CN110260047A - A kind of plumbing installation of geothermal energy - Google Patents

A kind of plumbing installation of geothermal energy Download PDF

Info

Publication number
CN110260047A
CN110260047A CN201910442466.XA CN201910442466A CN110260047A CN 110260047 A CN110260047 A CN 110260047A CN 201910442466 A CN201910442466 A CN 201910442466A CN 110260047 A CN110260047 A CN 110260047A
Authority
CN
China
Prior art keywords
pedestal
fixed
support bar
geothermal energy
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910442466.XA
Other languages
Chinese (zh)
Other versions
CN110260047B (en
Inventor
杨胜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Dadao New Energy Development Co Ltd
Original Assignee
Hunan Dadao New Energy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Dadao New Energy Development Co Ltd filed Critical Hunan Dadao New Energy Development Co Ltd
Priority to CN201910442466.XA priority Critical patent/CN110260047B/en
Publication of CN110260047A publication Critical patent/CN110260047A/en
Application granted granted Critical
Publication of CN110260047B publication Critical patent/CN110260047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/10Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Building Environments (AREA)

Abstract

The present invention provides a kind of plumbing installation of geothermal energy.The plumbing installation of the geothermal energy includes that support base, supporting mechanism, fixture, sealing mechanism, supporting mechanism described in fixed mechanism and compression mechanism are fixedly connected on the inside of the support base;The fixture is fixed on the top of the supporting mechanism;The sealing mechanism is fixed on the bottom surface of the support base, the sealing mechanism includes pedestal, groove, partition and spray head, the pedestal is installed on the bottom end of the supporting mechanism, the inside of the pedestal is equipped with the groove that side wall is arc, the partition is installed in the bottom end of the groove, and the sidewall slope of the groove installs the spray head;The fixed mechanism is rotatablely connected the inside of the pedestal;The compression mechanism is fixed on the inside of the pedestal, and the compression mechanism contradicts the fixed mechanism, and the compression mechanism is connected to the spray head.The plumbing installation of geothermal energy provided by the invention avoids roof leak.

Description

A kind of plumbing installation of geothermal energy
Technical field
The present invention relates to underground heat technical field more particularly to a kind of plumbing installations of geothermal energy.
Background technique
Geothermal energy is the natural thermal energy extracted by the earth's crust, lava of this energy from earth interior, and in the form of heating power In the presence of being the energy for being led to volcano eruption and earthquake.The temperature of earth interior is up to 7000 degree Celsius, and at 80 to 100 kilometers Depth, temperature can be down to 650 degree to 1200 degree Celsius.Flowing and lava through underground water influx 1 to 5 kilometer from the ground The earth's crust, heating power is able to be transferred to the place for being closer to ground.
When geothermal heat pipeline is installed on the roof of humid area, need on roof aperture that pipe support is fixed on roof On, when erection support, is easily damaged the waterproof layer on roof, leads to roof leak.
Therefore, it is necessary to which the plumbing installation for providing a kind of new geothermal energy solves above-mentioned technical problem.
Summary of the invention
In order to solve the above technical problems, the present invention provides plumbing installation that is a kind of and avoiding roof leak.
The plumbing installation of geothermal energy provided by the invention includes: support base, supporting mechanism, fixture, sealing mechanism, consolidates Determine the inside that supporting mechanism described in mechanism and compression mechanism is fixedly connected on the support base;The fixture is fixed on the support The top of mechanism;The sealing mechanism is fixed on the bottom surface of the support base, and the sealing mechanism includes pedestal, groove, partition And spray head, the pedestal are installed on the bottom end of the supporting mechanism, it is the described recessed of arc that the inside of the pedestal, which is equipped with side wall, Slot, the partition is installed in the bottom end of the groove, and the sidewall slope of the groove installs the spray head;The fixed mechanism turns The inside of the dynamic connection pedestal;The compression mechanism is fixed on the inside of the pedestal, and the compression mechanism contradicts described solid Determine mechanism, and the compression mechanism is connected to the spray head.
Preferably, the fixed mechanism includes bull stick and built-in fitting, and four sides of the pedestal are respectively between the bull stick It is threadedly coupled, the bull stick can contradict the top side wall of the built-in fitting.
Preferably, the top of the built-in fitting is I-shaped structure, and the bottom end of the built-in fitting is cylindrical structure.
Preferably, the compression mechanism includes connecting tube, constrictor, compression plate, storage bin and limit plate, the storage Case is symmetrically arranged on the inside of the pedestal, and the internal slide of the storage bin connects the compression plate, and the one of the compression plate End is fixedly connected with the constrictor, and the constrictor contradicts the bull stick;The bottom end of the storage bin is installed by the connecting tube, institute The bottom end for stating connecting tube connects the spray head;One end of the storage bin is symmetrically installed the limit plate, and the limit plate can support Touch the compression plate.
Preferably, the volume of two storage bins is greater than the volume of the groove, and the storage bin and the fixture It is mutually perpendicular to.
Preferably, the supporting mechanism includes first support bar, screw rod and second support bar;The inside of the support base is solid Surely the first support bar is connected, the internal slide of the first support bar connects the second support bar, second support The top of bar is installed by the fixture;It is threadedly coupled between the inside of the first support bar and the screw rod, and the screw rod supports Touch the second support bar.
Preferably, the bottom end of the first support bar is fixedly connected with the pedestal, and the top surface of the pedestal is square.
Compared with the relevant technologies, the plumbing installation of geothermal energy provided by the invention is had the following beneficial effects:
The present invention provides a kind of plumbing installation of geothermal energy, and the fixed mechanism is fixed on roof in roof drilling When, it reuses the fixed mechanism and the pedestal is fixed on roof, the inside of the pedestal, and institute are located at roof drilling State fixed mechanism it is again that the pedestal is fixed when, the fixed mechanism movement squeezes the compression mechanism of the chassis interior, So that the marine glue inside the compression mechanism is pressed into the inside of the spray head, marine glue the spray head flows downward inside into Enter the inside of the groove, marine glue enters the inside of the groove and the baffle contacts, the spacers block marine glue and makes After marine glue fills one end of the groove, marine glue crosses the partition and again fills the other end of the groove, thus Fill up marine glue by the junction of the pedestal and roof, thus seal marine glue by the pedestal and roof junction, The inside for preventing rainwater from entering the pedestal avoids roof leak to avoid contacting at rainwater and roof drilling.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of preferred embodiment of the plumbing installation of geothermal energy provided by the invention;
Fig. 2 is sealing mechanism schematic diagram of internal structure shown in FIG. 1;
Fig. 3 is compression mechanical part structural schematic diagram shown in Fig. 2.
Figure label: 1, support base, 2, fixture, 3, supporting mechanism, 31, first support bar, 32, screw rod, the 33, second support Bar, 4, fixed mechanism, 41, bull stick, 42, built-in fitting, 5, sealing mechanism, 51, pedestal, 52, groove, 53, partition, 54, spray head, 6, Compression mechanism, 61, connecting tube, 62, constrictor, 63, compression plate, 64, storage bin, 65, limit plate.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Please refer to Fig. 1, Fig. 2 and Fig. 3, wherein Fig. 1 is the one of the plumbing installation of geothermal energy provided by the invention The structural schematic diagram of kind preferred embodiment;Fig. 2 is sealing mechanism schematic diagram of internal structure shown in FIG. 1;Fig. 3 is shown in Fig. 2 Compression mechanical part structural schematic diagram.The plumbing installation of geothermal energy includes: support base 1, supporting mechanism 3, fixture 2, sealer Structure 5, fixed mechanism 4 and compression mechanism 6, the supporting mechanism 3 are fixedly connected on the inside of the support base 1;The fixture 2 is solid Due to the top of the supporting mechanism 3;
In the specific implementation process, as described in Figure 1, sealing mechanism 5, the sealing mechanism 5 are fixed on the support base 1 Bottom surface, the sealing mechanism 5 include pedestal 51, groove 52, partition 53 and spray head 54, and the pedestal 51 is installed on the support machine The bottom end of structure 3, the inside of the pedestal 51 are equipped with side wall for the groove 52 of arc, described in the bottom end installation of the groove 52 Partition 53, and the sidewall slope of the groove 52 installs the spray head 54;The fixed mechanism 4 is rotatablely connected the pedestal 51 It is internal;The compression mechanism 6 is fixed on the inside of the pedestal 51, and the compression mechanism 6 contradicts the fixed mechanism 4, and institute It states compression mechanism 6 and is connected to the spray head 54.
In the specific implementation process, as described in Figure 2, the fixed mechanism 4 includes bull stick 41 and built-in fitting 42, the pedestal 51 four sides are threadedly coupled between the bull stick 41 respectively, and the bull stick 41 can contradict the top side wall of the built-in fitting 42, The built-in fitting 42 is fixed on roof for convenience, in the bull stick 41 for rotating 51 side wall of pedestal, makes described turn Bar 41 clamps the built-in fitting 42, so that the pedestal 51 is fixed on roof.
In the specific implementation process, as described in Figure 2, the top of the built-in fitting 42 is I-shaped structure, in order to facilitate institute The fixed bull stick 41 of built-in fitting 42 is stated, and the bottom end of the built-in fitting 42 is cylindrical structure, in order to which the built-in fitting 42 is solid It is scheduled on roof.
In the specific implementation process, as described in Figure 3, the compression mechanism 6 includes connecting tube 61, constrictor 62, compression plate 63, storage bin 64 and limit plate 65, the storage bin 64 are symmetrically arranged on the inside of the pedestal 51, the storage bin 64 Internal slide connects the compression plate 63, and one end of the compression plate 63 is fixedly connected with the constrictor 62, the constrictor 62 Contradict the bull stick 41;The connecting tube 61 is installed in the bottom end of the storage bin 64, described in the bottom end connection of the connecting tube 61 Spray head 54;One end of the storage bin 64 is symmetrically installed the limit plate 65, and the limit plate 65 can contradict the compression plate 63, When the bull stick 41 enters the inside of the pedestal 51 for convenience, the bull stick 41 squeezes the constrictor 62, makes the pressure Contracting bar 62 drives the compression plate 62 in the internal motion of the storage bin 64, enters the marine glue inside the storage bin 64 The inside of the connecting tube 61, to make the marine glue inside the connecting tube 61 into the inside of the spray head 54.
In the specific implementation process, as described in Figure 2, the volume of two storage bins 64 is greater than the appearance of the groove 52 Product, and the storage bin 64 is mutually perpendicular to the fixture 2, the marine glue inside the storage bin 64 will be described recessed for convenience The inside of slot 52 fills.
In the specific implementation process, as described in Figure 1, the supporting mechanism 3 includes first support bar 31, screw rod 32 and second Support rod 33;The inside of the support base 1 is fixedly connected with the first support bar 31, the internal slide of the first support bar 31 The second support bar 33 is connected, the fixture 2 is installed on the top of the second support bar 33;The first support bar 31 it is interior It is threadedly coupled between portion and the screw rod 32, and the screw rod 32 contradicts the second support bar 33, for convenience described in rotation Screw rod 32 skids off the screw rod 32 from the inside of the first support bar 31, facilitates the second support bar 33 from described The inside of first support bar 31 skids off, to facilitate the cover degree for adjusting the fixture 2, is rotating the screw rod 32, the screw rod The 32 fixed second support bars 33, so that the height of the fixture 2 be fixed.
In the specific implementation process, as described in Figure 1, the bottom end of the first support bar 31 is fixedly connected with the pedestal 51, And the top surface of the pedestal 51 is square, in order to improve the stability of the first support bar 31, facilitate the pedestal 51 with Roof contact.
The working principle of the plumbing installation of geothermal energy provided by the invention is as follows: it drills on roof, it will be described pre- The bottom end of embedded part 42 is fixed on roof, and marine glue will be filled inside the storage bin 64, and marine glue pushes the compression plate 63 In the internal motion of the storage bin 64, the compression plate 63 is made to contradict the limit plate 65, then the pedestal 51 is placed on institute The top for stating built-in fitting 42 wraps up the pedestal 51 will at roof drilling.Rotate the four piece institutes parallel with the storage bin 64 Bull stick 41 is stated, so that the bull stick 41 is entered the inside of the pedestal 51, the bull stick 41 is made to contradict the inside of the built-in fitting 42, Clamp four bull sticks 41 by the I-shaped built-in fitting 42 in top respectively, the built-in fitting 42 is rotatablely connected described The top side wall of built-in fitting 42, the built-in fitting 42 is fixed by the bull stick 41, prevents the pedestal 51 from removing from roof, and Avoid 51 double swerve of pedestal.Two bull sticks 41 of rotation and the storage bin 64, this two bull sticks 41 divide Not Wei Yu the pedestal 51 both ends, and the bull stick 41 is staggered with the constrictor 62, rotates described in the bull stick 41 enters The inside of pedestal 51 makes two bull sticks 41 contradict the side of two built-in fittings 42 respectively.Rotating last two institutes Bull stick 41 is stated, the bull stick 41 rotates into the inside of the pedestal 51, and the bull stick 41 is made to contradict the another of the built-in fitting 42 Side clamps the bull stick 41 by the built-in fitting 42, and the pedestal 51 is fixed, prevents the pedestal 51 from swaying forwards and backwards, And the bull stick 41 squeezes the constrictor 62 in the internal motion of the pedestal 51, the constrictor 62 drives the compression plate 62 the storage bin 64 internal motion, so that marine glue inside the storage bin 64 is entered the inside of the connecting tube 61, To make the marine glue inside the connecting tube 61 enter the inside of the spray head 54;Marine glue the inside of the spray head 54 to Under flow into the inside of the groove 52, the inside that marine glue enters the groove 52 is contacted with the partition 53, it is described every Plate 53 stops marine glue, and after filling marine glue by one end of the groove 52, marine glue crosses the partition 53 again will be described The other end of groove 52 fills, to make marine glue fill up the junction of the pedestal 51 and roof, to make marine glue will The pedestal 51 is sealed with roof junction, prevents rainwater from entering the inside of the pedestal 51, so that rainwater and roof be avoided to bore It is contacted at hole, avoids roof leak.The screw rod 32 is rotated, keeps the screw rod 32 sliding from the inside of the first support bar 31 Out, facilitate and skid off the second support bar 33 from the inside of the first support bar 31, to facilitate the adjustment fixture 2 Cover degree is rotating the screw rod 32, the fixed second support bar 33 of the screw rod 32, so that the height of the fixture 2 be consolidated It is fixed, facilitate the inside that second pipe is fixed on to the fixture 2.
Compared with the relevant technologies, the plumbing installation of geothermal energy provided by the invention is had the following beneficial effects:
The present invention provides a kind of plumbing installation of geothermal energy, and the fixed mechanism 4 is fixed on room in roof drilling It when top, reuses the fixed mechanism 4 and the pedestal 51 is fixed on roof, positioned at the interior of the pedestal 51 at roof drilling Portion, and when the fixed mechanism 4 is fixed by the pedestal 51 again, the movement of fixed mechanism 4 squeezes inside the pedestal 51 The compression mechanism 6 makes the marine glue inside the compression mechanism 6 be pressed into the inside of the spray head 54, and marine glue is in the spray First 54 flows downward inside enters the inside of the groove 52, inside and the partition 53 of the marine glue into the groove 52 Contact, the partition 53 stop marine glue, and after filling marine glue by one end of the groove 52, marine glue crosses the partition 53 again fill the other end of the groove 52, thus fill up marine glue by the junction of the pedestal 51 and roof, thus Seal marine glue the pedestal 51 with roof junction, prevents rainwater from entering the inside of the pedestal 51, to avoid rain It is contacted at water and roof drilling, avoids roof leak.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (7)

1. a kind of plumbing installation of geothermal energy characterized by comprising
Support base (1);
Supporting mechanism (3), the supporting mechanism (3) are fixedly connected on the inside of the support base (1);
Fixture (2), the fixture (2) are fixed on the top of the supporting mechanism (3);
Sealing mechanism (5), the sealing mechanism (5) are fixed on the bottom surface of the support base (1), and the sealing mechanism (5) includes Pedestal (51), groove (52), partition (53) and spray head (54), the pedestal (51) are installed on the bottom end of the supporting mechanism (3), The inside of the pedestal (51) is equipped with the groove (52) that side wall is arc, and the partition is installed in the bottom end of the groove (52) (53), and the sidewall slope of the groove (52) installs the spray head (54);
Fixed mechanism (4), the fixed mechanism (4) are rotatablely connected the inside of the pedestal (51);
Compression mechanism (6), the compression mechanism (6) are fixed on the inside of the pedestal (51), and the compression mechanism (6) contradicts institute It states fixed mechanism (4), and the compression mechanism (6) is connected to the spray head (54).
2. the plumbing installation of geothermal energy according to claim 1, which is characterized in that the fixed mechanism (4) includes Four sides of bull stick (41) and built-in fitting (42), the pedestal (51) are threadedly coupled between the bull stick (41) respectively, and described turn Bar (41) can contradict the top side wall of the built-in fitting (42).
3. the plumbing installation of geothermal energy according to claim 2, which is characterized in that the top of the built-in fitting (42) For I-shaped structure, and the bottom end of the built-in fitting (42) is cylindrical structure.
4. the plumbing installation of geothermal energy according to claim 2, which is characterized in that the compression mechanism (6) includes Connecting tube (61), constrictor (62), compression plate (63), storage bin (64) and limit plate (65), the storage bin (64) are symmetrically pacified The internal slide of inside loaded on the pedestal (51), the storage bin (64) connects the compression plate (63), the compression plate (63) one end is fixedly connected the constrictor (62), and the constrictor (62) contradicts the bull stick (41);The storage bin (64) connecting tube (61) is installed in bottom end, and the bottom end of the connecting tube (61) connects the spray head (54);The storage bin (64) one end is symmetrically installed the limit plate (65), and the limit plate (65) can contradict the compression plate (63).
5. the plumbing installation of geothermal energy according to claim 4, which is characterized in that two storage bins (64) Volume is greater than the volume of the groove (52), and the storage bin (64) is mutually perpendicular to the fixture (2).
6. the plumbing installation of geothermal energy according to claim 1, which is characterized in that the supporting mechanism (3) includes First support bar (31), screw rod (32) and second support bar (33);The inside of the support base (1) is fixedly connected with described first The internal slide of strut (31), the first support bar (31) connects the second support bar (33), the second support bar (33) top is installed by the fixture (2);It is threadedly coupled between the inside of the first support bar (31) and the screw rod (32), And the screw rod (32) contradicts the second support bar (33).
7. the plumbing installation of geothermal energy according to claim 6, which is characterized in that the first support bar (31) Bottom end is fixedly connected the pedestal (51), and the top surface of the pedestal (51) is square.
CN201910442466.XA 2019-05-25 2019-05-25 Pipeline installation device for geothermal energy Active CN110260047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910442466.XA CN110260047B (en) 2019-05-25 2019-05-25 Pipeline installation device for geothermal energy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910442466.XA CN110260047B (en) 2019-05-25 2019-05-25 Pipeline installation device for geothermal energy

Publications (2)

Publication Number Publication Date
CN110260047A true CN110260047A (en) 2019-09-20
CN110260047B CN110260047B (en) 2021-02-26

Family

ID=67915405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910442466.XA Active CN110260047B (en) 2019-05-25 2019-05-25 Pipeline installation device for geothermal energy

Country Status (1)

Country Link
CN (1) CN110260047B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170128931A (en) * 2016-05-16 2017-11-24 대우조선해양 주식회사 Gap-filling assembly
CN207527172U (en) * 2017-12-05 2018-06-22 浙江新盛建设集团有限公司 A kind of concrete delivery pump pipe road connector
CN208750172U (en) * 2018-09-21 2019-04-16 泉州伟信服装有限公司 A kind of firm seat of chemical industry equipment pipeline support

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170128931A (en) * 2016-05-16 2017-11-24 대우조선해양 주식회사 Gap-filling assembly
CN207527172U (en) * 2017-12-05 2018-06-22 浙江新盛建设集团有限公司 A kind of concrete delivery pump pipe road connector
CN208750172U (en) * 2018-09-21 2019-04-16 泉州伟信服装有限公司 A kind of firm seat of chemical industry equipment pipeline support

Also Published As

Publication number Publication date
CN110260047B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN202628025U (en) Experiment device capable of simulating sealing of hole
CN207660586U (en) From anchoring, the integrated apparatus of self-sealing, high pressure water injection pressure break
CN201416430Y (en) Hydraulic controlled type concentric dual-pipe separate injection pipe string
CN104481581A (en) Gas-injection coal seam gas displacement physical similarity simulation experiment table
CN110260047A (en) A kind of plumbing installation of geothermal energy
CN204754881U (en) Double -barrelled gas well flow string parallels
CN104879097A (en) Gas well production string provided with double parallel pipes
CN109724860B (en) Mudstone core access device and access method thereof
CN104879098B (en) A kind of concentric double pipe gas well liquid loading tubing string
CN203476263U (en) Coiled tubing speed tubular column hanger
CN202215222U (en) Three-pipe thermal recovery wellhead of extremely-thicken oil horizontal well fireflood-assisted gravity drainage
CN201292830Y (en) Gusher and electric pump well sucker rod electric heater unit
CN203594375U (en) Ground hydraulic controlled type layered production string
CN103696415A (en) Energy-saving freezing pipe for freezing underwater
CN207212312U (en) A kind of multi-functional pressure obtaning device
CN114593312B (en) Stable supporting device for construction measurement equipment
CN207343191U (en) One kind fills varnish frock
CN206860149U (en) A kind of plunger lift pumping equipment
CN207066933U (en) Concrete impervious instrument
CN201915896U (en) Cone release oil pipe blanking plug
CN105443056A (en) Separated injection method for water injection well
CN205653901U (en) Floor riser entrance to a cave plugging device
CN110299043B (en) Three-dimensional constant-pressure high-efficiency simulated natural gas hydrate model
CN209493267U (en) It is a kind of for fill experiment lifting mold
CN2929162Y (en) Wellhead in-site test pressure complete set device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant