CN110258517A - A kind of construction method for underground continuous wall connector - Google Patents
A kind of construction method for underground continuous wall connector Download PDFInfo
- Publication number
- CN110258517A CN110258517A CN201910512558.0A CN201910512558A CN110258517A CN 110258517 A CN110258517 A CN 110258517A CN 201910512558 A CN201910512558 A CN 201910512558A CN 110258517 A CN110258517 A CN 110258517A
- Authority
- CN
- China
- Prior art keywords
- slot
- rectangle frame
- unit
- construction
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a kind of construction methods for underground continuous wall connector, including mud ditch, the inside of mud ditch is equipped with several continuous wall groove segments, it is seam crossing between adjacent continuous wall chase section, it is equipped with locating piece at the top of each continuous wall groove segment, leak detection room is connected at the top of locating piece, the bottom for room of hunting leak is communicated with several snorkels, the top and the corresponding position of snorkel of leak detection room are communicated with the second leak detection channel, are communicated with mounting groove at the top of the second leak detection channel.The present invention is in the pre-buried locating piece of each continuous wall groove segment, in the top of locating piece installation leak detection room, gas leakage detection is carried out to leak detection chamber interior, detect it is air tight after using second leak detection channel, chamber and snorkel progress leak detection, if being passed directly into concrete after detection leakage carries out leak stopping, extract locating piece after leak stopping out, it is simple and easy, and the leak detection of all continuous wall groove segments in a mud ditch can be completed.
Description
Technical field
The present invention relates to the related fields of diaphram wall, specially a kind of construction party for underground continuous wall connector
Method.
Background technique
On the whole, diaphram wall is to build up continuous armored concrete wall together in underground, as intercepting water, prevent
Infiltration, load-bearing, water-retaining structure.Diaphram wall is formed by many wall section spelling groups, and to keep continuously constructing between wall section, connector is adopted
With locking notch pipe technique, i.e., before slot section concrete is perfused, a pre-inserted diameter and the equal steel pipe of groove width in the end of slot section, i.e.,
Locking notch pipe extracts steel pipe after concrete initial set slowly, so that end is formed half blind mortise shape and connects shape.Also with good grounds wall body structure by
Power needs and rigid joint is arranged, so that first latter two wall section unifies.Diaphram wall is first of architectural engineering
Step, quality directly affect the quality of whole building.
The shape and installation method of connector have certainly for leakage whether can occur between the perfusion slot section of underground connection wall
Qualitative effect, existing connector mostly use greatly circular tube structure, it cannot be guaranteed that the leakproofness at the slot section of two unit grooves, and two
Have between unit groove section there is a situation where leaking generation, can not achieve the anti-effect for blending water blocking in side and propose on this basis
A kind of novel construction method for underground continuous wall connector, after connector construction and installation, greatly reduce unit groove section it
Between leakage, offer convenience to the subsequent job of staff.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods for underground continuous wall connector, to solve above-mentioned background skill
The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme: a kind of construction party for underground continuous wall connector
Method, including following construction method:
Preparation of construction: size and the scribing line of guide groove are designed according to surrounding terrain, guide groove is divided into several segment units
Slot;
The setting of slot: the slot of rectangular configuration is opened up in the two sides of all adjacent cells slots junction, and at slot
Rectangular frame structure is pre-installed, rectangular frame structure is made of one big rectangle frame and a small rectangle frame for being embedded in big rectangle frame, small
Inside of the rectangle frame through big rectangle frame to guide groove and the junction in two unit grooves, the avris of big rectangle frame and small square
It mutually slides the junction of shape frame;
Unit groove grooving: slot grooving is carried out using groover, every segment unit slot is excavated respectively, in unit groove knot
Wall reinforcing bar is led in the avris placement of structure, is built mud ditch and concrete pit in the avris of unit groove, is led and inject mud, shape in wall reinforcing bar
At leading wall construction;
Borehole cleaning: after grooving, first time borehole cleaning is completed to mud, before concrete perfusion, carries out secondary pile hole cleaning;
It hangs connector: placing the adapter body of an arcuate structure at the unit groove both ends for completing unit groove grooving, two
The curved opening of a adapter body is towards the two sides of unit groove, and two end edges of the arcuate structure and similar small rectangle frame
Avris is in contact;
It hangs steel mesh: using hanging device, hanging steel mesh between two adapter bodies;
Pouring underwater concrete: being passed through the pipeline connected with concrete pit at above-mentioned steel mesh, and by filling concrete
To the steel mesh, the construction of a unit groove is formed;
Next unit construction: according to the grooving of said units slot, borehole cleaning, hang connector, hang steel mesh and priming petock under mix
Coagulate the step of soil, realize the construction of the next unit slot adjacent with a upper unit groove, by the unit groove after two adjacent constructions it
Between the extraction of big rectangle frame, and the concrete perfusion between big rectangle frame and the outer wall of small rectangle frame;
It completes the construction of diaphragm wall: after by the construction of all unit grooves, completing the construction of diaphragm wall.
Preferably, in the step of setting of slot, slot is opened up using impact groover, the length of slot is equal to small square
To the length of big rectangle frame side, the width of slot is equal to the width of big rectangle frame for the side of shape frame.
Preferably, in the step of unit groove grooving the length of unit groove according to soil property, underground water, surrounding structures and fluting
Depth determine, groover includes grab type, impact type and rotary groover.
Preferably, in the step of hanging connector, connector includes flexible joint and rigid joint, the adapter body of arcuate structure
Width and width less than unit groove, be rounded structure, the avris and fillet knot of small rectangle frame at two end edges of adapter body
Structure contact position is equipped with arc-shaped slot, and arc-shaped slot is mutually clamped with the end edge of rounded structure.
Preferably, in the step of pouring underwater concrete, it can take out and connect when the concrete of unit groove is in leather hard
Head main body also may be selected not take out adapter body in the inside casting concrete of adapter body after taking-up.
Preferably, in the step of next unit is constructed, in the small rectangle frame after two adjacent constructions between unit groove
Portion's casting concrete.
Compared with prior art, the beneficial effects of the present invention are: the present invention passes through the two sides in adjacent cells slot junction
The slot for opening up rectangular configuration realizes the prepackage of rectangular frame structure, and rectangular frame structure is made of big rectangle frame and small rectangle frame, and
The two can be slided, and after the construction of adjacent cells slot, as soon as taking out big rectangle frame carries out pouring for time concrete, this is reduced
The case where being leaked at gap between two unit grooves, so that the side of unit groove there's almost no leakage scenarios, finally small
The inside of rectangle frame pours a concrete again, greatly reduces side leakage situation, without still further detection seam crossing side
The leakage scenarios in face reduce the process of construction;Using the adapter body of arcuate structure, and between adapter body and small rectangle frame
It is mutually clamped by arcuate structure, convenient for the taking-up of adapter body, adapter body is also an option that and does not take out, using flexible, according to
It needs to adjust at any time.
Detailed description of the invention
Fig. 1 is mounting structure schematic diagram one of the invention;
Fig. 2 is mounting structure schematic diagram two of the invention.
In figure: 1, guide groove;2, unit groove;3, slot;4, big rectangle frame;5, small rectangle frame;6, adapter body;7, reinforcing bar
Net.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " setting ", " peace
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, on can understanding as the case may be
State the concrete meaning of term in the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of construction method for underground continuous wall connector,
Including following construction method:
Preparation of construction: size and the scribing line of guide groove 1 are designed according to surrounding terrain, guide groove 1 is divided into several segments list
First slot;
The setting of slot 3: the slot 3 of rectangular configuration is opened up in the two sides of all adjacent cells slots junction, and in slot 3
Place's prepackage rectangular frame structure, rectangular frame structure are embedded in 5 groups of small rectangle frame of big rectangle frame 4 by one big rectangle frame 4 and one
At, inside of the small rectangle frame 5 through big rectangle frame 4 to guide groove 1 and the junction in two unit grooves, big rectangle frame 4
Avris is mutually slided with the junction of small rectangle frame 5;
Unit groove grooving: slot grooving is carried out using groover, every segment unit slot is excavated respectively, in unit groove knot
Wall reinforcing bar is led in the avris placement of structure, is built mud ditch and concrete pit in the avris of unit groove, is led and inject mud, shape in wall reinforcing bar
At leading wall construction;
Borehole cleaning: after grooving, first time borehole cleaning is completed to mud, before concrete perfusion, carries out secondary pile hole cleaning;
It hangs connector: placing the adapter body 6 of an arcuate structure at the unit groove both ends for completing unit groove grooving, two
The curved opening of a adapter body 6 is towards the two sides of unit groove, and two end edges of the arcuate structure and similar small rectangle frame 5
Avris be in contact;
It hangs steel mesh: using hanging device, hanging steel mesh between two adapter bodies 6;
Pouring underwater concrete: being passed through the pipeline connected with concrete pit at above-mentioned steel mesh, and by filling concrete
To the steel mesh, the construction of a unit groove is formed;
Next unit construction: according to the grooving of said units slot, borehole cleaning, hang connector, hang steel mesh and priming petock under mix
Coagulate the step of soil, realize the construction of the next unit slot adjacent with a upper unit groove, by the unit groove after two adjacent constructions it
Between big rectangle frame 4 extract out, and the concrete perfusion between big rectangle frame 4 and the outer wall of small rectangle frame 5;
It completes the construction of diaphragm wall: after by the construction of all unit grooves, completing the construction of diaphragm wall.
In the above-described embodiments, in the step of setting of slot 3, slot 3 is opened up using impact groover, slot 3
Length is equal to the side of small rectangle frame 5 to the length of big 4 side of rectangle frame, and the width of slot 3 is equal to the width of big rectangle frame 4.
In the above-described embodiments, the length of unit groove is constructed according to soil property, underground water, surrounding in the step of unit groove grooving
The depth of object and fluting determines that groover includes grab type, impact type and rotary groover.
In the above-described embodiments, in the step of hanging connector, connector includes flexible joint and rigid joint, arcuate structure
The width of adapter body 6 and width less than unit groove are rounded structure, the side of small rectangle frame 5 at two end edges of adapter body 6
Side and rounded structure contact position are equipped with arc-shaped slot, and arc-shaped slot is mutually clamped with the end edge of rounded structure.
In the above-described embodiments, in the step of pouring underwater concrete, leather hard can be in the concrete of unit groove
When take out adapter body 6, in the inside casting concrete of adapter body 6 after taking-up, also may be selected do not take out adapter body 6.
In the above-described embodiments, in the step of next unit is constructed, in the small square after two adjacent constructions between unit groove
The inside casting concrete of shape frame 5.
The present invention realizes rectangular frame structure by opening up the slot 3 of rectangular configuration in the two sides of adjacent cells slot junction
Prepackage, rectangular frame structure is made of big rectangle frame 4 and small rectangle frame 5, and the two can be slided, and has been constructed in adjacent cells slot
Bi Hou takes out big rectangle frame 4 and carries out pouring for a concrete, and this reduces what is leaked at gap between two unit grooves 2
Situation finally pours a coagulation in the inside of small rectangle frame 5 so that the side of unit groove 2 there's almost no leakage scenarios again
Soil greatly reduces side leakage situation, without the leakage scenarios for still further detecting seam crossing side, reduces the work of construction
Sequence;It is mutually clamped, is convenient for by arcuate structure using the adapter body 6 of arcuate structure, and between adapter body 6 and small rectangle frame 5
The taking-up of adapter body 6, it is also an option that not taking out, using flexible adjusts adapter body 6 at any time as needed.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of construction method for underground continuous wall connector, it is characterised in that: including following construction method:
Preparation of construction: size and the scribing line of guide groove (1) are designed according to surrounding terrain, guide groove (1) is divided into several segments list
First slot;
The setting of slot (3): the slot (3) of rectangular configuration is opened up in the two sides of all adjacent cells slots junction, and in slot
(3) rectangular frame structure is pre-installed at, rectangular frame structure is embedded in the small square of big rectangle frame (4) by one big rectangle frame (4) and one
Shape frame (5) composition, inside of the small rectangle frame (5) through big rectangle frame (4) to guide groove (1) and the connection in two unit grooves
Place, the avris of big rectangle frame (4) are mutually slided with the junction of small rectangle frame (5);
Unit groove grooving: slot grooving is carried out using groover, every segment unit slot is excavated respectively, in unit slot structure
Wall reinforcing bar is led in avris placement, is built mud ditch and concrete pit in the avris of unit groove, is led and inject mud in wall reinforcing bar, formation is led
Wall construction;
Borehole cleaning: after grooving, first time borehole cleaning is completed to mud, before concrete perfusion, carries out secondary pile hole cleaning;
It hangs connector: placing the adapter body (6) of an arcuate structure at the unit groove both ends for completing unit groove grooving, two
The curved opening of adapter body (6) is towards the two sides of unit groove, and two end edges of the arcuate structure and similar small rectangle frame
(5) avris is in contact;
It hangs steel mesh: using hanging device, hanging steel mesh between two adapter bodies (6);
Pouring underwater concrete: it is passed through the pipeline connected with concrete pit at above-mentioned steel mesh, and filling concrete extremely should
At steel mesh, the construction of a unit groove is formed;
Next unit construction: it according to the grooving of said units slot, borehole cleaning, hangs connector, hang steel mesh and pouring underwater concrete
The step of, realize the construction of the next unit slot adjacent with a upper unit groove, it will be between the unit groove after two adjacent constructions
Big rectangle frame (4) extraction, and the concrete perfusion between big rectangle frame (4) and the outer wall of small rectangle frame (5);
It completes the construction of diaphragm wall: after by the construction of all unit grooves, completing the construction of diaphragm wall.
2. a kind of construction method for underground continuous wall connector according to claim 1, it is characterised in that: slot (3)
Setting the step of in, opened up slot (3) using impact groover, the length of slot (3) is equal to the side of small rectangle frame (5)
To the length of big rectangle frame (4) side, the width of slot (3) is equal to the width of big rectangle frame (4).
3. a kind of construction method for underground continuous wall connector according to claim 1, it is characterised in that: unit groove at
The length of unit groove is determined according to the depth of soil property, underground water, surrounding structures and fluting in the step of slot, and groover includes grabbing
Bucket type, impact type and rotary groover.
4. a kind of construction method for underground continuous wall connector according to claim 1, it is characterised in that: hang connector
The step of in, connector includes flexible joint and rigid joint, the width of the adapter body (6) of arcuate structure and less than unit groove
Width, is rounded structure at two end edges of adapter body (6), and the avris of small rectangle frame (5) and rounded structure contact position are equipped with arc
The end edge of shape card slot, arc-shaped slot and rounded structure is mutually clamped.
5. a kind of construction method for underground continuous wall connector according to claim 1, it is characterised in that: under priming petock
In the step of concrete, adapter body (6) can be taken out when the concrete of unit groove is in leather hard, in connector master after taking-up
The inside casting concrete of body (6) also may be selected not taking out adapter body (6).
6. a kind of construction method for underground continuous wall connector according to claim 1, it is characterised in that: next unit
In the step of construction, in the inside casting concrete of the small rectangle frame (5) after two adjacent constructions between unit groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910512558.0A CN110258517B (en) | 2019-06-13 | 2019-06-13 | Construction method for underground continuous wall joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910512558.0A CN110258517B (en) | 2019-06-13 | 2019-06-13 | Construction method for underground continuous wall joint |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258517A true CN110258517A (en) | 2019-09-20 |
CN110258517B CN110258517B (en) | 2021-06-18 |
Family
ID=67918236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910512558.0A Expired - Fee Related CN110258517B (en) | 2019-06-13 | 2019-06-13 | Construction method for underground continuous wall joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258517B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2519517A1 (en) * | 1974-05-07 | 1975-11-20 | Sif Entreprise | METHOD OF SEALING BETWEEN PREFABRICATED PANELS OF A WALL IN THE FLOOR AND DEVICE FOR CARRYING OUT THE METHOD |
CN101168963A (en) * | 2007-11-05 | 2008-04-30 | 上海市第二市政工程有限公司 | Large depth underground continuous wall water-stop joint device |
CN101560767A (en) * | 2009-05-12 | 2009-10-21 | 广东省长大公路工程有限公司 | Method for connecting slotted sections in underground construction of diaphragm wall |
CN104790380A (en) * | 2015-04-13 | 2015-07-22 | 上海远方基础工程有限公司 | Underground diaphragm wall framework |
CN204510287U (en) * | 2015-03-19 | 2015-07-29 | 江苏建院营造有限公司 | A kind of snap close pipe preventing concrete from streaming |
CN204626466U (en) * | 2015-03-25 | 2015-09-09 | 天津深基工程有限公司 | Band wing ground-connecting-wall junction block |
-
2019
- 2019-06-13 CN CN201910512558.0A patent/CN110258517B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2519517A1 (en) * | 1974-05-07 | 1975-11-20 | Sif Entreprise | METHOD OF SEALING BETWEEN PREFABRICATED PANELS OF A WALL IN THE FLOOR AND DEVICE FOR CARRYING OUT THE METHOD |
CN101168963A (en) * | 2007-11-05 | 2008-04-30 | 上海市第二市政工程有限公司 | Large depth underground continuous wall water-stop joint device |
CN101560767A (en) * | 2009-05-12 | 2009-10-21 | 广东省长大公路工程有限公司 | Method for connecting slotted sections in underground construction of diaphragm wall |
CN204510287U (en) * | 2015-03-19 | 2015-07-29 | 江苏建院营造有限公司 | A kind of snap close pipe preventing concrete from streaming |
CN204626466U (en) * | 2015-03-25 | 2015-09-09 | 天津深基工程有限公司 | Band wing ground-connecting-wall junction block |
CN104790380A (en) * | 2015-04-13 | 2015-07-22 | 上海远方基础工程有限公司 | Underground diaphragm wall framework |
Also Published As
Publication number | Publication date |
---|---|
CN110258517B (en) | 2021-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106015737B (en) | The construction method of cross a river immersed tube integral installation | |
CN109356162B (en) | OPT occlusion pile side grouting water stopping method and grouting pipe device | |
CN110566273B (en) | Drainage system and drainage method for treating tunnel surrounding rock fracture water | |
US3796054A (en) | Method for the construction of impermeable walls | |
CN103669349B (en) | A kind of reducing stirring type anchor pole and construction method thereof | |
CN106939595A (en) | Construction process of rotary digging bottom expanding cast-in-place pile | |
CN107460882A (en) | A kind of retaining piles construction method of deep basal pit closing sealing | |
CN109137948A (en) | Grouting behind shaft or drift lining occlusion water-stopping method and equipment between a kind of stake | |
CN109630193A (en) | Subway Tunnel service channel excavates the administering method for water burst phenomenon occur | |
CN108166532A (en) | A kind of groutable underground continuous wall connector and its construction method | |
CN110453675A (en) | One kind is folded to pour formula diaphram wall and its construction method | |
CN110258517A (en) | A kind of construction method for underground continuous wall connector | |
CN110258516B (en) | Equipment and method for detecting and repairing water leakage at joint of groove section of underground diaphragm wall | |
CN106284303B (en) | A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector | |
CN106801414A (en) | Dyke and dyke construction method of a kind of band from discharge structure | |
CN112031811B (en) | Cliff water injection plugging system and method | |
CN209114505U (en) | Underwater view building | |
CN209162798U (en) | The anti-by-pass means of underground continuous wall connector | |
CN209324383U (en) | A kind of joint structure of Shield-bored tunnels and station | |
CN104790430B (en) | Construction method of underground continuous wall | |
CN207633336U (en) | A kind of railroad bridge protection wall of bored pile | |
CN110080249A (en) | A kind of pressure filling formula Diaphragm Wall Support Structure and its construction method | |
CN210368871U (en) | Cut-off equipment for water conservancy construction | |
CN221277762U (en) | Underground excavation tunnel waterproof structure of embedded grouting pipe | |
CN215630002U (en) | Large shield starting well open-cut reverse-construction ultra-deep foundation pit permanent-temporary combined supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Luo Lianhua Inventor after: Huang Hui Inventor after: Wang Huan Inventor before: Wang Huan |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210618 |
|
CF01 | Termination of patent right due to non-payment of annual fee |