CN110253743A - Exterior sheathing machining production line - Google Patents

Exterior sheathing machining production line Download PDF

Info

Publication number
CN110253743A
CN110253743A CN201910524516.9A CN201910524516A CN110253743A CN 110253743 A CN110253743 A CN 110253743A CN 201910524516 A CN201910524516 A CN 201910524516A CN 110253743 A CN110253743 A CN 110253743A
Authority
CN
China
Prior art keywords
pipeline
exterior sheathing
station
shelf
swabbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910524516.9A
Other languages
Chinese (zh)
Inventor
赵军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Zhongyang Energy-Saving Building Materials Technology Co Ltd
Original Assignee
Liaocheng Zhongyang Energy-Saving Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaocheng Zhongyang Energy-Saving Building Materials Technology Co Ltd filed Critical Liaocheng Zhongyang Energy-Saving Building Materials Technology Co Ltd
Priority to CN201910524516.9A priority Critical patent/CN110253743A/en
Publication of CN110253743A publication Critical patent/CN110253743A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/29Producing shaped prefabricated articles from the material by profiling or strickling the material in open moulds or on moulding surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B19/00Machines or methods for applying the material to surfaces to form a permanent layer thereon
    • B28B19/0092Machines or methods for applying the material to surfaces to form a permanent layer thereon to webs, sheets or the like, e.g. of paper, cardboard
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/003Methods for mixing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/0422Weighing predetermined amounts of ingredients, e.g. for consecutive delivery
    • B28C7/044Weighing mechanisms specially adapted therefor; Weighing containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/06Supplying the solid ingredients, e.g. by means of endless conveyors or jigging conveyors

Abstract

The present invention provides a kind of exterior sheathing machining production lines, it is related to Architectural Equipment technical field, exterior sheathing machining production line includes dispensing modules, processing assembly and product storage and maintenance component, dispensing modules include sequentially connected feed bin group, first weightometer, dry blender, transitional storehouse, second weightometer and wet mixer, feed bin group includes cement bin, husky storehouse and auxiliary material storehouse, first weightometer can be respectively to cement, husky and auxiliary material is weighed, then with specified ratio be delivered to dry blender be stirred be delivered to again after mixing transitional storehouse storage, then, after dry slurry is delivered to the weighing of the second weightometer by transitional storehouse, dry slurry is delivered to wet mixer again and the water stirring of designated ratio is added simultaneously by the second weightometer, to obtain finished product slurry.Alleviating exterior sheathing machining production line in the prior art cannot be guaranteed to carry out insulation board continual swabbing process, and then the technical issues of influence exterior sheathing production efficiency.

Description

Exterior sheathing machining production line
Technical field
The present invention relates to Architectural Equipment technical fields, in particular to a kind of exterior sheathing machining production line.
Background technique
Exterior sheathing machining production line be specifically on insulation board carry out swabbing and be laid with grid cloth (or be laid with reinforcing bar Net), wherein it in swabbing process, needs multiple swabbing according to demand, for example successively brushes three layers of slurry in the one side of insulation board, three layers Slurry successively plays the role of increasing cohesive force, heat preservation and cracking resistance, and proportion can be different according to demand for three layers of slurry.In the prior art, All it is that each component is matched by manual weighing, then mixes and be delivered to blender and be stirred to form slurry, then by slurry It is delivered to corresponding swabbing station.The setting causes slurry production efficiency low, it cannot be guaranteed that carrying out to insulation board continual Swabbing process.
Summary of the invention
The purpose of the present invention is to provide a kind of exterior sheathing machining production lines, to alleviate exterior sheathing processing in the prior art Production line cannot be guaranteed to carry out insulation board continual swabbing process, and then the technology for influencing exterior sheathing production efficiency is asked Topic.
The present invention provides a kind of exterior sheathing machining production line, including dispensing modules, processing assembly and product are stored and supported Protecting assembly;
The dispensing modules include sequentially connected feed bin group, the first weightometer, dry blender, transitional storehouse, the second weighing Meter and wet mixer, the feed bin group include cement bin, husky storehouse and auxiliary material storehouse;
The processing assembly includes the first pipeline, the end of first pipeline and product storage and maintenance group Part connection, the wet mixer can convey the slurry for being used for exterior sheathing swabbing to first pipeline.
Further, first pipeline includes the first swabbing station, the second swabbing station and third being sequentially arranged Swabbing station, the transitional storehouse, second weightometer and the wet mixer correspond and are equipped with three groups, and three described wet Blender is located at the top of the first swabbing station, the second swabbing station and the third swabbing station.
Further, the first swabbing station, the second swabbing station and the third swabbing station include using In the scraper component for paving slurry;
The scraper component includes the first scraper plate, cam mechanism and the first driving motor, the first scraper plate sliding peace Mounted in the top of first pipeline, first driving motor is mounted on first pipeline and by the cam Mechanism and first scraper plate are drivingly connected, to drive first scraper plate back and forth to slide along the width direction of first pipeline It is dynamic;
Alternatively, the scraper component includes the second driving motor, the installation axle being vertically arranged and is fixed on the installation Multiple the second scraper plates being obliquely installed on axis, the installation axle are rotatably installed in the top of first pipeline, Duo Gesuo It is circumferentially evenly distributed around the installation axle to state the second scraper plate, second driving motor be mounted on first pipeline and with The installation axle is drivingly connected, to drive multiple second scraper plates to rotate around the installation axle.
Further, the first swabbing station and third swabbing station top are equipped with corresponding described for accepting The hopper of slurry in wet mixer, the second swabbing station top are equipped with for accepting slurry in the corresponding wet mixer Transition blender.
Further, first pipeline between the first swabbing station and the second swabbing station and It is equipped with grid cloth between the second swabbing station and the third swabbing station or steel mesh is laid with station, described first is defeated Line sending is equipped between the third swabbing station and product storage and maintenance component and cuts cloth station.
It further, further include shelf, the shelf are equipped with multiple slideways for being used to place exterior sheathing from the bottom to top, described The both ends of slideway are equipped with the opening entered and left for exterior sheathing;
The product storage and maintenance component include the second conveying that loading assemblies and a row are used to convey the shelf Line, the loading assemblies dock with first pipeline and are used to be transferred to exterior sheathing on second pipeline On the shelf.
Further, the product storage and maintenance component further include multiple rows of third pipeline and relative spacing setting The first sliding rail and the second sliding rail, the third pipeline is provided along its length multiple shelf rest areas, multiple rows of described Three pipelines are between first sliding rail and second sliding rail, and third pipeline both ends are respectively with described first Sliding rail is connected with second sliding rail, and first sliding rail is equipped with first movement machine, and second sliding rail is equipped with second and moves Motivation;
The first movement machine can be moved along first sliding rail and with second pipeline and multiple rows of third Pipeline docking, for the shelf to be transferred to the third pipeline by second pipeline;Described second is mobile Machine can be moved along second sliding rail and be docked with second pipeline and multiple rows of third pipeline, to be used for institute It states shelf and second pipeline is moved to by the third pipeline.
Further, the product storage and maintenance component further include control cabinet, and the control cabinet is for recording each institute The exterior sheathing standing time in the shelf on shelf rest area is stated, and for controlling the shelf on each shelf rest area Access.
Further, second pipeline is equipped with blanking component, and the blanking component is located at the loading assemblies and leans on The side of nearly second sliding rail.
Further, the processing assembly further includes the 4th pipeline and overturning component, one end of the 4th pipeline It is docked with the blanking component, the other end is docked by the overturning component with the initial end of first pipeline, when described Second pipeline by the exterior sheathing in the received shelf of second moving machine be semi-finished product when, the blanking component can Exterior sheathing in shelf in second pipeline is transferred to the 4th pipeline, the overturning component is used for will be described Exterior sheathing on 4th pipeline is overturn to first pipeline.
Further, the processing assembly further includes the 5th pipeline, one end of the 5th pipeline and the blanking Component docking, the 5th pipeline are arranged in sequence and cut long side station, punching station, prescind side station and stack station, institute It states stack station and is located at the described one end of 5th pipeline far from the blanking component;
It is described when second pipeline is finished product by the exterior sheathing in the received shelf of second moving machine Exterior sheathing in shelf in second pipeline can be transferred to the 5th pipeline by blanking component.
Compared with the existing technology, exterior sheathing machining production line provided by the invention has the beneficial effect that:
Exterior sheathing machining production line provided by the invention, including dispensing modules, processing assembly and product storage and maintenance Component, wherein dispensing modules include sequentially connected feed bin group, the first weightometer, dry blender, transitional storehouse, the second weightometer And wet mixer, feed bin group include cement bin, husky storehouse and auxiliary material storehouse, cement bin, husky storehouse and auxiliary material storehouse with the first weightometer Connection, can convey respectively cement, sand and auxiliary material into the first weightometer, the first weightometer is respectively to cement, sand and auxiliary material After being weighed, with specified ratio be delivered to dry blender be stirred be delivered to again after mixing transitional storehouse storage it is standby With then, mixed dry slurry is delivered to the second weightometer and weighed by transitional storehouse, and the second weightometer is again by specified wt Dry slurry is delivered to wet mixer, at the same time, the water of designated ratio, wet mixer stirring can also be added into wet mixer Obtain finished product slurry.
Processing assembly includes the first pipeline, and the first pipeline can drive insulation board to move along its length to complete One face process operation, wet mixer are located at the top of the first pipeline, and the finished product slurry in wet mixer can be delivered to first To carry out swabbing operation on insulation board on pipeline;The end of first pipeline is stored with product and maintenance component docks, to After the one side of insulation board completes processing on the first pipeline, product storage can be moved to and maintenance component carries out storage drying.
At work, cement, sand and auxiliary material can be transported to cement bin, husky storehouse and batch bin in advance by staff respectively It is spare, at this point, the first weightometer can successively convey and weigh the water of designated ratio from cement bin, husky storehouse and batch bin Mud, sand and auxiliary material to dry blender are stirred uniformly mixed, and are delivered to transitional storehouse and store for future use, then, then by transitional storehouse In mixed drying slurry be delivered to the second weightometer with determine required for slurry amount, also determine will dry slurry conveying Required injected water volume when to wet mixer, the slurry for stirring formation in wet mixer at this time is finished product slurry.It is above-mentioned entirely to match Material operation, in addition to the raw material in artificial supplementation cement bin, husky storehouse and auxiliary material storehouse, remaining is to be automatically brought into operation, slurry production efficiency Height, in the case where guaranteeing that raw material is sufficient, can the continual extraction for completing cement, sand and auxiliary material, proportion, mix and stir It mixes, guarantees the swabbing process for thering is continual slurry to complete to insulation board during the work time, and then ensure that insulation board Production efficiency.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of exterior sheathing machining production line provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of dispensing modules in exterior sheathing machining production line provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of processing assembly in exterior sheathing machining production line provided in an embodiment of the present invention;
Fig. 4 is product storage and the structural representation of maintenance component in exterior sheathing machining production line provided in an embodiment of the present invention Figure.
Icon: 100- dispensing modules;200- processing assembly;The storage of 300- product and maintenance component;400- shelf;
110- feed bin group;The first weightometer of 120-;The dry blender of 130-;140- transitional storehouse;150- second is weighed Meter;160- wet mixer;170- hopper;180- transition blender;
111- cement bin;112- sand storehouse;113- auxiliary material storehouse;
The first pipeline of 210-;The 4th pipeline of 220-;The 5th pipeline of 230-;240- loading assemblies;250- is turned over Turn component;
211- the first swabbing station;212- the second swabbing station;213- third swabbing station;214- grid cloth or steel Muscle net laying sets station;215- cuts cloth station;
231- cuts long side station;232- punching station;233- prescinds side station;234- stack station;
The second pipeline of 310-;320- third pipeline;The first sliding rail of 330-;340- first movement machine;350- Two sliding rails;The second moving machine of 360-;370- blanking component;
321- shelf rest area.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
- Fig. 4 referring to Fig.1, exterior sheathing machining production line provided in this embodiment, including dispensing modules 100, processing assembly 200 and product storage and maintenance component 300, wherein dispensing modules 100 include sequentially connected feed bin group 110, first weighing Meter 120, dry blender 130, transitional storehouse 140, the second weightometer 150 and wet mixer 160, feed bin group 110 include cement bin 111, Sha Cang 112 and auxiliary material storehouse 113, cement bin 111, Sha Cang 112 and auxiliary material storehouse 113 are connect with the first weightometer 120, with energy Enough to convey cement, sand and auxiliary material respectively into the first weightometer 120, the first weightometer 120 respectively carries out cement, sand and auxiliary material After weighing, with specified ratio be delivered to dry blender 130 be stirred be delivered to again after mixing transitional storehouse 140 store it is standby With then, mixed dry slurry is delivered to the second weightometer 150 and weighed by transitional storehouse 140, and the second weightometer 150 again will The drying slurry of specified wt is delivered to wet mixer 160, at the same time, also designated ratio can be added into wet mixer 160 Water, wet mixer 160 stirs to get finished product slurry.
Processing assembly 200 includes the first pipeline 210, and the first pipeline 210 can drive insulation board along its length To complete a face process operation, wet mixer 160 is located at the top of the first pipeline 210, the finished product in wet mixer 160 for movement To carry out swabbing operation on the insulation board that slurry can be delivered on the first pipeline 210;The end of first pipeline 210 and production Product storage and maintenance component 300 dock, and after the one side of insulation board completes processing on the first pipeline 210, can be moved to production Product storage and maintenance component 300 carry out storage drying.
At work, cement, sand and auxiliary material can be transported to cement bin 111,112 and of Sha Cang in advance by staff respectively Batch bin is spare, at this point, the first weightometer 120 successively can be conveyed and be weighed from cement bin 111, Sha Cang 112 and batch bin The cement, sand and auxiliary material of designated ratio to dry blender 130 are stirred uniformly mixed out, and are delivered to the storage of transitional storehouse 140 It is spare, then, then by the mixed drying slurry in transitional storehouse 140 be delivered to the second weightometer 150 with determine required for slurry Amount, also determine required when that will dry slurry and be delivered to wet mixer 160 injected water volume, stirred in wet mixer 160 at this time The slurry of formation is finished product slurry.Above-mentioned entire dispensing operation, in addition to artificial supplementation cement bin 111, Sha Cang 112 and auxiliary material storehouse Raw material in 113, remaining is to be automatically brought into operation, slurry high production efficiency, in the case where guaranteeing that raw material is sufficient, can be continued not Extraction, proportion, mixing and the stirring of disconnected completion cement, sand and auxiliary material, guarantee have continual slurry during the work time The swabbing process to insulation board is completed, and then ensure that the production efficiency of insulation board.
It is worth explanation, cement bin 111, Sha Cang 112 and auxiliary material storehouse 113 are claimed by closed screw conveyor and first Meter 120 connects, and the first weightometer 120 is to be connect by closed screw conveyor with dry blender 130, dry blender 130 It is to be connect by bucket elevator with transitional storehouse 140, transitional storehouse 140 is to be connect by bucket elevator with the second weightometer 150, and second weighs Meter 150 is to be connect by bucket elevator with wet mixer 160;It, can be with further, since proportion of the auxiliary material in finished product slurry is extremely low The quality of manual weighing's auxiliary material, and load weighted auxiliary material is put into dry blender 130, i.e., only cement and sand are claimed automatically Amount, manual operation is also relatively fewer at this time, can equally guarantee the production efficiency of insulation board.
Specifically, the present embodiment also the concrete outcome of exterior sheathing machining production line is done it is described in detail below.
Referring to Fig. 3, in the present embodiment, the first pipeline 210 includes the first swabbing station 211, second brush being sequentially arranged Starch station 212 and third swabbing station 213, wherein initial end of the first swabbing station 211 close to the first pipeline 210.Transition Storehouse 140, the second weightometer 150 and wet mixer 160 correspond and are equipped with three groups, and three wet mixers 160 are located at the The top of one swabbing station 211, the second swabbing station 212 and third swabbing station 213, the setting can guarantee the first weightometer 120 weigh cement, sand and the auxiliary material of different ratio respectively, are then delivered to after mixing evenly accordingly through a dry blender 130 Transitional storehouse 140 store for future use, the demand of the slurry of different ratio needed for meeting three swabbing stations also ensures three swabbings Slurry at station will not be short, further ensures the production efficiency of exterior sheathing.
In the present embodiment, the first swabbing station 211, the second swabbing station 212 and third swabbing station 213 include being used for The scraper component that slurry is paved, wherein scraper component may include the first scraper plate, cam mechanism and the first driving motor, First scraper plate is slidably mounted on the top of the first pipeline 210, and the first driving motor is mounted on the first pipeline 210 and passes through Cam mechanism and the first scraper plate are drivingly connected, to drive the first scraper plate to reciprocatingly slide along the width direction of the first pipeline 210.
Specifically, height of first scraper plate when the width direction along the first pipeline 210 reciprocatingly slides remains unchanged, this When the first scraper plate and slurry can relatively move so that slurry is not easy to be bonded on the first scraper plate, and then be effectively ensured One scraper plate strike off to slurry the stabilization of operation.
Alternatively, scraper component can also include the second driving motor, the installation axle being vertically arranged and consolidate in the present embodiment Fixed multiple the second scraper plates being obliquely installed on the mounting shaft, installation axle is rotatably installed in the top of the first pipeline 210, multiple Second scraper plate is circumferentially evenly distributed around installation axle, and the second driving motor is mounted on the first pipeline 210 and drives with installation axle Connection, to drive multiple second scraper plates to rotate around installation axle.
Specifically, installation axle is rotatably installed in the surface of the first pipeline 210, the lower edge of the second scraper plate is horizontally disposed, And second scraper plate and insulation board to wait striking off the angle between one side be acute angle, by the second scraper plate there are four for, this time is every setting The lower edge that two the second scraper plates set are used to strike off slurry mutually abuts or is overlapping setting, and two the second scraper plates are relatively remote From the distance between one end be greater than the width of insulation board, to guarantee to complete to strike off operation to each position of insulation board. At work, the second driving motor drives four the second scraper plate rotations, can equally occur between the second scraper plate and slurry opposite It is mobile, so that slurry is not easy to be bonded on the second scraper plate, and then the second scraper plate is effectively ensured, slurry is carried out to strike off the steady of operation It is fixed.Referring to Fig. 2, in the present embodiment, it is equipped with above the first swabbing station 211 and third swabbing station 213 corresponding for accepting The hopper 170 of slurry in wet mixer 160 is equipped with above second swabbing station 212 and starches for accepting in corresponding wet mixer 160 The transition blender 180 of material.
It, can be by finished product slurry by the lower openings of wet mixer 160 after the stirring of wet mixer 160 forms finished product slurry It is delivered to hopper 170 or transition blender 180, at this point, dispensing modules 100 can continue to run, wet mixer 160 is made to continue to stir It mixes to form new finished product slurry, is further ensured that the lasting swabbing to insulation board;In addition, the lower ending opening size of hopper 170 can To change, hopper 170 can open opening of corresponding size, to meet insulation board swabbing amount needed for corresponding swabbing station;Together When, the slurry as needed for the second swabbing station 212 is more dry or usage amount is bigger, by the way that transition blender is arranged 180 replace hopper 170, and 180 moment of transition blender is in stirring, guarantee that slurry will not dry solidification wherein, also protect Card slurry can be smoothly delivered on insulation board by the lower ending opening of transition blender 180, and then by the second swabbing station 212 scraper plate is uniformly laid on insulation board.
It is worth explanation, the present embodiment there can also be more swabbing stations, when transition blender 180 is for needing long Between the slurry that stirs, hopper 170 can also be replaced to be applied to any one swabbing station, to meet the length of corresponding swabbing station Time stirs demand.
Referring to Fig. 3, in the present embodiment, the first pipeline 210 the first swabbing station 211 and the second swabbing station 212 it Between and be equipped between the second swabbing station 212 and third swabbing station 213 grid cloth or steel mesh is laid with station 214, First pipeline 210 is equipped between third swabbing station 213 and product storage and maintenance component 300 and cuts cloth station 215.
Specifically, be that multiple insulation boards are placed sequentially on the first pipeline 210 in process, adjacent insulation board It mutually abuts, is successively to spread coiled grid cloth out be pressed on multiple insulation boards when carrying out grid cloth laying station, this When, it needs cutting cloth station 215 for adjacent exterior sheathing before the good exterior sheathing of swabbing is delivered to product storage and maintenance component 300 Between grid cloth cutting, to form independent exterior sheathing.
According to the production requirement to exterior sheathing, the present embodiment only can be laid with station by setting grid cloth, can also set respectively It sets steel mesh and is laid with station and grid cloth laying station.
In the present embodiment, exterior sheathing machining production line further includes shelf 400, and shelf 400 are equipped with multiple be used for from the bottom to top The slideway of exterior sheathing is placed, slideway both ends are equipped with the opening entered and left for exterior sheathing, and product storage and maintenance component 300 include upper Material component 240 and a row are used to convey the second pipeline 310 of shelf 400, and loading assemblies 240 and the first pipeline 210 are right The shelf 400 for connecing and being used to be transferred to exterior sheathing on the second pipeline 310.
Specifically, loading assemblies 240 are including elevator and for pushing the push plate of exterior sheathing and cylinder, exterior sheathing is conveyed To the push position of elevator, according to the position of slideway vacant on shelf 400, elevator will push position rise to it is same with vacant slideway The position of sample height, then, cylinder operation, push plate pushes to exterior sheathing in slideway.And so on, by controller, promoted Machine from the bottom to top successively can push to exterior sheathing in the slideway of shelf 400, after all slideways of shelf 400 do not have it is vacant after, Second pipeline 310 removes fully loaded shelf 400 from elevator, and unloaded shelf 400 are moved at elevator, so as to Exterior sheathing is persistently processed in processing assembly 200.
Referring to Fig. 4, in the present embodiment, product storage and maintenance component 300 further include multiple rows of third pipeline 320, and The first sliding rail 330 and the second sliding rail 350, third pipeline 320 of relative spacing setting are provided along its length multiple shelf Rest area 321, multiple rows of third pipeline 320 is between the first sliding rail 330 and the second sliding rail 350, and 320 liang of third pipeline End is connect with the first sliding rail 330 and the second sliding rail 350 respectively, and the first sliding rail 330 is equipped with first movement machine 340, the second sliding rail 350 are equipped with the second moving machine 360;First movement machine 340 can be moved along the first sliding rail 330 and with the second pipeline 310 and Multiple rows of third pipeline 320 docks, for shelf 400 to be transferred to third pipeline 320 by the second pipeline 310;Second Moving machine 360 can be moved along the second sliding rail 350 and be docked with the second pipeline 310 and multiple rows of third pipeline 320, to be used for Shelf 400 are moved to the second pipeline 310 by third pipeline 320.
Specifically, after the second pipeline 310 receives fully loaded shelf 400 from loading assemblies 240, it can be towards the first sliding rail 330 directions are mobile and dock with the first movement machine 340 being located on the first sliding rail 330, and shelf 400 are able to be transferred to the first shifting Motivation 340, at this point, first movement machine 340 is moved to 320 one end of third pipeline of a specified row, shelf along the second sliding rail 350 400 are transported on the third pipeline 320, and third pipeline 320 drives shelf 400 to be moved to specified shelf rest area 321;When the exterior sheathing on the shelf 400 in component 300 is stored and conserved to product, which needs to take out, the second moving machine 360 is the Two sliding rails 350 are mobile to dock with corresponding third pipeline 320, at this time near the second sliding rail 350 on third pipeline 320 Shelf 400 on shelf rest area 321 are moved to the second moving machine 360, complete shelf 400 and take out operation.
In the present embodiment, product storage and maintenance component 300 further include control cabinet, and control cabinet is put for recording each shelf It sets the exterior sheathing standing time in the shelf 400 in area 321, and for controlling the shelf 400 on each shelf rest area 321 Access.
I.e. control cabinet is able to record on the shelf 400 in product storage and maintenance component 300 in each shelf rest area 321 Exterior sheathing standing time, be also able to record exterior sheathing on the shelf 400 in each shelf rest area 321 be semi-finished product also It is finished product, staff according to the data on control cabinet controls the second moving machine 360, and to take out a row or several rows corresponding third defeated Shelf 400 in line sending 320.
Above-mentioned " control " being previously mentioned is that those skilled in the art are used by the automatic work that control cabinet completes equipment Common terminology, details are not described herein again.
Referring to Fig. 4, in this implementations, the second pipeline 310 is located at feeding group equipped with blanking component 370, blanking component 370 Part 240 is close to the side of the second sliding rail 350.
Specifically, blanking component 370 includes positioned at the jack of 310 lower section of the second pipeline and for pushing exterior sheathing Cylinder and push plate, when the second pipeline 310 carries fully loaded shelf 400 and is moved to the surface of blanking component 370, jacking Machine driving push position moves up, and push position jacks up exterior sheathing, and exterior sheathing is made to be detached from the bottom surface of slideway, at this point, cylinder driving push plate moves It is dynamic, which can be released by slideway.
Alternatively, blanking component 370 can also include elevator and belt conveyor, the second pipeline 310 in the present embodiment When fully loaded shelf 400 are moved on elevator, elevator, which moves down, drives shelf 400 to move down, so that the exterior sheathing on slideway Slideway is lifted off by the belt conveyor for being located at 400 lower section of shelf, belt conveyor is able to release exterior sheathing by slideway;With such It pushes away, elevator continues to move down successively to release the exterior sheathing on shelf 400 from the bottom to top.
It is worth explanation, what is stored in the shelf rest area 321 having in product storage and maintenance component 300 is unloaded goods Frame 400, when the fully loaded shelf 400 on loading assemblies 240 are taken out and are mobile towards the first sliding rail 330 by the second pipeline 310, Second moving machine 360 can be fed directly on the second pipeline 310 after taking out unloaded shelf 400, and the second pipeline 310 drives It moves unloaded shelf 400 and passes through blanking component 370 and face loading assemblies 240, unloaded shelf 400 are transferred to feeding group Part 240.
Referring to Fig. 3, in the present embodiment, processing assembly 200 further includes the 4th pipeline 220 and overturning component 250, and the 4th is defeated 220 one end of line sending is docked with blanking component 370, the initial end pair that the other end passes through overturning component 250 and the first pipeline 210 It connects, when the second pipeline 310 is semi-finished product by the exterior sheathing in the received shelf 400 of the second moving machine 360, blanking component 370 can be transferred to the exterior sheathing in the shelf 400 on the second pipeline 310 the 4th pipeline 220, and overturning component 250 is used It overturns in by the exterior sheathing on the 4th pipeline 220 to the first pipeline 210.
Specifically, the 4th pipeline 220 is L shape pipeline, i.e., semi-finished product exterior sheathing is first on the 4th pipeline 220 along the The length direction of one pipeline 210 is mobile, then does and translates close to the first pipeline 210 again, is moved to overturning component 250 to it When place, exterior sheathing is overturn 180 ° by axis of one long side by overturning component 250, and exterior sheathing just falls in the first pipeline 210 Initial end, and unprocessed one side is arranged upward.
Referring to Fig. 3, in the present embodiment, processing assembly 200 further includes the 5th pipeline 230,230 one end of the 5th pipeline with Blanking component 370 docks, and the 5th pipeline 230, which is arranged in sequence, to be cut long side station 231, punching station 232, prescinds side station 233 And stack station 234, stack station 234 are located at the 5th one end of pipeline 230 far from blanking component 370;When the second conveying When the exterior sheathing in shelf 400 on line 310 is finished product, blanking component 370 can be by the shelf 400 on the second pipeline 310 In exterior sheathing be transferred to the 5th pipeline 230.
Specifically, the exterior sheathing of finished product is just being formed after cutting long side, punching and prescinding side for the outer of construction Template is moved to finished product area by fork truck, the whole process of exterior sheathing is completed after the completion of its stack.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (11)

1. a kind of exterior sheathing machining production line, which is characterized in that including dispensing modules (100), processing assembly (200) and product Storage and maintenance component (300);
The dispensing modules (100) include sequentially connected feed bin group (110), the first weightometer (120), dry blender (130), Transitional storehouse (140), the second weightometer (150) and wet mixer (160), the feed bin group (110) include cement bin (111), Husky storehouse (112) and auxiliary material storehouse (113);
The processing assembly (200) includes the first pipeline (210), the end of first pipeline (210) and the product Storage and maintenance component (300) connection, the wet mixer (160) can convey to first pipeline (210) for outer The slurry of template swabbing.
2. exterior sheathing machining production line according to claim 1, which is characterized in that first pipeline (210) includes The first swabbing station (211), the second swabbing station (212) and the third swabbing station (213) being sequentially arranged, the transitional storehouse (140), second weightometer (150) and the wet mixer (160) correspond and are equipped with three groups, three wet stirrings Machine (160) is located at the first swabbing station (211), the second swabbing station (212) and the third swabbing station (213) top.
3. exterior sheathing machining production line according to claim 2, which is characterized in that the first swabbing station (211), institute It states the second swabbing station (212) and the third swabbing station (213) includes the scraper component for paving slurry;
The scraper component includes the first scraper plate, cam mechanism and the first driving motor, and first scraper plate is slidably mounted on The top of first pipeline (210), first driving motor are mounted on first pipeline (210) and pass through institute It states cam mechanism and first scraper plate is drivingly connected, to drive first scraper plate along the width of first pipeline (210) Degree direction reciprocatingly slides;
Alternatively, the scraper component includes the second driving motor, the installation axle being vertically arranged and is fixed in the installation axle Multiple the second scraper plates being obliquely installed, the installation axle is rotatably installed in the top of first pipeline (210), Duo Gesuo It is circumferentially evenly distributed around the installation axle to state the second scraper plate, second driving motor is mounted on first pipeline (210) It above and with the installation axle is drivingly connected, to drive multiple second scraper plates to rotate around the installation axle.
4. exterior sheathing machining production line according to claim 2, which is characterized in that the first swabbing station (211) and The hopper for accepting slurry in the corresponding wet mixer (160) is equipped with above the third swabbing station (213) (170), the transition for accepting slurry in the corresponding wet mixer (160) is equipped with above the second swabbing station (212) Blender (180).
5. exterior sheathing machining production line according to claim 2, which is characterized in that first pipeline (210) is in institute It states between the first swabbing station (211) and the second swabbing station (212) and in the second swabbing station (212) and institute It states and is equipped with grid cloth or steel mesh laying station (214), first pipeline (210) between third swabbing station (213) It is equipped between the third swabbing station (213) and product storage and maintenance component (300) and cuts cloth station (215).
6. exterior sheathing machining production line according to claim 1-5, which is characterized in that further include shelf (400), the shelf (400) are equipped with multiple for placing the slideway of exterior sheathing from the bottom to top, and the both ends of the slideway are equipped with The opening entered and left for exterior sheathing;
The product storage and maintenance component (300) include loading assemblies (240) and a row for conveying the shelf (400) the second pipeline (310), the loading assemblies (240) are docked with first pipeline (210) and are used for external mold Plate is transferred on the shelf (400) on second pipeline (310).
7. exterior sheathing machining production line according to claim 6, which is characterized in that the product storage and maintenance component (300) further include multiple rows of third pipeline (320) and relative spacing setting the first sliding rail (330) and the second sliding rail (350), the third pipeline (320) is provided along its length multiple shelf rest areas (321), multiple rows of third conveying Line (320) is between first sliding rail (330) and second sliding rail (350), and the third pipeline (320) both ends It is connect respectively with first sliding rail (330) and second sliding rail (350), first sliding rail (330) is equipped with first and moves Motivation (340), second sliding rail (350) are equipped with the second moving machine (360);
The first movement machine (340) can it is mobile along first sliding rail (330) and with second pipeline (310) and more Third pipeline (320) docking is arranged, for the shelf (400) to be transferred to institute by second pipeline (310) State third pipeline (320);Second moving machine (360) can be mobile along second sliding rail (350) and with described second Pipeline (310) and multiple rows of third pipeline (320) docking, for conveying the shelf (400) by the third Line (320) is moved to second pipeline (310).
8. exterior sheathing machining production line according to claim 7, which is characterized in that the product storage and maintenance component It (300) further include control cabinet, the control cabinet is used to record in the shelf (400) on each shelf rest area (321) Exterior sheathing standing time, and the access for controlling the shelf (400) on each shelf rest area (321).
9. exterior sheathing machining production line according to claim 7, which is characterized in that set on second pipeline (310) Have blanking component (370), the blanking component (370) is located at the loading assemblies (240) close to second sliding rail (350) Side.
10. exterior sheathing machining production line according to claim 9, which is characterized in that the processing assembly (200) further includes 4th pipeline (220) and overturning component (250), one end of the 4th pipeline (220) and the blanking component (370) are right It connects, the other end is docked by overturning component (250) with the initial end of first pipeline (210), when described second defeated Line sending (310) by the exterior sheathing in the received shelf (400) of second moving machine (360) be semi-finished product when, under described Exterior sheathing in shelf (400) in second pipeline (310) can be transferred to the 4th conveying by material component (370) Line (220), overturning component (250) are used to overturn the exterior sheathing on the 4th pipeline (220) to described first defeated In line sending (210).
11. exterior sheathing machining production line according to claim 9, which is characterized in that the processing assembly (200) further includes 5th pipeline (230), one end of the 5th pipeline (230) are docked with the blanking component (370), the 5th conveying Line (230), which is arranged in sequence, to be cut long side station (231), punching station (232), prescinds side station (233) and stack station (234), the stack station (234) is located at the one end of the 5th pipeline (230) far from the blanking component (370);
When second pipeline (310) is finished product by the received exterior sheathing of second moving machine (360), the blanking group Exterior sheathing in shelf (400) in second pipeline (310) can be transferred to the 5th pipeline by part (370) (230)。
CN201910524516.9A 2019-06-17 2019-06-17 Exterior sheathing machining production line Pending CN110253743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910524516.9A CN110253743A (en) 2019-06-17 2019-06-17 Exterior sheathing machining production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910524516.9A CN110253743A (en) 2019-06-17 2019-06-17 Exterior sheathing machining production line

Publications (1)

Publication Number Publication Date
CN110253743A true CN110253743A (en) 2019-09-20

Family

ID=67918855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910524516.9A Pending CN110253743A (en) 2019-06-17 2019-06-17 Exterior sheathing machining production line

Country Status (1)

Country Link
CN (1) CN110253743A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1853891A (en) * 2005-04-18 2006-11-01 傅炳煌 Production and automatic producer for building dry powder and mortar
US20090039558A1 (en) * 2004-04-15 2009-02-12 U.S. Technology Corporation Concrete block and method of making same
CN202640550U (en) * 2012-07-04 2013-01-02 山西洪远机械设备有限公司 Production system of organic compound outer die heat-preservation board
CN204725628U (en) * 2014-07-01 2015-10-28 乔明云 A kind of concrete composite heat insulation exterior sheathing automated manufacturing machine
CN105252641A (en) * 2015-09-10 2016-01-20 卓达新材料科技集团有限公司 Automatic production line for plate
CN106584664A (en) * 2016-12-01 2017-04-26 中国建筑科学研究院建筑机械化研究分院 Production line of frame-carried precast slab
CN107199631A (en) * 2017-06-09 2017-09-26 安徽新境界自动化技术有限公司 A stage enhancement type vertical hair composite rock wool insulation board automatic production lines
CN107538607A (en) * 2016-06-27 2018-01-05 湖南晨熙绿色建筑产业有限公司 A kind of production line and production method of heat preservation dismounting-free formwork for building
CN109591168A (en) * 2018-11-28 2019-04-09 北京星航机电装备有限公司 A kind of fixed die station production line component conservation control system of PC and control method
CN109732778A (en) * 2019-02-28 2019-05-10 三一汽车制造有限公司 Mortar blending device and mortar mixing plant

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090039558A1 (en) * 2004-04-15 2009-02-12 U.S. Technology Corporation Concrete block and method of making same
CN1853891A (en) * 2005-04-18 2006-11-01 傅炳煌 Production and automatic producer for building dry powder and mortar
CN202640550U (en) * 2012-07-04 2013-01-02 山西洪远机械设备有限公司 Production system of organic compound outer die heat-preservation board
CN204725628U (en) * 2014-07-01 2015-10-28 乔明云 A kind of concrete composite heat insulation exterior sheathing automated manufacturing machine
CN105252641A (en) * 2015-09-10 2016-01-20 卓达新材料科技集团有限公司 Automatic production line for plate
CN107538607A (en) * 2016-06-27 2018-01-05 湖南晨熙绿色建筑产业有限公司 A kind of production line and production method of heat preservation dismounting-free formwork for building
CN106584664A (en) * 2016-12-01 2017-04-26 中国建筑科学研究院建筑机械化研究分院 Production line of frame-carried precast slab
CN107199631A (en) * 2017-06-09 2017-09-26 安徽新境界自动化技术有限公司 A stage enhancement type vertical hair composite rock wool insulation board automatic production lines
CN109591168A (en) * 2018-11-28 2019-04-09 北京星航机电装备有限公司 A kind of fixed die station production line component conservation control system of PC and control method
CN109732778A (en) * 2019-02-28 2019-05-10 三一汽车制造有限公司 Mortar blending device and mortar mixing plant

Similar Documents

Publication Publication Date Title
CN107186872B (en) Self preservation temperature building block brick apparatus for producing
CN212948498U (en) Integrated folding type vehicle-mounted mobile mixing station and main supporting frame and conveying device thereof
CN103737713A (en) Automated building block production line
CN102632548B (en) Production method of foam slurry core-filled building block capable of being quickly condensed under steam-curing-free condition
CN102672815B (en) Production method of foam slurry core-filling building blocks free of steaming
CN102672796A (en) Semi-automatic production method of foam slurry core-filling building blocks
CN110253743A (en) Exterior sheathing machining production line
RU2659362C1 (en) Mobile autonomous plant for production wall building and road materials
CN102632546A (en) Stage-by-stage maintenance method in automatic production process of foam slurry core filling building blocks
CN211492177U (en) Wet-mixed mortar manufacturing equipment
CN205294338U (en) Automatic distributing device of bulk material warehouse all standing formula
CN202462626U (en) Batching machine for bricks made from waste steelmaking slag
CN202129866U (en) Mobile concrete mixing plant with safety protection measures
CN108927490B (en) Sand supply and mixing system applied to 3D printer
CN107363978B (en) Automatic feeding method for brick machine feeding bin
CN212241612U (en) Can realize mixing modularization concrete mixing plant of material in succession
CN107415053A (en) A kind of slurry production line
CN204869205U (en) Novel full automatic production line of compound self preservation temperature building block
CN209775155U (en) Concrete prefab compounding device
CN210361930U (en) Automatic loading and unloading stirring host
CN208100716U (en) A kind of transferring device for a plurality of production line of fused cast refractories
RU2502595C2 (en) Truck-mounted concrete mixer
CN107599147B (en) Automatic feeding device for brick press feeding bin
CN212632332U (en) Automatic change production line feed arrangement
CN105415502A (en) Stirring station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination