CN110258680A - A kind of diaphram wall restorative procedure - Google Patents
A kind of diaphram wall restorative procedure Download PDFInfo
- Publication number
- CN110258680A CN110258680A CN201910511833.7A CN201910511833A CN110258680A CN 110258680 A CN110258680 A CN 110258680A CN 201910511833 A CN201910511833 A CN 201910511833A CN 110258680 A CN110258680 A CN 110258680A
- Authority
- CN
- China
- Prior art keywords
- diaphram wall
- grouting
- water
- hole
- leakage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a kind of diaphram wall restorative procedures, including the following steps: S1, tentatively judge diaphram wall position to be repaired, staff judges the reparation position determination of diaphram wall reparation using detection device and repairs depth, and determines adjacent existing intact diaphram wall projected depth;S2, reason is repaired according to the data parameters analysis diaphram wall detected, common diaphram wall needs the problem of repairing;S3, preliminary planning diaphram wall repair process mode;S4, the process flow of diaphram wall repairing construction is formulated;S5, it is directed to diaphram wall percolating water repairing construction Specific construction operating procedure;S6, diaphram wall bulge and leakage muscle repairing construction Specific construction operating procedure are directed to, construction flexible waterproof material or brushing polymer waterproof, erosion resistant coating after being repaired to diaphragm wall, allow its water impermeability and crack resistance with higher, it will repair and reinforcing be combined as a whole, using effect is good, is suitble to promote the use of.
Description
Technical field
The present invention relates to architectural engineering recovery technique field, specially a kind of diaphram wall restorative procedure.
Background technique
Diaphram wall can be divided into cast-in-place diaphram wall and coercion underground continuous wall two major classes, apply in engineering at present
The slot section form of cast-in-place diaphram wall mainly have wallboard type, T-type and П shape etc., and can be by by various forms slot section group
It closes, forms the structure types such as trellis, cylindrical shape.Diaphram wall is that foundation engineering uses a kind of trench machine, edge on the ground
The periphery axis of deep excavation project excavate out a long and narrow deep trouth under the conditions of mud off, after clear slot, hung in slot
Steel reinforcement cage is put, then builds up a unit groove section with tremie method underwater concreting with tremie method, so carries out paragraph by paragraph, builds up one in underground
The continuous armored concrete wall in road, as intercept water, antiseepage, load-bearing, water-retaining structure.
After decades of development, the technology of diaphram wall is quite mature, and diaphram wall is
Instead of many traditional construction methods, and it is used for many aspects of foundation engineering.Diaphram wall in the construction process, because each
Kind factor leads to the concrete defect of some diaphram walls, and defect directly affects construction quality and safety, needs to connect underground
Continuous wall is repaired, and it is incomplete to obtain renovation technique to diaphram wall at present, and traditional leak stopping etc. repairs operating method right
Its waterproof, antiseptic property are poor after diaphram wall is repaired, the inadequate persistence of plugging effect, to solve the above-mentioned problems, therefore,
Design a kind of diaphram wall restorative procedure.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of diaphram wall restorative procedure
Problem.
To achieve the above object, the invention provides the following technical scheme: a kind of diaphram wall restorative procedure, including it is following
Several steps:
S1, tentatively judge diaphram wall position to be repaired, staff judges that diaphram wall is repaired using detection device
Multiple reparation position is determining and repairs depth, and determines adjacent existing intact diaphram wall projected depth.
S2, reason is repaired according to the data parameters analysis diaphram wall detected, common diaphram wall needs are repaired
Multiple problem includes: (1) percolating water;(2) bulge and leakage muscle.
S3, preliminary planning diaphram wall repair process mode: (1) Seepage water includes water seepage treatment and gushes at sand
Reason;(2) bulge and leakage muscle processing.
S4, diaphram wall repairing construction process flow: (1) leak stopping reparation at diaphram wall percolating water is formulated: leakage
Position determination-drafting expanded view-leakage analysis-determines waterproofing-seepage place cleaning-closure, drilling-peace
Fill high-pressure slip-casting-mud jacking-diaphram wall defect repair-brushing polymer waterproof, erosion resistant coating;
(2) bulge and leakage muscle reparation: bulge and leakage muscle portion position determination-drafting expanded view-bulge and leakage muscle portion position reason
Analyze-determine mending option-rejected region cleaning-diaphram wall defect repair-brushing polymer waterproof, erosion resistant coating.
S5, be directed to diaphram wall percolating water repairing construction Specific construction operating procedure: (1) underground continuous wall seam seeps
When water is little, centered on leakage point, artificial seam crossing of digging is rinsed well groove with water at groove, is directlyed adopt double
Fast cement is rapidly jammed in groove, and secret room is then applied in recessed joint cell wall and squeezed with tool, is covered until double quick water
Mud fever solidification;
(2) if continuous wall seam leak is larger, grouting for water plugging need to be used:
The first step is in seam two sides or upper and lower each 15cm or so arrangement grout hole;
Second step buries grouting nozzle, after the insertion drilling of pressure ring grouting nozzle, with spanner rotating nut, i.e. compression movable sleeve
Pipe and pressure ring, make elastic rubber ring expand and compress to hole wall surrounding, couple grouting nozzle and hole wall securely, observation blocks situation
With each hole connection situation, it is normally carried out with guaranteeing to be in the milk;
Grouting equipment is installed and checked to third step, to ensure the safe handling in grouting construction;
4th step select a wherein hole slip casting, be typically chosen in lower and the biggish grouting nozzle of leak, after it is porous see slurry after,
Each hole is closed immediately, still persistently mud jacking, grouting pressure should be greater than leakage water pressure, promote slurries inversely along leak paths,
It infuses not when into slurry, stops mud jacking, close grouting nozzle immediately, in order to prevent the reflux of slurries, block grouting pipe, Ying Xianguan
The valve of grouting nozzle is closed, then stops mud jacking, after slip casting, grouting equipment should be cleaned immediately, is used again convenient for next time;
5th step rejects grouting nozzle after grout cures, carries out surface regulation, and observe grouting for water plugging effect, when necessary
Repeatable slip casting;
6th step surface construction flexible waterproof material or brushing polymer waterproof, erosion resistant coating at the hole after slip casting.
S6, diaphram wall bulge and leakage muscle repairing construction Specific construction operating procedure are directed to:
(1) bulge is handled: the method for taking stage excavation, layered shaping first, under earth excavation to bulge top surface
Suspend when 1.0m and excavate, it is quasi- take manually to hold pneumatic pick and cut abolish, exposure one must be excavated immediately following earth excavation progress by abolishing bulge
Section abolishes one section in time;
(2) leakage muscle processing: muscle face must be leaked to diaphram wall and carry out dabbing, cleaning, high-pressure blast and water cleaning, then to leakage
Muscle face is good that sand finish must leak muscle face for large area using medium coarse sand mixing using mixing, sprays coagulation using spraying machine
Soil carries out Seal treatment, manually has a shave levelling, reaches basal plane and check and accept to obtain standard.
As a preferred technical solution of the present invention, 16-24cm of pitch-row of the injected hole, hole depth >=30cm is tiltedly worn
Crack, 8-14mm of aperture.
As a preferred technical solution of the present invention, the selection of the slip casting hole site should make bottom and the leakage of injected hole
Water gap intersection, be selected in the maximum position of water leakage, it is good to reach transmissibility, under normal circumstances, horizontal fracture preferably along seam under to
Upper deflecting hole;Make straight hole in the suitable face gap of vertical fracture.
As a preferred technical solution of the present invention, the depth of the injected hole should not penetrate works, stay 10-
20cm length is safe distance.
As a preferred technical solution of the present invention, the pitch-row of the injected hole should regard leak pressure, gap size, leakage
Depending on water is how many and the dilation angle of slurries, generally 50-100cm.
As a preferred technical solution of the present invention, the embedded number of the grouting nozzle should be no less than two, that is, set one
Mouth is draining or gas nozzle, and another mouth is grouting nozzle, makes a hole as single hole leak can also push up water, buries a grouting nozzle.
As a preferred technical solution of the present invention, the chemical grouting agent is soluble polyurethane grouting agent.
As a preferred technical solution of the present invention, the polymer waterproof, the polymerization that erosion resistant coating is machine, inorganic compounding
Object material.
Compared with prior art, the beneficial effects of the present invention are: the present invention obtain diaphram wall restorative procedure mainly for
Percolating water, bulge and leakage muscle problem is obtained in diaphram wall to be repaired, it is detailed for different diaphram wall percolating waters,
Bulge and leakage tendon shape condition obtain repair process method using different, and mode of operation refinement, operating procedure are detailed, and ease of use personnel make
With;After being repaired to diaphram wall, in diaphram wall surface construction flexible waterproof material or brushing polymer waterproof, prevent
Rotten layer carries out repairing and reinforcement to diaphram wall, allows diaphram wall repair surface water impermeability with higher and crack resistance,
And use polymer material also has preferable corrosion resistance, this to improve repair after diaphram wall overall durability be
It is very beneficial, the present invention obtain restorative procedure will repair and reinforcing be combined as a whole, using effect more preferably, be suitble to promote the use of.
Specific embodiment
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment
Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field
Art personnel every other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
Embodiment 1: a kind of diaphram wall restorative procedure, including the following steps:
S1, tentatively judge diaphram wall position to be repaired, staff judges that diaphram wall is repaired using detection device
Multiple reparation position is determining and repairs depth, and determines adjacent existing intact diaphram wall projected depth.
S2, reason: percolating water is repaired according to the data parameters analysis diaphram wall detected.
S3, preliminary planning diaphram wall repair process mode: Seepage water includes that water seepage treatment is handled with sand is gushed.
S4, diaphram wall repairing construction process flow: leak stopping reparation at diaphram wall percolating water: seepage place is formulated
Determination-drafting expanded view-leakage analysis-determines that waterproofing-seepage place cleaning-closure, drilling-installation are high
Pressure grouting-mud jacking-diaphram wall defect repair-brushing polymer waterproof, erosion resistant coating.
S5, be directed to diaphram wall percolating water repairing construction Specific construction operating procedure: (1) underground continuous wall seam seeps
When water is little, centered on leakage point, artificial seam crossing of digging is rinsed well groove with water at groove, is directlyed adopt double
Fast cement is rapidly jammed in groove, and secret room is then applied in recessed joint cell wall and squeezed with tool, is covered until double quick water
Mud fever solidification;
(2) if continuous wall seam leak is larger, grouting for water plugging need to be used:
The first step is in seam two sides or upper and lower each 15cm or so arrangement grout hole;
Second step buries grouting nozzle, after the insertion drilling of pressure ring grouting nozzle, with spanner rotating nut, i.e. compression movable sleeve
Pipe and pressure ring, make elastic rubber ring expand and compress to hole wall surrounding, couple grouting nozzle and hole wall securely, observation blocks situation
With each hole connection situation, it is normally carried out with guaranteeing to be in the milk;
Grouting equipment is installed and checked to third step, to ensure the safe handling in grouting construction;
4th step select a wherein hole slip casting, be typically chosen in lower and the biggish grouting nozzle of leak, after it is porous see slurry after,
Each hole is closed immediately, still persistently mud jacking, grouting pressure should be greater than leakage water pressure, promote slurries inversely along leak paths,
It infuses not when into slurry, stops mud jacking, close grouting nozzle immediately, in order to prevent the reflux of slurries, block grouting pipe, Ying Xianguan
The valve of grouting nozzle is closed, then stops mud jacking, after slip casting, grouting equipment should be cleaned immediately, is used again convenient for next time;
5th step rejects grouting nozzle after grout cures, carries out surface regulation, and observe grouting for water plugging effect, when necessary
Repeatable slip casting;
6th step surface construction flexible waterproof material or brushing polymer waterproof, erosion resistant coating at the hole after slip casting.
16-24cm of pitch-row of injected hole, hole depth >=30cm, oblique through cracks seam, 8-14mm of aperture.
The selection of slip casting hole site should be such that the bottom of injected hole intersects with leak gap, be selected in the maximum position of water leakage,
It is good to reach transmissibility, under normal circumstances, horizontal fracture upward deflecting hole preferably under seam;It makes directly in the suitable face gap of vertical fracture
Hole.
The depth of injected hole should not penetrate works, and staying 10-20cm length is safe distance.
The pitch-row of injected hole should be depending on leak pressure, depending on gap size, water leakage be how many and the dilation angle of slurries, generally
For 50-100cm.
The embedded number of grouting nozzle should be no less than two, that is, set a mouth as draining or gas nozzle, another mouth is grouting nozzle, such as single
Hole leak can also push up water and make a hole, bury a grouting nozzle.
Chemical grouting agent is soluble polyurethane grouting agent.
Polymer waterproof, the polymer material that erosion resistant coating is machine, inorganic compounding.
Embodiment 2: a kind of diaphram wall restorative procedure, including the following steps:
S1, tentatively judge diaphram wall position to be repaired, staff judges that diaphram wall is repaired using detection device
Multiple reparation position is determining and repairs depth, and determines adjacent existing intact diaphram wall projected depth.
S2, reason: bulge and leakage muscle is repaired according to the data parameters analysis diaphram wall detected.
S3, preliminary planning diaphram wall repair process mode: bulge and leakage muscle processing.
S4, formulate the process flow of diaphram wall repairing construction: bulge and leakage muscle reparation: bulge and leakage muscle portion position determine-
It draws expanded view-bulge and the leakage muscle portion position analysis of causes-and determines that mending option-rejected region cleaning-diaphram wall lacks
Fall into reparation-brushing polymer waterproof, erosion resistant coating.
S5, diaphram wall bulge and leakage muscle repairing construction Specific construction operating procedure are directed to:
(1) bulge is handled: the method for taking stage excavation, layered shaping first, under earth excavation to bulge top surface
Suspend when 1.0m and excavate, it is quasi- take manually to hold pneumatic pick and cut abolish, exposure one must be excavated immediately following earth excavation progress by abolishing bulge
Section abolishes one section in time;
(2) leakage muscle processing: muscle face must be leaked to diaphram wall and carry out dabbing, cleaning, high-pressure blast and water cleaning, then to leakage
Muscle face is good that sand finish must leak muscle face for large area using medium coarse sand mixing using mixing, sprays coagulation using spraying machine
Soil carries out Seal treatment, manually has a shave levelling, reaches basal plane and check and accept to obtain standard.
Chemical grouting agent is soluble polyurethane grouting agent.
Polymer waterproof, the polymer material that erosion resistant coating is machine, inorganic compounding.
The present invention obtains diaphram wall restorative procedure and obtains percolating water, bulge and leakage muscle problem mainly in diaphram wall
It is repaired, it is detailed for different that diaphram wall percolating water, bulge and leakage tendon shape condition obtain repair process side using different
Method, mode of operation refinement, operating procedure are detailed, and ease of use personnel use;After being repaired to diaphram wall, connect in underground
Continuous wall surface construction flexible waterproof material or brushing polymer waterproof, erosion resistant coating carry out repairing and reinforcement to diaphram wall, allow ground
Lower diaphragm wall repair surface water impermeability with higher and crack resistance, and use polymer material also has preferable anti-corruption
Corrosion, this to improve repair after diaphram wall overall durability be it is very beneficial, the present invention obtain restorative procedure will repair and
Reinforcing is combined as a whole, and using effect more preferably, is suitble to promote the use of.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. a kind of diaphram wall restorative procedure, which is characterized in that including the following steps:
S1, tentatively judge diaphram wall position to be repaired, staff judges diaphram wall reparation using detection device
It repairs position determination and repairs depth, and determine adjacent existing intact diaphram wall projected depth.
S2, reason is repaired according to the data parameters analysis diaphram wall detected, what common diaphram wall needed to repair
Problem includes: (1) percolating water;(2) bulge and leakage muscle.
S3, preliminary planning diaphram wall repair process mode: (1) Seepage water includes that water seepage treatment is handled with sand is gushed;(2)
Bulge and leakage muscle processing.
S4, diaphram wall repairing construction process flow: (1) leak stopping reparation at diaphram wall percolating water: seepage place is formulated
Determination-drafting expanded view-leakage analysis-determines that waterproofing-seepage place cleaning-closure, drilling-installation are high
Pressure grouting-mud jacking-diaphram wall defect repair-brushing polymer waterproof, erosion resistant coating;
(2) bulge and leakage muscle reparation: bulge and leakage muscle portion position determination-drafting expanded view-bulge and leakage muscle portion position reason point
Analyse-determine mending option-rejected region cleaning-diaphram wall defect repair-brushing polymer waterproof, erosion resistant coating.
S5, it is directed to diaphram wall percolating water repairing construction Specific construction operating procedure: (1) underground continuous wall seam water percolating capacity
When little, centered on leakage point, groove is rinsed well with water at groove, directlys adopt double quick water by artificial seam crossing of digging
Mud is rapidly jammed in groove, and secret room is then applied in recessed joint cell wall and squeezed with tool, is covered until double-quick cement is sent out
Thermocoagulation;
(2) if continuous wall seam leak is larger, grouting for water plugging need to be used:
The first step is in seam two sides or upper and lower each 15cm or so arrangement grout hole;
Second step buries grouting nozzle, after the insertion drilling of pressure ring grouting nozzle, with spanner rotating nut, i.e., compression moving casing and
Pressure ring makes elastic rubber ring expand and compress to hole wall surrounding, couples grouting nozzle and hole wall securely, and observation blocks situation and each
Hole connection situation, to guarantee that grouting is normally carried out;
Grouting equipment is installed and checked to third step, to ensure the safe handling in grouting construction;
4th step select a wherein hole slip casting, be typically chosen in lower and the biggish grouting nozzle of leak, after it is porous see slurry after, immediately
Each hole is closed, still persistently mud jacking, grouting pressure should be greater than leakage water pressure, promote slurries inversely along leak paths, note arrives
Not when into slurry, stop mud jacking, close grouting nozzle immediately, in order to prevent the reflux of slurries, blocks grouting pipe, should first close note
The valve of mouth is starched, then stops mud jacking, after slip casting, grouting equipment should be cleaned immediately, is used again convenient for next time;
5th step rejects grouting nozzle after grout cures, carries out surface regulation, and observe grouting for water plugging effect, can weigh when necessary
Multiple slip casting;
6th step surface construction flexible waterproof material or brushing polymer waterproof, erosion resistant coating at the hole after slip casting;
S6, diaphram wall bulge and leakage muscle repairing construction Specific construction operating procedure are directed to:
(1) bulge is handled: the method for taking stage excavation, layered shaping first, under earth excavation to bulge top surface when 1.0m
Pause is excavated, it is quasi- take manually to hold pneumatic pick and cut abolish, one section of exposure must be excavated in time immediately following earth excavation progress by abolishing bulge
Abolish one section;
(2) leakage muscle processing: muscle face must be leaked to diaphram wall and carry out dabbing, cleaning, high-pressure blast and water cleaning, then to leakage muscle face
It is good that sand finish must leak muscle face for large area using medium coarse sand mixing using mixing, using spraying machine gunite concrete into
Row Seal treatment is manually had a shave levelling, is reached basal plane and is checked and accepted to obtain standard.
2. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the pitch-row of the injected hole
16-24cm, hole depth >=30cm, oblique through cracks seam, 8-14mm of aperture.
3. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the choosing of the slip casting hole site
Selecting should be such that the bottom of injected hole intersects with leak gap, be selected in the maximum position of water leakage, with good, the ordinary circumstance that reaches transmissibility
Under, horizontal fracture upward deflecting hole preferably under seam;Make straight hole in the suitable face gap of vertical fracture.
4. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the depth of the injected hole is not
Works should be penetrated, staying 10-20cm length is safe distance.
5. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the pitch-row of the injected hole is answered
Depending on leak pressure, depending on gap size, water leakage be how many and the dilation angle of slurries, generally 50-100cm.
6. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the embedded number of the grouting nozzle
Mesh should be no less than two, that is, set a mouth as draining or gas nozzle, and another mouth is grouting nozzle, make a hole as single hole leak can also push up water,
Bury a grouting nozzle.
7. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the chemical grouting agent is water
Soluble polyurethane grouting agent.
8. a kind of diaphram wall restorative procedure according to claim 1, which is characterized in that the polymer waterproof is prevented
Rotten layer is the polymer material of machine, inorganic compounding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910511833.7A CN110258680A (en) | 2019-06-13 | 2019-06-13 | A kind of diaphram wall restorative procedure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910511833.7A CN110258680A (en) | 2019-06-13 | 2019-06-13 | A kind of diaphram wall restorative procedure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258680A true CN110258680A (en) | 2019-09-20 |
Family
ID=67918097
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910511833.7A Pending CN110258680A (en) | 2019-06-13 | 2019-06-13 | A kind of diaphram wall restorative procedure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258680A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827260A (en) * | 2020-07-17 | 2020-10-27 | 中铁六局集团有限公司 | Defect repairing and leaking stoppage construction method for underground diaphragm wall |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653777A (en) * | 2018-12-11 | 2019-04-19 | 中国铁路设计集团有限公司 | A kind of high-speed railway open trench tunnel percolating water and crack area entirety regulation method |
-
2019
- 2019-06-13 CN CN201910511833.7A patent/CN110258680A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653777A (en) * | 2018-12-11 | 2019-04-19 | 中国铁路设计集团有限公司 | A kind of high-speed railway open trench tunnel percolating water and crack area entirety regulation method |
Non-Patent Citations (2)
Title |
---|
BODKNED: "轨道交通地下连续墙施工缺陷修补专项方案_精品.doc", 《原创力文档》 * |
刘玉民: "深基坑地下连续墙渗漏水的预防补救及修复措施", 《江西建材》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827260A (en) * | 2020-07-17 | 2020-10-27 | 中铁六局集团有限公司 | Defect repairing and leaking stoppage construction method for underground diaphragm wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106917409B (en) | A kind of rock lid weight consolidation grouting construction method | |
CN103541359B (en) | Method for repairing and treating quality defect of cast-in-place pile | |
CN105527661A (en) | Detection and leakage blocking methods of concrete building water leakage | |
JP7257086B2 (en) | Comprehensive Construction Method for Low Overburden Sections of Tunnels | |
CN110821205A (en) | Concrete crack negative pressure repairing construction device and construction method | |
CN106759297A (en) | A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits | |
CN111424613B (en) | Method for treating through cracks of roller compacted concrete dam | |
CN112482415B (en) | Consolidation grouting method for underground cavern under high external water pressure and flowing water condition | |
CN112832826A (en) | Tunnel deformation joint plugging construction process | |
CN105464194A (en) | Water proofing and leak repairing construction method for sewage pipe network below underground water level | |
CN111140264A (en) | Method for treating water leakage of cracks of tunnel concrete lining structure | |
CN111206610A (en) | Construction method for treating piping of exploration hole of foundation pit by curtain grouting method | |
CN110258680A (en) | A kind of diaphram wall restorative procedure | |
CN110735642A (en) | shield originating end combined type reinforcing structure and construction method thereof | |
CN211285196U (en) | Concrete crack negative pressure repairing construction device | |
CN116771386A (en) | Dynamic sequential grouting method for ultra-temperature hot water tunnel | |
CN116291482A (en) | Advanced grouting reinforcement method for deep-buried long tunnel on earth surface | |
CN110565710A (en) | foundation ring loosening and reinforcing treatment scheme | |
CN109779287A (en) | Microdilatancy water-proof emulsion construction technology | |
CN112901222B (en) | Treatment process for concrete water seepage cracks of inverted arch of tunnel | |
CN115012993A (en) | Rapid and safe disposal method for tunnel water-rich karst surge body | |
CN114293600A (en) | Method for processing broken pile defect of precast pile in weak soil area | |
CN112695701A (en) | Method for treating upstream and downstream through cracks of concrete dam body | |
CN113152476A (en) | Excavation construction method for soft geological foundation pit of existing line station | |
CN113638744B (en) | Method for treating joint defects of underground continuous wall of water-rich soft soil stratum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |
|
RJ01 | Rejection of invention patent application after publication |