sensor is transmitted to microcontroller 4, microcontroller 4 is compared with the original height set, and control air bag post 2 is deflated simultaneously, reduces carrying needed for the plate of road Power.
In the present embodiment, after air bag post 2 is inflated, air bag post 2 longitudinally extends along its axial direction.2 surface of air bag post Corrugated foldable, in the case where no inflation, air bag post 2 can be folded, and be inflated when to air bag post 2 Afterwards, air bag post 2 extends along its length, to guarantee that air bag post 2 can be gradually inserted into marshland in gas replenishment process.
Wherein, one end that air bag post 2 is connect with concrete dirt road plate 1 is equipped with overhanging end, inside overhanging end and air bag post 2 It is not connected to;When pouring concrete dirt road plate 1, overhanging end is stretched in concrete dirt road plate 1.2 top of air bag post has outer End is stretched, overhanging end is not connected to inside air bag.
In addition, one end that ionization column 3 is connect with concrete dirt road plate 1 is equipped with the first buckle, 1 bottom of concrete dirt road plate Portion is equipped with the second buckle 13 corresponding with the first buckle, the first buckle and 13 clamping of the second buckle.In each air bag post 2 and in advance It is equipped with multiple second buckles 13 around 1 junction of concrete road plate processed, is equipped with and the second 13 pairs of buckle in one end of ionization column 3 The first buckle answered is connected and fixed when installation ionizes column 3 by the first buckle and the second buckle 13;By way of buckle Connection is a preferred embodiment of the invention, can also be connected and fixed by modes such as screw, steel nails.
In some embodiments, the length value for ionizing column 3 is more than or equal to the length value after the longitudinal extension of air bag inflation.Ionization The length value of column 3 is greater than the length value after air bag post 2 is inflated, and just can guarantee during ionization in this way, 2 lower section of air bag post Soil particle it is mobile toward ionization 3 direction of column, with guarantee air bag post 2 during extending down, the not resistance of soil particle Gear;In addition, to keep certain between the outer wall of air bag post 2 and the inner wall for ionizing column 3 for the effective progress for guaranteeing ionization process Distance avoids the two from contacting, and causes ionization to fail, and there are enough spaces to soil particle for needs.Preferably, electric Side wall from column 3 is equipped with through-hole, during ionization, supplies the water flow in soil.
In some embodiments, one end of concrete dirt road plate 1 is equipped with bulge-structure 11, and the other end is equipped with to be tied with protrusion The corresponding card slot 12 of structure 11, bulge-structure 11 protrude into the card slot 12 of another concrete dirt road plate 1.Two blocks of precast concretes It is tentatively connected and fixed by bulge-structure 11 and card slot 12 first between road plate 1, structure as scheduled stretches in card slot 12;Then lead to Flexible steel material 8 is crossed further to be connected and fixed two blocks of concrete dirt road plates 1.
Embodiment 2
The present invention also provides a kind of installation method for assembled road marshy plate, using above assembled road plate, The following steps are included:
S1. assembled road plate is assembled;Concrete dirt road plate 1 is sling by crane, ionization column 3 is sleeved on each Outside air bag post 2, and pass through 13 clamping of the second buckle of the first buckle and 1 bottom of concrete dirt road plate, air bag post for column 3 is ionized 2 outer wall and the inner wall of ionization column 3 keep certain distance, to guarantee being normally carried out for ionization;Just by ionization column 3 and power supply 5 Pole connection, air bag post 2 are connect with the cathode of power supply 5, and microcontroller 4 and power supply 5 are electrically connected, range sensor 7 and gyro Instrument sensor 6 and microcontroller 4 communicate to connect;
Road board size is generally 2m*6m*0.2m;Air bag post 2 uses circular cross section, and diameter is generally 0.8m, road plate one End sets bulge-structure 11, and one end sets card slot 12, for connecting front and back road deck, as shown in Figure 3;2 height of air bag post after inflation Depending on vehicular load, the design load that is such as open to traffic is 50kN, and the height of inflation rear gasbag column 2 should be 6m.
On casting concrete road when plate, overhanging end is first embedded in concrete blinding, pre-buried depth is about concrete road plate The one third of thickness has air bag post 2 under concrete road plate quadrangle, 2 boundary of air bag post should be short from road plate to half Side 10cm should bury gyro sensor 6, and electric wire is drawn from side from long side 20cm among mold;Then coagulation is poured The production of marshland assembled road plate is completed in soil, indoor maintenance to concrete final set.
S2. concrete dirt road plate 1 is hung to right above marshland to be laid, moves down it slowly, it will Ionization column 3 is inserted into marshland, until concrete dirt road plate 1 is laid on marshland;
S3. startup power supply 5, while being powered to all air bag posts 2 and ionization column 3, start to ionize, after energization, Ionize column 3 it is positively charged, air bag post 2 is negatively charged, since soil particle is negatively charged in marshland, soil particle to ionization 3 direction of column Mobile, hydrone is mobile to 2 direction of air bag post, at the same time, booster air pump, while all air bag posts 2 are inflated, gas It after capsule column 2 is inflated, is extended along marshland depth direction, is inserted into air bag post 2 in marshland;When the air pressure in air bag post 2 reaches Stop inflation after to setting value, and stops being powered to ionization column 3 and air bag post 2;
S4. crane unclamps the support to concrete dirt road plate 1, and concrete dirt road plate 1 passes through the buoyancy of air bag post 2 It is laid on marshland, completes the assembly of one block of concrete dirt road plate 1;
S5. step S1 to step S4 is repeated, the assembly of next block of concrete dirt road plate 1 is carried out;Prefabricated mixed to two pieces It, will be wait pacify when concrete dirt road plate 1 to be installed is laid on marshland by crane when solidifying dirt road plate 1 is attached The bulge-structure 11 of the concrete dirt road plate 1 of dress is inserted into the card slot 12 of another block of already installed concrete dirt road plate 1 It is interior, realize preliminary connection;Then further by flexible steel material 8 on the surface of two pieces of 1 junctions of concrete dirt road plate Fixed, the both ends of flexible steel material 8 are fixedly connected respectively at two blocks of concrete dirt road plates 1.
In installation method provided by the invention, main innovative point is through assembled road plate on marshland upper berth Road is realized in air bag quick insertion marshland using the air bag post 2 and ionization column 3 installed on the plate of assembled road, without by soil The obstruction of earth particle is passed using the information between gyro sensor 6, range sensor 7, air pump and microcontroller 4 It passs, control concrete dirt road plate 1 can keep certain buoyancy on marshland to support the load on road surface, avoid prefabricated mixed Solidifying 1 run-off the straight of dirt road plate, floating or sinking;In addition, it is necessary to explanation, microcontroller 4 belongs in the prior art Controller is transmitted, controller is according to receipts for those skilled in the art by the information between sensor and controller Control of the information realization arrived to equipment belongs to the state of the art, and the present invention is only by controller in the prior art With in control circuit of the invention, and it is not belonging to innovative point of the invention.
Wherein, also by buckle and card between the concrete dirt road plate 1 on marshland and the road plate on normal road surface The mode of slot 12 is tentatively connected, and is then further fixed on the surface of the junction of the two by flexible steel material 8, soft One end of property steel material 8 is fixed on the road plate on normal road surface, and the other end is fixed on the concrete dirt road on marshland road surface On plate 1.
In addition, the plane information of 6 real-time monitoring concrete road road plate of gyro sensor and being transferred to microcontroller 4, microcontroller 4 is carried out pair by the road plate panel data that measures to gyro sensor 6 and preset panel data Than if road surface load is excessive, so that 1 run-off the straight of concrete dirt road plate, then microcontroller 4 controls booster air pump and power supply 5, the air bag post 2 of the side lower than setting road plate plane is inflated;7 real-time monitoring concrete dirt road of range sensor The relative altitude value on 1 surface of plate and surrounding marsh ground surface, when concrete dirt road plate 1 occurs to float or sink, Microcontroller 4 controls air bag post 2 and is inflated or deflates.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (10)

1. one kind is used for assembled road marshy plate, including concrete dirt road plate (1), which is characterized in that further include that can lead Air bag post (2), hollow ionization column (3), microcontroller (4), air pump and the power supply (5) of electricity;In the concrete Multiple air bag posts (2), one end of air bag post (2) and the fixed company of concrete dirt road plate (1) is arranged in dirt road plate (1) bottom interval It connects, the other end is for stretching in marshland;Each air bag post (2) is enclosed outside equipped with an ionization column (3), the ionization One end of column (3) is detachably connected with concrete dirt road plate (1), and the other end is for stretching in marshland;The air bag Column (2) and the cathode of power supply (5) are electrically connected, and the anode of the ionization column (3) and power supply (5) is electrically connected;The gas Pump is connect with air bag post (2), for inflating to air bag post (2);The microcontroller (4) and power supply (5) is electrically connected, and is used In the unlatching or stopping of control power supply (5);The microcontroller (4) is also electrically connected with air pump, for controlling air pump It opens or stops.
2. according to claim 2 be used for assembled road marshy plate, which is characterized in that further include gyro sensor (6) and range sensor (7);The gyro sensor (6) is set at the centroid of concrete dirt road plate (1), described Range sensor (7) is set to the side wall of concrete dirt road plate (1);The gyro sensor (6) and range sensor (7) Communicated to connect with microcontroller (4).
3. according to claim 2 be used for assembled road marshy plate, which is characterized in that when the air bag post (2) After inflation, the air bag post (2) longitudinally extends along its axial direction.
4. according to claim 3 be used for assembled road marshy plate, which is characterized in that the air bag post (2) with One end of concrete dirt road plate (1) connection is equipped with overhanging end, is not connected to inside the overhanging end and air bag post (2);It is pouring When building concrete dirt road plate (1), the overhanging end is stretched in concrete dirt road plate (1).
5. according to claim 3 be used for assembled road marshy plate, which is characterized in that the ionization column (3) with One end of concrete dirt road plate (1) connection is equipped with the first buckle, and concrete dirt road plate (1) bottom is equipped with and first Buckle corresponding second buckle (13), first buckle and the second buckle (13) clamping.
6. according to claim 3 be used for assembled road marshy plate, which is characterized in that the ionization column (3) Length value is more than or equal to the length value after the longitudinal extension of air bag inflation.
7. according to any one of claims 1 to 7 be used for assembled road marshy plate, which is characterized in that described is pre- One end of concrete road plate (1) processed is equipped with bulge-structure (11), and the other end is equipped with card slot (12) corresponding with bulge-structure (11), The bulge-structure (11) protrudes into the card slot (12) of another concrete dirt road plate (1).
8. a kind of installation method for assembled road marshy plate, which is characterized in that using any one of claim 2 to 6 The assembled road plate, comprising the following steps:
S1. assembled road plate is assembled;Concrete dirt road plate (1) is sling by crane, ionization column (3) is sleeved on each Air bag post (2) outside, and will ionize column (3) and pass through the second buckle (13) card of the first buckle and concrete dirt road plate (1) bottom It connects, the outer wall of air bag post (2) and the inner wall of ionization column (3) keep certain distance, to guarantee being normally carried out for ionization;Column will be ionized (3) it is connect with the anode of power supply (5), air bag post (2) is connect with the cathode of power supply (5), microcontroller (4) and power supply (5) electricity Property connection, range sensor (7) and gyro sensor (6) and microcontroller (4) communication connection;
S2. concrete dirt road plate (1) is hung to right above marshland to be laid, moves down it slowly, it will be electric It is inserted into marshland from column (3), until concrete dirt road plate (1) is laid on marshland;
S3. startup power supply (5), while being powered to all air bag posts (2) and ionization column (3), start to ionize, be powered Afterwards, ionization column (3) is positively charged, and air bag post (2) is negatively charged, and since soil particle is negatively charged in marshland, soil particle is to ionization Column (3) direction is mobile, and hydrone is mobile to air bag post (2) direction, at the same time, booster air pump, while to all air bag posts (2) it is inflated, after air bag post (2) inflation, is extended along marshland depth direction, made in air bag post (2) insertion marshland;When Air pressure in air bag post (2) stops inflation after reaching setting value, and stops being powered to ionization column (3) and air bag post (2);
S4. crane unclamps the support to concrete dirt road plate (1), and concrete dirt road plate (1) passes through the buoyancy of air bag post (2) It is laid on marshland, completes the assembly of one piece of concrete dirt road plate (1);
S5. step S1 to step S4 is repeated, the assembly of next piece of concrete dirt road plate (1) is carried out;To two pieces of concretes It, will be to when concrete dirt road plate (1) to be installed is laid on marshland by crane when dirt road plate (1) is attached The bulge-structure (11) of the concrete dirt road plate (1) of installation is inserted into another piece of already installed concrete dirt road plate (1) Card slot (12) in, realize preliminary connection;Then pass through flexible steel on the surface of two pieces of concrete dirt road plate (1) junctions Material (8) further fixes, and the both ends of flexible steel material (8) are fixedly connected respectively at two pieces of concrete dirt road plates (1).
9. the installation method according to claim 8 for assembled road marshy plate, which is characterized in that be set to marsh It is carried out tentatively between the concrete dirt road plate (1) of ground and the road plate on normal road surface also by buckle and the mode of card slot (12) Then connection is further fixed on the surface of the junction of the two by flexible steel material (8), flexible steel material (8) One end is fixed on the road plate on normal road surface, and the other end is fixed on the concrete dirt road plate (1) on marshland road surface.
10. the installation method for assembled road marshy plate according to claim 8 or claim 9, which is characterized in that described Gyro sensor (6) real-time monitoring concrete road road plate plane information and be transferred to microcontroller (4), miniature control Device (4) processed is compared by the road plate panel data measured to gyro sensor (6) with preset panel data, if Road surface load is excessive, so that concrete dirt road plate (1) run-off the straight, then microcontroller (4) controls booster air pump and power supply (5), the air bag post (2) of the side lower than setting road plate plane is inflated;Described range sensor (7) real-time monitoring is pre- The relative altitude value on concrete road plate (1) surface and surrounding marsh ground surface processed, when in concrete dirt road plate (1) generation Microcontroller (4) controls air bag post (2) and is inflated or deflates when floating perhaps sinking.
CN201910517217.2A 2019-06-14 2019-06-14 Assembled road board for marsh lands and installation method thereof Active CN110295526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910517217.2A CN110295526B (en) 2019-06-14 2019-06-14 Assembled road board for marsh lands and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910517217.2A CN110295526B (en) 2019-06-14 2019-06-14 Assembled road board for marsh lands and installation method thereof

Publications (2)

Publication Number Publication Date
CN110295526A true CN110295526A (en) 2019-10-01
CN110295526B CN110295526B (en) 2023-08-18

Family

ID=68028004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910517217.2A Active CN110295526B (en) 2019-06-14 2019-06-14 Assembled road board for marsh lands and installation method thereof

Country Status (1)

Country Link
CN (1) CN110295526B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1161249A (en) * 1966-08-29 1969-08-13 Bell Aerospace Corp Ground Effect Machine
CN101033609A (en) * 2007-03-27 2007-09-12 天津大学 Method of reinforcing soft soil foundation by gas extrusion drainage and used gasbag
CN201459560U (en) * 2009-05-26 2010-05-12 中冶实久建设有限公司 Roadbed stable layer structure
JP2012225145A (en) * 2011-04-07 2012-11-15 Gecoss Corp Covering plate
KR101301728B1 (en) * 2013-04-01 2013-08-30 주식회사 서은이엔씨 Lining board for temporary road of marshy land
CN106565020A (en) * 2016-11-01 2017-04-19 浙江水利水电学院 Ecological floating bridge for high lake wetland landscape river, and installation method thereof
CN206529685U (en) * 2016-10-27 2017-09-29 中铁二院工程集团有限责任公司 A kind of railroad bridge smart altitude adjusts bearing
CN109083128A (en) * 2018-09-10 2018-12-25 浙江吉通地空建筑科技有限公司 Fashioned iron column assembled underground continuous wall with high-bearing capacity
CN210507017U (en) * 2019-06-14 2020-05-12 广东工业大学 A assembled way board for marsh land

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1161249A (en) * 1966-08-29 1969-08-13 Bell Aerospace Corp Ground Effect Machine
CN101033609A (en) * 2007-03-27 2007-09-12 天津大学 Method of reinforcing soft soil foundation by gas extrusion drainage and used gasbag
CN201459560U (en) * 2009-05-26 2010-05-12 中冶实久建设有限公司 Roadbed stable layer structure
JP2012225145A (en) * 2011-04-07 2012-11-15 Gecoss Corp Covering plate
KR101301728B1 (en) * 2013-04-01 2013-08-30 주식회사 서은이엔씨 Lining board for temporary road of marshy land
CN206529685U (en) * 2016-10-27 2017-09-29 中铁二院工程集团有限责任公司 A kind of railroad bridge smart altitude adjusts bearing
CN106565020A (en) * 2016-11-01 2017-04-19 浙江水利水电学院 Ecological floating bridge for high lake wetland landscape river, and installation method thereof
CN109083128A (en) * 2018-09-10 2018-12-25 浙江吉通地空建筑科技有限公司 Fashioned iron column assembled underground continuous wall with high-bearing capacity
CN210507017U (en) * 2019-06-14 2020-05-12 广东工业大学 A assembled way board for marsh land

Also Published As

Publication number Publication date
CN110295526B (en) 2023-08-18

Similar Documents

Publication Publication Date Title
CN111827129A (en) Construction system and construction method for cast-in-place box girder at excavation section of existing line bridge-changing excavation section in active service
CN107956202B (en) Safe and stable crescent bridge and mounting process thereof
CN108411751A (en) Asphalt road surface local repairs structure and restorative procedure
CN110295526A (en) One kind being used for assembled road marshy plate and its installation method
CN210507017U (en) A assembled way board for marsh land
CN103774522A (en) Environment-friendly colored porous pavement structure applied to slow-traffic system
CN105803886B (en) A kind of method using the cast-in-place annular proving road of foam lightweight material
CN211713563U (en) Fixing device for paving road bricks
CN207958949U (en) Asphalt road surface local repairs structure
CN210066404U (en) A central separation area curb for highway
CN110924263A (en) Water-permeable ecological brick fixing device and laying method
CN216338811U (en) Anti-collapse road pavement structure
CN218580390U (en) Concrete curbstone permeates water
CN215366590U (en) Highway subgrade fixing device that availability factor is high
CN213417474U (en) Municipal administration paving brick
CN220352535U (en) Municipal road construction roadbed drainage structure
CN219908639U (en) Construction structure is contained to section of wading water passage pipe based on
CN219245176U (en) Rainfall erosion simulation reinforced soil slope test device
CN210368501U (en) Water permeable brick
CN216237944U (en) Combined type steel fiber reinforced concrete road surface structure that permeates water
CN213013746U (en) Weather-resistant steel footpath square brick
CN217896110U (en) Municipal administration drainage road structure of permeating water
CN216514941U (en) Spliced temporary construction road module
CN215829241U (en) Highway frame-type abutment
CN216786736U (en) Double-aggregate multi-level permeable brick

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant