CN110241825A - A kind of reservoir liner pipe rockfill grouting construction method and structure - Google Patents

A kind of reservoir liner pipe rockfill grouting construction method and structure Download PDF

Info

Publication number
CN110241825A
CN110241825A CN201910603584.4A CN201910603584A CN110241825A CN 110241825 A CN110241825 A CN 110241825A CN 201910603584 A CN201910603584 A CN 201910603584A CN 110241825 A CN110241825 A CN 110241825A
Authority
CN
China
Prior art keywords
pipe
internal lining
grouting
lining pipe
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910603584.4A
Other languages
Chinese (zh)
Other versions
CN110241825B (en
Inventor
卢建华
尚斌
高大水
吴文霞
江山红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201910603584.4A priority Critical patent/CN110241825B/en
Publication of CN110241825A publication Critical patent/CN110241825A/en
Application granted granted Critical
Publication of CN110241825B publication Critical patent/CN110241825B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Sewage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of reservoir liner pipe rockfill grouting construction method and structure, comprising: one, internal lining pipe laying: original is contained into mixed and disorderly substances in pipe, mud silt etc. before internal lining pipe laying and is cleaned out, is drawn from downstream toward upstream end, side weld ddge is applied;Two, internal lining pipe welds: internal lining pipe total interface is using live sweat soldering;Three, packer permeability test: internal lining pipe carries out packer permeability test after installing, and packer permeability test pressure is not less than 0.6MPa, and the duration records pressure condition for 24 hours, every 3h, examines the leakproofness of liner pipe fitting;Four, rockfill grouting: after internal lining pipe traction in place, cavity setting import concrete plug and outlet concrete plug within the scope of internal lining pipe inlet and outlet 1m between former culvert pipe, exhaust pipe and grout pipe need to be reserved when closure, carry out rockfill grouting operation every 48h after the completion of closure.The present invention can make former culvert pipe combine closely with interior lined pipe, block closely knit, be effectively ensured the construction quality of internal lining pipe recovery technique, and it is safe and extend internal lining pipe service life to guarantee that internal lining pipe uses.

Description

A kind of reservoir liner pipe rockfill grouting construction method and structure
Technical field
The present invention relates to a kind of reservoir liner pipe rockfill grouting construction method and structures, belong to rockfill grouting construction method Field.
Background technique
Earth and rockfill dam dam body culvert pipe is the water release works that China's small reservoir generallys use, and dam body culvert pipe is generally embedded in dam In body or on the dam foundation.Dam body culvert pipe can have different degrees of structural failure, pipe shaft leakage, tube bottom siltation, pipe through many years operation The problems such as body faulting of slab ends not only influence reservoir profit point, but also seriously threaten dam safety.Contain for small reservoir dam body Existing problems are managed, there is culvert pipe centainly more than needed for the cross-section of river, lined pipe can reinforce and change in former culvert pipe It makes, closure reinforcing is carried out using backfilling material between internal lining pipe and former culvert pipe.
It blocks to reinforce at present and only entrance and outlet is blocked using concrete, the non-grout sealing in middle section, or block not Closely knit, there are cavitys on top, are easy to produce leakage problems, threaten dam body safety.When entrance head is higher, there is pressure in internal lining pipe Stream, if interlude grout sealing leakiness, can reduce internal lining pipe safety in utilization and service life.
Summary of the invention
To solve the above problems, the invention proposes a kind of reservoir liner pipe rockfill grouting construction method and structures.
The first object of the present invention is to provide a kind of reservoir liner pipe rockfill grouting construction method, comprising the following steps:
1. internal lining pipe is laid
The building facilities such as former import lying pipe, outlet abutment wall are removed before internal lining pipe laying, and original is contained into mixed and disorderly substances in pipe, mud silt It etc. cleaning out, is drawn from downstream toward upstream end, side weld ddge is applied;
2. internal lining pipe welds
Internal lining pipe total interface is wanted to add with heating plate close contact using live sweat soldering, tubing butt welding connector Heat removes heating plate and melting end is docking together rapidly, be cooled to environment temperature to after melting, it is ensured that joint strength is higher than pipe Body intensity;
3. packer permeability test
Internal lining pipe carries out packer permeability test after installing, packer permeability test pressure is not less than 0.6MPa, the duration for 24 hours, every 3h records pressure condition, examines the leakproofness of liner pipe fitting;
4. rockfill grouting
After internal lining pipe traction in place, coagulation grave is carried out to the cavity within the scope of internal lining pipe inlet and outlet 1m between former culvert pipe Stifled, respectively import concrete plug and outlet concrete plug, when closure, need to reserve exhaust pipe and grout pipe, after the completion of closure Rockfill grouting operation is carried out every 48h;
Grouting uses orifice closing formula cycle grouting method, while cementing operations, internal lining pipe is kept to press water state, when grouting It is carried out from culvert pipe Outlet Section, slurries are gradually upstream perfused from downstream.
Further, at the top of culvert pipe admission section before grouting, the row of Φ 30mm is first placed between former culvert pipe and internal lining pipe Tracheae, exhaust pipe totally two, length 1.5m.
Further, at the top of culvert pipe Outlet Section before grouting, the plating of Φ 50mm is first placed between former culvert pipe and internal lining pipe Zinc steel pipe is as grout pipe, and grout pipe totally two, length 10m.
Further, when cementing operations, the overflow situation of exhaust pipe is observed, after 5min is discharged from exhaust pipe in cement grout, Block exhaust pipe;Every hole requires multiple filling three times, and each intermittent time is not less than 3d;For the first time, it is in the milk for the second time and for the third time Pressure requirements are 0.1MPa, 0.15MPa, 0.20MPa, start slurry traversing valve after each grouting reaches design pressure, and keep it Design pressure just stops hole grouting when midge amount per minute is further continued for perfusion 30min less than 1L/min formula.
Further, use cement mortar when being in the milk for the first time, fine silt incorporation is the 20% of siccative weight, second and Neat slurry is used when third time is perfused.
The second object of the present invention is to provide a kind of reservoir liner pipe rockfill grouting constructing structure, which is characterized in that packet Include former culvert pipe, internal lining pipe, tube wall rockfill grouting, import concrete plug, outlet concrete plug, exhaust pipe, grout pipe;It is described Internal lining pipe is located inside former culvert pipe;Import concrete plug setting inducer 1m range between internal lining pipe and former culvert pipe It is interior;The outlet concrete plug setting is between internal lining pipe and former culvert pipe within the scope of outlet section 1m;The tube wall rockfill grouting It is set between internal lining pipe, former culvert pipe, import concrete plug and outlet concrete plug;The exhaust pipe setting is mixed in import Solidifying soil the upper part of the plug;The grout pipe is arranged in outlet concrete the upper part of the plug.
The construction quality of internal lining pipe recovery technique can be effectively ensured in the present invention, complete reservoir dam body culvert pipe renovation technique.One Kind reservoir liner pipe rockfill grouting construction method can make former culvert pipe combine closely with interior lined pipe, block closely knit, effective guarantor The construction quality of internal lining pipe recovery technique is demonstrate,proved, it is safe and extend internal lining pipe service life to guarantee that internal lining pipe uses.
Detailed description of the invention
Fig. 1 is that reservoir dam dam body culvert pipe adds inner tube scheme arrangement figure.
Fig. 2 is internal lining pipe rockfill grouting layout drawing.
Fig. 3 is import grouting layout drawing.
Fig. 4 is outlet grouting layout drawing.
In figure: 1 is dam dam body, and 2 be import stilling pool slab, and 3 be export channel, and 4 be former culvert pipe, and 5 be internal lining pipe, and 6 are back Grouting is filled out, 7 be import concrete plug, and 8 be outlet concrete plug, and 9 be exhaust pipe, and 10 be grout pipe.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to Following embodiments.
As shown in figures 1-4, a kind of reservoir liner pipe rockfill grouting constructing structure, which is characterized in that including former culvert pipe 4, Internal lining pipe 5, tube wall rockfill grouting 6, import concrete plug 7, outlet concrete plug 8, exhaust pipe 9, grout pipe 10;In described Bushing pipe 5 is located inside former culvert pipe 4;The setting of import concrete plug 7 inducer 1m model between internal lining pipe 5 and former culvert pipe 4 In enclosing;The setting of outlet concrete plug 8 is between internal lining pipe 5 and former culvert pipe 4 within the scope of outlet section 1m;The tube wall backfill Grouting 6 is set between internal lining pipe 5, former culvert pipe 4, import concrete plug 7 and outlet concrete plug 8;The exhaust pipe 9 is set It sets on 7 top of import concrete plug;The grout pipe 10 is arranged on 8 top of outlet concrete plug.
A kind of reservoir liner pipe rockfill grouting construction method, includes the following steps:
1. pipeline laying
The building facilities such as former import lying pipe, outlet abutment wall should be removed before pipeline laying, by sundries, mud mud in former culvert pipe 4 Sand etc. is cleaned out, and is drawn from downstream toward upstream end, and side weld ddge is applied.
2. pipeline welds
For 5 total interface of internal lining pipe using live sweat soldering, when welding, which should be noted that, prevents excessive temperature distortion.Pipe Road sweat soldering uses specific purpose tool, and temperature control should be accurate, should put pipe on the same axis before welding.
Tubing butt welding connector is wanted can be with heating plate close contact, and after being heated to thawing, removing heating plate rapidly will fusing End is docking together, and is cooled to environment temperature, it is ensured that joint strength is higher than pipe shaft intensity.
3. packer permeability test
Internal lining pipe 5 carries out packer permeability test after installing, packer permeability test pressure is not less than 0.6Mpa, the duration for 24 hours, every 3h records pressure condition, examines the leakproofness of 5 connector of internal lining pipe, prevents grouting slurries from entering internal lining pipe 5, causes internal lining pipe 5 stifled Plug.
4. rockfill grouting
After the traction in place of internal lining pipe 5, concrete closure, respectively import are carried out to the cavity within the scope of pipeline inlet and outlet 1m Concrete plug 7 and outlet concrete plug 8, when closure, need to reserve exhaust pipe 9 and grout pipe 10, after the completion of closure just every 48h It can be carried out 6 operation of tube wall rockfill grouting.
At the top of culvert pipe admission section before grouting, the exhaust pipe 9 of Φ 30mm, row are first placed between former culvert pipe 4 and internal lining pipe 5 Tracheae 9 totally two, length 1.5m.At the top of culvert pipe Outlet Section before grouting, Φ first is placed between former culvert pipe 4 and internal lining pipe 5 The coating steel pipe of 50mm is as grout pipe 10, and coating steel pipe 10 totally two, length 10m, 10 outlet section 2m range edge of coating steel pipe Presbyopia is arranged on periphery, is conducive to be in the milk.
Grouting uses orifice closing formula cycle grouting method.While cementing operations, keeps internal lining pipe 5 to press water state, prevent Grouting pressure is excessive to cause internal lining pipe 5 to deform.It is carried out when grouting from culvert pipe Outlet Section, slurries are gradually upstream filled from downstream Note.The overflow situation of exhaust pipe is observed, cement grout blocks exhaust pipe 9 after exhaust pipe discharge 5min.Every hole requires to fill 3 again Secondary, each intermittent time is not less than 3d.For the first time, second and third time grouting pressure requirements be 0.1MPa, 0.15MPa, 0.20MPa starts slurry traversing valve after each grouting reaches design pressure, and keeps its design pressure, when midge amount per minute is small Perfusion 30min, which is further continued for, in 1L/min formula just stops hole grouting.
Cement mortar is used when being perfused for the first time, fine silt incorporation is the 20% of siccative weight, and second and third time fill Neat slurry is used when note.Grout coordinate ratio generally uses the level Four such as 3:1,2:1,1.5:1,1:1.Using denseer when being perfused for the first time Slurries, second and third time then use diluter slurries.
The content that this specification is not described in detail belongs to the prior art well known to professional and technical personnel in the field.

Claims (6)

1. a kind of reservoir liner pipe rockfill grouting construction method, which comprises the following steps:
1. internal lining pipe is laid
The building facilities such as former import lying pipe, outlet abutment wall are removed before internal lining pipe (5) laying, by the interior sundries of former culvert pipe (4), mud mud Sand etc. is cleaned out, and is drawn from downstream toward upstream end, and side weld ddge is applied;
2. internal lining pipe welds
Internal lining pipe (5) total interface using live sweat soldering, want to heat with heating plate close contact by tubing butt welding connector It to thawing, removes heating plate and melting end is docking together rapidly, be cooled to environment temperature, it is ensured that joint strength is higher than pipe shaft Intensity;
3. packer permeability test
Internal lining pipe (5) carries out packer permeability test after installing, packer permeability test pressure is not less than 0.6MPa, the duration for 24 hours, every 3h Pressure condition is recorded, the leakproofness of internal lining pipe (5) connector is examined;
4. rockfill grouting
After internal lining pipe (5) traction in place, the cavity within the scope of internal lining pipe (5) inlet and outlet 1m between former culvert pipe (4) is mixed Solidifying grave is stifled, respectively import concrete plug (7) and outlet concrete plug (8), and when closure need to reserve exhaust pipe (9) and filling Slurry pipe (10) carries out rockfill grouting (6) operation every 48h after the completion of closure;
Grouting uses orifice closing formula cycle grouting method, while cementing operations, internal lining pipe (5) is kept to press water state, when grouting It is carried out from culvert pipe Outlet Section, slurries are gradually upstream perfused from downstream.
2. a kind of reservoir liner pipe rockfill grouting construction method according to claim 1, it is characterised in that: culvert pipe import Before profile head grouting, the exhaust pipe (9) of Φ 30mm is first placed between former culvert pipe (4) and internal lining pipe (5), exhaust pipe (9) is altogether Two, length 1.5m.
3. a kind of reservoir liner pipe rockfill grouting construction method according to claim 1, it is characterised in that: culvert pipe outlet Before profile head grouting, the coating steel pipe of Φ 50mm is first placed between former culvert pipe (4) and internal lining pipe (5) as grout pipe (10), grout pipe (10) totally two, length 10m.
4. a kind of reservoir liner pipe rockfill grouting construction method according to claim 1, it is characterised in that: cementing operations When, the overflow situation of exhaust pipe (9) is observed, after 5min is discharged from exhaust pipe (9) in cement grout, is blocked exhaust pipe (9);It wants in every hole Ask multiple filling three times, each intermittent time is not less than 3d;For the first time, second and third time grouting pressure requirements be 0.1MPa, 0.15MPa, 0.20MPa start slurry traversing valve after each grouting reaches design pressure, and keep its design pressure, when per minute Midge amount is further continued for perfusion 30min less than 1L/min formula and just stops hole grouting.
5. a kind of reservoir liner pipe rockfill grouting construction method according to claim 4, it is characterised in that: fill for the first time Cement mortar is used when slurry, fine silt incorporation is the 20% of siccative weight, and second and third time use neat slurry when being perfused.
6. a kind of reservoir liner pipe rockfill grouting constructing structure characterized by comprising
Former culvert pipe (4),
It is internal to be located at former culvert pipe (4) for internal lining pipe (5);
Import concrete plug (7), setting is between internal lining pipe (5) and former culvert pipe (4) within the scope of inducer 1m;
Outlet concrete plug (8), setting is between internal lining pipe (5) and former culvert pipe (4) within the scope of outlet section 1m;
It is stifled to be set to internal lining pipe (5), former culvert pipe (4), import concrete plug (7) and outlet concrete for tube wall rockfill grouting (6) Between head (8);
Exhaust pipe (9) is arranged on import concrete plug (7) top;
Grout pipe (10) is arranged on outlet concrete plug (8) top.
CN201910603584.4A 2019-07-05 2019-07-05 Backfill grouting construction method and structure for reservoir lining pipeline Active CN110241825B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910603584.4A CN110241825B (en) 2019-07-05 2019-07-05 Backfill grouting construction method and structure for reservoir lining pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910603584.4A CN110241825B (en) 2019-07-05 2019-07-05 Backfill grouting construction method and structure for reservoir lining pipeline

Publications (2)

Publication Number Publication Date
CN110241825A true CN110241825A (en) 2019-09-17
CN110241825B CN110241825B (en) 2024-04-12

Family

ID=67891001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910603584.4A Active CN110241825B (en) 2019-07-05 2019-07-05 Backfill grouting construction method and structure for reservoir lining pipeline

Country Status (1)

Country Link
CN (1) CN110241825B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647435A (en) * 2019-10-11 2021-04-13 上海友为工程设计有限公司 Improved plugging method for through-dike culvert

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182865A (en) * 1997-09-08 1999-03-26 Sekisui Chem Co Ltd Lining method for pipe culvert
JP2001159476A (en) * 1999-09-22 2001-06-12 Sekisui Chem Co Ltd Lining construction method for existing pipe passage
US6719493B1 (en) * 1999-07-13 2004-04-13 Friedrich Meyer Method and system for encasing an endless, laid pipeline conduit with backfill concrete
CN102486247A (en) * 2010-12-02 2012-06-06 杨兵 Water supply and drainage pipeline repair technique adopting size film lining method
WO2014012305A1 (en) * 2012-07-17 2014-01-23 中国长江三峡集团公司 Method for repairing large diameter concrete water-supply pipe
CN107165168A (en) * 2017-07-13 2017-09-15 中国电建集团华东勘测设计研究院有限公司 Full closure underground chamber backfill, consolidation grouting pipeline layout
CN206707725U (en) * 2017-02-18 2017-12-05 中铁华铁工程设计集团有限公司 A kind of Tunnel Second Lining vault backfills Grouting Pipe
CN208965598U (en) * 2018-08-17 2019-06-11 中国电建集团华东勘测设计研究院有限公司 The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN210658362U (en) * 2019-07-05 2020-06-02 长江勘测规划设计研究有限责任公司 Construction structure for backfill grouting of lining pipeline of reservoir

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182865A (en) * 1997-09-08 1999-03-26 Sekisui Chem Co Ltd Lining method for pipe culvert
US6719493B1 (en) * 1999-07-13 2004-04-13 Friedrich Meyer Method and system for encasing an endless, laid pipeline conduit with backfill concrete
JP2001159476A (en) * 1999-09-22 2001-06-12 Sekisui Chem Co Ltd Lining construction method for existing pipe passage
CN102486247A (en) * 2010-12-02 2012-06-06 杨兵 Water supply and drainage pipeline repair technique adopting size film lining method
WO2014012305A1 (en) * 2012-07-17 2014-01-23 中国长江三峡集团公司 Method for repairing large diameter concrete water-supply pipe
CN206707725U (en) * 2017-02-18 2017-12-05 中铁华铁工程设计集团有限公司 A kind of Tunnel Second Lining vault backfills Grouting Pipe
CN107165168A (en) * 2017-07-13 2017-09-15 中国电建集团华东勘测设计研究院有限公司 Full closure underground chamber backfill, consolidation grouting pipeline layout
CN208965598U (en) * 2018-08-17 2019-06-11 中国电建集团华东勘测设计研究院有限公司 The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN210658362U (en) * 2019-07-05 2020-06-02 长江勘测规划设计研究有限责任公司 Construction structure for backfill grouting of lining pipeline of reservoir

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647435A (en) * 2019-10-11 2021-04-13 上海友为工程设计有限公司 Improved plugging method for through-dike culvert

Also Published As

Publication number Publication date
CN110241825B (en) 2024-04-12

Similar Documents

Publication Publication Date Title
CN105951859B (en) Base pit dewatering well wears concrete of basement bottom plate closure sealing construction processing method
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
WO2021189932A1 (en) Plugging method
CN206346209U (en) A kind of quick solution dewatering well piping plugging structure
CN112412496A (en) Full-section advanced curtain grouting construction method for water-rich broken geological zone tunnel
CN103821114B (en) A kind of reservoir culvert method for blocking discarded under seepage pressure effect
CN111441392A (en) Grouting water guide leakage stoppage structure and underwater jet grouting anchor cable water stop construction method
CN110241788A (en) A kind of reservoir dam body culvert pipe reconstruction structure and construction method
CN110241825A (en) A kind of reservoir liner pipe rockfill grouting construction method and structure
CN110206071A (en) A kind of diaphram wall seam reinforcement means and device
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN204827469U (en) A tunnel for transmission fluid
CN104846935A (en) High-position pool seepage treatment and transformation method
CN210658362U (en) Construction structure for backfill grouting of lining pipeline of reservoir
CN104964121B (en) A kind of sleeve water leakage plugging method
CN108360573B (en) Device for preventing post-cast strip of basement floor from leaking and construction method thereof
CN206844136U (en) Closure high speed, big flow move the flow control system of water karst
CN104452788B (en) The method for blocking of tailings storage backwater tapered pipeline and device
CN110565740B (en) Method for connecting open hole of submarine tunnel and riser
CN211342004U (en) Hole reinforcing and leakage preventing construction structure for side wall of old water pool
CN209324383U (en) A kind of joint structure of Shield-bored tunnels and station
CN209557818U (en) A kind of prefabricated reinforced concrete pipeline with shutoff ring
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant