CN110284521A - It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete - Google Patents

It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete Download PDF

Info

Publication number
CN110284521A
CN110284521A CN201910702923.4A CN201910702923A CN110284521A CN 110284521 A CN110284521 A CN 110284521A CN 201910702923 A CN201910702923 A CN 201910702923A CN 110284521 A CN110284521 A CN 110284521A
Authority
CN
China
Prior art keywords
ultra
high performance
concrete
connector
performance concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910702923.4A
Other languages
Chinese (zh)
Inventor
江星宏
李科
吴文平
皮小强
胡学兵
丁浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201910702923.4A priority Critical patent/CN110284521A/en
Publication of CN110284521A publication Critical patent/CN110284521A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Abstract

The invention belongs to open trench tunnel engineering field, it is related to a kind of pouring connector, precast slab mounting assist member using the tunnel structure and installation method that pour connector after ultra-high performance concrete, including after precast concrete plate, ultra-high performance concrete;The precast concrete plate is equipped at least two, and connector is poured after the ultra-high performance concrete for connecting adjacent precast concrete plate;The precast slab mounting assist member is removably disposed in adjacent precast slab on piece, for fixing adjacent precast concrete plate;Dependence present invention reduces fabricated construction to equipment special, be conducive to sufficiently be conducive to existing engineering equipment, it improves the general applicability of fabricated construction, reduce popularization and application difficulty, be conducive to make up that construction process existing for traditional prefbricated tunnel lining structure is many and diverse, quality assurance is difficult, big deficiency is measured in operation maintenance.

Description

It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete
Technical field
The invention belongs to open trench tunnel engineering fields, are related to a kind of using the tunnel knot for pouring connector after ultra-high performance concrete Structure and installation method.
Background technique
The important function that tunnel structure has reduction route distance, improves line style condition.However, big by construction site place The limitation of the objective factors such as small, operating personnel, curing condition, cast-in-place concrete quality is irregular, is that tunnel structure is century-old big Meter buries security risk, and prefbricated tunnel lining structure has the advantages that factory's batch production, live quick spicing forming type, procedure, The operation mode of equipmentization is conducive to improve quality, reduces cost, becomes country and greatly develops direction.
Conventional concrete prefbricated tunnel lining joint form mainly has bolt connecting type connector and rear pouring concrete joint type two Kind form.It for being bolted, is linked together between different plates by fastening bolt, not formed physical connection, connector between plate Infiltration, bolt corrosion outstanding problem, operation maintenance work amount are big;Normal concrete connector is poured according to after, then it need to be in connector portions A large amount of overlap joint reinforcing bars are laid in position, to guarantee the good transmission force property of successive pouring concrete, after pour that process is more, pours difficulty greatly, quality It is difficult to ensure.
With the rapid development of materials industry, ultra-high performance concrete material property is rapidly promoted, with Ultra-high Performance Concrete (UHPC) is that the high-performance concrete material of representative has both high intensity, lower shrinkage, easily conserves Outstanding mechanical property, but this kind of material is not applied in assembled open trench tunnel structure.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of using the tunnel structure for pouring connector after ultra-high performance concrete And installation method, using the architectural characteristic of ultra-high performance concrete itself, to improve the stability of assembled open trench tunnel structure, It is reduced using difficulty.
In order to achieve the above objectives, the invention provides the following technical scheme:
It is a kind of using the tunnel structure for pouring connector after ultra-high performance concrete, including precast concrete plate, very-high performance Connector, precast slab mounting assist member are poured after concrete;The precast concrete plate is equipped at least two, the superelevation Connector can be poured for connecting adjacent precast concrete plate after concrete;The precast slab mounting assist member is removably Adjacent precast slab on piece is set, for fixing adjacent precast concrete plate.
Optionally, the seam between adjacent precast concrete plate connects in vertically convenient for pouring after ultra-high performance concrete Head flows certainly.
Optionally, precast concrete plate is made of armored concrete.
Optionally, the joint gap between adjacent precast concrete plate is w, 5d≤w≤15d;D is the maximum of reinforcing bar Diameter.
Optionally, the seam between adjacent precast concrete plate has certain slope angle, angle a, and 5 °≤a≤15 °, Convenient for pouring the closely knit from flowing of connector after ultra-high performance concrete.
Optionally, it gravys with meat or vegetables poured over rice or noodles after the ultra-high performance concrete using ultra-high performance concrete material UHPC.
Optionally, it is equipped with screw hole on precast concrete plate and precast slab mounting assist member, precast slab is auxiliary Installation component is helped to be connected by bolt with precast concrete plate.
Optionally, adjacent precast concrete plate is arranged in parallel or is arranged vertically.
Optionally, arrangement in a certain angle between adjacent precast concrete plate.
A kind of installation method using the tunnel structure for pouring connector after ultra-high performance concrete uses superelevation using above-mentioned The tunnel structure of connector is poured after energy concrete, comprising the following steps: installation precast concrete plate;In adjacent precast concrete It is tamped in the gap of plate using ultra-high performance concrete, pours connector after forming ultra-high performance concrete;It is auxiliary using precast slab Installation component is helped to connect adjacent precast concrete plate;After ultra-high performance concrete intensity is up to standard, precast slab auxiliary is removed Installation component.
The beneficial effects of the present invention are:
The present invention is when carrying out precast concrete plate and dividing, without sticking to existing structure built by opencut method or so piecemeal, up and down The plate zoned format of piecemeal, rectangle section of jurisdiction, which is divided, carries out muti-piece in combination with the mechanized equipments sizes such as transport, lifting, load carrying behaviour It divides, to reduce dependence of the fabricated construction to equipment special, is conducive to sufficiently be conducive to existing engineering equipment, improves dress General applicability with formula structure reduces popularization and application difficulty, is conducive to make up existing for traditional prefbricated tunnel lining structure and apply Work process is many and diverse, quality assurance is difficult, big deficiency is measured in operation maintenance.
Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.Target of the invention and other advantages can be realized by following specification and It obtains.
Detailed description of the invention
To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention is made below in conjunction with attached drawing excellent The detailed description of choosing, in which:
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the first assembling form of precast concrete plate of the invention;
Fig. 3 is second of assembling form of precast concrete plate of the invention;
Fig. 4 is the third assembling form of precast concrete plate of the invention.
Fig. 5 is overall structure side view of the invention.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.It should be noted that diagram provided in following embodiment is only to show Meaning mode illustrates basic conception of the invention, and in the absence of conflict, the feature in following embodiment and embodiment can phase Mutually combination.
Wherein, the drawings are for illustrative purposes only and are merely schematic diagrams, rather than pictorial diagram, should not be understood as to this The limitation of invention;Embodiment in order to better illustrate the present invention, the certain components of attached drawing have omission, zoom in or out, not Represent the size of actual product;It will be understood by those skilled in the art that certain known features and its explanation may be omitted and be in attached drawing It is understood that.
The same or similar label correspond to the same or similar components in the attached drawing of the embodiment of the present invention;It is retouched in of the invention In stating, it is to be understood that if there is the orientation or positional relationship of the instructions such as term " on ", "lower", "left", "right", "front", "rear" To be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description of the present invention and simplification of the description, rather than indicate or It implies that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore is described in attached drawing The term of positional relationship only for illustration, is not considered as limiting the invention, for the ordinary skill of this field For personnel, the concrete meaning of above-mentioned term can be understood as the case may be.
Fig. 1-Fig. 5 is please referred to, the element numbers in attached drawing respectively indicate: precast concrete plate 1, ultra-high performance concrete After pour connector 2, precast slab mounting assist member 3, bolt 4.
The present invention relates to a kind of using the tunnel structure for pouring connector 2 after ultra-high performance concrete, including precast slab Connector 2, precast slab mounting assist member 3 are poured after piece 1, ultra-high performance concrete;The precast concrete plate 1 is equipped at least Two, connector 2 is poured after the ultra-high performance concrete for connecting adjacent precast concrete plate 1;The precast slab is auxiliary Installation component 3 is helped to be removably disposed on adjacent precast concrete plate 1, for fixing adjacent precast concrete plate 1。
Optionally, the seam between adjacent precast concrete plate 1 connects in vertically convenient for pouring after ultra-high performance concrete First 2 flowing certainly;Precast concrete plate 1 is made of armored concrete;Seam between adjacent precast concrete plate 1 Width is w, and 5d≤w≤15d, d are the maximum gauge of reinforcing bar;To guarantee connector ultra-high performance concrete and existing plate coagulation Soil, the good simultaneously control joint width of plate bar splicing, pour ultra-high performance concrete dosage, cost are saved, after preventing after reduction Pouring concrete contraction distortion causes crack;Seam between adjacent precast concrete plate 1 has certain slope angle, angle a, 5 °≤a≤15 °, convenient for poured after ultra-high performance concrete connector 2 from flowing, closely knit and to prevent excessive seam angle from causing prefabricated 1 shape of concrete plate is uneven, is unfavorable for preparation, transport;It is gravied with meat or vegetables poured over rice or noodles after the ultra-high performance concrete using very-high performance coagulation Soil material UHPC;Screw hole, precast slab auxiliary are equipped on precast concrete plate 1 and precast slab mounting assist member 3 Installation component 3 is connected by bolt 4 with precast concrete plate 1;The adjacent parallel arrangement of precast concrete plate 1 or vertical cloth It sets;Arrangement in a certain angle between adjacent precast concrete plate 1;It can shape according to precast concrete plate 1, position Several precast slab mounting assist members 3 are arranged in difference, and the shape of different precast slab mounting assist members 3 can not also Together.
For ultra-high performance concrete: refer mainly to be with Ultra-high Performance Concrete (UHPC) For the ultra-high performance concrete material of representative.The far super common C40 concrete material of its material mechanical performance, as compression strength is 150~250MPa, flexural tensile strength are 30~40MPa, and the slump is 400~700mm, and new-old concrete adhesive strength is greater than 2.0MPa, anchorage length of steel bar about 5~8d.Ultra-high performance concrete material property is in French material standard " Concrete- Ultra-high Performance Fiber-reinforced Concrete–Specifications,Performance Production and Conformity " it has been described in (NF P18 470 (EN)).
The invention further relates to a kind of installation method using the tunnel structure for pouring connector 2 after ultra-high performance concrete, applications It is above-mentioned using the tunnel structure for pouring connector 2 after ultra-high performance concrete, comprising the following steps: installation precast concrete plate 1;? It is tamped in the gap of adjacent precast concrete plate 1 using ultra-high performance concrete, pours and connect after formation ultra-high performance concrete First 2, it after the completion of the filling of last-cost joint ultra-high performance concrete, only needs to consolidate, without excessive vibration density, to prevent superelevation Steel fibre component in energy concrete is sunk, and causes material property uneven;Phase is connected using precast slab mounting assist member 3 Adjacent precast concrete plate 1 in 1 manufacturing process of precast concrete plate, remains for the screw hole for installing bolt 4, hole depth palpus in advance Meet 4 depth requirements of " Reinforcement Technology of Concrete Structure specification " (GB50367-2013) related anchor bolt;Very-high performance coagulation After native intensity is up to standard, precast slab mounting assist member 3 is removed.Again with grouting material by the screw hole on precast concrete plate 1 It tamps.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered in the present invention Scope of the claims in.

Claims (10)

1. a kind of using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: including precast concrete plate, Connector, precast slab mounting assist member are poured after ultra-high performance concrete;
The precast concrete plate is equipped at least two, and it is adjacent pre- for connecting that connector is poured after the ultra-high performance concrete Concrete plate processed;The precast slab mounting assist member is removably disposed in adjacent precast slab on piece, uses In the adjacent precast concrete plate of fixation.
2. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: adjacent Precast concrete plate between seam in vertical, convenient for poured after ultra-high performance concrete connector from flowing.
3. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: prefabricated Concrete plate is made of armored concrete.
4. as described in claim 3 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: adjacent Precast concrete plate between joint gap be w, 5d≤w≤15d;D is the maximum gauge of reinforcing bar.
5. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: adjacent Precast concrete plate between seam have certain slope angle, angle a, is convenient for ultra-high performance concrete by 5 °≤a≤15 ° The closely knit from flowing of connector is poured afterwards.
6. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: described It is gravied with meat or vegetables poured over rice or noodles after ultra-high performance concrete using ultra-high performance concrete material UHPC.
7. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: prefabricated Be equipped with screw hole on concrete plate and precast slab mounting assist member, precast slab mounting assist member by bolt with Precast concrete plate is connected.
8. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: adjacent Precast concrete plate parallel arrangement or be arranged vertically.
9. as described in claim 1 using the tunnel structure for pouring connector after ultra-high performance concrete, it is characterised in that: adjacent Precast concrete plate between arrangement in a certain angle.
10. a kind of installation method using the tunnel structure for pouring connector after ultra-high performance concrete, using such as claim 1~9 Using the tunnel structure for pouring connector after ultra-high performance concrete described in any one, which comprises the following steps: peace Fill precast concrete plate;It is tamped, is formed super using ultra-high performance concrete in the gap of adjacent precast concrete plate Connector is poured after high performance concrete;Adjacent precast concrete plate is connected using precast slab mounting assist member;Superelevation After energy concrete strength is up to standard, precast slab mounting assist member is removed.
CN201910702923.4A 2019-07-31 2019-07-31 It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete Pending CN110284521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910702923.4A CN110284521A (en) 2019-07-31 2019-07-31 It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910702923.4A CN110284521A (en) 2019-07-31 2019-07-31 It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete

Publications (1)

Publication Number Publication Date
CN110284521A true CN110284521A (en) 2019-09-27

Family

ID=68024506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910702923.4A Pending CN110284521A (en) 2019-07-31 2019-07-31 It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete

Country Status (1)

Country Link
CN (1) CN110284521A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177944A (en) * 2007-12-07 2008-05-14 颜小荣 Prefabricated water-stop continuous wall concrete component
CN102251491A (en) * 2011-04-15 2011-11-23 吴兆圣 Waterproof method for prefabricated reinforced concrete box culvert interfaces and interface water stopper
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN104818996A (en) * 2015-04-28 2015-08-05 中铁工程设计咨询集团有限公司 Inverted arch prefabricated monomer, inverted arch and preparation method of inverted arch prefabricated monomer
WO2015169707A2 (en) * 2014-05-06 2015-11-12 Trelleborg Ridderkerk B.V. Method for producing a construction element, in particular a tunnel element, having a watertight seal
CN106948375A (en) * 2017-05-15 2017-07-14 哈尔滨工业大学 A kind of prefabricated pipe gallery steel plate concrete attachment structure
CN108952755A (en) * 2018-07-18 2018-12-07 安徽省交通规划设计研究总院股份有限公司 A kind of assembled ultra-high performance concrete arcuate channels
CN108999077A (en) * 2018-07-06 2018-12-14 上海市政工程设计研究总院(集团)有限公司 The circumferential weld connection structure and its circumferential weld connection method of prefabricated stand column and adjacent members
CN109610312A (en) * 2018-12-26 2019-04-12 北京工业大学 Prefabrication and assembly construction floorings based on the connection of X-type presstressed reinforcing steel
KR20190043293A (en) * 2017-10-18 2019-04-26 정병영 Pmrecast concrete structure coupling method
CN210421165U (en) * 2019-07-31 2020-04-28 招商局重庆交通科研设计院有限公司 Tunnel structure adopting ultra-high performance concrete post-cast joint

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177944A (en) * 2007-12-07 2008-05-14 颜小荣 Prefabricated water-stop continuous wall concrete component
CN102251491A (en) * 2011-04-15 2011-11-23 吴兆圣 Waterproof method for prefabricated reinforced concrete box culvert interfaces and interface water stopper
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
WO2015169707A2 (en) * 2014-05-06 2015-11-12 Trelleborg Ridderkerk B.V. Method for producing a construction element, in particular a tunnel element, having a watertight seal
CN104818996A (en) * 2015-04-28 2015-08-05 中铁工程设计咨询集团有限公司 Inverted arch prefabricated monomer, inverted arch and preparation method of inverted arch prefabricated monomer
CN106948375A (en) * 2017-05-15 2017-07-14 哈尔滨工业大学 A kind of prefabricated pipe gallery steel plate concrete attachment structure
KR20190043293A (en) * 2017-10-18 2019-04-26 정병영 Pmrecast concrete structure coupling method
CN108999077A (en) * 2018-07-06 2018-12-14 上海市政工程设计研究总院(集团)有限公司 The circumferential weld connection structure and its circumferential weld connection method of prefabricated stand column and adjacent members
CN108952755A (en) * 2018-07-18 2018-12-07 安徽省交通规划设计研究总院股份有限公司 A kind of assembled ultra-high performance concrete arcuate channels
CN109610312A (en) * 2018-12-26 2019-04-12 北京工业大学 Prefabrication and assembly construction floorings based on the connection of X-type presstressed reinforcing steel
CN210421165U (en) * 2019-07-31 2020-04-28 招商局重庆交通科研设计院有限公司 Tunnel structure adopting ultra-high performance concrete post-cast joint

Similar Documents

Publication Publication Date Title
CN109487686A (en) A kind of unit construction bridge panel transverse joint using UHPC grouting material
KR100495782B1 (en) A Facing panel for reinforced earth wall and its construction method
KR100991869B1 (en) Single and continuous prestressed concrete girder bridge and the construction method
CN105863111A (en) Embedded prefabricated concrete shear wall anti-bending steel frame structure
CN107675812B (en) Ultra-high performance concrete plate seam connection structure and its construction method
JP2014177766A (en) Method for constructing concrete precast floor slab for bridge
CN108625477A (en) A kind of assembled beam-column node and its construction method
CN208792505U (en) A kind of precast wall body and assembling structure of assembled architecture
CN110284521A (en) It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete
CN106088639A (en) Perforation rib pull bar constraint rectangular steel pipe outsourcing self-compacting concrete reinforces RC post
CN107964966A (en) Slope reinforcement system for foundation construction engineering
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN210421165U (en) Tunnel structure adopting ultra-high performance concrete post-cast joint
CN107905368B (en) A kind of assembled beam and assembled column connection structure and construction method
CN208604499U (en) Limit the built-in concrete beam bridge steel reinforced concrete anchoring piece of Local Cracking
CN108560730A (en) The ring muscle pin tenon connecting structure and its construction method of concrete component
CN205874960U (en) Profiled sheet wave form steel web truss combination beam
CN205840052U (en) Reinforced concrete wall and attachment structure thereof is filled out in a kind of assembled steel framework
CN208379795U (en) The ring muscle pin tenon connecting structure of concrete component
CN209868976U (en) Device for injecting retarder to enable fibers at joint of concrete structure to be continuous
CN207538197U (en) Part uses the section steel concrete column-steel girder node of fibre reinforced concrete
CN207244837U (en) Bean column node connects system and assembled wallboard
CN113062236A (en) Wall protection integrated pipe culvert and construction method thereof
CN112160468A (en) Built-in heat-insulation cast-in-place concrete composite shear wall structure and construction method
CN109339120A (en) Basement group manages method for waterproofing through walls

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination