CN110258332A - Closure linker water tank ballast device and method - Google Patents

Closure linker water tank ballast device and method Download PDF

Info

Publication number
CN110258332A
CN110258332A CN201910264482.4A CN201910264482A CN110258332A CN 110258332 A CN110258332 A CN 110258332A CN 201910264482 A CN201910264482 A CN 201910264482A CN 110258332 A CN110258332 A CN 110258332A
Authority
CN
China
Prior art keywords
water tank
closure
water
linker
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910264482.4A
Other languages
Chinese (zh)
Inventor
刘奎
廖红玉
刘明周
余珊
孙广宏
黄达铠
周媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910264482.4A priority Critical patent/CN110258332A/en
Publication of CN110258332A publication Critical patent/CN110258332A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention belongs to technical field of bridge construction, and in particular to a kind of closure linker water tank ballast device and method.A kind of closure linker water tank ballast device, including two water tanks, by connecting into a linker communicating pipe between two water tanks, two water tanks are respectively placed at closure section two sides when use;The water tank upper offers water inlet, and the water tank lower part is equipped with water outlet, and the water outlet is equipped with drain valve;Flowmeter is additionally provided on the water outlet of the water tank;Linker is additionally provided between two water tanks, the linker includes two graduated transparent vertical ducts of mark, and two vertical ducts are separately mounted on two water tanks, and the bottom of two vertical ducts is injected with colored liquid by transverse pipe connection connection.The present invention has used law of connected vessels, is connected to closure section two sides water tank, ensure that two sides counterweight is uniform, the unloading of full symmetric balance.

Description

Closure linker water tank ballast device and method
Technical field
The invention belongs to technical field of bridge construction, and in particular to a kind of closure linker water tank ballast device and side Method.
Background technique
Traditional bridge steel structure closure segment and abutment lapping construction operation usually distinguishes heap earth bag, water tank using two sides Or water packet, concrete precast block carry out closure segment and abutment lapping construction ballast conversion process;Its ballast method is more original, applies Operation during work is cumbersome and work efficiency is low.Secondly heap earth bag, water tank or the water packet used carries out closure segment and abutment overlap joint The formation for ballast conversion process of constructing is lack of standardization, cannot at the uniform velocity and symmetrically guarantee the reduction of two sides counterweight complete equipilibrium, and not Can directly monitoring bridge at any time vertical deformation.
Summary of the invention
In view of the above technical problems, the purpose of the present invention is to provide a kind of closure linker water tank ballast device and Method, the device and method have used law of connected vessels, are connected to closure section two sides water tank, ensure that two sides counterweight is equal Even, full symmetric balance unloading, solves and reduces with cannot symmetrically guaranteeing closure section two sides counterweight complete equipilibrium in the prior art The problem of.
To achieve the above object, the technical solution used in the present invention is:
A kind of closure linker water tank ballast device, it is characterised in that: including two water tanks, pass through company between two water tanks Siphunculus connection is connected into a linker, and two water tanks are respectively placed at closure section two sides when use.
Further, the water tank upper offers water inlet, and the water tank lower part is equipped with water outlet, on the water outlet Equipped with drain valve.
Further, flowmeter is additionally provided on the water outlet of the water tank.
Further, the communicating pipe is fire hose, and both ends pass through bayonet coupling and connect with the lower part of corresponding water tank.
Further, the water tank side is equipped with liquidometer.
Further, connection indicator is additionally provided between two water tanks, the connection indicator includes two and indicates scale Transparent vertical duct, two vertical ducts are separately mounted on two water tanks, and the bottom of two vertical ducts passes through a transverse pipe and connects Lead to and connect, and is injected with colored liquid.
Further, reflectorized paint is brushed on the water tank.
A kind of application method of closure linker water tank ballast device, it is characterised in that the following steps are included:
A, two water tanks are respectively placed at closure section two sides, then are connected to and are connected by communicating pipe;
B, it is filled the water again into two water tanks, checks the quality that liquidometer waits for the quality of Water in Water Tanks and closure section waits for casting concrete Stop injection when equal;
C, it selects the period that temperature is minimum in one day to carry out the construction of closure section, starts to beat while pouring closure section concrete Drain valve sluicing is opened, guarantees that the mass velocity of drain valve sluicing is equal to the mass velocity of closure section concreting.
A method of closure construction is carried out using closure linker water tank ballast device, it is characterised in that packet Include following steps:
1, in the pre-buried anchor plate in closure section two sides, the construction of two sides balance grouting section is completed by cast-in-place cantilever method, and conserve and arrive Design strength;
2, movable hanging basket, installation template;
3, it carries out water tank ballast: in front of across closure segment locking, two water tanks being respectively placed at closure section two sides, then It is connected to and is connected by communicating pipe, closed drain valve, filled the water with water pump into water tank, check liquidometer, stopped to after designing scale Injection;
5, two vertical ducts of adjustment installation make liquid level in two vertical ducts maintain an equal level, and write down the initial scale value of liquid level;
6, closure segment stiff skeleton is installed: the pre-buried anchor plate in connection bridge closure section two sides is respectively welded with rigid connecting rod;
7, start to pour closure section concrete, open simultaneously drain valve, guarantee that the mass velocity that drain valve sluices is equal to closure section The mass velocity of concreting, water has been let out in water tank while closure section concreting is completed;
8, it is covered and is conserved after the completion of concreting, until reaching design strength.
The invention has the benefit that
(1) the device of the invention and approach application law of connected vessels, is connected to closure section two sides water tank, ensure that two sides Counterweight is uniform, the unloading of full symmetric balance, and closure section two sides counterweight complete equipilibrium cannot symmetrically be guaranteed in the prior art by solving The problem of ground is reduced.Water outlet of water tank is equipped with flowmeter and adjustable drain valve, can be supervised in real time according to the speed of perfusion of concrete The speed that discharges water of control water tank, reaches to synchronize etc. and unloads again.
(2) by being connected to the communicating pipe of fire hose material, bearing capacity is high, corrosion-resistant, low temperature resistant, resistance to for water tank two sides Mill, light weight, adjustable in length is convenient for construction.Communicating pipe connects built-in rubber sealing ring construction and installation disassembly by bayonet coupling Convenient, dense water can replacement that is good, facilitating communicating pipe.
(3) a small-sized connection indicator is installed on water tank, injects colored liquid, the liquid by observing two sides is carved Degree variation, the two sides vertical deformation that can intuitively monitor cantilever segment at any time are poor.
(4) pass through water tank ballast, be sky water tank light weight in handling process, reduce mechanical lifting, transport, construction party Just, save the cost.
(5) liquidometer is filled on water tank with law of connected vessels, liquid level can be intuitively known very much, to know water tank The quality of interior water, when water filling can guarantee water tank quality with close up it is equal across concrete quality;And liquidometer heavy-walled glass pipe There is metal cylinder outside form, prevents from carrying, glass tube form is damaged in construction.
(6) it is carried out (when usual morning 1~6) when minimum temperature generally on the day of when closure section construction, by water tank Brush reflectorized paint, it is ensured that the safety to carry on construction work at night.
Detailed description of the invention
Fig. 1 is the stereoscopic schematic diagram of closure linker water tank ballast device.
Fig. 2 is the schematic top plan view of closure linker water tank ballast device.
Fig. 3 is the end view of closure section when closure linker water tank ballast device uses.
In figure: 1, cantilever segment;2, water tank;3, flowmeter;4, drain valve;5, liquidometer;6, water inlet;7, communicating pipe;8, Bayonet coupling;9, transverse pipe;10, two lead to adapter tube;11, pipe clamp;12, vertical duct;13, anchor plate;14, rigid connecting rod.
Specific embodiment
For a better understanding of the present invention, technical solution of the present invention is done further below with reference to embodiment and attached drawing Explanation.
As shown in Figure 1,2 and 3, a kind of closure linker water tank ballast device, including two water tanks 2, the water tank 2 Upper to be brushed with reflectorized paint, by the connection connection of communicating pipe 7 between two water tanks 2, two water tanks 2 are respectively placed at bridge when use Closure section two sides.2 top of water tank offers water inlet 6, and 2 lower part of water tank is equipped with water outlet, sets on the water outlet There are flowmeter 3 and drain valve 4.2 side of water tank is equipped with liquidometer 5(, that is, glass-tube liquid level meter, glass-tube liquid level meter heavy wall glass There is metal cylinder outside glass pipe form).Connection indicator is additionally provided between two water tanks 2, the connection indicator includes two marks Graduated transparent vertical duct 12, two vertical duct 12(pass through pipe clamp 11) it is separately mounted on two water tanks 2, two are vertical The bottom of pipe 12 is connected (vertical duct 12 directly leads to adapter tube 10 by two with transverse pipe 9 and connect) by a transverse pipe 9 connection, and It is (nontransparent, such as red, black, blue to be injected with colored liquid;Become in casting process by the liquid scale of observation two sides Change, the two sides vertical deformation that can intuitively monitor cantilever segment 1 at any time is poor).
The communicating pipe 7 is fire hose, and both ends pass through bayonet coupling 8 and corresponding water tank 2 (with rubber seal) Lower part connection.Fire hose is the pipe shaft (band body) of a kind of tubulose, strip caused by being knitted as canvas.
A kind of application method of closure linker water tank ballast device, comprising the following steps:
A, two water tanks 2 are respectively placed at closure section two sides, then pass through the connection connection of communicating pipe 7.
B, it is filled the water again into two water tanks 2, checks quality and closure section to be poured coagulation of the liquidometer 5 to water in water tank 2 Stop injection when the quality of soil is equal.
C, it selects the period (usually morning 1~6 point) that temperature is minimum in one day to carry out the construction of closure section, starts to pour Drain valve 4 is opened while building closure section concrete to sluice, and guarantees that the mass velocity that drain valve 4 sluices is equal to closure section concrete The mass velocity poured (water has been let out in water tank 4 while closure section concreting is completed).It is converted into common volume flow rate (the usually used unit of concrete is volume), the volume flow rate that drain valve 4 sluices is the volume flow rate of concreting 2.551 again;Continuous observation flowmeter 3 in casting process, then with the quality versus of casting concrete, and according to In Situ Concrete It pours practical measuring and calculating concrete supply and pours rate adaptation drain valve 4, guarantee balance unloading.Guarantee balance unloading, unit time Concrete pouring quality is equal with regard to the quality that must discharge water with water tank 2, i.e. m concrete=m water, it is known that the density of concrete and water is led to It crosses following formula and show that sluicing speed must be 2.551 times of concreting speed, specific conversion is as follows: e concrete=25KN/ M3, because of 1kg=9.8N=9.8*10-3KN, e concrete=25*102.04KN/m3=2.551*103kg/m3;Because e water= 1*103kg/m, so e concrete=2.551e water.Guarantee balance unloading m concrete=m water, e concrete v concrete t=e water V water t, 2.551e water v concrete t=e water v water t, so v water=2.551v concrete.
A method of closure construction, including following step are carried out using closure linker water tank ballast device It is rapid:
1, in the pre-buried anchor plate 13 in closure section two sides, two sides balance grouting section 1 is completed by cast-in-place cantilever method and is constructed, and conserve To design strength.
2, movable hanging basket, installation template (in after the completion of the construction of across tail box beam section, utilize tower crane to remove one side hanging of closure segment Basket, by other side hanging basket advancing into across closure segment, the outside mould bases and bed die frame integral forward lead of closure segment, until with opposite direction In across tail box beam section concrete overlap joint).
3, it carries out 2 counterweight of water tank: in front of across closure segment locking, two water tanks 2 being respectively placed at closure section Two sides, then (connect at 7 both ends of communicating pipe on two sides water tank 2 respectively by bayonet coupling 8) by the connection connection of communicating pipe 7, it closes Drain valve 4 is closed, is filled the water with water pump into water tank 2, checks liquidometer 5, stops injection to after designing scale.
5, two vertical ducts 12 of adjustment installation make liquid level in two vertical ducts 12 maintain an equal level, and write down the initial scale value of liquid level.
6, by design drawing installation reinforcing bar and prestress pipe.
7, closure segment stiff skeleton is installed: the pre-buried anchor in connection bridge closure section two sides is respectively welded with rigid connecting rod 14 Solid plate 13;The welding selection of closure segment stiff skeleton carries out when minimum temperature on the day of, organizes sufficient personnel and welding machine while applying When welding, and locking it in welding, there is safeguard measure to prestressing force bellows already installed on bottom plate, in case welding slag damages Hurt bellows.Stiff skeleton is arranged in the form of " pre-buried anchor plate 13+ rigid connecting rod ".Anchor plate and connecting rod are all made of It is bis- that [28c channel steel group is welded, and tamps the gap held out against between rigid extension bar and anchor rod with sheet metal simultaneously.
In figure: 1, cantilever segment;2, water tank;3, flowmeter;4, drain valve;5, liquidometer;6, water inlet;7, communicating pipe;8, Bayonet coupling;9, transverse pipe;10, two lead to adapter tube;11, pipe clamp;12, vertical duct;13, anchor plate;14, rigid connecting rod.
8, start to pour closure section concrete, open simultaneously drain valve 4, the mass velocity for guaranteeing that drain valve 4 sluices is equal to The mass velocity of closure section concreting, water has been let out in water tank 4 while closure section concreting is completed;In casting process Viewing flowmeter 4 in real time guarantees that sluicing volume flow rate is 2.551 times of casting concrete volume flow rate;In casting process in real time Record 11 scale value of vertical duct, it is ensured that the vertical displacement deformation of 1 two sides of cantilever segment is consistent, and closure section concreting is completed simultaneously Water has been let out in water tank.Before closure section concreting, diel continuous observation at times carried out to cantilever section, observation temperature with Absolute altitude variation, temperature and relationship of beam body temperature of cantilever segment 1 etc., pour and close up section concrete, and sequence: bottom is poured when pouring Plate → web (balance staggeredly pours) → top plate, flange plate.
9, it is covered and is conserved after the completion of concreting, until reaching design strength.Successively in tensioning across closing up beam The transverse prestress beam and anchor bolt grouting of section, tensioning vertical prestressing steel beam simultaneously anchor, and two times tensioning anchor is carried out after 1-2 weeks Gu slip casting.
10, hanging basket is removed by scheme requirement: removing protective platform → dismounting internal model → dismounting bottom basket and outer side mold → dismounting Main truss and running gear.
The principle of the present invention: the present invention uses law of connected vessels, is connected to closure section two sides water tank 2, ensure that two Side counterweight is uniform, the unloading of full symmetric balance;And the speed to be discharged water according to the speed of perfusion of concrete, the water tank that converts, and By checking water outlet flowmeter 3, the water quality and the concrete quality poured for calculating unloading are compared, and are then adjusted and are let out in implementation The water discharged amount of water valve.One small-sized connection indicator is installed on water tank 2, injects colored liquid, it is vertical by observation two sides The liquid scale of pipe 12 changes, and the two sides vertical deformation that can intuitively monitor cantilever segment 1 at any time is poor.
Described above is only Application Example of the invention, cannot limit the right model of the present invention with this certainly It encloses, therefore according to equivalence changes made by scope of the present invention patent, still belongs to protection scope of the present invention.

Claims (9)

1. a kind of closure linker water tank ballast device, it is characterised in that: including two water tanks (2), two water tanks (2) it Between by communicating pipe (7) connect into a linker, two water tanks (2) are respectively placed at closure section two when use Side.
2. closure linker water tank ballast device according to claim 1, it is characterised in that: on the water tank (2) Portion offers water inlet (6), and water tank (2) lower part is equipped with water outlet, and the water outlet is equipped with drain valve (4).
3. closure linker water tank ballast device according to claim 2, it is characterised in that: the water tank (2) Flowmeter (3) are additionally provided on water outlet.
4. closure linker water tank ballast device according to claim 1, it is characterised in that: the communicating pipe (7) For fire hose, both ends pass through bayonet coupling (8) and connect with the lower part of corresponding water tank (2).
5. closure linker water tank ballast device according to claim 1, it is characterised in that: water tank (2) side Face is equipped with liquidometer (5).
6. closure linker water tank ballast device according to claim 1, it is characterised in that: two water tanks (2) it Between be additionally provided with connection indicator, the connection indicator includes two graduated transparent vertical ducts (12) of mark, and two are vertical Pipe (12) is separately mounted on two water tanks (2), and the bottom of two vertical ducts (12) is connected by a transverse pipe (9) connection, and It is injected with colored liquid.
7. closure linker water tank ballast device according to claim 1, it is characterised in that: on the water tank (2) Brushed with reflectorized paint.
8. the application method of -7 any closure linker water tank ballast devices, feature exist according to claim 1 In the following steps are included:
A, two water tanks (2) are respectively placed at closure section two sides, then pass through communicating pipe (7) connection connection;
B, it is mixed to check that liquidometer (5) with closure section waits pouring to the quality of water in water tank (2) for the water filling into two water tanks (2) again The quality of solidifying soil stops injection when equal;
C, it selects the period that temperature is minimum in one day to carry out the construction of closure section, starts to beat while pouring closure section concrete Drain valve (4) sluicing is opened, guarantees that the mass velocity of drain valve (4) sluicing is equal to the mass velocity of closure section concreting.
9. a kind of carry out closure construction using the closure linker water tank ballast device as claimed in claim 1 to 7 Method, it is characterised in that the following steps are included:
1, in the pre-buried anchor plate in closure section two sides (13), two sides balance grouting section (1) construction is completed by cast-in-place cantilever method, and Conserve design strength;
2, movable hanging basket, installation template;
3, it carries out water tank (2) counterweight: in front of across closure segment locking, two water tanks (2) being respectively placed at closure section Two sides, then by communicating pipe (7) connection connection, close drain valve (4), with water pump, the water filling into water tank (2), checks liquidometer (5), to stopping injection after design scale;
5, two vertical ducts (12) of adjustment installation, make two interior liquid levels of vertical duct (12) maintain an equal level, and write down the initial scale value of liquid level;
6, closure segment stiff skeleton is installed: the pre-buried anchoring in connection bridge closure section two sides is respectively welded with rigid connecting rod (14) Plate (13);
7, start to pour closure section concrete, open simultaneously drain valve (4), guarantee that the mass velocity that drain valve 4 sluices is equal to conjunction The mass velocity that imperial section concrete pours, water tank (4) interior water has been let out while closure section concreting is completed;
8, it is covered and is conserved after the completion of concreting, until reaching design strength.
CN201910264482.4A 2019-04-03 2019-04-03 Closure linker water tank ballast device and method Pending CN110258332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910264482.4A CN110258332A (en) 2019-04-03 2019-04-03 Closure linker water tank ballast device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910264482.4A CN110258332A (en) 2019-04-03 2019-04-03 Closure linker water tank ballast device and method

Publications (1)

Publication Number Publication Date
CN110258332A true CN110258332A (en) 2019-09-20

Family

ID=67913460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910264482.4A Pending CN110258332A (en) 2019-04-03 2019-04-03 Closure linker water tank ballast device and method

Country Status (1)

Country Link
CN (1) CN110258332A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493362A (en) * 2011-11-24 2012-06-13 中铁二十三局集团有限公司 Construction method for midspan closure segment of longspan continuous rigid frame bridge
KR101242842B1 (en) * 2012-07-31 2013-03-12 권예지 Construction method for corrugated steel plate web-psc composite beam
CN204550465U (en) * 2015-03-13 2015-08-12 中冶焦耐工程技术有限公司 The power-saving balanced water tank that a kind of liquid level is adjustable
CN206146396U (en) * 2016-10-21 2017-05-03 山西省交通科学研究院 Stride bridge cantilever greatly and fold vertical deformation monitoring system
CN108716189A (en) * 2018-06-05 2018-10-30 中交第二航务工程局有限公司 Large span T-steel structure beam sections for joining island bridge install closure method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493362A (en) * 2011-11-24 2012-06-13 中铁二十三局集团有限公司 Construction method for midspan closure segment of longspan continuous rigid frame bridge
KR101242842B1 (en) * 2012-07-31 2013-03-12 권예지 Construction method for corrugated steel plate web-psc composite beam
CN204550465U (en) * 2015-03-13 2015-08-12 中冶焦耐工程技术有限公司 The power-saving balanced water tank that a kind of liquid level is adjustable
CN206146396U (en) * 2016-10-21 2017-05-03 山西省交通科学研究院 Stride bridge cantilever greatly and fold vertical deformation monitoring system
CN108716189A (en) * 2018-06-05 2018-10-30 中交第二航务工程局有限公司 Large span T-steel structure beam sections for joining island bridge install closure method

Similar Documents

Publication Publication Date Title
CN109680677A (en) A kind of construction of diaphragm wall technique
CN108333109B (en) Concrete structure internal crack monitoring device and method
CN103926377B (en) Testing device for valve pipe slip casting model and testing method thereof
CN108004925B (en) Prestress reinforced concrete circular arch tower construction method
CN110700854B (en) Tunnel secondary lining vault concrete longitudinal continuous pouring construction method
CN109958231A (en) A kind of oblique Construction of Steel Pipe Concrete Column method of Large Diameter Pipeline heavy wall
CN207983691U (en) A kind of Rock And Soil slip casting flow-dividing control converting system
CN110439286A (en) A kind of liner is put more energy into joint steel pipe concrete column drag reduction jack-up construction method of weakening
CN107288037A (en) A kind of base-supporting freely-supported encircles arch rib jacking concrete construction method
CN108344544B (en) Test device and method for measuring defect leakage quantity of composite geomembrane
CN109235270A (en) A kind of main pier bearing platform construction technology
CN104328738A (en) Continuous steel structure construction method for bridge building
CN202870056U (en) Test device of grouting reinforcement model for weak dam
CN208870037U (en) A kind of mass concrete water-cooling circulating device
CN102435398B (en) Test unit of cavity sluice gate of nuclear power station reactor
CN110258332A (en) Closure linker water tank ballast device and method
CN210719589U (en) Pipeline pressure testing device
CN210343359U (en) Prevent pressing of tunnel invert uplift and float structure
CN209760241U (en) Electric grouting system
CN117431839A (en) Construction method of cast-in-situ beam of pipeline bridge of south-water and north-water-crossing main channel
CN202255786U (en) Reactor cavity sluice gate test device of nuclear power station reactor
CN208043356U (en) A kind of experimental rig measuring composite geo-membrane defect leakage
CN208309611U (en) A kind of underwater broken line flow-guiding structure
CN213175612U (en) Skid-mounted vehicle-mounted oil field output liquid metering device
CN208984465U (en) A kind of highway compactness test detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920