CN110821205A - Concrete crack negative pressure repair construction device and construction method - Google Patents
Concrete crack negative pressure repair construction device and construction method Download PDFInfo
- Publication number
- CN110821205A CN110821205A CN201911163406.0A CN201911163406A CN110821205A CN 110821205 A CN110821205 A CN 110821205A CN 201911163406 A CN201911163406 A CN 201911163406A CN 110821205 A CN110821205 A CN 110821205A
- Authority
- CN
- China
- Prior art keywords
- negative pressure
- grouting
- base
- crack
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 44
- 230000008439 repair process Effects 0.000 title claims abstract description 34
- 238000002347 injection Methods 0.000 claims abstract description 52
- 239000007924 injection Substances 0.000 claims abstract description 52
- 230000009471 action Effects 0.000 claims abstract description 9
- 238000007789 sealing Methods 0.000 claims description 60
- 238000005086 pumping Methods 0.000 claims description 26
- 239000003795 chemical substances by application Substances 0.000 claims description 22
- 239000000565 sealant Substances 0.000 claims description 20
- 239000004744 fabric Substances 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 11
- 238000012669 compression test Methods 0.000 claims description 7
- 239000000428 dust Substances 0.000 claims description 6
- 238000001125 extrusion Methods 0.000 claims description 6
- 239000003566 sealing material Substances 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims 4
- 230000001680 brushing effect Effects 0.000 claims 2
- 239000012535 impurity Substances 0.000 claims 2
- 230000000694 effects Effects 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 19
- 230000008569 process Effects 0.000 description 9
- CSCPPACGZOOCGX-UHFFFAOYSA-N Acetone Chemical compound CC(C)=O CSCPPACGZOOCGX-UHFFFAOYSA-N 0.000 description 4
- 210000003437 trachea Anatomy 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 239000003518 caustics Substances 0.000 description 2
- 239000012459 cleaning agent Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明涉及一种对混凝土裂缝进行修补的施工装置和施工方法,属于建筑施工技术领域,在注浆底座的中部设有注入口;所述抽负压装置包括插入注浆底座注入口的抽负压顶嘴、一端与抽负压顶嘴连接,另一端与真空泵连接的气管;所述注浆装置包括插入注浆底座注入口的注浆喷嘴、通过浆管与注浆喷嘴连接的注浆泵。通过该装置往裂缝中挤压注浆的同时,通过真空泵的作用,在裂缝中产生负压,该负压使得修补所用的材料在注浆泵的挤压作用下,能有效克服重力作用,更容易填充、填实整个裂缝,达到全面修补混凝土裂缝的作用。
The invention relates to a construction device and a construction method for repairing concrete cracks, belonging to the technical field of building construction. An injection port is arranged in the middle of a grouting base; The grouting device includes a grouting nozzle inserted into the injection port of the grouting base, and a grouting pump connected with the grouting nozzle through the grouting pipe. While squeezing grouting into the crack through the device, a negative pressure is generated in the crack through the action of the vacuum pump. It is easy to fill and fill the entire crack to achieve the effect of comprehensive repair of concrete cracks.
Description
技术领域technical field
本发明属于建筑施工技术领域,特别涉及一种在梁、板(墙、柱)等混凝土出现裂缝后对混凝土裂缝负压修补施工装置和施工方法。The invention belongs to the technical field of building construction, and particularly relates to a construction device and a construction method for repairing concrete cracks with negative pressure after cracks occur in concrete such as beams, slabs (walls, columns).
背景技术Background technique
随着社会的不断进步、城市的不断发展,各种立体交通中的道路桥梁也应运而生,桥梁在使用一定的期限后,因过载车辆、环境等因素的作用,致使许多桥梁(板)的底面出现了不同程度的细微裂缝,该裂缝虽然暂时对桥梁的安全不会有大的影响,但随着时间的推移,在桥梁服役过程中受环境与荷载的影响,微小的裂缝可发展成具有破坏性的贯穿裂缝和深层裂缝。贯穿裂缝和深层裂缝会对普通钢筋或预应力钢筋产生腐蚀,破坏结构的整体性,改变混凝土的受力条件,从而有使局部甚至整体结构发生破坏的可能,严重影响桥梁的质量和运行安全性。With the continuous progress of society and the continuous development of cities, various road bridges in three-dimensional traffic have also emerged. After bridges have been used for a certain period, due to overloaded vehicles, the environment and other factors, many bridges (boards) have been damaged. Different degrees of fine cracks appear on the bottom surface. Although the cracks will not have a great impact on the safety of the bridge temporarily, as time goes on, under the influence of the environment and load during the service of the bridge, the tiny cracks can develop into Destructive through and deep fissures. Through cracks and deep cracks will corrode ordinary steel bars or prestressed steel bars, destroy the integrity of the structure, and change the stress conditions of concrete, which may damage the local or even the overall structure, seriously affecting the quality and operational safety of the bridge. .
对于混凝土裂缝,一般的修补方法有表面处理法、灌浆法、聚合物浸入法、钻孔嵌塞法等等。而对于桥梁、化工厂的混凝土封闭池,其受力、混凝土材料受自身及外部环境等诸多因素,其裂缝一般都在梁(板)的下表面,再加之重力的因素,按一般的修补方法,其修补剂很难填充,也很难填实整个裂缝,其修补质量很难达到设计要求。For concrete cracks, the general repair methods include surface treatment method, grouting method, polymer immersion method, drilling impact method and so on. As for the concrete closed pools of bridges and chemical plants, the cracks are generally on the lower surface of the beams (slabs) due to the stress, the concrete material is affected by itself and the external environment and many other factors, plus the factors of gravity, according to the general repair method , the repair agent is difficult to fill, and it is difficult to fill the entire crack, and its repair quality is difficult to meet the design requirements.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种混凝土裂缝的负压修补施工装置和施工方法,通过本发明的施工装置和方法,对混凝土裂缝进行修补时,在往裂缝中挤压注浆的同时,通过真空泵的作用,在裂缝中产生负压,该负压使得修补所用的材料在注浆泵的挤压作用下,能有效克服修补材料重力作用,更容易填充、填实整个裂缝,达到全面修补混凝土裂缝的作用。The object of the present invention is to provide a negative pressure repairing construction device and construction method for concrete cracks, through the construction device and method of the present invention, when repairing concrete cracks, while squeezing grouting into the cracks, through the vacuum pump Under the extrusion action of the grouting pump, the material used for repair can effectively overcome the gravity effect of the repair material, and it is easier to fill and fill the entire crack, so as to achieve a comprehensive repair of concrete cracks. effect.
本发明的目的是通过以下技术方案实现的:一种混凝土裂缝的负压修补施工装置,其特征在于:它包括注浆底座、抽负压装置和注浆装置,所述注浆底座由座体和座体中部与座体垂直并贯通座体的注入口组成;所述抽负压装置包括插入注浆底座注入口的抽负压顶嘴、一端与抽负压顶嘴连接,另一端与真空泵连接的气管;所述注浆装置包括插入注浆底座注入口的注浆喷嘴、通过浆管与注浆喷嘴连接的注浆泵。The object of the present invention is achieved through the following technical solutions: a negative pressure repairing construction device for concrete cracks, characterized in that: it includes a grouting base, a negative pressure pumping device and a grouting device, and the grouting base is formed by the base body. It is composed of an injection port whose middle part of the base body is perpendicular to the base body and penetrates through the base body; the negative pressure pumping device includes a negative pressure pumping nozzle inserted into the injection port of the grouting base, one end is connected with the negative pressure pumping nozzle, and the other end is connected with the vacuum pump. The gas pipe; the grouting device includes a grouting nozzle inserted into the injection port of the grouting base, and a grouting pump connected with the grouting nozzle through the grouting pipe.
所述注入口内安装密封胶垫。A sealing gasket is installed in the injection port.
所述注浆底座的内周边设有密封凹槽。The inner periphery of the grouting base is provided with a sealing groove.
一种混凝土裂缝的负压修补施工装置的施工方法,其特征在于:它包括以下步骤:A construction method of a negative pressure repairing construction device for concrete cracks is characterized in that: it comprises the following steps:
1)、确定底座位置:按30~50cm距离设置抽负压口或注浆口;1) Determine the position of the base: set the negative pressure port or grouting port at a distance of 30-50cm;
2)、封闭混凝土裂缝:将混凝土裂缝用密封材料封闭,预留出底座的位置;2) Sealing concrete cracks: Seal the concrete cracks with sealing materials, and reserve the position of the base;
3)、安装底座:在所选定的抽负压口和注浆口的位置处,沿着裂缝将底座固定;3) Install the base: at the selected position of the negative pressure suction port and the grouting port, fix the base along the crack;
4)、注修补剂:在封闭的条件下,将抽负压顶嘴及注浆喷嘴分别插入相邻的两个底座的注入口上,开启真空泵,通过抽负压顶嘴及气管,将裂缝中的空气抽出,产生负压;再开启专用注浆泵,在注浆泵的挤压及裂缝中的负压共同作用下,将事先配制好的修补剂填充到混凝土裂缝中,待抽负压顶嘴底座的注入口返浆,确认本段裂缝已灌满后,可停止注浆,将抽负压顶嘴及注浆喷嘴移至下一组底座的注入口进行循环注浆。4), injecting repair agent: under closed conditions, insert the suction nozzle and grouting nozzle into the injection ports of the two adjacent bases, turn on the vacuum pump, and pump the negative pressure nozzle and trachea to remove the cracks. The air is pumped out to generate negative pressure; then the special grouting pump is turned on. Under the combined action of the extrusion pump and the negative pressure in the crack, the pre-prepared repair agent is filled into the concrete crack, and the base of the negative pressure nozzle is to be pumped. After confirming that the cracks in this section are filled, the grouting can be stopped, and the suction nozzle and grouting nozzle are moved to the injection port of the next group of bases for circulating grouting.
所述混凝土裂缝负压修补施工方法,它还包括以下步骤:Described concrete crack negative pressure repair construction method, it also comprises the following steps:
1)、清理裂缝:在权利要求4步骤1)确定底座位置之前,先清除混凝土裂缝表面的灰尘、油污,保证裂缝基层的干燥、畅通,并用气泵清理裂缝中的杂物。1) Clean the cracks: Before determining the position of the base in step 1) of
所述混凝土裂缝负压修补施工方法,它还包括以下步骤:Described concrete crack negative pressure repair construction method, it also comprises the following steps:
4)、压气试验:在权利要求4步骤3)安装底座完毕后,待封闭带硬化后,进行压气试验,检查封闭带是否封严,压缩气体通过底座注入口进入裂缝中,气压控制在0.1~0.2MPa。4) Compression test: After the installation of the base in step 3) of
所述混凝土裂缝负压修补施工方法,它还包括以下步骤:Described concrete crack negative pressure repair construction method, it also comprises the following steps:
7)、基层复原:待权利要求4步骤4)所注入的修补剂固化后,清除密封胶及密封条/布,必要时可用打磨机对表面密封胶进行打磨,最后使用专用的基层修复材料,进行表面恢复,使其颜色与原混凝土结构表面尽量保持一致。7) Restoration of the base layer: After the repairing agent injected in step 4) of
所述封闭混凝土裂缝:将混凝土裂缝先用密封胶刷一遍,宽度约为5cm,再用密封条/布全部贴严、贴实,形成封闭带,预留出底座的位置。The sealing of concrete cracks: first brush the concrete cracks with sealant, the width is about 5cm, and then use the sealing strips/cloths to stick them tightly and firmly to form a sealing belt, and reserve the position of the base.
一种混凝土裂缝的负压修补施工装置的施工方法,其特征在于:它包括以下步骤:A construction method of a negative pressure repairing construction device for concrete cracks is characterized in that: it comprises the following steps:
1)、清理裂缝:先清除混凝土裂缝表面的灰尘、油污,保证裂缝基层的干燥、畅通,并用气泵清理裂缝中的杂物;1) Clean the cracks: first remove the dust and oil on the surface of the concrete cracks to ensure the dryness and smoothness of the crack base, and use an air pump to clean up the debris in the cracks;
2)、确定底座位置:按30~50cm距离设置抽负压口或注浆口;2) Determine the position of the base: set the negative pressure port or grouting port at a distance of 30-50cm;
3)、封闭混凝土裂缝:将混凝土裂缝用密封材料封闭,预留出底座的位置;3) Sealing concrete cracks: sealing the concrete cracks with sealing material, and reserving the position of the base;
4)、安装底座:在所选定的抽负压口和注浆口的位置处,沿着裂缝将底座固定;4) Install the base: at the selected position of the negative pressure suction port and the grouting port, fix the base along the crack;
5)、压气试验:待封闭带硬化后,进行压气试验,检查封闭带是否封严,压缩气体通过底座注入口进入裂缝中,气压控制在0.1~0.2MPa;5) Compression test: After the sealing belt is hardened, carry out a compression test to check whether the sealing belt is sealed tightly. The compressed gas enters the crack through the base injection port, and the air pressure is controlled at 0.1-0.2MPa;
6)、注修补剂:在封闭的条件下,将抽负压顶嘴及注浆喷嘴分别插入相邻的两个底座的注入口上,开启真空泵,通过抽负压顶嘴及气管,将裂缝中的空气抽出,产生负压;再开启专用注浆泵,在注浆泵的挤压及裂缝中的负压共同作用下,将事先配制好的修补剂填充到混凝土裂缝中,待抽负压顶嘴底座的注入口返浆,确认本段裂缝已灌满后,可停止注浆,将抽负压顶嘴及注浆喷嘴移至下一组底座的注入口进行循环注浆;6), injecting repair agent: under closed conditions, insert the suction nozzle and grouting nozzle into the injection ports of the two adjacent bases, turn on the vacuum pump, and pump the negative pressure nozzle and trachea to remove the cracks. The air is pumped out to generate negative pressure; then the special grouting pump is turned on. Under the combined action of the extrusion pump and the negative pressure in the crack, the pre-prepared repair agent is filled into the concrete crack, and the base of the negative pressure nozzle is to be pumped. After confirming that the cracks in this section are filled, the grouting can be stopped, and the suction nozzle and grouting nozzle can be moved to the injection port of the next group of bases for circulating grouting;
7)、基层复原:所注入的修补剂固化后,清除密封胶及密封条/布,必要时可用打磨机对表面密封胶进行打磨,最后使用专用的基层修复材料,进行表面恢复,使其颜色与原混凝土结构表面尽量保持一致。7) Restoration of the base layer: After the injected repair agent is cured, remove the sealant and sealing strip/cloth. If necessary, use a sander to polish the surface sealant. Finally, use a special base repair material to restore the surface to make it color. It should be as consistent as possible with the original concrete structure surface.
所述封闭混凝土裂缝:将混凝土裂缝先用密封胶刷一遍,宽度约为5cm,再用密封条/布全部贴严、贴实,形成封闭带,预留出底座的位置。The sealing of concrete cracks: first brush the concrete cracks with sealant, the width is about 5cm, and then use the sealing strips/cloths to stick them tightly and firmly to form a sealing belt, and reserve the position of the base.
本发明的优点和有益效果是:The advantages and beneficial effects of the present invention are:
本发明利用混凝土裂缝修补施工装置通过负压装置将裂缝中的空气抽出,形成一种负压的环境,在注浆泵的挤压作用下,能很好的解决裂缝深处不容易填充、填实的问题。The invention uses the concrete crack repairing construction device to extract the air in the crack through the negative pressure device to form a negative pressure environment, and under the squeezing action of the grouting pump, it can well solve the problem that the depth of the crack is not easy to fill and fill real problem.
附图说明Description of drawings
图1 是施工工艺流程图a:清理裂缝、确定注入口位置;Figure 1 is the construction process flow chart a: clean up the cracks and determine the location of the injection port;
图2是施工工艺流程图b:用密封胶、密封条/布密封裂缝;Figure 2 is the construction process flow chart b: seal cracks with sealant, sealing strip/cloth;
图3是施工工艺流程图c:安装底座;Fig. 3 is the construction process flow chart c: install the base;
图4是施工工艺流程图d:将抽负压顶嘴、注浆喷嘴安装在底座上;Fig. 4 is the construction process flow chart d: install the suction nozzle and the grouting nozzle on the base;
图5是施工工艺流程图e: 启动真空泵,抽负压;Fig. 5 is construction process flow chart e: start vacuum pump, pump negative pressure;
图6是施工工艺流程图f: 起动注浆泵,开始注浆;Figure 6 is the construction process flow chart f: start the grouting pump and start grouting;
图7是施工工艺流程图g:基层复原;Fig. 7 is construction process flow chart g: basic level restoration;
图8是底座剖面示意图;Figure 8 is a schematic cross-sectional view of the base;
图9是底座的俯视图;Figure 9 is a top view of the base;
图10是抽负压装置示意图;10 is a schematic diagram of a negative pressure pumping device;
图11是注浆装置示意图。Figure 11 is a schematic diagram of a grouting device.
其中:in:
1-梁(板),2-裂缝,3-预留注入口,4-密封胶,5-密封条,6-底座,7-注浆喷嘴,8-抽负压顶嘴,9-修补剂,10-修复好的裂缝,11-注入口,12-密封凹槽,13-密封胶垫,14-气管,15-真空泵,16-浆管,17-注浆泵,18-座体。1-beam (plate), 2-crack, 3-reserved injection port, 4-sealant, 5-seal, 6-base, 7-grouting nozzle, 8-pumping negative pressure top nozzle, 9-repairing agent, 10- repaired crack, 11- injection port, 12- sealing groove, 13- sealing gasket, 14- air pipe, 15- vacuum pump, 16- slurry pipe, 17- grouting pump, 18- seat body.
具体实施方式Detailed ways
下面结合附图对施工装置和施工方法进行详细介绍。The construction device and construction method are described in detail below with reference to the accompanying drawings.
实施例1:一种混凝土裂缝的负压修补施工装置,它包括注浆底座6、抽负压装置和注浆装置,所述注浆底座6包括一个圆形的座体18,圆形座体18的中部一体成型与座体垂直的管状注入口11,管状注入口11与座体18贯通,注入口11内安装直径略小于注入口内径的密封胶垫13,注浆底座6的座体边沿内周间隔设有一圈密封凹槽12;所述抽负压装置包括抽负压顶嘴8,抽负压顶嘴8的一端插入注浆底座6的注入口11内,抽负压顶嘴8与底座注入口11的内径相匹配,抽负压顶嘴8插入注入口6内的密封胶垫13,可以抽气,拔出来后密封胶垫13随即密封,抽负压顶嘴8的另一端通过气管14与真空泵15连接,通过真空泵将封闭的裂缝里的空气抽出,产生负压;所述注浆装置包括注浆喷嘴7,注浆喷嘴7的一端插入注浆底座6的注入口11内,注浆喷嘴7与底座注入口11的内径相匹配,另一端通过浆管16与注浆泵17连接,在注浆泵的挤压及裂缝中的负压作用下,将修补液填充到混凝土裂缝中。Embodiment 1: A negative pressure repairing construction device for concrete cracks, which includes a
实施例2:如图1-7所示,使用实施例1的施工装置对混凝土裂缝负压修补的施工方法,以某市政工程进行一处桥梁裂缝的修补工作为例,该桥梁为现浇混凝土,梁(板)1厚度为400mm,下构桥墩为柱式墩,基础除0#桥台为扩大基础,其余均采用钻孔灌注桩;因使用年限及混凝土自身等多种因素影响,其桥下面产生了大量细微的裂缝2,为防止裂缝进一步恶化影响桥梁的安全,需对该裂缝进行修补。Example 2: As shown in Figures 1-7, the construction method of negative pressure repairing concrete cracks using the construction device of Example 1, taking the repair work of a bridge crack in a municipal project as an example, the bridge is cast-in-place concrete , the thickness of beam (slab) 1 is 400mm, the lower pier is a column pier, and the foundation except the 0# abutment is the expansion foundation, and the rest are all bored piles; due to various factors such as the service life and the concrete itself, the bridge A large number of
现采用负压修补的方法对该裂缝进行修补,在对裂缝修补施工过程中,遵照以下步骤进行:The crack is now repaired by the method of negative pressure repair. In the process of repairing the crack, follow the following steps:
1)、准备工作:准备修补所需的机具、材料等;1) Preparatory work: prepare the equipment, materials, etc. required for repair;
2)、清理裂缝:清除混凝土裂缝2表面的灰尘、油污,必要时用清洗剂清洗,保证裂缝基层的干燥、畅通,并用气泵清理裂缝中的杂物;2), clean up cracks: remove the dust and oil on the surface of
3)、确定底座位置:按30~50cm距离设置预留注入口3,该预留注入口3处安装抽负压装置即为抽负压口,安装注浆装置即为注浆口,该预留注入口3位置尽量设置在裂缝较宽、开口较通畅或开叉的部位;如图1所示;3) Determine the position of the base: Set the reserved
4)、封闭混凝土裂缝:将混凝土裂缝先用密封胶刷一遍,宽度约为5cm,再用密封条/布全部贴严、贴实,形成封闭带,达到封闭裂缝的作用的同时,因密封条/布强度较高,可起到加固的作用,预留出底座的位置; 如图2所示;4) Sealing concrete cracks: first brush the concrete cracks with sealant, with a width of about 5cm, and then use the sealing strips/cloths to stick them tightly and firmly to form a sealing belt, which can seal the cracks. / The cloth has high strength, which can play a role in reinforcement, and reserve the position of the base; as shown in Figure 2;
5)、安装底座:在所选定的预留注入口3的位置处,沿着裂缝将底座6用密封胶4一一固定,并检查底座6粘牢、密封的同时,保证注入口11的畅通;如图3所示;5) Install the base: at the selected position of the reserved
6)、压气试验:封闭带硬化后,压缩气体通入底座注入口进行压气试验,检查封闭带是否严密,气压控制在0.1~0.2MPa,此时,在封闭带及底座周围涂上肥皂水,如发现通气后封闭带上有泡沫出现,说明该部位漏气,对漏气部位再次封闭;6) Air pressure test: After the sealing belt is hardened, the compressed gas is passed into the base injection port for air pressure test to check whether the sealing belt is tight and the air pressure is controlled at 0.1-0.2MPa. If it is found that there is foam on the sealing belt after ventilation, it means that the part is leaking, and the leaking part is closed again;
7)、注修补剂:在封闭的条件下,将抽负压顶嘴及注浆喷嘴分别安装在相邻的两个底座的注入口上,开启真空泵,通过抽负压顶嘴及气管,将裂缝中的空气抽出,产生负压;7), injecting repair agent: under closed conditions, install the suction nozzle and grouting nozzle on the injection ports of the two adjacent bases, turn on the vacuum pump, and pump the negative pressure nozzle and trachea. The air is extracted to generate negative pressure;
再开启专用注浆泵,在注浆泵的挤压及裂缝中的负压共同作用下,将事先配制好的修补剂9填充到混凝土裂缝中,待抽负压顶嘴底座的注入口返浆,确认本段裂缝已灌满后,停止注浆,将抽负压顶嘴及注浆喷嘴移至下一组底座进行循环注浆;Then turn on the special grouting pump, under the combined action of the squeeze of the grouting pump and the negative pressure in the crack, fill the
由于底座注入口11内安装直径略小于注入口11内径的密封胶垫13,用抽负压顶嘴或注浆喷嘴刺透胶垫,就能进行抽真空或注浆,拔出后,胶垫则封闭,底座注入口有关闭、密封的功能;Since the sealing
8)、基层复原:待所注入的修补剂固化后,根据工程需要,清除密封胶及密封条/布,也可不清除,必要时用打磨机对表面密封胶进行打磨,最后使用专用的基层修复材料,进行表面恢复,使其颜色与原混凝土结构表面尽量保持一致,裂缝修补好,如图7所示修补好的裂缝10;8), restoration of the base layer: after the injected repair agent is cured, remove the sealant and sealing strip/cloth according to the needs of the project. material, carry out surface restoration to make its color as consistent as possible with the original concrete structure surface, and repair the cracks, as shown in Figure 7. Repaired cracks 10;
9)、注浆工作完毕后,用压缩空气将抽负压装置和注浆装置中残液吹净,并使用丙酮冲洗管路及工具,以备下次使用。9) After the grouting work is completed, use compressed air to blow out the residual liquid in the suction negative pressure device and the grouting device, and use acetone to flush the pipeline and tools for the next use.
实施例3:如图1-7所示,使用实施例1的施工装置对混凝土裂缝负压修补的施工方法,以某化工项目的一个封闭水池顶板裂缝的修补工作为例,该封闭水池为现浇混凝土,水池长20米,宽8米,高3.5米,其中梁(板)1厚度为200mm;因使用年限及混凝土自身等多种因素影响,其顶板1下面产生了大量细微的裂缝2,由于化工企业内存在有腐蚀性物质,为防止裂缝进一步扩大,腐蚀性物质侵蚀板的钢筋,影响水池的结构安全,需对该裂缝进行修补。Embodiment 3: As shown in Figure 1-7, the construction method of concrete crack repairing with negative pressure using the construction device of Example 1 is taken as an example of the repairing work of a closed pool roof crack in a certain chemical project. When pouring concrete, the pool is 20 meters long, 8 meters wide, and 3.5 meters high, of which the thickness of the beam (slab) 1 is 200 mm; due to the influence of various factors such as the service life and the concrete itself, a large number of
现采用负压修补的方法对该裂缝进行修补,在对裂缝修补施工过程中,遵照以下步骤进行:The crack is now repaired by the method of negative pressure repair. In the process of repairing the crack, follow the following steps:
1)、准备工作:准备修补所需的机具、材料等;1) Preparatory work: prepare the equipment, materials, etc. required for repair;
2)、清理裂缝:清除混凝土裂缝2表面的灰尘、油污,必要时用清洗剂清洗,保证裂缝基层的干燥、畅通,并用气泵清理裂缝中的杂物;2), clean up cracks: remove the dust and oil on the surface of
3)、确定底座位置:按30~50cm距离设置预留注入口3,该预留注入口3处安装抽负压装置即为抽负压口,安装注浆装置即为注浆口,该预留注入口3位置尽量设置在裂缝较宽、开口较通畅或开叉的部位;如图1所示;3) Determine the position of the base: Set the reserved
4)、封闭混凝土裂缝:将混凝土裂缝先用密封胶刷一遍,宽度约为5cm,再用密封条/布全部贴严、贴实,形成封闭带,达到封闭裂缝的作用的同时,因密封条/布强度较高,可起到加固的作用,预留出底座的位置; 如图2所示;4) Sealing concrete cracks: first brush the concrete cracks with sealant, with a width of about 5cm, and then use the sealing strips/cloths to stick them tightly and firmly to form a sealing belt, which can seal the cracks. / The cloth has high strength, which can play a role in reinforcement, and reserve the position of the base; as shown in Figure 2;
5)、安装底座:在所选定的预留注入口3的位置处,沿着裂缝将底座6用密封胶4一一固定,并检查底座6粘牢、密封的同时,保证注入口11的畅通;如图3所示;5) Install the base: at the selected position of the reserved
6)、压气试验:封闭带硬化后,压缩气体通入底座注入口进行压气试验,检查封闭带是否严密,气压控制在0.1~0.2MPa,此时,在封闭带及底座周围涂上肥皂水,如发现通气后封闭带上有泡沫出现,说明该部位漏气,对漏气部位再次封闭;6) Air pressure test: After the sealing belt is hardened, the compressed gas is passed into the base injection port for air pressure test to check whether the sealing belt is tight and the air pressure is controlled at 0.1-0.2MPa. If it is found that there is foam on the sealing belt after ventilation, it means that the part is leaking, and the leaking part is closed again;
7)、注修补剂:在封闭的条件下,将抽负压顶嘴及注浆喷嘴分别安装在相邻的两个底座的注入口上,开启真空泵,通过抽负压顶嘴及气管,将裂缝中的空气抽出,产生负压;7), injecting repair agent: under closed conditions, install the suction nozzle and grouting nozzle on the injection ports of the two adjacent bases, turn on the vacuum pump, and pump the negative pressure nozzle and trachea. The air is extracted to generate negative pressure;
再开启专用注浆泵,在注浆泵的挤压及裂缝中的负压共同作用下,将事先配制好的修补剂9填充到混凝土裂缝中,待抽负压顶嘴底座的注入口返浆,确认本段裂缝已灌满后,停止注浆,将抽负压顶嘴及注浆喷嘴移至下一组底座进行循环注浆;Then turn on the special grouting pump, under the combined action of the squeeze of the grouting pump and the negative pressure in the crack, fill the
由于底座注入口11内安装直径略小于注入口11内径的密封胶垫13,用抽负压顶嘴或注浆喷嘴刺透胶垫,就能进行抽真空或注浆,拔出后,胶垫则封闭,底座注入口有关闭、密封的功能;Since the sealing
8)、基层复原:待所注入的修补剂固化后,根据工程需要,清除密封胶及密封条/布,也可不清除,必要时用打磨机对表面密封胶进行打磨,最后使用专用的基层修复材料,进行表面恢复,使其颜色与原混凝土结构表面尽量保持一致,裂缝修补好,如图7所示修补好的裂缝10;8), restoration of the base layer: after the injected repair agent is cured, remove the sealant and sealing strip/cloth according to the needs of the project. material, carry out surface restoration to make its color as consistent as possible with the original concrete structure surface, and repair the cracks, as shown in Figure 7. Repaired cracks 10;
9)、注浆工作完毕后,用压缩空气将抽负压装置和注浆装置中残液吹净,并使用丙酮冲洗管路及工具,以备下次使用。9) After the grouting work is completed, use compressed air to blow out the residual liquid in the suction negative pressure device and the grouting device, and use acetone to flush the pipeline and tools for the next use.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911163406.0A CN110821205A (en) | 2019-11-25 | 2019-11-25 | Concrete crack negative pressure repair construction device and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911163406.0A CN110821205A (en) | 2019-11-25 | 2019-11-25 | Concrete crack negative pressure repair construction device and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110821205A true CN110821205A (en) | 2020-02-21 |
Family
ID=69558845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911163406.0A Pending CN110821205A (en) | 2019-11-25 | 2019-11-25 | Concrete crack negative pressure repair construction device and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110821205A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535610A (en) * | 2020-05-20 | 2020-08-14 | 南京恒瑞工程技术有限公司 | Negative-pressure glue injection construction method |
CN112049030A (en) * | 2020-10-03 | 2020-12-08 | 张海伟 | Road and bridge multiaxial crack reinforcing apparatus |
CN112227498A (en) * | 2020-09-30 | 2021-01-15 | 长春市城建维护集团股份有限公司 | Non-excavation construction method for municipal pipeline |
CN112482805A (en) * | 2020-11-04 | 2021-03-12 | 中国二十冶集团有限公司 | Suction-jet type dense filling device and method for holes and pores |
CN113062207A (en) * | 2021-04-14 | 2021-07-02 | 浙江大学 | A new repair method for submerged bridge pier cracks |
CN114397432A (en) * | 2022-03-24 | 2022-04-26 | 四川省水利水电勘测设计研究院有限公司 | Concrete structure surface crack detection device |
CN114396075A (en) * | 2021-12-31 | 2022-04-26 | 中交二公局第六工程有限公司 | Grouting material for repairing through cracks in pipe gallery and repair method for through cracks in pipe gallery |
CN114837131A (en) * | 2022-06-01 | 2022-08-02 | 黄华日 | Flood control dam repairing device and method for flood control hydraulic engineering |
CN115467550A (en) * | 2022-09-14 | 2022-12-13 | 武汉二航路桥特种工程有限责任公司 | Concrete crack repairing method |
CN115874840A (en) * | 2022-12-05 | 2023-03-31 | 中建三局第一建设(四川)有限责任公司 | Concrete roof panel crack repairing method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203961331U (en) * | 2014-07-04 | 2014-11-26 | 东华理工大学 | Miniature slip casting closing device |
JP5824588B1 (en) * | 2015-04-06 | 2015-11-25 | 中日本高速技術マーケティング株式会社 | Vacuum grout injection method |
CN105442863A (en) * | 2015-11-23 | 2016-03-30 | 广东赛力克建筑技术工程有限公司 | Method for concrete structural crack repair |
CN109371860A (en) * | 2018-12-14 | 2019-02-22 | 梁惠文 | A kind of construction method for repairing Bridge Crack |
CN211285196U (en) * | 2019-11-25 | 2020-08-18 | 王景瑞 | Concrete crack negative pressure repairing construction device |
-
2019
- 2019-11-25 CN CN201911163406.0A patent/CN110821205A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203961331U (en) * | 2014-07-04 | 2014-11-26 | 东华理工大学 | Miniature slip casting closing device |
JP5824588B1 (en) * | 2015-04-06 | 2015-11-25 | 中日本高速技術マーケティング株式会社 | Vacuum grout injection method |
CN105442863A (en) * | 2015-11-23 | 2016-03-30 | 广东赛力克建筑技术工程有限公司 | Method for concrete structural crack repair |
CN109371860A (en) * | 2018-12-14 | 2019-02-22 | 梁惠文 | A kind of construction method for repairing Bridge Crack |
CN211285196U (en) * | 2019-11-25 | 2020-08-18 | 王景瑞 | Concrete crack negative pressure repairing construction device |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535610B (en) * | 2020-05-20 | 2022-04-19 | 南京恒瑞工程技术有限公司 | Negative-pressure glue injection construction method |
CN111535610A (en) * | 2020-05-20 | 2020-08-14 | 南京恒瑞工程技术有限公司 | Negative-pressure glue injection construction method |
CN112227498A (en) * | 2020-09-30 | 2021-01-15 | 长春市城建维护集团股份有限公司 | Non-excavation construction method for municipal pipeline |
CN112227498B (en) * | 2020-09-30 | 2022-06-21 | 长春市城建维护集团股份有限公司 | Non-excavation construction method for municipal pipeline |
CN112049030A (en) * | 2020-10-03 | 2020-12-08 | 张海伟 | Road and bridge multiaxial crack reinforcing apparatus |
CN112049030B (en) * | 2020-10-03 | 2021-11-19 | 张海伟 | Road and bridge multiaxial crack reinforcing apparatus |
CN112482805A (en) * | 2020-11-04 | 2021-03-12 | 中国二十冶集团有限公司 | Suction-jet type dense filling device and method for holes and pores |
CN113062207B (en) * | 2021-04-14 | 2022-03-11 | 浙江大学 | Novel repairing method for bridge pier cracks immersed under water |
CN113062207A (en) * | 2021-04-14 | 2021-07-02 | 浙江大学 | A new repair method for submerged bridge pier cracks |
CN114396075A (en) * | 2021-12-31 | 2022-04-26 | 中交二公局第六工程有限公司 | Grouting material for repairing through cracks in pipe gallery and repair method for through cracks in pipe gallery |
CN114396075B (en) * | 2021-12-31 | 2023-08-22 | 中交二公局第六工程有限公司 | Grouting material for repairing pipe gallery through crack and pipe gallery through crack repairing method |
CN114397432A (en) * | 2022-03-24 | 2022-04-26 | 四川省水利水电勘测设计研究院有限公司 | Concrete structure surface crack detection device |
CN114837131A (en) * | 2022-06-01 | 2022-08-02 | 黄华日 | Flood control dam repairing device and method for flood control hydraulic engineering |
CN115467550A (en) * | 2022-09-14 | 2022-12-13 | 武汉二航路桥特种工程有限责任公司 | Concrete crack repairing method |
CN115874840A (en) * | 2022-12-05 | 2023-03-31 | 中建三局第一建设(四川)有限责任公司 | Concrete roof panel crack repairing method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110821205A (en) | Concrete crack negative pressure repair construction device and construction method | |
US20200318774A1 (en) | Local repair method combining internally bonded CFRP and polymer grouting for cracks in drainage pipe | |
CN106321121A (en) | Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works | |
CN211285196U (en) | Concrete crack negative pressure repairing construction device | |
CN105464194B (en) | Less than the sewage network water-proof repairing construction method of level of ground water | |
CN113090068B (en) | Vacuum pouring process for rush-repairing deep-buried building top concrete structure under limited conditions | |
CN113944342A (en) | Leveling layer hollowing repairing method | |
KR100489515B1 (en) | Panel for repairing, reinforcing con'c body and method of using the same | |
CN111536362B (en) | Method for grouting and reinforcing fiber grids of large-diameter concrete pipeline lining | |
CN111945497A (en) | Concrete structure pore filling operation device and method | |
CN112900490A (en) | Deformation joint grouting and leaking stoppage subway structure water leakage treatment method | |
JP3897354B1 (en) | Manhole repair and reinforcement methods | |
CN112195970A (en) | River-crossing tunnel engineering waterproof construction method | |
JP2840566B2 (en) | Deep reinforcement method for concrete structures | |
CN206706687U (en) | A kind of concrete slab extruding, which destroys, repairs structure | |
KR20220161584A (en) | A repairing method for column type underwater structures | |
KR20080063723A (en) | Non-excavation repair method of water and sewage pipe | |
CN214194878U (en) | Drainage ditch box prosthetic devices | |
CN213297255U (en) | Prefabricated floor reinforcing structure | |
CN114045742B (en) | Construction method of bridge abutment of large-span inverted siphon pipe bridge | |
CN110258680A (en) | A kind of diaphram wall restorative procedure | |
CN217652776U (en) | An operation tunnel leaking remediation structure | |
KR100482984B1 (en) | Anchor for leveling panel and method of using the same | |
CN115897506A (en) | Repairing method for concrete steel plate corner protector | |
KR20120099839A (en) | Waterproof method of construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |