CN110242320B - 一种地铁车站中间钢管立柱开挖方法 - Google Patents
一种地铁车站中间钢管立柱开挖方法 Download PDFInfo
- Publication number
- CN110242320B CN110242320B CN201910445281.4A CN201910445281A CN110242320B CN 110242320 B CN110242320 B CN 110242320B CN 201910445281 A CN201910445281 A CN 201910445281A CN 110242320 B CN110242320 B CN 110242320B
- Authority
- CN
- China
- Prior art keywords
- steel
- steel support
- supports
- support
- sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/152—Laggings made of grids or nettings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/60—Devices for withdrawing props or chocks
- E21D15/603—Devices for withdrawing props or chocks by means of hydraulic devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D19/00—Provisional protective covers for working space
- E21D19/04—Provisional protective covers for working space for use in drifting galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910445281.4A CN110242320B (zh) | 2019-05-27 | 2019-05-27 | 一种地铁车站中间钢管立柱开挖方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910445281.4A CN110242320B (zh) | 2019-05-27 | 2019-05-27 | 一种地铁车站中间钢管立柱开挖方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110242320A CN110242320A (zh) | 2019-09-17 |
CN110242320B true CN110242320B (zh) | 2020-11-10 |
Family
ID=67885171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910445281.4A Active CN110242320B (zh) | 2019-05-27 | 2019-05-27 | 一种地铁车站中间钢管立柱开挖方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110242320B (zh) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5461210B2 (ja) * | 2010-01-27 | 2014-04-02 | 西松建設株式会社 | アーチ鉄筋の組立方法およびアーチ鉄筋構造 |
CN102704939B (zh) * | 2012-06-26 | 2014-10-01 | 中国建筑第五工程局有限公司 | 特大断面隧道组合型钢临时支撑开挖法 |
CN103334778A (zh) * | 2012-12-21 | 2013-10-02 | 中交一公局第三工程有限公司 | 台阶临时支撑加部分双侧壁的施工工艺 |
CN106703828B (zh) * | 2017-01-22 | 2019-06-21 | 济南轨道交通集团有限公司 | 采用预制装配式衬砌结合pba建造地铁车站的施工方法 |
CN108979663B (zh) * | 2018-05-25 | 2023-08-01 | 中国建筑股份有限公司 | 一种采用临时中隔柱支撑的地铁车站主体结构施工方法 |
CN108842819B (zh) * | 2018-09-07 | 2020-06-16 | 中国能源建设集团安徽电力建设第一工程有限公司 | 一种城市轨道交通电缆线路隧道施工方法 |
-
2019
- 2019-05-27 CN CN201910445281.4A patent/CN110242320B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN110242320A (zh) | 2019-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967050B (zh) | 一种地铁车站的施工方法 | |
CN102031784B (zh) | 深基坑灌注护坡桩加锚索支护施工方法 | |
CN106988750B (zh) | 一种大跨度区间隧道超近距离下穿既有站的实施方式 | |
CN111576431A (zh) | 四层地铁站基坑开挖方法 | |
CN106979021B (zh) | 大断面黄土隧道开挖及初期支护快速封闭成环方法 | |
CN113756314B (zh) | 一种适用于长三角地区软土地基深大地铁基坑开挖的施工方法 | |
CN111119059A (zh) | 高墩现浇箱梁超高复合式支架体系及施工方法 | |
CN107044114A (zh) | 一种高竖井内大型压力钢管倒装施工方法 | |
CN105714829B (zh) | 深基坑开挖与地下车站建设的施工装置及采用其的施工方法 | |
CN105178968B (zh) | 隧道掘进机顶推支撑装置及施工方法 | |
CN111395395A (zh) | 一种地铁深基坑盖挖下支撑系统安装工艺 | |
CN113389562B (zh) | 一种用于地铁隧道的盾构机快速始发施工方法 | |
CN110242320B (zh) | 一种地铁车站中间钢管立柱开挖方法 | |
CN108331429A (zh) | 一种管状高耸钢结构安装方法 | |
CN110145317B (zh) | 一种盾构机过站施工方法 | |
CN111395176A (zh) | 一种基于便捷化的移动模架下放、拆除施工方法 | |
CN106480826A (zh) | 单线箱梁墩顶现浇横移施工工法 | |
CN116695715A (zh) | 充气式锁口管及其应用于地下连续墙的施工方法 | |
CN112796783B (zh) | 一种盾构先行通过暗挖隧道内管片拆除施工工法 | |
CN206753488U (zh) | 一种人工挖孔桩扩孔用辅助设备 | |
CN109930610A (zh) | 受限环境基坑采用混凝土加钢管混合斜撑支护的施工方法 | |
CN106245531B (zh) | 双侧吊杆式下挂钢结构桥安装方法 | |
CN111173549B (zh) | 一种高地应力巷道支护装置与施工方法 | |
CN212358029U (zh) | 一种用于缆索吊机的隧道式锚碇结构 | |
CN111809521A (zh) | 一种用于缆索吊机的隧道式锚碇结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211110 Address after: 100166 No. 100, Xiaotun Road, Fengtai District, Beijing Patentee after: China construction Communications Construction Group Co., Ltd Patentee after: T.Y.LIN INTERNATIONAL ENGINEERING CONSULTING (CHINA) Co.,Ltd. Patentee after: Chongqing University Address before: 610500 No. 5, floor 7, building 2, No. 188, xingle North Road, Xindu town, Xindu District, Chengdu, Sichuan Patentee before: Sichuan Branch of CSCEC Communications Construction Group Co., Ltd Patentee before: T.Y.LIN INTERNATIONAL ENGINEERING CONSULTING (CHINA) Co.,Ltd. Patentee before: Chongqing University |